| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 1.1 | Business Office | Quality | Perform work in accordance with all | 1.1.1.1 | 0.0% | Planned Sampling | |
| professional and quality standards. | |||||||
| Timeliness | Perform all business office functions | 1.1.1.1 | 0 | Planned Sampling | |||
| in accordance with approved SOP | |||||||
| Reporting | Complete and maintain required | 1.1.1.1 | 10.0% | Planned Sampling | |||
| documentation. | |||||||
| 5.1 | Prepare and | Quality | Prepare, submit, and maintain | 1.2.5 | 10.0% | Planned Sampling | |
| Provide Records, | complete and accurate records and | ||||||
| Reports and | reports. | ||||||
| Submittals | |||||||
| Timeliness | Prepare all records and reports within | 1.2.5. | 10% | Planned Sampling | |||
| the specified time frame. | |||||||
| Technical Exhibit | C-1-001-1 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.1 | Emergency (Priority | Quality | Perform work in accordance with all | 5.1.2.2.1 | 10.0% | Planned Sampling | |
| 1) Sos | applicable professional and quality | ||||||
| standards. | |||||||
| Timeliness | Respond to Emergency (Priority 1) | 5.1.2.2.1 | 5.0% | Planned Sampling | |||
| SOs within one hour during normal | |||||||
| business hours and two hours during | |||||||
| non-business hours, and complete all | |||||||
| work within 24 hours. | |||||||
| Reporting | Maintain complete and accurate | 5.1.2.6 | 10.0% | Planned Sampling | |||
| records of work. | |||||||
| Labor | All labor charges shall be fare and | 5.1.2.6 | 10.0% | Planned Sample | |||
| reasonable to include, but not limited | |||||||
| to sub-contract cost. | |||||||
| Technical Exhibit | C-1-001-2 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.1 | Urgent (Priority 2) | Quality | Perform work in accordance with all | 5.1.2.2.2 | 10.0% | Planned Sampling | |
| Sos | applicable professional and quality | ||||||
| standards. | |||||||
| Timeliness | Respond to and complete Urgent | 5.1.2.2.2 | 10.0% | Planned Sampling | |||
| (Priority 2) SOs within 15 calendar | |||||||
| days for non kitchen equipment | |||||||
| repairs, and 5 calendar days for | |||||||
| kitchen equipment repairs. | |||||||
| Reporting | Maintain complete and accurate | 5.1.2.6 | 10.0% | Planned Sampling | |||
| records of work. | |||||||
| Labor | All labor charges shall be fare and | 5.1.2.6 | 10.0% | Planned Sample | |||
| reasonable to include, but not limited | |||||||
| to sub-contract cost. | |||||||
| 5.1 | Individual Job | Quality | Perform work in accordance with all | 5.1.2.3 | 5.0% | Planned Sampling | |
| Orders (IJOs) | applicable professional and quality | ||||||
| standards. | |||||||
| Timeliness | Accomplish tasks within time frames | 5.1.2.3 | 10.0% | Planned Sampling | |||
| as specified on approved IJO. | |||||||
| Reporting | Maintain complete and accurate | 5.1.2.6 | 10.0% | Planned Sampling | |||
| records of work. | |||||||
| Technical Exhibit | C-1-001-3 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.1 | Work Reception | Quality | Perform work reception in | 5.1.2.4 | 5.0% | Planned Sampling | |
| accordance with all applicable | |||||||
| professional and quality standards. | |||||||
| Timeliness | Receive SOs 24 hours per day, 7 | 5.1.2.4.2 | 5.0% | Planned Sampling | |||
| days per week. | |||||||
| 5.1 | IJO Work Estimating | Quality | Provide preliminary estimates that are | 5.1.2.5.4.3 | 8.0% | 100% Inspection | |
| reasonable and accurate. Provide | |||||||
| detailed estimates that are reasonable | |||||||
| and accurate to include a complete | |||||||
| scope of work, a bill of materials | |||||||
| using appropriate materials | |||||||
| catalogues, with quantities, and price | |||||||
| per item, and single line drawings as | |||||||
| necessary. | |||||||
| Timeliness | Submit estimates by date as directed | 5.1.2.5.4.3 | 8.0% | 100% Inspection | |||
| by the Government or KO. | |||||||
| Reporting | Maintain complete and accurate | 5.1.2.5.4.3 | 8.0% | Planned Sample | |||
| records of work. | |||||||
| Technical Exhibit | C-1-001-4 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.1 | Energy | Quality | Operate the Energy Management and | 5.1.4.3 | 5.0% | Planned Sampling | |
| Management and | Control System (EMCS) in accordance | ||||||
| Control Systems | with all applicable professional and | ||||||
| (EMCS) | quality standards. | ||||||
| Timeliness | Operate, maintain, and monitor the | 5.1.4.3.1 | 5.0% | Planned Sampling | |||
| EMCS 24 hours per day, 7 days per | |||||||
| week. | |||||||
| Reporting | Prepare, maintain, and submit, as | 5.1.4.3 | 5.0% | Planned Sampling | |||
| required, all documentation requested | |||||||
| by the KO or his/her representative. | |||||||
| 5.1 | Routine (Priority 3) | Quality | Perform work in accordance with all | 5.1.2.2.3 | 10.0% | Planned Sampling | |
| SOs | applicable professional and quality | ||||||
| standards. | |||||||
| Timeliness | Respond to and complete Routine | 5.1.2.2.3 | 10% | Planned Sampling | |||
| (Priority 3) SOs within 30 calendar | |||||||
| days of request | |||||||
| Reporting | Maintain complete and accurate | 5.1.2.6 | 10.0% | Planned Sampling | |||
| records of work. | |||||||
| Labor | All labor charges shall be fare and | 5.1.2.6 | 10.0% | Planned Sample | |||
| reasonable to include, but not limited | |||||||
| to sub-contract cost. | |||||||
| Technical Exhibit | C-1-001-5 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.2 | Electrical | Quality | Perform maintenance and inspection | 5.2.3.1 | 2.5% | Planned Sampling | |
| Preventive | as specified and in accordance with | ||||||
| Maintenance | applicable quality and workmanship | ||||||
| standards. | |||||||
| Timeliness | Perform maintenance and inspection | 5.2.3.1 | 4.0% | Planned Sampling | |||
| in accordance with specified PM | |||||||
| schedule. | |||||||
| Reporting | Maintain complete and accurate | 5.2.3.1 | 4.0% | Planned Sampling | |||
| records of work. | |||||||
| 5.2 | Fire Alarm System | Quality | Perform maintenance and inspection | 5.2.3.2 | 5.0% | Planned Sampling | |
| Checks | as specified and in accordance with | ||||||
| applicable quality and workmanship | |||||||
| standards. | |||||||
| Timeliness | Perform daily checks of the King | 5.2.3.2 | 5.0% | Planned Sampling | |||
| Fisher console. Perform visual and | |||||||
| operational checks of the transmitters | |||||||
| and control panels semi-annually. | |||||||
| Reporting | Prepare, submit, and maintain all | 5.2.2.2.1 | 5.0% | Planned Sampling | |||
| required documentation. | |||||||
| Technical Exhibit | C-1-001-6 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.2 | Miscellaneous | Quality | Perform maintenance and inspection | 5.2.3.3 | 10.0% | Planned Sampling | |
| Building | as specified and in accordance with | ||||||
| Maintenance | applicable quality and workmanship | ||||||
| standards. | |||||||
| Timeliness | Perform maintenance and inspection | 5.2.3.3 | 10.0% | Planned Sampling | |||
| in accordance with specified PM | |||||||
| schedule. | |||||||
| Reporting | Maintain complete and accurate | 5.2.3.3 | 10.0% | Planned Sampling | |||
| records of work. | |||||||
| 5.2 | Building and Traffic | Quality | Perform work in accordance with | 5.2.3.6 | 10.0% | Planned Sampling | |
| Signs | Installation Design Guide TM 5-708-10. | ||||||
| Timeliness | Repair/replace signs per monthly | 5.2.3.6 | 10.0% | Planned Sampling | |||
| scheduled inspections. | |||||||
| Reporting | Maintain complete and accurate | 5.2.3.6 | 10.0% | Planned Sampling | |||
| checklist of locations of damaged | |||||||
| and/or missing signs. | |||||||
| Technical Exhibit | C-1-001-7 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.3 | Dining Facility | Quality | Perform maintenance and repair of | 5.2.3.8 | 5.0% | Planned Sampling | |
| Equipment | Government-owned dining facility | ||||||
| Maintenance | equipment in accordance with all | ||||||
| professional and quality standards, | |||||||
| and all applicable regulations. | |||||||
| Timeliness | Perform work in accordance with | 5.2.3.8 | 5.0% | Planned Sampling | |||
| specific timeframes. | |||||||
| Reporting | Maintain a current record of all dining | 5.2.3.8 | 5.0% | Planned Sampling | |||
| equipment receiving PM. | |||||||
| 5.4 | Electrical Systems | Quality | Perform maintenance, inspections, | 5.4.3.2 | 5.0% | Planned Sampling | |
| and tests as specified in accordance | |||||||
| with applicable safety regulations, | |||||||
| manufacturer specifications, and | |||||||
| quality standards. | |||||||
| Timeliness | Perform maintenance and inspection | 5.4.3.2 | 5.0% | Planned Sampling | |||
| in accordance with specified PM | |||||||
| schedule. | |||||||
| Reporting | Maintain complete and accurate | 5.4.3.2 | 5.0% | Planned Sampling | |||
| records of work. | |||||||
| Technical Exhibit | C-1-001-8 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.4 | Fuel Distribution | Quality | |||||
| Systems | |||||||
| Timeliness | Perform fuel monitoring in accordance | 5.4.3.3 | 10.0% | Planned Sampling | |||
| with specified schedule. | |||||||
| Reporting | Maintain complete and accurate | 5.4.3.3 | 10.0% | Planned Sampling | |||
| records of work. | |||||||
| 5.4 | Peak Shaving | Quality | Maintain and operate the Peak | 5.4.3.5 | 10.0% | Planned Sampling | |
| Propane Plants | Shaving Propane Plants in | ||||||
| accordance with applicable | |||||||
| regulations. | |||||||
| Timeliness | Perform maintenance and inspection | 5.4.3.5 | 10.0% | Planned Sampling | |||
| in accordance with specified | |||||||
| schedule. | |||||||
| Reporting | Maintain complete and accurate | 5.4.3.5 | 10.0% | Planned Sampling | |||
| records of work. | |||||||
| Technical Exhibit | C-1-001-9 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.5 | Maintenance of the | Quality | Perform work in accordance with all | 5.5.3.1.1 | 5.0% | Planned Sampling | |
| Energy | applicable regulations and | ||||||
| Management and | professional standards to include TM | ||||||
| Control System | 5-815-2. | ||||||
| (EMCS) | |||||||
| Timeliness | Perform preventive maintenance on | 5.5.3.1.1 | 5.0% | Planned Sampling | |||
| EMCS control system on a quarterly | |||||||
| basis. | |||||||
| Reporting | Maintain complete and accurate | 5.5.3.1.1 | 5.0% | Planned Sampling | |||
| records of work. | |||||||
| 5.5 | Boiler Plant | Quality | Maintain and operate the three steam | 5.5.3.2 | 5.0% | Planned Sampling | |
| Operations | boilers in Building 9202 in accordance | ||||||
| with all applicable regulations and | |||||||
| professional standards to include AR | |||||||
| 420-49 and the Clean Air Act. | |||||||
| Timeliness | Maintain, operate, monitor, and staff | 5.5.3.2 | 5.0% | Planned Sampling | |||
| boilers in Building 9202 on a daily | |||||||
| basis and respond to any operational | |||||||
| problem immediately upon discovery, | |||||||
| 24 hours/day, 7 days/week. | |||||||
| Reporting | Document work performed in logbook. | 5.5.3.2.1 | 10.0% | Planned Sampling | |||
| Technical Exhibit | C-1-001-10 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.5 | Water Testing and | Quality | Perform water testing and inspection | 5.5.3.3 | 5.0% | Planned Sampling | |
| Treatment | as specified and in accordance with | ||||||
| applicable quality and professional | |||||||
| standards. | |||||||
| Timeliness | Perform testing and inspection in | 5.5.3.3 | 5.0% | Planned Sampling | |||
| accordance with specified PM | |||||||
| schedule. | |||||||
| Reporting | Maintain accurate records and sample | 5.5.3.3 | 10.0% | Planned Sampling | |||
| collection records. | |||||||
| 5.5 | Air Conditioning to | Quality | Perform specified tasks in | 5.5.3.4 | 5.0% | Planned Sampling | |
| Heat and Heat to | accordance with all professional | ||||||
| Air Conditioning | standards and safety regulations. | ||||||
| Changeover | |||||||
| Timeliness | Perform changeover of systems at | 5.5.3.4 | 5.0% | Validated Customer | |||
| required times. | Complaints and Incidental | ||||||
| Inspections | |||||||
| Reporting | Maintain a report of all work | 5.5.3.4 | 5.0% | Planned Sampling | |||
| performed for changeover services, | |||||||
| including hours expended, equipment | |||||||
| name and number, and facility name | |||||||
| and number, and indicate any needed | |||||||
| repairs submitted via service order. | |||||||
| Technical Exhibit | C-1-001-11 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.5 | Cooling Plants and | Quality | Perform work in accordance with all | 5.5.3.5 | 10.0% | Planned Sampling | |
| Systems | environmental, professional | ||||||
| standards, safety regulations, and | |||||||
| manufacturer manuals. | |||||||
| Timeliness | Perform maintenance and inspection | 5.5.3.5 | 10.0% | Planned Sampling | |||
| in accordance with specified PM | |||||||
| schedule. | |||||||
| Reporting | Maintain logbooks and building | 5.5.3.5 | 10.0% | Planned Sampling | |||
| checklist. | |||||||
| 5.5 | Heating Plants and | Quality | Perform work in accordance with all | 5.5.3.6 | 5.0% | Planned Sampling | |
| Systems | professional standards and safety | ||||||
| regulations. | |||||||
| Timeliness | Perform maintenance and inspection | 5.5.3.6 | 5.0% | Planned Sampling | |||
| in accordance with specified PM | |||||||
| schedule. | |||||||
| Reporting | Maintain logbooks and building | 5.5.3.6 | 5.0% | Planned Sampling | |||
| checklists. | |||||||
| Technical Exhibit | C-1-001-12 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.5 | Filter Change | Quality | Perform work in accordance with all | 5.5.3.5.2 | 15.0% | Planned Sampling | |
| applicable professional and quality | |||||||
| standards. | |||||||
| Timeliness | Perform all filter change in | 5.5.3.5.2 | 15.0% | Planned Sampling | |||
| accordance with specified | |||||||
| timeframes. | |||||||
| Reporting | Maintain complete and accurate | 5.5.3.5.2 | 15.0% | ||||
| records. | |||||||
| 5.6 | Operation of Inert | Quality | Operate inert landfill in accordance | 5.6.3.1 | 10.0% | Planned Sampling | |
| Landfill | with all applicable Federal, State, and | ||||||
| local regulations. | |||||||
| Timeliness | The contractor shall have personnel | 5.6.3.1 | 10.0% | Planned Sampling | |||
| available to operate the inert landfill | |||||||
| from 0745 through 1615 Monday | |||||||
| through Friday. | |||||||
| Technical Exhibit | C-1-001-13 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.6 | Mowing | Quality | Perform grass cutting as specified, | 5.6.3.3 | 10.0% | Planned Sampling | |
| including removing clippings, and in | |||||||
| accordance with industry standards. | |||||||
| Timeliness | Maintain grass at a height of 2 to 3 | 5.6.3.3 | 10.0% | Planned Sampling | |||
| inches in improved areas, less than 6 | |||||||
| inches in unimproved areas, on a | |||||||
| weekly basis in high visibility areas | |||||||
| and on parade fields, and the road | |||||||
| shoulders twice per year. | |||||||
| 5.6 | Specific | Quality | Perform work in accordance with all | 5.6.3.5 | 5.0% | Planned Sampling | |
| Requirements for | applicable professional and quality | ||||||
| Buildings 4 and 6 | standards. | ||||||
| Timeliness | Perform work as specified and in | 5.6.3.5 | 5.0% | Planned Sampling | |||
| accordance with designated | |||||||
| schedule. | |||||||
| Technical Exhibit | C-1-001-14 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.6 | Leaf Removal | Quality | Perform work in accordance with all | 5.6.3.6 | 5.0% | Planned Sampling | |
| applicable professional and quality | |||||||
| standards. | |||||||
| Timeliness | Perform leaf removal services in | 5.6.3.6 | 5.0% | Planned Sampling | |||
| family housing areas and high visibility | |||||||
| areas on the Main Post on a weekly | |||||||
| basis for ten weeks beginning | |||||||
| approximately the end of November. | |||||||
| Reporting | Maintain complete and accurate | 5.6.3.6 | 5.0% | Planned Sampling | |||
| records of work. | |||||||
| 5.6 | Plowing Jump | Quality | Perform work in accordance with all | 5.6.3.7 | 2.5% | 100% Inspection | |
| Towers | applicable professional and quality | ||||||
| standards. | |||||||
| Timeliness | Plow jump towers on a quarterly | 5.6.3.7 | 4.0% | 100% Inspection | |||
| basis. | |||||||
| Reporting | Maintain complete and accurate | 5.6.3.7 | 4.0% | 100% Inspection | |||
| records of work. | |||||||
| Technical Exhibit | C-1-001-15 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.6 | Dredging of | Quality | Perform work in accordance with all | 5.6.3.8 | 10.0% | Planned Sampling | |
| Ditches | applicable professional and quality | ||||||
| standards. | |||||||
| Timeliness | Dredge ditches from Baker Street to | 5.6.3.8 | 10.0% | Planned Sampling | |||
| Leonard Street on Custer Road and | |||||||
| from Bradshaw Street to LoBauch | |||||||
| Street on 82nd Airborne Division Road | |||||||
| on an annual basis. | |||||||
| 5.6 | Fencing Inspection | Quality | Perform work in accordance with all | 5.6.3.9 | 10.0% | Planned Sampling | |
| applicable professional and quality | |||||||
| standards. | |||||||
| Timeliness | Inspect the fencing along the ASP and | 5.6.3.9 | 10.0% | Planned Sampling | |||
| at LAAF on a semi-annual basis. | |||||||
| Reporting | Maintain complete and accurate | 5.6.3.9 | 10.0% | Planned Sampling | |||
| records of work. | |||||||
| Technical Exhibit | C-1-001-16 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.6 | Culverts and | Quality | Perform work in accordance with all | 5.6.3.10 | 2.5% | 100% Inspection | |
| Ditches | applicable professional and quality | ||||||
| standards. | |||||||
| Timeliness | Clean sand and debris from Laundry | 5.6.3.10 | 4.0% | 100% Inspection | |||
| Creek going through Lawson Army | |||||||
| Airfield (LAAF) on an annual basis. | |||||||
| 5.7 | Paved Surface | Quality | Perform work in accordance with all | 5.7.3.1 | 5.0% | Planned Sampling | |
| Sweeping and | applicable professional and quality | ||||||
| Cleaning | standards. | ||||||
| Timeliness | Perform work as specified and in | 5.7.3.1 | 5.0% | Planned Sampling | |||
| accordance with designated | |||||||
| schedule. | |||||||
| Reporting | Maintain complete and accurate | 5.7.3.1 | 5.0% | Planned Sampling | |||
| records of work. | |||||||
| Technical Exhibit | C-1-001-17 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.9 | Operation of the | Quality | Operate the Center, providing high | 5.9.3.1 | 5.0% | Validated Customer Complaints | |
| Self-Help Center | quality customer service, materials, | ||||||
| training, tools and storage. | |||||||
| Timeliness | Operate the Self-Help Center 52 | 5.9.3.1 | 5.0% | Validated Customer Complaints | |||
| weeks of the year from 0830 to 1600 | |||||||
| Tuesday through Saturday. | |||||||
| Reporting | Maintain database of customer files | 5.9.3.1.2 | 10.0% | Validated Customer Complaints | |||
| and all other Self-Help Center | |||||||
| information. | |||||||
| 5.9 | Stockage of Items | Quality | Supply Government-owned parts and | 5.9.3.1.1.1 | 5.0% | Validated Customer Complaints | |
| materials for users of the Self-Help | |||||||
| program in accordance with the | |||||||
| Stockage List. | |||||||
| Timeliness | Maintain the stockage level for | 5.9.3.1.1.1 | 5.0% | Validated Customer Complaints | |||
| required items in the Self-Help Center | |||||||
| at the level approved in the stockage | |||||||
| list, unless otherwise approved or | |||||||
| directed by the KO. | |||||||
| Reporting | Requisition supplies on the approved | 5.9.3.1.1.1 | 5.0% | Validated Customer Complaints | |||
| list by submitting DA Form 2702 or an | |||||||
| equivalent format. | |||||||
| Technical Exhibit | C-1-001-18 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.11 | Grading of Course | Quality | Perform work in accordance with all | 5.11.3 | 15.0% | 100% Sampling | |
| and Range Roads | professional standards and applicable | ||||||
| regulations. | |||||||
| Timeliness | Perform work in accordance with | 5.11.3 | 15% | 100% Sampling | |||
| monthly schedules provided by Range | |||||||
| Division. | |||||||
| Reporting | Prepare, submit, and maintain all | 5.11.3 | 5.0% | 100% Sampling | |||
| required documentation. | |||||||
| 5.11 | Obstacle and | Quality | Replace all ropes and conduct test as | 5.11.3.2 | 5.0% | Planned Sampling | |
| Confidence Course | required, in accordance with all | ||||||
| applicable professional and quality | |||||||
| standards. | |||||||
| Timeliness | Conduct all test and inspections as | 5.11.3.2 | 5% | Planned Sampling | |||
| required at 6-month intervals and | |||||||
| submit all deficiencies to DPW work | |||||||
| coordinator. | |||||||
| Reporting | Prepare and maintain complete and | 5.11.3.2 | 5.0% | Planned Sampling | |||
| accurate records | |||||||
| Technical Exhibit | C-1-001-19 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.15 | Opening and | Quality | Perform work as specified and in | 5.12.3.1 | 5.0% | Planned Sampling | |
| Closing the Main | accordance with DA PAM 290-5 and | ||||||
| Post Cemetery | all other applicable standards and | ||||||
| regulations. | |||||||
| Timeliness | Operate cemetery from 0800 to 1900 | 5.12.3.1 | 5.0% | Planned Sampling | |||
| on a daily basis, except for Memorial | |||||||
| Day which shall be operated from | |||||||
| 0800 to 1900. The vehicle drive | |||||||
| through gates shall be closed during | |||||||
| hours of darkness. | |||||||
| 5.15 | Headstone | Quality | Perform work as specified and in | 5.12.3.2 | 5.0% | Planned Sampling | |
| Maintenance at the | accordance with DA PAM 290-5 and | ||||||
| Main Post | all other applicable standards and | ||||||
| Cemetery | regulations. | ||||||
| Timeliness | Clean headstones twice per year. | 5.12.3.2 | 5.0% | Planned Sampling | |||
| Reporting | Prepare and maintain complete and | 5.12.3.2 | 5.0% | Planned Sampling | |||
| accurate records | |||||||
| Technical Exhibit | C-1-001-20 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.15 | Main Post | Quality | Perform work in accordance with all | 5.12.3.3 | 5.0% | 100% Inspection | |
| Cemetery Grounds | professional and quality standards. | ||||||
| Maintenance | |||||||
| Timeliness | Perform grounds maintenance as | 5.12.3.3 | 5.0% | 100% Inspection | |||
| specified and in accordance with | |||||||
| applicable schedule. | |||||||
| Reporting | Prepare and maintain complete and | 5.12.3.3 | 5.0% | 100% Inspection | |||
| accurate records | |||||||
| 5.17 | Buildings and | Quality | Perform work in accordance with all | 5.10.3.1 | 5.0% | Planned Sampling | |
| Structures | professional standards and applicable | ||||||
| Maintenance for | regulations. | ||||||
| Camp Merrill | |||||||
| Timeliness | Perform work in accordance with | 5.10.3.1 | 4.0% | Planned Sampling | |||
| specified schedule. | |||||||
| Reporting | Maintain complete and accurate | 5.10.3.1 | 5.0% | Planned Sampling | |||
| records of work. | |||||||
| Technical Exhibit | C-1-001-21 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.17 | Utility Systems | Quality | Perform work in accordance with all | 5.10.3.3 | 5.0% | Planned Sampling | |
| Operation and | professional standards and applicable | ||||||
| Maintenance for | regulations. | ||||||
| Camp Merrill | |||||||
| Timeliness | Perform work in accordance with | 5.10.3.3 | 5.0% | Planned Sampling | |||
| specified schedule. | |||||||
| Reporting | Document water tests in log. | 5.10.3.3. | 5.0% | Planned Sampling | |||
| 5.17 | HVAC Systems | Quality | Perform work in accordance with all | 5.10.3.4 | 10.0% | Planned Sampling | |
| Operation and | professional standards and applicable | ||||||
| Maintenance for | regulations. | ||||||
| Camp Merrill | |||||||
| Timeliness | Perform work in accordance with | 5.10.3.4 | 4.0% | Planned Sampling | |||
| specified schedule. | |||||||
| Reporting | Maintain complete and accurate | 5.10.3.4 | 10.0% | Planned Sampling | |||
| records of work. | |||||||
| Technical Exhibit | C-1-001-22 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.17 | Grounds | Quality | Perform work in accordance with all | 5.10.3.5 | 10.0% | Planned Sampling | |
| Maintenance for | professional standards and applicable | ||||||
| Camp Merrill | regulations. | ||||||
| Timeliness | Perform work in accordance with | 5.10.3.5 | 10.0% | Planned Sampling | |||
| specified schedule. | |||||||
| Reporting | Maintain complete and accurate | 5.10.3.5 | 10.0% | Planned Sampling | |||
| records of work. | |||||||
| 5.17 | Surfaced Area | Quality | Perform work in accordance with all | 5.10.3.6 | 5.0% | Planned Sampling | |
| Maintenance for | professional standards and applicable | ||||||
| Camp Merrill | regulations. | ||||||
| Timeliness | Blade, grade, and pull ditches on a | 5.10.3.6 | 5.0% | Planned Sampling | |||
| semi-annual basis. | |||||||
| Reporting | Maintain complete and accurate | 5.10.3.6 | 5.0% | Planned Sampling | |||
| records of work. | |||||||
| Technical Exhibit | C-1-001-23 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.17 | Water Plant and | Quality | Perform work in accordance with all | 5.10.3.7 | 10.0% | Planned Sampling | |
| Sewage | professional standards and applicable | ||||||
| Processing for | regulations to include, but not be | ||||||
| Camp Merrill | limited to, EPD regulations and TMs 5- | ||||||
| 813-3 and 5-814-7. | |||||||
| Timeliness | Perform work in accordance with | 5.10.3.7 | 10.0% | Planned Sampling | |||
| specified schedule. | |||||||
| Reporting | Maintain complete and accurate | 5.10.3.7 | 10.0% | Planned Sampling | |||
| records of work. | |||||||
| 5.17 | Emergency (Priority | Quality | Perform work in accordance with all | 5.10.2.2 | 5.0% | Planned Sampling | |
| 1) Sos for Camp | applicable professional and quality | ||||||
| Merrill | standards. | ||||||
| Timeliness | Respond to Emergency (Priority 1) | 5.10.2.2 | 5.0% | Planned Sampling | |||
| SOs within one hour during normal | |||||||
| business hours and two hours during | |||||||
| non-business hours, and complete all | |||||||
| work within 24 hours. | |||||||
| Reporting | Maintain complete and accurate | 5.10.2.2 | 5.0% | Planned Sampling | |||
| records of work. | |||||||
| Labor | All labor charges shall be fare and | 5.10.2.2 | 5.0% | Planned Sample | |||
| reasonable to include, but not limited | |||||||
| to sub-contract cost. | |||||||
| Technical Exhibit | C-1-001-24 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.17 | Urgent (Priority 2) | Quality | Perform work in accordance with all | 5.10.2.2 | 5.0% | Planned Sampling | |
| Sos for Camp | applicable professional and quality | ||||||
| Merrill | standards. | ||||||
| Timeliness | Respond to and complete Urgent | 5.10.2.2 | 5.0% | Planned Sampling | |||
| (Priority 2) SOs within 15 calendar | |||||||
| days for non kitchen equipment | |||||||
| repairs, and 5 calendar days for | |||||||
| kitchen equipment repairs. . | |||||||
| Reporting | Maintain complete and accurate | 5.10.2.2 | 5.0% | Planned Sampling | |||
| records of work. | |||||||
| Labor | All labor charges shall be fare and | 5.10.2.2 | 5.0% | Planned Sample | |||
| reasonable to include, but not limited | |||||||
| to sub-contract cost. | |||||||
| 5.17 | Routine (Priority 3) | Quality | Perform work in accordance with all | 5.10.2.2 | 5.0% | Planned Sampling | |
| Sos for Camp | applicable professional and quality | ||||||
| Merrill | standards. | ||||||
| Timeliness | Respond to and complete Routine | 5.10.2.2 | 5.0% | Planned Sampling | |||
| (Priority 3) SOs within 30 calendar | |||||||
| days of request | |||||||
| Reporting | Maintain complete and accurate | 5.10.2.2 | 5.0% | Planned Sampling | |||
| records of work. | |||||||
| Labor | All labor charges shall be fare and | 5.10.2.2 | 5.0% | Planned Sample | |||
| reasonable to include, but not limited | |||||||
| to sub-contract cost. | |||||||
| Technical Exhibit | C-1-001-25 | Fort Benning |
| TECHNICAL EXHIBIT 1-001 | Section C | ||||||
| Contract No: | |||||||
| PERFORMANCE REQUIREMENTS SUMMARY | |||||||
| The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The | |||||||
| Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee | |||||||
| Contract | Performanc | ||||||
| Sect. | Requiremen | e Category | Performance Indicator | Paragraph | ALP | Method of Sampling | |
| 5.18 | MRF Collection | Quality | Preform all collections of recyclable | 5.08 | 15.0% | Planned Sampling | |
| material in accordance with all | |||||||
| applicable professional and quality | |||||||
| standards. | |||||||
| Timeliness | Collect all recyclable material in | 5.08 | 15% | Planned Sampling | |||
| accordance with schedule. | |||||||
| Reporting | Prepare, maintain, and submit | 5.08 | 15.0% | Planned Sampling | |||
| complete and accurate records. | |||||||
| Technical Exhibit | C-1-001-26 | Fort Benning |
Other files for this federal contract opportunity
Show all 50
Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .