Attachment 6 General Decision Number UT31.pdf

PDF 106 KB Posted

Attached to
Base Operation Support Services for Dugway Proving Grounds, UT Federal contract opportunity
Solicitation number
W911S6-16-R-0002
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Joint Base Lewis-McChord

About this file

Attachment 6 General Decision Number UT31

View the file

Other files for this federal contract opportunity

Other files attached to Base Operation Support Services for Dugway Proving Grounds, UT, newest first.
File Type Posted
Response_to_Question_3.xlsx XLSX spreadsheet
Attachment L5 Pricing Proposal Form Amend0002.xlsx XLSX spreadsheet
Attachment 6 General Decision Number UT170031.pdf PDF
Attachment 5 General Decision Number UT170107.pdf PDF
Attachment 11B DD Form 254 Cont Amendment 0002.pdf PDF
Attachment 8 General Decision Number UT170067.pdf PDF
W911S6-16-R-0002-0001 SF30 Modification Document Released.pdf PDF
Attachment L4 PPQCover, 16-R-0002, DPG BOSS, 14 MAR 17 V2 J1.pdf PDF
Attachment L5 Pricing Proposal Form --16-R-0002 DPG BASEOPS10Mar17.xlsx XLSX spreadsheet
Attachment L2 Relevant Contracts, 16-R-0002, Dugway Proving Grounds, BOSS,10Mar17.docx DOCX document
Attachment L6-Proposed Staffing.xlsx XLSX spreadsheet
TE-A Automation Technology.pdf PDF
TE-T Hantavirus Contamination Prevention.pdf PDF
TE-Z Top Dressing Soil Spec.pdf PDF
TE-C ISR Requirements.pdf PDF
TE-MMM Gas Leak Survey Requirements.docx DOCX document
Attachment 11B DD Form 254 Continuation Sheet 22AUG16.pdf PDF
Attachment L6-Base--Line Staffing 28Feb.xlsx XLSX spreadsheet
TE-S O&M-Plans.doc DOC document
TE-JJ-1 Generator Hour Report.xlsx XLSX spreadsheet
TE-PPP Spill Report Form.docx DOCX document
Attachment L4 PPQCover, 15-R-0011, DPG BOSS, 22 Apr 16.docx DOCX document
TE-KKK-1 Amerigas Owned Propane Tanks.pdf PDF
TE-V-4 Carr Semi-Improved Land Area.pdf PDF
Attachment L1 Teaming Consent, 15-R-0011, DPG, BOSS, 22Apr16.docx DOCX document
TE-C-1 ISR_CLS CLIN Structure 13DEC16.xlsx XLSX spreadsheet
Attachment 11A DD Form 254 Contract Security Clasification Specification Form 22AUG16.pdf PDF
Attachment L5 Pricing Proposal Form --16-R-0002 DPG BASEOPS.xlsx XLSX spreadsheet
TE-BBB-1 AST-UllageLog.docx DOCX document
TE-LLL Utility Data.docx DOCX document
TE-UUU List Back Flow Preventors.pdf PDF
TE-FF Snow Removal Priorities.pdf PDF
TE-Q-1 Historical Work Load.xlsx XLSX spreadsheet
TE-B Typical Certifications.pdf PDF
Attachment 8 General Decision Number UT67.pdf PDF
TE-DD Paved Roads & Parking Sections.xlsx XLSX spreadsheet
TE-Q Real Property Facilities C.5.2.2.xlsx XLSX spreadsheet
TE-BBB AST-Visual Inspect Form.docx DOCX document
Attachment 10 Mission Essential Services MFR.pdf PDF
TE-W Mowing Requirements Ranges.docx DOCX document
Attachment 3 PWS Technical Exhibit Listing.pdf PDF
TE-WW Air Dryers.pdf PDF
TE-TTT Well Water Report Sample.docx DOCX document
TE-CC Approved Pesticides.xlsx XLSX spreadsheet
TE-KKK Government Owned Propane Tanks.xlsx XLSX spreadsheet
TE-MM Lightining & Grounding Protection.pdf PDF
TE-JJ Generator List.pdf PDF
TE-QQQ Sewage Treatment Monthly Log.xlsx XLSX spreadsheet
Attachment L3 PPQ, 16-R-0002, DPG BOSS, 22Apr16.docx DOCX document
TE-E Outstanding Obligations Report.xlsx XLSX spreadsheet
Show all 50

Base Operation Support Services for Dugway Proving Grounds, UT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: UT160031 01/08/2016 UT31

Superseded General Decision Number: UT20150031

State: Utah

Construction Type: Heavy

County: Tooele County in Utah.

Including Water and Sewer line and Natural Gas Pipeline Construction

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016

* ELEC0057-002 03/01/2015

Rates Fringes

LINE CONSTRUCTION

Lineman.....................$ 42.94 13.32

ENGI0003-005 07/01/2013

Rates Fringes

OPERATOR: Power Equipment (1)Mechanic-Excluding Natural Gas Pipeline Construction................$ 27.55 15.65 (2A)Blade/Grader............$ 25.89 15.65

(3) Backhoe/Excavator, Front End Loader(Over 5 cu.yds.)....................$ 25.37 15.65

(4) Asphalt Paver, Bulldozer, Front End Loader(2 to 5 cu. yds.), Grade Setter, Oil Distributor, Scraper........$ 24.37 15.65

(5) Asphalt Roller, Bobcat/Skid loader, Front End Loader(Under 2 cu.

yds.), Oiler................$ 23.37 15.65

(6) Screed..................$ 22.41 15.65

12/1/2016http://www.wdol.gov/wdol/scafiles/davisbacon/UT31.dvb?v=0

(7) Roller(Dirt and Grade Compaction).................$ 21.50 15.65

ENGI0003-056 07/01/2013

Natural Gas Pipeline Construction Only

Rates Fringes

OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Mechanic.........$ 35.68 17.57 Oiler.......................$ 22.03 11.88

IRON0027-002 07/01/2015

Rates Fringes

IRONWORKER

(Ornamental,Structural)..........$ 26.18 19.10

IRON0847-001 08/01/2013

Rates Fringes

IRONWORKER, REINFORCING..........$ 26.61 11.60

LABO0295-006 07/01/2014

Natural Gas Pipeline Construction Only

Rates Fringes

LABORER

Common or General, Pipelayer...................$ 20.59 8.65 Pot Tender and Sand blaster.$ 20.85 8.65

LABO0295-015 07/01/2014

Rates Fringes

LABORER

(1)Flagger..................$ 20.59 8.65 (3)Mason Tender (Cement/Concrete), Hand Held Saw, Jackhammer, Power Saw...................$ 20.85 8.65 (5)Hand Held Drill..........$ 21.65 8.65

LABO0295-038 07/01/2014

Excluding Natural Gas Pipeline & Water/Sewer Line Construction

Rates Fringes

LABORER (1)Common or General)....$ 20.59 8.65

TEAM0222-020 06/01/2015

NATURAL GAS PIPELINE CONSTRUCTION ONLY

Rates Fringes

TRUCK DRIVER

Group 1:

Articulated End Dump, Low Boy, Rollagon or Similar type Equipment, Truck Mechanic...................$ 37.11 10.98 Group 2:

A-Frame, Challenger(For transportation purposes), Forklift, Fuel Truck, Gin Pole, Rubber-Tired Tractor, Tandem Float (4 & 5 Axle), Track Truck/All-Track Dumper Equipment, Vacuum Truck, Winch Truck................$ 36.58 10.98 Group 3:

Ambulance , Bus, Dump Truck (2 and 3 axle), Flatbed Truck (2 and 3 axle), Grease Truck, Hot Pass Truck (3 axle), Jeep, Pick-up, Single Axle Float (3 axle), Skid Truck (2 and 3 axle), Station Wagon, Stringer Bead & Hot Pass (2 axle), Swamp Buggy/ Marsh Buggy, or similar type equipment, Team Driver, Water Truck (2 and 3 axle).$ 33.13 10.98

Premium Pay:

Add $2.25 to the above Rate for the following classifications

Group 1: Low Boy and Truck Mechanic Group 2: Stringer Truck

SUUT2008-041 08/19/2008

Rates Fringes

CARPENTER, Includes Form Work....$ 14.63 0.97

CEMENT MASON/CONCRETE FINISHER...$ 17.08 3.14

ELECTRICIAN......................$ 23.74 7.64

LABORER: Landscape..............$ 7.25 0.00

LABORER: Pipelayer (Excluding Natural Gas Pipeline Construction)....................$ 14.00 0.00

OPERATOR: Crane.................$ 28.97 9.40

OPERATOR: Trackhoe (Excluding Natural Gas Pipeline and Water/Sewer Line Construction)....................$ 19.98 0.00

TRUCK DRIVER (Excluding Natural Gas Pipeline Construction)....................$ 14.40 3.99

WATER & SEWER LINES:

Laborer, Common or General.......$ 12.81 0.00

WATER & SEWER LINES:

Operator-Backhoe/Excavator/Tra ckhoe............................$ 16.19 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION