TE-JJ-1 Generator Hour Report.xlsx

XLSX spreadsheet 42 KB Posted

Attached to
Base Operation Support Services for Dugway Proving Grounds, UT Federal contract opportunity
Solicitation number
W911S6-16-R-0002
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Joint Base Lewis-McChord

About this file

TE-JJ-1 Generator Hour Report

View the file

Other files for this federal contract opportunity

Other files attached to Base Operation Support Services for Dugway Proving Grounds, UT, newest first.
File Type Posted
Attachment 1-DPG BOSS PWS--Amend 0002.pdf PDF
Attachment L3 PPQ, 16-R-0002, DPG BOSS, 10Mar17.docx DOCX document
W911S6-16-R-0002-0002 Modification Final.pdf PDF
Attachment L2 Relevant Contracts, 16-R-0002, Amend 0002.pdf PDF
W911S6-16-R-0002-0002 Conformed CopyFinal.pdf PDF
Attachment L6-Proposed Staffing Amendment 0002.xlsx XLSX spreadsheet
DPG_BOSS_Set_1_Responses_to_Questions.xlsx XLSX spreadsheet
W911S6-16-R-0002-0001 SF33 Conformed Copy Released.pdf PDF
TE-R Historic Buildings.pdf PDF
TE-TT Chiller Water Chemistry.xlsx XLSX spreadsheet
TE-SS Air Conditioner Systems.pdf PDF
TE-UU Exhaust Fans.pdf PDF
TE-VV Air Compressors.pdf PDF
TE-EE Unpaved Roads.pdf PDF
TE-DDD List of Lifting Devices.xlsx XLSX spreadsheet
TE-G Burn Rate Example.xlsx XLSX spreadsheet
TE-AA Pure Live Seed Mix.pdf PDF
TE-SSS WaterOperatingLogs Sample.pdf PDF
Attachment 2-PRS 16-R-0002, DPG BOSS, 26jul16.pdf PDF
TE-ZZZ Self Help Stock Level.pdf PDF
TE-NN Boiler Operating Log.xlsx XLSX spreadsheet
TE-V-3 Baker Semi-Improved Land Area.pdf PDF
TE-WWW List Army Housing Units.xlsx XLSX spreadsheet
TE-YY Evaporative Coolers.pdf PDF
Attachment 12-Historical IJOs.pdf PDF
Attachment 6 General Decision Number UT31.pdf PDF
TE-K Government Facilities for Use by Contract.pdf PDF
TE-CC-1 Out of cycle request.xlsx XLSX spreadsheet
TE-V-2 MAAF Avery Semi-Improved Land Area.pdf PDF
Attachment 9 WD 05 2532.pdf PDF
TE-D ECV Report.xlsx XLSX spreadsheet
TE-NNN Gas Leak and Repair Report.docx DOCX document
TE-U English Village Improved Area.pdf PDF
TE-XXX Estimated Appliances Replacment.xlsx XLSX spreadsheet
TE-FF-1 Historical Snowfall Data.xlsx XLSX spreadsheet
TE-LL UPS Locations.xlsx XLSX spreadsheet
Attachment 5 General Decision Number UT107.pdf PDF
TE-RRR Wastewater Treatment Systems.pdf PDF
TE-Y Irrigation System Components.docx DOCX document
TE-FFF VTS Location & Data.xlsx XLSX spreadsheet
TE-PP Boiler List 28MAR16.xlsx XLSX spreadsheet
TE-QQ Water Tret Stands Boilers.docx DOCX document
TE-V-1 Ditto Semi-Improved Land Area.pdf PDF
TE-V English Village Semi-Improved Land Area.pdf PDF
TE-HH PCB SOP.docx DOCX document
Attachment 7 General Decision Number UT57.pdf PDF
TE-RR Furnances-UnitHeaters.pdf PDF
Attachment 1-DPG BOSS Performance Work Statement Final-9Feb17.pdf PDF
TE-F Subcontract Report Example.xlsx XLSX spreadsheet
TE-GGG Fire Alarm and Fire Suppression System List.pdf PDF
Show all 50

Base Operation Support Services for Dugway Proving Grounds, UT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

generators

Solicitation: W911S6-16-R-0002
Technical Exhibit JJ-1
4/6/16
GENERATORS HOURSYearAutomated run time (min)JanuraryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecember
BUILDINGSERIAL NUMBERFUELFUEL CAPACITY GALSKWKVAPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.Emergency
10
20
30

Brian Duncan: Brian Duncan:

1 un-explained40
50
60

Brian Duncan: Brian Duncan:

1.3 un-explained Brian Duncan: Brian Duncan:

1 un-explained70
80

Brian Duncan: Brian Duncan:

2.3 un-explained90
100
110
120

Brian Duncan: Brian Duncan:

1.2 un-explained130
140
150
160

Brian Duncan: Brian Duncan:

motherboard bad unit will not turn off after powere is restored Brian Duncan: Brian Duncan:

.3 un-explained160
170
180
190
200
210
220
230
240
25

: Robert Fisher:

THIS BLDG IS ACTUALLY 9545

Chad Weatherly: Chad Weatherly:

1.6 hrs. un-explained. Multiple power bumps/ power outages.

Brian Duncan: Brian Duncan:

1.2 un-explained Brian Duncan: Brian Duncan:

1.3 un-explained Brian Duncan: Brian Duncan:

.7 Spyder Test Brian Duncan: Brian Duncan:

.9 bad transfer switch Brian Duncan: Brian Duncan:

1.1 un-explained Brian Duncan: Brian Duncan:

.4 un-explained Brian Duncan: Brian Duncan:

2.5 outage Brian Duncan: Brian Duncan:

2 Spyders Test Brian Duncan: Brian Duncan:

.3 un-explained Brian Duncan: Brian Duncan:

.4 un-explained Under DPW direction to run once a month Chad Weatherly: Chad Weatherly:

5.2 hrs. possible outage.

Brian Duncan: Brian Duncan:

.3 un-explained

Brian Duncan: Brian Duncan:

.4 un-explained 25 0

Brian Duncan: Brian Duncan:

1.7 un-explained 26 0

Brian Duncan: Brian Duncan:

1.2 un-explained Amy: Chad: ATS is not functioning. Genset ran under no load. WO submitted for repair.

Brian Duncan: Brian Duncan:

1.7 power outage Amy:

Chad: Automatic run time of .6hrs.270
280
290

Brian Duncan: Brian Duncan:

9.8 outages300
310
320
330

Brian Duncan: Brian Duncan:

busted display Chad Weatherly: Chad Weatherly:

.7 hrs. possible outage.

Brian Duncan: Brian Duncan:

busted display Brian Duncan: Brian Duncan:

1.3 un-explained Chad Weatherly: Chad Weatherly:

Total hours include generator PM and start up after batteries were replaced.

Chad Weatherly: Chad Weatherly:

Transfer switch is broken. Ran gen without load.

Amy: Chad: In phase monitor board out of calibration. May account for 1.8 run hours.

Chad Weatherly: Chad Weatherly:

Run time was only .5 hours under load. Tech was confused about Opacity test.

Chad Weatherly: Chad Weatherly:

.8 hrs. un-expalined. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

1.3 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

1.5 hrs. un-explained. Multiple power bumps/ power outages. 34 0

Brian Duncan: Brian Duncan:

.5 un-explained Chad Weatherly: Chad Weatherly:

5.6 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

1.8 hrs. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

4.8 hrs. unexplained.

Brian Duncan: Brian Duncan:

.4 un-explained Chad Weatherly: Chad Weatherly:

3.4 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

.5 hrs un-explained.

Brian Duncan: Brian Duncan:

1.7 new display and board Brian Duncan: Brian Duncan:

1.2 power outage Chad Weatherly: Chad Weatherly:

Includes automatic run time.

Amy: Chad: Possible Mechanics PM.

Chad Weatherly: Chad Weatherly:

Generator shut down. Engine issues.

Chad Weatherly: Chad Weatherly:

3.4 hrs. possible outage.350
360
370
380
390
400

Brian Duncan: Brian Duncan:

.7 un-explained Chad Weatherly: Chad Weatherly:

Run time includes PM of generator plus servicing of pilot lights.

Chad Weatherly: Chad Weatherly:

6.5 hrs. un-explained. Multiple power bumps/ power outages.

Brian Duncan: Brian Duncan:

.6 un-explained Chad Weatherly: Chad Weatherly:

Mechanics ran for .3 hours.

Chad Weatherly: Chad Weatherly:

.6 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

2.1 hr possible outage.

Chad Weatherly: Chad Weatherly:

.7 hrs. un-explained.410
420

Brian Duncan: Brian Duncan:

.5 un-explained Chad Weatherly: Chad Weatherly:

.2 hrs. unexplained.

Amy: Chad: Generator is down for repairs. Bad water pump and injectors.

Chad Weatherly: Chad Weatherly:

1.3 hrs. un-explained. Multiple power bumps/ power outages.430
440
450
460
470
480

: Robert Fisher:

CHANGED FROM 10W

Chad Weatherly: Chad Weatherly:

1.1 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

2.3 hrs. possible outage.

Amy: Chad: Possible outage of 2.9 hrs.

Chad Weatherly: Chad Weatherly:

1.2 hrs. un-explained. Multiple power bumps/ power outages. 49 0 : Robert Fisher:

CHANGED FROM 10W

Chad Weatherly: Chad Weatherly:

Mechanics ran for .1 hours.

Amy: Chad: Possible outage 2.6 hrs.

Chad Weatherly: Chad Weatherly:

.8 hrs. un-explained. Multiple power bumps/ power outages.

Brian Duncan: Brian Duncan:

.2 un-explained Chad Weatherly: Chad Weatherly:

.5 hrs. possble outage.

Chad Weatherly: Chad Weatherly:

6.9 hrs. possible outage.

Brian Duncan: Brian Duncan:

.8 un-explained Chad Weatherly: Chad Weatherly:

Mechanics ran for .3 hours.

Chad Weatherly: Chad Weatherly:

Gen is down for repairs. Should be completed this week.

Brian Duncan: Brian Duncan:

36.1 bad circuit board Chad Weatherly: Chad Weatherly:

1.4 hrs. possible outage.

Brian Duncan: Brian Duncan:

.3 un-explained Brian Duncan: Brian Duncan:

2.4 power outage

Brian Duncan: Brian Duncan:

.3 un-explained Chad Weatherly: Chad Weatherly:

4.1 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

.3 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

No entry into log for May but have a sheet with same readings as this month.

Brian Duncan: Brian Duncan:

.4 un-explained Chad Weatherly: Chad Weatherly:

.6 unexplained.

Chad Weatherly: Chad Weatherly:

.4 hrs. unexplained.

Brian Duncan: Brian Duncan:

.8 un-explained 50 0

Brian Duncan: Brian Duncan:

1 un-explained Chad Weatherly: Chad Weatherly:

.6 hrs. un-explained. Multiple power bumps/ power outages. 51 0

BD13: BD13:

.5 un-explained Chad Weatherly: Chad Weatherly:

1.6 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

2.2 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

26.5 hrs. un-explained. Multiple power bumps/ power outages.520
530
540
550
560

Brian Duncan: Brian Duncan:

.6 un-explained Chad Weatherly: Chad Weatherly:

.3 hrs. unknown.

Chad Weatherly: Chad Weatherly:

2.7 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

Readings are actual display readings dut to the fact the display has been changed.

Chad Weatherly: Chad Weatherly:

.2 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

.7 hrs. un-explained. Multiple power bumps/ power outages.

Brian Duncan: Brian Duncan:

1.2 un-explained Brian Duncan: Brian Duncan:

.7 un-explained Brian Duncan: Brian Duncan:

2.6 Bad limit switch

in transfer switch; Under DPW direction to run once a month Brian Duncan: Brian Duncan:

.7 un-explained Chad Weatherly: Chad Weatherly:

.2 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

1.8 hrs. possible outage. 57 0

Brian Duncan: Brian Duncan:

.9 un-explained Chad Weatherly: Chad Weatherly:

3.9 hrs. possible outage.

Amy: Chad: Possible outage of .8 hrs. 58 0

Brian Duncan: Brian Duncan:

2.6 power outage Chad Weatherly: Chad Weatherly:

.3 hours for Mechanics. .6 hours generator PM.

Chad Weatherly: Chad Weatherly:

2.0 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

Tech installed new pilot lights and tested for .2 hrs. Monthly PM was for .5 hrs.

Amy: Chad: Possible outage 2.9 hrs.

Chad Weatherly: Chad Weatherly:

1.2 hrs. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

.4 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

.8 hrs. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

Mechanics ran for .3 hours.

Brian Duncan: Brian Duncan:

1.1 power outage Brian Duncan: Brian Duncan:

.8 Spyder Test Chad Weatherly: Chad Weatherly:

Display was changed out. This is actual run time on display.

Amy: Chad: Generator ran due to outage. Loss of primary fuse on 6/08 to 6/09. 24.9 hrs.

Chad Weatherly: Chad Weatherly:

1.2 hrs. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

.2 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

4.3 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

2.2 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

.4 hours unexplained and an additional .1 hours for mechanical repairs from log book.

Chad Weatherly: Chad Weatherly:

.3 hrs unexplained.

Chad Weatherly: Chad Weatherly:

5.7 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

1.3 hrs. possible outage.590
600
610
620

Brian Duncan: Brian Duncan:

.3 un-explained Chad Weatherly: Chad Weatherly:

7.5 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

.3 hrs. un-explained.

Chad Weatherly: Chad Weatherly:

5.1 hours outage.

Chad Weatherly: Chad Weatherly:

2.2 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

3.7 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

.7 hrs. un-explained. Multiple power bumps/ power outages.

Brian Duncan: Brian Duncan:

.5 un-explained630
64

Brian Duncan: Brian Duncan:

.7 un-explained Chad Weatherly: Chad Weatherly:

.9 hours unexplained.

Chad Weatherly: Chad Weatherly:

Time counter was changed. Times are actual counter times.

Chad Weatherly: Chad Weatherly:

3.4 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

.8 hrs. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

Includes .3 hors run time for mechanics PM.

Chad Weatherly: Chad Weatherly:

.8 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

.8 hrs unknown.

Chad Weatherly: Chad Weatherly:

2.6 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

1 hr. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

1.9 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

4.8 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

11.2 hrs unexplained.

Chad Weatherly: Chad Weatherly:

Hold Testing until October per DPW request.

Chad Weatherly: Chad Weatherly:

2.1 hr power outage Chad Weatherly: Chad Weatherly:

18.9 hours unexplained.

Chad Weatherly: Chad Weatherly:

Includes .3 hrs run time for mechanics PM.

Chad Weatherly: Chad Weatherly:

.1 hr unexplained.

Chad Weatherly: Chad Weatherly:

.2 hrs. unknown Chad Weatherly: Chad Weatherly:

.6 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

.9 hrs. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

2.2 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

.6 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

.4 hours unexplained.

Chad Weatherly: Chad Weatherly:

.6 hours unexplained.

Chad Weatherly: Chad Weatherly:

Run time was only .4 hours under load. Tech was confused about Opacity test.

Chad Weatherly: Chad Weatherly:

2.6 hrs. possible outage.

Amy: Chad: Generator ran for appx. 4 days before being reported. Repaired bad transfer switch.

Chad Weatherly: Chad Weatherly:

.5 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

2.1 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

8.8 hours possible outage.

Chad Weatherly: Chad Weatherly:

Includes 1 hr. generator test run plus .3 hrs generator maintenance by Mechanics.

Chad Weatherly: Chad Weatherly:

2 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

1.6 hrs. unexplained Chad Weatherly: Chad Weatherly:

.5 hrs. possible outage. 65

Chad Weatherly: Chad Weatherly:

First PM performed on this generator.

Chad Weatherly: Chad Weatherly:

16.1 hrs. run time due to faulty transfer switch. WO# 610784 66

Chad Weatherly: Chad Weatherly:

New generator. First PM for this generator. 67

Chad Weatherly: Chad Weatherly:

Building turnover. New Generator and first PM.