TE_5.2-017_-_Earth_Electrode_Subsystem_Checklist_For_Existing_Facilities.pdf

PDF 88 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
Solicitation number
W911SF-16-R-0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - Fort Benning, GA Base Operations, newest first.
File Type Posted
TE_5.2-014_-_Ground_Fault_Protection_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_1-008-_BCT_Impact_Statement.doc DOC document
TE_5.4-005a-__Operating_Checklist_for_Peak_Shaving_Plant_(ne.doc DOC document
TE_5.11-001-_List_of_Ranges.doc DOC document
TE_5.12-005_Headstone_Cleaning_and_Alignement_Maintenance_Tracking_Chart.doc DOC document
TE_1-003_Real_Property_Inventory.xlsx XLSX spreadsheet
TE_1-003a-_Definitions_of_Real_Property_Inventory.xls XLS spreadsheet
TE_5.2-009-_Building_and_Traffic_Sign_Areas.doc DOC document
TE_5_10-002-_Bldgs__Requiring_Fire_Sprinkler_Inspections_(JAN_2017).docx DOCX document
TE_5.11-004_Obstacle_and_Confidence_Course.xlsx XLSX spreadsheet
TE_5.2-015_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_5.1-002-_Service_Order_(SO)_Priority_Classifications.doc DOC document
TE_3-003-_GFE-_Camp_Merrill.xls XLS spreadsheet
TE_5.2-010-_Locations_of_Welcome_Home_Ceremony_Signs.doc DOC document
TE_5.9-001-_Recommended_Self-Help_Center_Stockage_List.xls XLS spreadsheet
TE_5.2-028_Emergency_Light_Building_List.xlsx XLSX spreadsheet
TE_5.10-007-_Chiller_Building_List.xls XLS spreadsheet
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.docx DOCX document
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.docx DOCX document
Technical_Exhibit_5.13-001_Chiller_Equipment.docx DOCX document
TE_5.2-024_SUPRESSION_LIST.xlsx XLSX spreadsheet
Sec_C-5.9_SELF-HELP.docx DOCX document
Sec_C-5.13_Chiller_Maintenance_and_Repair_Index.pdf PDF
Attachment_6_-_Specific_Relevant_Contract_Reference_Sheet_12-R-0012_DPW_Benning_BASOPS.pdf PDF
Attachment_9_-_Wage_Determination_16-R-0012_DPW_Benning_BASOPS.pdf PDF
Solicitation_W911SF-16-R-0012_DPW_BASOPS_Solicitation.pdf PDF
Sec_C-5.5_HVAC_SYSTEMS_OPERATION_&_MAINTENANCE.rtf RTF text file
Sec_C-1__General_Information.docx DOCX document
TE_5.7-003-Road_Inspection_Areas.pdf PDF
TE_5.2-018_-_Grounding_And_Bonding_Connection_Checklist_For_Existing_Facilities.pdf PDF
TE_5.10-007-_Chiller_Building_List_rev_by_amendment.pdf PDF
Technical_Exhibit_5.13-002a_Chiller_Data.pdf PDF
TE_5.11-001-_List_of_Ranges.pdf PDF
TE_5.10-003-_Bldgs._Requiring_Heater_Inspections.pdf PDF
TE_5.3-002-_Dining_Facility_Equip. _PMCS _and_Repair_rev_by_amendment.pdf PDF
TE_5.2-001-_Required_Scheduled_Tasks.pdf PDF
TABLE_OF_CONTENTS_-_Draft_PWS_ _Technical_Exhibits.pdf PDF
TE_3-001-_Gov't_Furnished_Facilities.pdf PDF
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.pdf PDF
Technical_Exhibit_5.13-002b_Refrigerant_Use_Data.pdf PDF
TE_5.2-004-_Assesment_of_NRE-Ft._Benning-Historic_Resources_.pdf PDF
TE_5.2-007-_ICYET_Inspection_Deficiency_List.pdf PDF
TE_5.4-005a-__Operating_Checklist_for_Peak_Shaving_Plant_(ne.pdf PDF
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.pdf PDF
TE_5.2-013_-_Earth_Ground_Electrode_Subsystem_Check_list_For_New_Facilities.pdf PDF
TE_5.1-007-_SO_procedure_for_Bldgs._Under_Barracks_Maint._Pr.pdf PDF
Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.pdf PDF
TE_3-004-_GSA_Vehicles_for_KTR_use.pdf PDF
TE_5.4-001-_Required_Scheduled_Tasks.pdf PDF
TE_5.4-002-_List_of_Emergency_Generators.pdf PDF
Show all 50

Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 5.1-017

DA FORM 7452-4-R, FEB 2002 USAPA V1.00

EARTH ELECTRODE SUBSYSTEM CHECKLIST FOR EXISTING FACILITIES

For use of this form, see TM 5-690; the proponent agency is COE.

1. FACILITY 2. DATE (YYYYMMDD)

3. LOCATION 4. INSPECTOR

5. SKETCH THE LAYOUT OF THE EARTH ELECTRODE SUBSYSTEM (Or attach an up-to-date engineering drawing)

6. SOIL CONDITIONS (Type)

LOAM OR HUMUS CLAY SAND GRAVEL

7. EARTH ELECTRODE SUBSYSTEM RESISTANCE

MEASUREMENT

8. LAST RESISTANCE MEASUREMENT 9. MONTHS SINCE LAST RESISTANCE MEASUREMENT

COMPONENT IDENTIFICATION

10. GROUND RODS

10a. TYPE 10b. SIZE (Diameter) 10c. LENGTH 10d. PHYSICAL CONDITION

11. GROUND CONDUCTORS

11 a. TYPE 11 b. SIZE 11 c. MATERIAL 11d. PHYSICAL CONDITION

12. INTERCONNECTING CONDUCTORS

12a. TYPE 12b. SIZE 12c. MATERIAL 12d. PHYSICAL CONDITION

13. RISERS

13a. PHYSICAL CONDITION 13b. MEASURED RESISTANCE

13. GROUND WELLS

13a. PHYSICAL CONDITION 13b. MEASURED RESISTANCE

14. WEATHER CONDITIONS (At time of inspection)

WET DRY SNOW RAIN MIST

15. MEASURED TEMPERATURE 16. DAYS SINCE LAST PRECIPITATION