TE_5.2-022_-_Shielding_Subsystem_Checklist_For_Existing_Facilities.pdf

PDF 72 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
Solicitation number
W911SF-16-R-0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - Fort Benning, GA Base Operations, newest first.
File Type Posted
TE_5.2-014_-_Ground_Fault_Protection_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_1-008-_BCT_Impact_Statement.doc DOC document
TE_5.4-005a-__Operating_Checklist_for_Peak_Shaving_Plant_(ne.doc DOC document
TE_5.11-001-_List_of_Ranges.doc DOC document
TE_5.12-005_Headstone_Cleaning_and_Alignement_Maintenance_Tracking_Chart.doc DOC document
TE_1-003_Real_Property_Inventory.xlsx XLSX spreadsheet
TE_1-003a-_Definitions_of_Real_Property_Inventory.xls XLS spreadsheet
TE_5.2-009-_Building_and_Traffic_Sign_Areas.doc DOC document
TE_5_10-002-_Bldgs__Requiring_Fire_Sprinkler_Inspections_(JAN_2017).docx DOCX document
TE_5.11-004_Obstacle_and_Confidence_Course.xlsx XLSX spreadsheet
TE_5.2-015_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_5.1-002-_Service_Order_(SO)_Priority_Classifications.doc DOC document
TE_3-003-_GFE-_Camp_Merrill.xls XLS spreadsheet
TE_5.2-010-_Locations_of_Welcome_Home_Ceremony_Signs.doc DOC document
TE_5.9-001-_Recommended_Self-Help_Center_Stockage_List.xls XLS spreadsheet
TE_5.2-028_Emergency_Light_Building_List.xlsx XLSX spreadsheet
TE_5.10-007-_Chiller_Building_List.xls XLS spreadsheet
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.docx DOCX document
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.docx DOCX document
Technical_Exhibit_5.13-001_Chiller_Equipment.docx DOCX document
TE_5.2-024_SUPRESSION_LIST.xlsx XLSX spreadsheet
Sec_C-5.9_SELF-HELP.docx DOCX document
Sec_C-5.13_Chiller_Maintenance_and_Repair_Index.pdf PDF
Attachment_6_-_Specific_Relevant_Contract_Reference_Sheet_12-R-0012_DPW_Benning_BASOPS.pdf PDF
Attachment_9_-_Wage_Determination_16-R-0012_DPW_Benning_BASOPS.pdf PDF
Solicitation_W911SF-16-R-0012_DPW_BASOPS_Solicitation.pdf PDF
Sec_C-5.5_HVAC_SYSTEMS_OPERATION_&_MAINTENANCE.rtf RTF text file
Sec_C-1__General_Information.docx DOCX document
TE_5.7-003-Road_Inspection_Areas.pdf PDF
TE_5.2-018_-_Grounding_And_Bonding_Connection_Checklist_For_Existing_Facilities.pdf PDF
TE_5.10-007-_Chiller_Building_List_rev_by_amendment.pdf PDF
Technical_Exhibit_5.13-002a_Chiller_Data.pdf PDF
TE_5.11-001-_List_of_Ranges.pdf PDF
TE_5.10-003-_Bldgs._Requiring_Heater_Inspections.pdf PDF
TE_5.3-002-_Dining_Facility_Equip. _PMCS _and_Repair_rev_by_amendment.pdf PDF
TE_5.2-001-_Required_Scheduled_Tasks.pdf PDF
TABLE_OF_CONTENTS_-_Draft_PWS_ _Technical_Exhibits.pdf PDF
TE_3-001-_Gov't_Furnished_Facilities.pdf PDF
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.pdf PDF
Technical_Exhibit_5.13-002b_Refrigerant_Use_Data.pdf PDF
TE_5.2-004-_Assesment_of_NRE-Ft._Benning-Historic_Resources_.pdf PDF
TE_5.2-007-_ICYET_Inspection_Deficiency_List.pdf PDF
TE_5.4-005a-__Operating_Checklist_for_Peak_Shaving_Plant_(ne.pdf PDF
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.pdf PDF
TE_5.2-013_-_Earth_Ground_Electrode_Subsystem_Check_list_For_New_Facilities.pdf PDF
TE_5.1-007-_SO_procedure_for_Bldgs._Under_Barracks_Maint._Pr.pdf PDF
Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.pdf PDF
TE_3-004-_GSA_Vehicles_for_KTR_use.pdf PDF
TE_5.4-001-_Required_Scheduled_Tasks.pdf PDF
TE_5.4-002-_List_of_Emergency_Generators.pdf PDF
Show all 50

Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 5.1-022

LOCATION DEFICIENCIES

LOCATION DEFICIENCIES

7. CHECK ALL UTILITY LINES, ELECTRICAL CONDUCTORS, AND DATA CABLES FOR PROPER BONDING AND

SHIELDING

a. UTILITY LINES, ELECTRICAL CONDUCTORS, AND DATA CABLES ARE PROPERLY BONDED TO THE

SHIELD AT THE POINT OF ENTRANCE

b. ALL ELECTRICAL GROUNDED AND GROUNDING CONDUCTORS ARE IN THE SAME CONDUIT AS PHASE

CONDUCTORS

c. ALL ELECTRICAL FILTERS AND CONDUCTORS ARE PROPERLY ENCLOSED INSIDE METAL (STEEL)

CASES/CONDUITS

d. ALL METAL OBJECTS/CASES/CONDUITS ARE PROPERLY BONDED TO GROUND

e. DATA CABLES ARE PROPERLY BONDED TO THE SIGNAL GROUND FEFERENCE SYSTEM

LOCATION GROUND CIRCUITS CURRENT MEASUREMENTS

LOCATION BOND CIRCUIT RESISTANCES

SHIELDING SUBSYSTEM CHECKLIST FOR EXISTING FACILITIES

For use of this form, see TM 5-690; the proponent agency is COE.

5. VISUALLY INSPECT THE EXISTING SHIELD NETWORK FOR PROPER GROUNDING AND SIGNS OF DAMAGE, CORROSION, AND

LOOSENESS

6. CHECK SHIELDING ON ALL DOORS, WINDOWS, VENTILATION PORTS, VISUAL ACCESS OPEININGS, AND WALLS FOR

PROPER INSTALLATION AND BONDING

8. MEASURE STRAY CURRENTS ON THE GROUND CIRCUITS

9. MEASURE THE BOND RESISTANCES

DA FORM 7452-9-R, FEB 2002 USAPA V1.00

1. FACILITY 2. DATE (YYYYMMDD)

3. LOCATION 4. INSPECTOR

File details come from the government source that posted it. Updated .