Attachment_0007_Integration_Schedule_Events.pdf

PDF 68 KB Posted

Attached to
ELECTRO-OPTIC / INFRARED / LASER DESIGNATOR PAYLOAD PRODUCTION AND SYSTEM SUPPORT
Solicitation number
W909MY17R0016
Issued by

About this file

Attachment 0007 Draft Integration Schedule

View the file

Other files

File Type Posted
A01-W909MY17R0016-0007-Amendment_0007.pdf PDF
Questions_and_Answers-Amendment_0007.pdf PDF
W909MY17R0016-0006-Amendment_0006.pdf PDF
Attachment_0001_-__Performance_Work_Statement_20180130_Revised.pdf PDF
W909MY17R0016-Amendment_0005.pdf PDF
Question_and_Answer-Amendment_0005.pdf PDF
Amendment_0004-Questions_and_Answers_20180124.pdf PDF
Amendment_0004-Questions_and_Answers_20180123.pdf PDF
W909MY17R0016-Amendment_0004.pdf PDF
Attachment_0002_-_Performance_Based_Specification_20180123_Revised.pdf PDF
Attachment_0008_Price_Model_Amendment_0004-22_Jan_2018.xlsx XLSX spreadsheet
Amendment_0004-Questions_and_Answers.pdf PDF
W909MY17R0016-Amendment_0003-20180118.pdf PDF
Amendment_0003_-_Consolidated_Questions_and_Answers_20180110.pdf PDF
Attachment_0008_Price_Model_Amendment_0003-17_Jan_2018.xlsx XLSX spreadsheet
Exhibit_A-CDRLs_20180108.pdf PDF
Attachment_0001_-__Performance_Work_Statement_20180104_Revised.pdf PDF
Attachment_0005_DD254.pdf PDF
Attachment_0002_-_Performance_Based_Specification_20180103_Revised.pdf PDF
W909MY17R0016-Amendment_0002.pdf PDF
Attachment_0008_Price_Model_2018-01-03_Revised.xlsx XLSX spreadsheet
alignment_tool-Response_to_Q._45.pdf PDF
Stanchion_rigid-Response_to_Q.45.pdf PDF
Amendment_0002_-_Consolidated_Questions_and_Answers_20180110.pdf PDF
main_plate-Response_to_Q.45.pdf PDF
CSP_camera_arm-Response_to_Q.45.PDF PDF
W909MY17R0016-Amendment_0001.pdf PDF
Questions_and_Answers-Amendment_0001.pdf PDF
Attachment_0002_-_Performance_Based_Specification_171117_FINAL.pdf PDF
Attachment_0006-Test_Plan-20171207.PDF PDF
Attachment_0001_-__Performance_Work_Statement_20171213.pdf PDF
0-W909MY17R0016.pdf PDF
Attachment_0009_Past_Performance_Questionairre.docx DOCX document
Attachment_0007_Integration_Schedule_Events.pdf PDF
Attachment_0005_DD254.pdf PDF
Attachment_0010_-_Non_disclosure_Agreement_(NDA)-for_ICD_W909MY-17-R-0016.pdf PDF
Attachment_0004-QASP.pdf PDF
Exhibit_A-20171212.pdf PDF
Attachment_0008_Price_Model_2017-12-13.xlsx XLSX spreadsheet
Industry_Day_at_Yuma_Proving_Ground_Questions_and_Answers-Final.pdf PDF
21-25_of_132.pdf PDF
71-75_of_132.pdf PDF
31-35_of_132.pdf PDF
A07_-_Pre-Proposal_Conference_-_Shadow_Industry_Slides_at_YPG.PPTX PPTX presentation
91-95_of_132.pdf PDF
Photos_Industry_Day-YPG_6-10_of_132.pdf PDF
106-110_of_132.pdf PDF
61-65_of_132.pdf PDF
101-105_of_132.pdf PDF
26-30_of_132.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0007

Integration Schedule Events

WBS

Element Task Evidence Standard Schedule

Duration

1.3.1.1 & 1.3.1.2

Multiplayer and

SWDAR

Modifications Design

Video format 720p HD-SDI or Analog NTSC 17 days

1.3.2.1 Payload Hardware

Integration Design Mechanical drawings Mechanical Interface compatible with

ICD Section 3.1.1 5 days

1.3.2.2 Encoder Modifications Design

Video format 720p HD-SDI or Analog NTSC 10 days

1.3.2.3 Payload INS Design Electrical interface

document GPS Interface per ICD Section 3.3.4 20 days

1.3.2.4 Electrical Harness

Design

Electrical interface drawing

Compatibility with existing wiring harness per ICD Section 3.4 10 days

1.3.2.6 Shock Mount

Design Mechanical Drawings

Compliance with mechanical installation utilizing no shock isolators per ICD Section 3.1.1, or utilizing shock isolators (NSN 5340-33-210- 7059) per ICD Section 3.1.2 if isolation is necessary.

5 days

1.3.2.8 Electromagnetic Environmental Effects (E3) Design

Test report

Documented operation while exposed to electromagnetic environments specified in PBS sections 3.9.5.2 and 3.9.5.3

5 days

1.7.5.4 Electromagnetic Environments Ground Testing

Test report

Documented operation while exposed to electromagnetic environments specified in PBS sections 3.9.5.2 and 3.9.5.3

5 days

1.7.5.7 Public Health

Command Testing

Laser subsystem functional design documentation

Compliance with PBS Sections

3.4.1.3.1 (LTM States), 3.4.1.4.1 (LRF States), 3.4.1.5.1 (LD States)

20 days

1.7.5.8 Hellfire Verification

Testing

Laser subsystem functional design documentation

Compliance with PBS Sections

3.4.1.3.1 (LTM States), 3.4.1.4.1 (LRF States), 3.4.1.5.1 (LD States)

15 days

1.7.5.12 GPS Testing Test report Documentation of integration on an aircraft that uses SAASM GPS 5 days