TE_5.2-013_-_Earth_Ground_Electrode_Subsystem_Check_list_For_New_Facilities.pdf

PDF 117 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
Solicitation number
W911SF-16-R-0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - Fort Benning, GA Base Operations, newest first.
File Type Posted
Special_Notice___Sources_Sought___Benning_BASOPS_20_Mar_18.docx DOCX document
Technical_Exhibit_5.13-007_Governmnet_Furnished_Property.docx DOCX document
TE_5.2-005-_Bldgs._Designated_for_Roof_Truss_Inspection.xls XLS spreadsheet
Technical_Exhibit_5.13-002a_Chiller_Data.docx DOCX document
TE_5.4-002a_Monthly_emergency_Hour-meter_Reading_Report.docx DOCX document
TE_1-011-_ASP_Identifications.xls XLS spreadsheet
TE_5.1-006_Variance_Report.xlsx XLSX spreadsheet
TE_5.2-006-_Roof_Truss_Inspection_Form.doc DOC document
TE_1-001_Fort_Benning_PRS.rtf RTF text file
TE_5.1-004_Master_Agreements_Register.xls XLS spreadsheet
TE_5.1-001-_Service_Order_(SO)_Workload_Summary.xls XLS spreadsheet
TE_5.4-006_Petroleum_Products_Issued.docx DOCX document
TE_5.4-003-_List_of_Fuel_Tanks.xls XLS spreadsheet
TE_5.2-025_List_of_Ranges,_Lighting_Protection_&_Grounding_Points.docx DOCX document
TE_5.4-002-_List_of_Emergency_Generators.xls XLS spreadsheet
TE_512_004_Work_Load_Data.xlsx XLSX spreadsheet
TE_5.2-016_-_Signal_Ground_Reference_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_5.3-001_Inventory_Of_Dining_Facility_Equipment.xls XLS spreadsheet
TE_1-013_DPW__Network_Access.doc DOC document
TE_5.12-006a_Columbarian_Numbering.doc DOC document
TE_1-009-_List_of_Restricted_Areas.doc DOC document
Technical_Exhibit_5.13-004_Deliverables_Schedule.docx DOCX document
Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.docx DOCX document
TE_5.2-027_Traffic_Light_Control_List.xlsx XLSX spreadsheet
TE_5.2-026_Mas_Fire_Alarm_Schedule_as_of_01April2013.xlsx XLSX spreadsheet
Attachment_2_-_Technical_Exhibits_Listing_16-R-0012_Benning_BASOPS.docx DOCX document
Attachment_7_-_Pricing_and_Labor_Matrix_16-R-0012_DPW_Benning_BASOPS_8_Aug_17.xlsx XLSX spreadsheet
Sec_C-5.10_REMOTE_CAMP_OPERATION_MAINTENANCE__SUPPORT.docx DOCX document
Sec_C-2_Definitions.docx DOCX document
Sec_C-5.1__TECHNICAL_DESCRIPTION_OF_WORK.doc DOC document
Attachment_5_-_Cover_Sheet_Past_Performance_Questionaire_DPW_Benning_BASOPS.pdf PDF
Sec_C-5.2_BUILDINGS_&_STRUCTURES_MAINTENANCE.doc DOC document
Technical_Exhibit_5.13-001_Chiller_Equipment.pdf PDF
TE_5.3-001-Inventory_of_Dining_Facility_Equipment.pdf PDF
TE_5.5-004-_List_of_Buildings_Requiring_Monthly_Filter_Chang.pdf PDF
TE_5.2-010-_Locations_of_Welcome_Home_Ceremony_Signs.pdf PDF
Technical_Exhibit_5.13-007_Governmnet_Furnished_Property.pdf PDF
TE_5.2-022_-_Shielding_Subsystem_Checklist_For_Existing_Facilities.pdf PDF
Sec_C-3_Government-Furnished_Property_and_Servicesb.pdf PDF
TE_5.7-002-_Street_Sweeping_Schedule.pdf PDF
TE_5.2-002-_List_of_Memorials.pdf PDF
TE_5.11-002-_Maintenance_Allocation_Chart.pdf PDF
Sec_C-5.2_BUILDINGS_ _STRUCTURES_MAINTENANCEb.pdf PDF
TE_5.5-003-_List_of_Building_Requiring_Changeover.pdf PDF
TE_5.9-001-_Recommended_Self-Help_Center_Stockage_List.pdf PDF
TE_5.11-004-_Obstacle_and_Confidence_Courses.pdf PDF
TE_5.11-003-_Range Service_Roads _Access_Grading_prioritizat.pdf PDF
TE_5.7-001-_Required_Scheduled_Tasks.pdf PDF
TE_5.2-006-_Roof_Truss_Inspection_Form.pdf PDF
TE_5.5-001-_Required_Scheduled_Tasks.pdf PDF
Show all 50

Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 5.2-013

8. GROUND RODS

EARTH GROUND ELECTRODE SUBSYSTEM CHECKLIST FOR NEW FACILITIES

For use of this form, see TM 5-690; the proponent agency is COE.

5. SOIL RESISTIVITY (ohm-cm) (Obtain from site survey or from the measured resistance of a rod or group of rods)

6. RESISTANCE OF COMPLETED EARTH ELECTRODE SUBSYSTEM

(ohms)

7. SKETCH OF FINAL EARTH ELECTRODE SUBSYSTEM (Show dimensions, locations of other buried metal objects, risers for lightning, power, or signal ground connections, and any ground wells.) (Corrected engineering drawings may be attached in lieu of sketch.)

8a. TYPE 8b. SIZE 8c. NUMBER OF ADDITIONAL RODS

8d. POSITIONED AND INSTALLED AS SPECIFIED

YES NO

8e. PHYSICAL CONDITION

9. GROUND CONDUCTORS

9a. TYPE 9b. SIZE 9c. MATERIAL

9d. DISTANCE BETWEEN TWO SUCCESSIVE GROUND CONDUCTORS 9e. BURIED DEPTH

10. INTERCONNECTING CONDUCTORS

10a. TYPE 10b. SIZE 10c. MATERIAL

11. CONNECTORS/FITTINGS

11a. PROPER TYPE/SIZE/MATERIAL AS SPECIFIED

YES NO

11 b. MEASUREMENT OF RESISTANCE BETWEEN TWO CONNECTION POINTS

12. RISERS

12a. PROPERLY INSTALLED

YES NO

12b. PROPERLY SIZED

YES NO

12c. LOCATED AS SPECIFIED

YES NO

13. FUTURE INACCESSIBLE JOINTS AND CONNECTIONS

13a. PROPERLY INSTALLED

YES NO

13b. PROPERLY CONNECTED

YES NO

14. GROUND WELLS

14a. INSTALLED AS SPECIFIED

YES NO

14b. MEASURED RESISTANCE-TO-EARTH (ohms)

DA FORM 7452-R, FEB 2002 USAPA V1.00

1. FACILITY 2. DATE (YYYYMMDD)

3. LOCATION 4. INSPECTOR

COMPONENT IDENTIFICATION

File details come from the government source that posted it. Updated .