OSUT-AR RANGE PROJECTS FY19
SECTION 05 21 19
OPEN WEB STEEL JOIST FRAMING
07/07
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS B2.1/B2.1M (2009) Welding Procedure and Performance Qualification
AWS D1.1/D1.1M (2008; Errata 2009) Structural Welding Code - Steel
STEEL JOIST INSTITUTE (SJI)
SJI LOAD TABLES (2005) Standard Specifications Load Tables and Weight Tables for Steel Joists and Joist Girders - 42nd Edition
SJI MANUAL (2003) 75 Year Manual, 1928-2003
SJI TD 10 (2003) Technical Digest for the Design of Fire Resistive Assemblies with Steel Joists
SJI TD 8 (2008) Welding Of Open-Web Steel Joists And Joist Girders
SJI TD 9 (2008) Technical Digest for the Handling and Erection of Steel Joists and Joist Girders
THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC PS 14.01 (1982; E 2004) Steel Joist Shop Painting System
SSPC Paint 15 (1999; E 2004) Steel Joist Shop Primer/Metal Building Primer
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.1200 Hazard Communication
29 CFR 1926 Safety and Health Regulations for Construction
29 CFR 1926.757 Steel Erection; Open Web Steel Joists
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Welder qualification
Material Safety Data Sheet (MSDS) per OSHA 1910.1200
SD-02 Shop Drawings
Steel joist framing; G
SD-06 Test Reports
Erection inspection
Welding inspections
SD-07 Certificates
Accessories
Certification of Compliance
1.3 REGULATORY REQUIREMENT
All joist girder framing must conform to 29 CFR 1926.757. Secure all joist bridging and anchoring in place prior to the application of any construction loads. Distribute temporary loads so that joist capacity is not exceeded. Do not apply loads to bridging.
1.4 DELIVERY AND STORAGE
Handle, transport, and store joists in a manner to prevent damage affecting their structural integrity. Store all items off the ground in a well drained location protected from the weather and easily accessible for inspection and handling.
1.5 QUALITY ASSURANCE
All work must comply with the requirements set forth in 29 CFR 1926.
1.5.1 Drawing Requirements
Submit steel joist framing drawings. Show joist type and size, layout in plan, and erection details including methods of anchoring, framing at openings, type and spacing of bridging, requirements for field welding, and details of accessories as applicable.
1.5.2 Certification of Compliance
Prior to construction commencement, submit Material Safety Data Sheetper 29 CFR 1910.1200 for steel joists , and certification for welder qualification, compliance with AWS B2.1/B2.1M, welding operation, and tacker, stating the type of welding and positions qualified for, the code and procedure qualified under, date qualified, and the firm and individual certifying the qualification tests.
Submit certification of compliance for the following:
SJI MANUAL
SJI TD 8
SJI TD 9
SJI TD 10
29 CFR 1926
29 CFR 1926.757
PART 2 PRODUCTS
2.1 JOISTS AND ACCESSORIES
Provide design data from SJI LOAD TABLES for the joist series indicated.
2.2 PAINTING
2.2.1 Shop Painting
Clean and prime joists in accordance with SSPC Paint 15 and SSPC PS 14.01, Steel Joist Shop Painting System, using only Type I, "Red Oxide Paint."
Finish coat of paint is specified in Section 09 90 00 PAINTING AND COATING.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Handling and Erection
Conform to SJI LOAD TABLES for the joist series indicated.
3.1.2 Welding
All welding must conform to AWS B2.1/B2.1M and AWS D1.1/D1.1M.
3.3 PAINTING
3.3.1 Touch-Up Painting
After erection of joists, touch-up connections and areas of abraded shop coat with paint of the same type used for the shop coat.
3.3.2 Field Painting
Paint joists requiring a finish coat in conformance with the requirements of Section 09 90 00 PAINTING AND COATING.
3.4 VISUAL INSPECTIONS
3.4.1 Erection Inspection
AWS D1.1/D1.1M, Section 6. Perform erection inspection and field welding inspections with AWS certified welding inspectors. Welding inspectors must visually inspect and mark welds.
-- End of Section --