TE_5.2-022_-_Shielding_Subsystem_Checklist_For_Existing_Facilities.pdf
PDF 72 KB Posted
- Attached to
- Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
- Solicitation number
- W911SF-16-R-0012
View the file
Other files for this federal contract opportunity
Show all 50
Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 5.1-022
LOCATION DEFICIENCIES
LOCATION DEFICIENCIES
7. CHECK ALL UTILITY LINES, ELECTRICAL CONDUCTORS, AND DATA CABLES FOR PROPER BONDING AND
SHIELDING
a. UTILITY LINES, ELECTRICAL CONDUCTORS, AND DATA CABLES ARE PROPERLY BONDED TO THE
SHIELD AT THE POINT OF ENTRANCE
b. ALL ELECTRICAL GROUNDED AND GROUNDING CONDUCTORS ARE IN THE SAME CONDUIT AS PHASE
CONDUCTORS
c. ALL ELECTRICAL FILTERS AND CONDUCTORS ARE PROPERLY ENCLOSED INSIDE METAL (STEEL)
CASES/CONDUITS
d. ALL METAL OBJECTS/CASES/CONDUITS ARE PROPERLY BONDED TO GROUND
e. DATA CABLES ARE PROPERLY BONDED TO THE SIGNAL GROUND FEFERENCE SYSTEM
LOCATION GROUND CIRCUITS CURRENT MEASUREMENTS
LOCATION BOND CIRCUIT RESISTANCES
SHIELDING SUBSYSTEM CHECKLIST FOR EXISTING FACILITIES
For use of this form, see TM 5-690; the proponent agency is COE.
5. VISUALLY INSPECT THE EXISTING SHIELD NETWORK FOR PROPER GROUNDING AND SIGNS OF DAMAGE, CORROSION, AND
LOOSENESS
6. CHECK SHIELDING ON ALL DOORS, WINDOWS, VENTILATION PORTS, VISUAL ACCESS OPEININGS, AND WALLS FOR
PROPER INSTALLATION AND BONDING
8. MEASURE STRAY CURRENTS ON THE GROUND CIRCUITS
9. MEASURE THE BOND RESISTANCES
DA FORM 7452-9-R, FEB 2002 USAPA V1.00
1. FACILITY 2. DATE (YYYYMMDD)
3. LOCATION 4. INSPECTOR