OSUT_1_01_57_23_Storm_Water_Pollution_Prevention.pdf
PDF 32 KB Posted
- Attached to
- Armor OSUT 1
- Solicitation number
- W911SF-19-R-0018
About this file
Storm Water
View the file
Other files
Show 40 more
Latest 50 of 126 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OUST-AR RANGE PROJECTS FY19
SECTION 01 57 23.00 10
STORM WATER POLLUTION PREVENTION MEASURES
PART 1 GENERAL
1.1 DEFINITIONS
Only use this paragraph to define terms used in the specification section that are not defined by a commercial or Government standard and to provide a common interpretation of a term for contractual purposes.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-07 Certificates
Mill Certificate or Affidavit; G, PO
Certificate attesting that the Contractor has met all specified requirements.
-- End of Section --
File details come from the government source that posted it.