Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.pdf

PDF 22 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
Solicitation number
W911SF-16-R-0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - Fort Benning, GA Base Operations, newest first.
File Type Posted
TE_5.2-014_-_Ground_Fault_Protection_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_1-008-_BCT_Impact_Statement.doc DOC document
TE_5.4-005a-__Operating_Checklist_for_Peak_Shaving_Plant_(ne.doc DOC document
TE_5.11-001-_List_of_Ranges.doc DOC document
TE_5.12-005_Headstone_Cleaning_and_Alignement_Maintenance_Tracking_Chart.doc DOC document
TE_1-003_Real_Property_Inventory.xlsx XLSX spreadsheet
TE_1-003a-_Definitions_of_Real_Property_Inventory.xls XLS spreadsheet
TE_5.2-009-_Building_and_Traffic_Sign_Areas.doc DOC document
TE_5_10-002-_Bldgs__Requiring_Fire_Sprinkler_Inspections_(JAN_2017).docx DOCX document
TE_5.11-004_Obstacle_and_Confidence_Course.xlsx XLSX spreadsheet
TE_5.2-015_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_5.1-002-_Service_Order_(SO)_Priority_Classifications.doc DOC document
TE_3-003-_GFE-_Camp_Merrill.xls XLS spreadsheet
TE_5.2-010-_Locations_of_Welcome_Home_Ceremony_Signs.doc DOC document
TE_5.9-001-_Recommended_Self-Help_Center_Stockage_List.xls XLS spreadsheet
TE_5.2-028_Emergency_Light_Building_List.xlsx XLSX spreadsheet
TE_5.10-007-_Chiller_Building_List.xls XLS spreadsheet
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.docx DOCX document
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.docx DOCX document
Technical_Exhibit_5.13-001_Chiller_Equipment.docx DOCX document
TE_5.2-024_SUPRESSION_LIST.xlsx XLSX spreadsheet
Sec_C-5.9_SELF-HELP.docx DOCX document
Sec_C-5.13_Chiller_Maintenance_and_Repair_Index.pdf PDF
Attachment_6_-_Specific_Relevant_Contract_Reference_Sheet_12-R-0012_DPW_Benning_BASOPS.pdf PDF
Attachment_9_-_Wage_Determination_16-R-0012_DPW_Benning_BASOPS.pdf PDF
Solicitation_W911SF-16-R-0012_DPW_BASOPS_Solicitation.pdf PDF
Sec_C-5.5_HVAC_SYSTEMS_OPERATION_&_MAINTENANCE.rtf RTF text file
Sec_C-1__General_Information.docx DOCX document
TE_5.7-003-Road_Inspection_Areas.pdf PDF
TE_5.2-018_-_Grounding_And_Bonding_Connection_Checklist_For_Existing_Facilities.pdf PDF
TE_5.10-007-_Chiller_Building_List_rev_by_amendment.pdf PDF
Technical_Exhibit_5.13-002a_Chiller_Data.pdf PDF
TE_5.11-001-_List_of_Ranges.pdf PDF
TE_5.10-003-_Bldgs._Requiring_Heater_Inspections.pdf PDF
TE_5.3-002-_Dining_Facility_Equip. _PMCS _and_Repair_rev_by_amendment.pdf PDF
TE_5.2-001-_Required_Scheduled_Tasks.pdf PDF
TABLE_OF_CONTENTS_-_Draft_PWS_ _Technical_Exhibits.pdf PDF
TE_3-001-_Gov't_Furnished_Facilities.pdf PDF
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.pdf PDF
Technical_Exhibit_5.13-002b_Refrigerant_Use_Data.pdf PDF
TE_5.2-004-_Assesment_of_NRE-Ft._Benning-Historic_Resources_.pdf PDF
TE_5.2-007-_ICYET_Inspection_Deficiency_List.pdf PDF
TE_5.4-005a-__Operating_Checklist_for_Peak_Shaving_Plant_(ne.pdf PDF
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.pdf PDF
TE_5.2-013_-_Earth_Ground_Electrode_Subsystem_Check_list_For_New_Facilities.pdf PDF
TE_5.1-007-_SO_procedure_for_Bldgs._Under_Barracks_Maint._Pr.pdf PDF
TE_3-004-_GSA_Vehicles_for_KTR_use.pdf PDF
TE_5.4-001-_Required_Scheduled_Tasks.pdf PDF
TE_5.4-002-_List_of_Emergency_Generators.pdf PDF
TE_5.10-006a-_Boiler_Building_List.pdf PDF
Show all 50

Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE 5.13-005

Operational Inspection Checklist

NOTE: Air conditioning season shall be approximately mid-April through October for all chillers and equipment except those located at buildings 4, 6, 398 396, 5500, 9201, 9230, and the cooling tower at building 96. Mandatory air conditioning for these buildings shall be approximately 1 March through 30

November and as directed by the Government (Note: Chillers may be required to he turned off and back on again due to weather cycles).

Weekly Inspections (unless listed otherwise)

1 Chillers

a. Review logs for trends.

b. Inspect chiller for leaks (air, refrigerant, and water).

c. Inspect starter contacts for burns and discoloration.

d. Observe and record unusual noises and vibrations.

e. Check refrigerant level in sight glass.

f. Check oil level in sight glass.

g. Verify operation of the oil heater and cooler.

h. Check purge operation.

i. Check all chilled water and steam lines for leaks.

j. Check all controls for proper operation.

k. Drain air compressor tanks, check automatic bleeders, pressure switches, starters, and regulators.

l. Check refrigerant solution and adjust.(monthly)

m. Check/clean strainers. (monthly)

n. Check insulation on piping. (monthly)

o. Check exhaust fans for proper operation.

2. Towers

a. Check to ensure fill and drift eliminators are in place and functioning as intended.

b. Check starter, heater and contacts.

c.. Check controls and safeties.

TE 5.13-005

d. APPENDIX C Cont e.

f.

g.

h.

i.

j.

k.

l.

m.

n.

o.

p.

q.

r.

s.

t.

3. Pumps

a. Check seals and bearings. Lubricate as required.

b. Check frame, support, pad, for excessive vibration.

c. Check pipe and pipe supports to ensure no undue stresses are on the pump. (monthly)

d. Check flanges, bolts, gaskets, gauges, unions, valves, and air vents.

e. Check alignment of shaft and couplings and couplings for slippage. (monthly)

f. Check pump housing and insulation. (monthly)

g. Check for proper rotation of impeller.

h. Check electrical wiring, connections, relays, starters and heaters.

i. Check control system and safeties.

Check tower railing/ladders.

Check and pull vacuum on all absorbers.

Check variable speed drives.

Check all condenser water piping for leaks.

Check fill and trash screens.

Lubricate pump and motor. (monthly)

Check bearings, seals, packing and oil level in transmission.

Lubricate fan motor. (monthly)

Lubricate and operate all valves.

Check water level in basin.

Check fan thermostats for proper settings.

Check motor drive and coupling.

Check fan belts for tension and wear.

Check gear reducers and drive shafts.

Check/clean strainers.

Check make-up valves and float assembly.

Check all spray or distribution nozzles for proper flow.