TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
1.1Business OfficeQualityPerform work in accordance with all1.1.1.10.0%Planned Sampling
professional and quality standards.
TimelinessPerform all business office functions1.1.1.10Planned Sampling
in accordance with approved SOP
ReportingComplete and maintain required1.1.1.110.0%Planned Sampling
documentation.
5.1Prepare andQualityPrepare, submit, and maintain1.2.510.0%Planned Sampling
Provide Records,complete and accurate records and
Reports andreports.
Submittals
TimelinessPrepare all records and reports within1.2.5.10%Planned Sampling
the specified time frame.
Technical ExhibitC-1-001-1Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.1Emergency (PriorityQualityPerform work in accordance with all5.1.2.2.110.0%Planned Sampling
1) Sosapplicable professional and quality
standards.
TimelinessRespond to Emergency (Priority 1)5.1.2.2.15.0%Planned Sampling
SOs within one hour during normal
business hours and two hours during
non-business hours, and complete all
work within 24 hours.
ReportingMaintain complete and accurate5.1.2.610.0%Planned Sampling
records of work.
LaborAll labor charges shall be fare and5.1.2.610.0%Planned Sample
reasonable to include, but not limited
to sub-contract cost.
Technical ExhibitC-1-001-2Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.1Urgent (Priority 2)QualityPerform work in accordance with all5.1.2.2.210.0%Planned Sampling
Sosapplicable professional and quality
standards.
TimelinessRespond to and complete Urgent5.1.2.2.210.0%Planned Sampling
(Priority 2) SOs within 15 calendar
days for non kitchen equipment
repairs, and 5 calendar days for
kitchen equipment repairs.
ReportingMaintain complete and accurate5.1.2.610.0%Planned Sampling
records of work.
LaborAll labor charges shall be fare and5.1.2.610.0%Planned Sample
reasonable to include, but not limited
to sub-contract cost.
5.1Individual JobQualityPerform work in accordance with all5.1.2.35.0%Planned Sampling
Orders (IJOs)applicable professional and quality
standards.
TimelinessAccomplish tasks within time frames5.1.2.310.0%Planned Sampling
as specified on approved IJO.
ReportingMaintain complete and accurate5.1.2.610.0%Planned Sampling
records of work.
Technical ExhibitC-1-001-3Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.1Work ReceptionQualityPerform work reception in5.1.2.45.0%Planned Sampling
accordance with all applicable
professional and quality standards.
TimelinessReceive SOs 24 hours per day, 75.1.2.4.25.0%Planned Sampling
days per week.
5.1IJO Work EstimatingQualityProvide preliminary estimates that are5.1.2.5.4.38.0%100% Inspection
reasonable and accurate. Provide
detailed estimates that are reasonable
and accurate to include a complete
scope of work, a bill of materials
using appropriate materials
catalogues, with quantities, and price
per item, and single line drawings as
necessary.
TimelinessSubmit estimates by date as directed5.1.2.5.4.38.0%100% Inspection
by the Government or KO.
ReportingMaintain complete and accurate5.1.2.5.4.38.0%Planned Sample
records of work.
Technical ExhibitC-1-001-4Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.1EnergyQualityOperate the Energy Management and5.1.4.35.0%Planned Sampling
Management andControl System (EMCS) in accordance
Control Systemswith all applicable professional and
(EMCS)quality standards.
TimelinessOperate, maintain, and monitor the5.1.4.3.15.0%Planned Sampling
EMCS 24 hours per day, 7 days per
week.
ReportingPrepare, maintain, and submit, as5.1.4.35.0%Planned Sampling
required, all documentation requested
by the KO or his/her representative.
5.1Routine (Priority 3)QualityPerform work in accordance with all5.1.2.2.310.0%Planned Sampling
SOsapplicable professional and quality
standards.
TimelinessRespond to and complete Routine5.1.2.2.310%Planned Sampling
(Priority 3) SOs within 30 calendar
days of request
ReportingMaintain complete and accurate5.1.2.610.0%Planned Sampling
records of work.
LaborAll labor charges shall be fare and5.1.2.610.0%Planned Sample
reasonable to include, but not limited
to sub-contract cost.
Technical ExhibitC-1-001-5Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.2ElectricalQualityPerform maintenance and inspection5.2.3.12.5%Planned Sampling
Preventiveas specified and in accordance with
Maintenanceapplicable quality and workmanship
standards.
TimelinessPerform maintenance and inspection5.2.3.14.0%Planned Sampling
in accordance with specified PM
schedule.
ReportingMaintain complete and accurate5.2.3.14.0%Planned Sampling
records of work.
5.2Fire Alarm SystemQualityPerform maintenance and inspection5.2.3.25.0%Planned Sampling
Checksas specified and in accordance with
applicable quality and workmanship
standards.
TimelinessPerform daily checks of the King5.2.3.25.0%Planned Sampling
Fisher console. Perform visual and
operational checks of the transmitters
and control panels semi-annually.
ReportingPrepare, submit, and maintain all5.2.2.2.15.0%Planned Sampling
required documentation.
Technical ExhibitC-1-001-6Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.2MiscellaneousQualityPerform maintenance and inspection5.2.3.310.0%Planned Sampling
Buildingas specified and in accordance with
Maintenanceapplicable quality and workmanship
standards.
TimelinessPerform maintenance and inspection5.2.3.310.0%Planned Sampling
in accordance with specified PM
schedule.
ReportingMaintain complete and accurate5.2.3.310.0%Planned Sampling
records of work.
5.2Building and TrafficQualityPerform work in accordance with5.2.3.610.0%Planned Sampling
SignsInstallation Design Guide TM 5-708-10.
TimelinessRepair/replace signs per monthly5.2.3.610.0%Planned Sampling
scheduled inspections.
ReportingMaintain complete and accurate5.2.3.610.0%Planned Sampling
checklist of locations of damaged
and/or missing signs.
Technical ExhibitC-1-001-7Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.3Dining FacilityQualityPerform maintenance and repair of5.2.3.85.0%Planned Sampling
EquipmentGovernment-owned dining facility
Maintenanceequipment in accordance with all
professional and quality standards,
and all applicable regulations.
TimelinessPerform work in accordance with5.2.3.85.0%Planned Sampling
specific timeframes.
ReportingMaintain a current record of all dining5.2.3.85.0%Planned Sampling
equipment receiving PM.
5.4Electrical SystemsQualityPerform maintenance, inspections,5.4.3.25.0%Planned Sampling
and tests as specified in accordance
with applicable safety regulations,
manufacturer specifications, and
quality standards.
TimelinessPerform maintenance and inspection5.4.3.25.0%Planned Sampling
in accordance with specified PM
schedule.
ReportingMaintain complete and accurate5.4.3.25.0%Planned Sampling
records of work.
Technical ExhibitC-1-001-8Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.4Fuel DistributionQuality
Systems
TimelinessPerform fuel monitoring in accordance5.4.3.310.0%Planned Sampling
with specified schedule.
ReportingMaintain complete and accurate5.4.3.310.0%Planned Sampling
records of work.
5.4Peak ShavingQualityMaintain and operate the Peak5.4.3.510.0%Planned Sampling
Propane PlantsShaving Propane Plants in
accordance with applicable
regulations.
TimelinessPerform maintenance and inspection5.4.3.510.0%Planned Sampling
in accordance with specified
schedule.
ReportingMaintain complete and accurate5.4.3.510.0%Planned Sampling
records of work.
Technical ExhibitC-1-001-9Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.5Maintenance of theQualityPerform work in accordance with all5.5.3.1.15.0%Planned Sampling
Energyapplicable regulations and
Management andprofessional standards to include TM
Control System5-815-2.
(EMCS)
TimelinessPerform preventive maintenance on5.5.3.1.15.0%Planned Sampling
EMCS control system on a quarterly
basis.
ReportingMaintain complete and accurate5.5.3.1.15.0%Planned Sampling
records of work.
5.5Boiler PlantQualityMaintain and operate the three steam5.5.3.25.0%Planned Sampling
Operationsboilers in Building 9202 in accordance
with all applicable regulations and
professional standards to include AR
420-49 and the Clean Air Act.
TimelinessMaintain, operate, monitor, and staff5.5.3.25.0%Planned Sampling
boilers in Building 9202 on a daily
basis and respond to any operational
problem immediately upon discovery,
24 hours/day, 7 days/week.
ReportingDocument work performed in logbook.5.5.3.2.110.0%Planned Sampling
Technical ExhibitC-1-001-10Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.5Water Testing andQualityPerform water testing and inspection5.5.3.35.0%Planned Sampling
Treatmentas specified and in accordance with
applicable quality and professional
standards.
TimelinessPerform testing and inspection in5.5.3.35.0%Planned Sampling
accordance with specified PM
schedule.
ReportingMaintain accurate records and sample5.5.3.310.0%Planned Sampling
collection records.
5.5Air Conditioning toQualityPerform specified tasks in5.5.3.45.0%Planned Sampling
Heat and Heat toaccordance with all professional
Air Conditioningstandards and safety regulations.
Changeover
TimelinessPerform changeover of systems at5.5.3.45.0%Validated Customer
required times.Complaints and Incidental
Inspections
ReportingMaintain a report of all work5.5.3.45.0%Planned Sampling
performed for changeover services,
including hours expended, equipment
name and number, and facility name
and number, and indicate any needed
repairs submitted via service order.
Technical ExhibitC-1-001-11Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.5Cooling Plants andQualityPerform work in accordance with all5.5.3.510.0%Planned Sampling
Systemsenvironmental, professional
standards, safety regulations, and
manufacturer manuals.
TimelinessPerform maintenance and inspection5.5.3.510.0%Planned Sampling
in accordance with specified PM
schedule.
ReportingMaintain logbooks and building5.5.3.510.0%Planned Sampling
checklist.
5.5Heating Plants andQualityPerform work in accordance with all5.5.3.65.0%Planned Sampling
Systemsprofessional standards and safety
regulations.
TimelinessPerform maintenance and inspection5.5.3.65.0%Planned Sampling
in accordance with specified PM
schedule.
ReportingMaintain logbooks and building5.5.3.65.0%Planned Sampling
checklists.
Technical ExhibitC-1-001-12Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.5Filter ChangeQualityPerform work in accordance with all5.5.3.5.215.0%Planned Sampling
applicable professional and quality
standards.
TimelinessPerform all filter change in5.5.3.5.215.0%Planned Sampling
accordance with specified
timeframes.
ReportingMaintain complete and accurate5.5.3.5.215.0%
records.
5.6Operation of InertQualityOperate inert landfill in accordance5.6.3.110.0%Planned Sampling
Landfillwith all applicable Federal, State, and
local regulations.
TimelinessThe contractor shall have personnel5.6.3.110.0%Planned Sampling
available to operate the inert landfill
from 0745 through 1615 Monday
through Friday.
Technical ExhibitC-1-001-13Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.6MowingQualityPerform grass cutting as specified,5.6.3.310.0%Planned Sampling
including removing clippings, and in
accordance with industry standards.
TimelinessMaintain grass at a height of 2 to 35.6.3.310.0%Planned Sampling
inches in improved areas, less than 6
inches in unimproved areas, on a
weekly basis in high visibility areas
and on parade fields, and the road
shoulders twice per year.
5.6SpecificQualityPerform work in accordance with all5.6.3.55.0%Planned Sampling
Requirements forapplicable professional and quality
Buildings 4 and 6standards.
TimelinessPerform work as specified and in5.6.3.55.0%Planned Sampling
accordance with designated
schedule.
Technical ExhibitC-1-001-14Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.6Leaf RemovalQualityPerform work in accordance with all5.6.3.65.0%Planned Sampling
applicable professional and quality
standards.
TimelinessPerform leaf removal services in5.6.3.65.0%Planned Sampling
family housing areas and high visibility
areas on the Main Post on a weekly
basis for ten weeks beginning
approximately the end of November.
ReportingMaintain complete and accurate5.6.3.65.0%Planned Sampling
records of work.
5.6Plowing JumpQualityPerform work in accordance with all5.6.3.72.5%100% Inspection
Towersapplicable professional and quality
standards.
TimelinessPlow jump towers on a quarterly5.6.3.74.0%100% Inspection
basis.
ReportingMaintain complete and accurate5.6.3.74.0%100% Inspection
records of work.
Technical ExhibitC-1-001-15Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.6Dredging ofQualityPerform work in accordance with all5.6.3.810.0%Planned Sampling
Ditchesapplicable professional and quality
standards.
TimelinessDredge ditches from Baker Street to5.6.3.810.0%Planned Sampling
Leonard Street on Custer Road and
from Bradshaw Street to LoBauch
Street on 82nd Airborne Division Road
on an annual basis.
5.6Fencing InspectionQualityPerform work in accordance with all5.6.3.910.0%Planned Sampling
applicable professional and quality
standards.
TimelinessInspect the fencing along the ASP and5.6.3.910.0%Planned Sampling
at LAAF on a semi-annual basis.
ReportingMaintain complete and accurate5.6.3.910.0%Planned Sampling
records of work.
Technical ExhibitC-1-001-16Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.6Culverts andQualityPerform work in accordance with all5.6.3.102.5%100% Inspection
Ditchesapplicable professional and quality
standards.
TimelinessClean sand and debris from Laundry5.6.3.104.0%100% Inspection
Creek going through Lawson Army
Airfield (LAAF) on an annual basis.
5.7Paved SurfaceQualityPerform work in accordance with all5.7.3.15.0%Planned Sampling
Sweeping andapplicable professional and quality
Cleaningstandards.
TimelinessPerform work as specified and in5.7.3.15.0%Planned Sampling
accordance with designated
schedule.
ReportingMaintain complete and accurate5.7.3.15.0%Planned Sampling
records of work.
Technical ExhibitC-1-001-17Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.9Operation of theQualityOperate the Center, providing high5.9.3.15.0%Validated Customer Complaints
Self-Help Centerquality customer service, materials,
training, tools and storage.
TimelinessOperate the Self-Help Center 525.9.3.15.0%Validated Customer Complaints
weeks of the year from 0830 to 1600
Tuesday through Saturday.
ReportingMaintain database of customer files5.9.3.1.210.0%Validated Customer Complaints
and all other Self-Help Center
information.
5.9Stockage of ItemsQualitySupply Government-owned parts and5.9.3.1.1.15.0%Validated Customer Complaints
materials for users of the Self-Help
program in accordance with the
Stockage List.
TimelinessMaintain the stockage level for5.9.3.1.1.15.0%Validated Customer Complaints
required items in the Self-Help Center
at the level approved in the stockage
list, unless otherwise approved or
directed by the KO.
ReportingRequisition supplies on the approved5.9.3.1.1.15.0%Validated Customer Complaints
list by submitting DA Form 2702 or an
equivalent format.
Technical ExhibitC-1-001-18Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.11Grading of CourseQualityPerform work in accordance with all5.11.315.0%100% Sampling
and Range Roadsprofessional standards and applicable
regulations.
TimelinessPerform work in accordance with5.11.315%100% Sampling
monthly schedules provided by Range
Division.
ReportingPrepare, submit, and maintain all5.11.35.0%100% Sampling
required documentation.
5.11Obstacle andQualityReplace all ropes and conduct test as5.11.3.25.0%Planned Sampling
Confidence Courserequired, in accordance with all
applicable professional and quality
standards.
TimelinessConduct all test and inspections as5.11.3.25%Planned Sampling
required at 6-month intervals and
submit all deficiencies to DPW work
coordinator.
ReportingPrepare and maintain complete and5.11.3.25.0%Planned Sampling
accurate records
Technical ExhibitC-1-001-19Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.15Opening andQualityPerform work as specified and in5.12.3.15.0%Planned Sampling
Closing the Mainaccordance with DA PAM 290-5 and
Post Cemeteryall other applicable standards and
regulations.
TimelinessOperate cemetery from 0800 to 19005.12.3.15.0%Planned Sampling
on a daily basis, except for Memorial
Day which shall be operated from
0800 to 1900. The vehicle drive
through gates shall be closed during
hours of darkness.
5.15HeadstoneQualityPerform work as specified and in5.12.3.25.0%Planned Sampling
Maintenance at theaccordance with DA PAM 290-5 and
Main Postall other applicable standards and
Cemeteryregulations.
TimelinessClean headstones twice per year.5.12.3.25.0%Planned Sampling
ReportingPrepare and maintain complete and5.12.3.25.0%Planned Sampling
accurate records
Technical ExhibitC-1-001-20Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.15Main PostQualityPerform work in accordance with all5.12.3.35.0%100% Inspection
Cemetery Groundsprofessional and quality standards.
Maintenance
TimelinessPerform grounds maintenance as5.12.3.35.0%100% Inspection
specified and in accordance with
applicable schedule.
ReportingPrepare and maintain complete and5.12.3.35.0%100% Inspection
accurate records
5.17Buildings andQualityPerform work in accordance with all5.10.3.15.0%Planned Sampling
Structuresprofessional standards and applicable
Maintenance forregulations.
Camp Merrill
TimelinessPerform work in accordance with5.10.3.14.0%Planned Sampling
specified schedule.
ReportingMaintain complete and accurate5.10.3.15.0%Planned Sampling
records of work.
Technical ExhibitC-1-001-21Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.17Utility SystemsQualityPerform work in accordance with all5.10.3.35.0%Planned Sampling
Operation andprofessional standards and applicable
Maintenance forregulations.
Camp Merrill
TimelinessPerform work in accordance with5.10.3.35.0%Planned Sampling
specified schedule.
ReportingDocument water tests in log.5.10.3.3.5.0%Planned Sampling
5.17HVAC SystemsQualityPerform work in accordance with all5.10.3.410.0%Planned Sampling
Operation andprofessional standards and applicable
Maintenance forregulations.
Camp Merrill
TimelinessPerform work in accordance with5.10.3.44.0%Planned Sampling
specified schedule.
ReportingMaintain complete and accurate5.10.3.410.0%Planned Sampling
records of work.
Technical ExhibitC-1-001-22Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.17GroundsQualityPerform work in accordance with all5.10.3.510.0%Planned Sampling
Maintenance forprofessional standards and applicable
Camp Merrillregulations.
TimelinessPerform work in accordance with5.10.3.510.0%Planned Sampling
specified schedule.
ReportingMaintain complete and accurate5.10.3.510.0%Planned Sampling
records of work.
5.17Surfaced AreaQualityPerform work in accordance with all5.10.3.65.0%Planned Sampling
Maintenance forprofessional standards and applicable
Camp Merrillregulations.
TimelinessBlade, grade, and pull ditches on a5.10.3.65.0%Planned Sampling
semi-annual basis.
ReportingMaintain complete and accurate5.10.3.65.0%Planned Sampling
records of work.
Technical ExhibitC-1-001-23Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.17Water Plant andQualityPerform work in accordance with all5.10.3.710.0%Planned Sampling
Sewageprofessional standards and applicable
Processing forregulations to include, but not be
Camp Merrilllimited to, EPD regulations and TMs 5-
813-3 and 5-814-7.
TimelinessPerform work in accordance with5.10.3.710.0%Planned Sampling
specified schedule.
ReportingMaintain complete and accurate5.10.3.710.0%Planned Sampling
records of work.
5.17Emergency (PriorityQualityPerform work in accordance with all5.10.2.25.0%Planned Sampling
1) Sos for Campapplicable professional and quality
Merrillstandards.
TimelinessRespond to Emergency (Priority 1)5.10.2.25.0%Planned Sampling
SOs within one hour during normal
business hours and two hours during
non-business hours, and complete all
work within 24 hours.
ReportingMaintain complete and accurate5.10.2.25.0%Planned Sampling
records of work.
LaborAll labor charges shall be fare and5.10.2.25.0%Planned Sample
reasonable to include, but not limited
to sub-contract cost.
Technical ExhibitC-1-001-24Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.17Urgent (Priority 2)QualityPerform work in accordance with all5.10.2.25.0%Planned Sampling
Sos for Campapplicable professional and quality
Merrillstandards.
TimelinessRespond to and complete Urgent5.10.2.25.0%Planned Sampling
(Priority 2) SOs within 15 calendar
days for non kitchen equipment
repairs, and 5 calendar days for
kitchen equipment repairs. .
ReportingMaintain complete and accurate5.10.2.25.0%Planned Sampling
records of work.
LaborAll labor charges shall be fare and5.10.2.25.0%Planned Sample
reasonable to include, but not limited
to sub-contract cost.
5.17Routine (Priority 3)QualityPerform work in accordance with all5.10.2.25.0%Planned Sampling
Sos for Campapplicable professional and quality
Merrillstandards.
TimelinessRespond to and complete Routine5.10.2.25.0%Planned Sampling
(Priority 3) SOs within 30 calendar
days of request
ReportingMaintain complete and accurate5.10.2.25.0%Planned Sampling
records of work.
LaborAll labor charges shall be fare and5.10.2.25.0%Planned Sample
reasonable to include, but not limited
to sub-contract cost.
Technical ExhibitC-1-001-25Fort Benning
TECHNICAL EXHIBIT 1-001Section C
Contract No:
PERFORMANCE REQUIREMENTS SUMMARY
The Performance Requirements Summary (PRS) identifies major work requirements and their standards of performance. The
Contractor's adherence to these standards will be used in combination with other factors, as input to the Government's Award Fee
ContractPerformanc
Sect.Requiremene CategoryPerformance IndicatorParagraphALPMethod of Sampling
5.18MRF CollectionQualityPreform all collections of recyclable5.0815.0%Planned Sampling
material in accordance with all
applicable professional and quality
standards.
TimelinessCollect all recyclable material in5.0815%Planned Sampling
accordance with schedule.
ReportingPrepare, maintain, and submit5.0815.0%Planned Sampling
complete and accurate records.
Technical ExhibitC-1-001-26Fort Benning

Other files for this federal contract opportunity

Other files attached to Sources Sought - Fort Benning, GA Base Operations, newest first.
File Type Posted
TE_5.2-014_-_Ground_Fault_Protection_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_1-008-_BCT_Impact_Statement.doc DOC document
TE_5.4-005a-__Operating_Checklist_for_Peak_Shaving_Plant_(ne.doc DOC document
TE_5.11-001-_List_of_Ranges.doc DOC document
TE_5.12-005_Headstone_Cleaning_and_Alignement_Maintenance_Tracking_Chart.doc DOC document
TE_1-003_Real_Property_Inventory.xlsx XLSX spreadsheet
TE_1-003a-_Definitions_of_Real_Property_Inventory.xls XLS spreadsheet
TE_5.2-009-_Building_and_Traffic_Sign_Areas.doc DOC document
TE_5_10-002-_Bldgs__Requiring_Fire_Sprinkler_Inspections_(JAN_2017).docx DOCX document
TE_5.11-004_Obstacle_and_Confidence_Course.xlsx XLSX spreadsheet
TE_5.2-015_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_5.1-002-_Service_Order_(SO)_Priority_Classifications.doc DOC document
TE_3-003-_GFE-_Camp_Merrill.xls XLS spreadsheet
TE_5.2-010-_Locations_of_Welcome_Home_Ceremony_Signs.doc DOC document
TE_5.9-001-_Recommended_Self-Help_Center_Stockage_List.xls XLS spreadsheet
TE_5.2-028_Emergency_Light_Building_List.xlsx XLSX spreadsheet
TE_5.10-007-_Chiller_Building_List.xls XLS spreadsheet
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.docx DOCX document
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.docx DOCX document
Technical_Exhibit_5.13-001_Chiller_Equipment.docx DOCX document
TE_5.2-024_SUPRESSION_LIST.xlsx XLSX spreadsheet
Sec_C-5.9_SELF-HELP.docx DOCX document
Sec_C-5.13_Chiller_Maintenance_and_Repair_Index.pdf PDF
Attachment_6_-_Specific_Relevant_Contract_Reference_Sheet_12-R-0012_DPW_Benning_BASOPS.pdf PDF
Attachment_9_-_Wage_Determination_16-R-0012_DPW_Benning_BASOPS.pdf PDF
Solicitation_W911SF-16-R-0012_DPW_BASOPS_Solicitation.pdf PDF
Sec_C-5.5_HVAC_SYSTEMS_OPERATION_&_MAINTENANCE.rtf RTF text file
Sec_C-1__General_Information.docx DOCX document
TE_5.7-003-Road_Inspection_Areas.pdf PDF
TE_5.2-018_-_Grounding_And_Bonding_Connection_Checklist_For_Existing_Facilities.pdf PDF
TE_5.10-007-_Chiller_Building_List_rev_by_amendment.pdf PDF
Technical_Exhibit_5.13-002a_Chiller_Data.pdf PDF
TE_5.11-001-_List_of_Ranges.pdf PDF
TE_5.10-003-_Bldgs._Requiring_Heater_Inspections.pdf PDF
TE_5.3-002-_Dining_Facility_Equip. _PMCS _and_Repair_rev_by_amendment.pdf PDF
TE_5.2-001-_Required_Scheduled_Tasks.pdf PDF
TABLE_OF_CONTENTS_-_Draft_PWS_ _Technical_Exhibits.pdf PDF
TE_3-001-_Gov't_Furnished_Facilities.pdf PDF
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.pdf PDF
Technical_Exhibit_5.13-002b_Refrigerant_Use_Data.pdf PDF
TE_5.2-004-_Assesment_of_NRE-Ft._Benning-Historic_Resources_.pdf PDF
TE_5.2-007-_ICYET_Inspection_Deficiency_List.pdf PDF
TE_5.4-005a-__Operating_Checklist_for_Peak_Shaving_Plant_(ne.pdf PDF
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.pdf PDF
TE_5.2-013_-_Earth_Ground_Electrode_Subsystem_Check_list_For_New_Facilities.pdf PDF
TE_5.1-007-_SO_procedure_for_Bldgs._Under_Barracks_Maint._Pr.pdf PDF
Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.pdf PDF
TE_3-004-_GSA_Vehicles_for_KTR_use.pdf PDF
TE_5.4-001-_Required_Scheduled_Tasks.pdf PDF
TE_5.4-002-_List_of_Emergency_Generators.pdf PDF
Show all 50

Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .