ELECTRO-OPTIC / INFRARED / LASER DESIGNATOR PAYLOAD PRODUCTION AND SYSTEM SUPPORT
Solicitation number
W909MY17R0016
Issued by

About this file

Exhibit A-CDRLs-Revised

View the file

Other files

File Type Posted
A01-W909MY17R0016-0007-Amendment_0007.pdf PDF
Questions_and_Answers-Amendment_0007.pdf PDF
W909MY17R0016-0006-Amendment_0006.pdf PDF
Attachment_0001_-__Performance_Work_Statement_20180130_Revised.pdf PDF
W909MY17R0016-Amendment_0005.pdf PDF
Question_and_Answer-Amendment_0005.pdf PDF
Amendment_0004-Questions_and_Answers_20180124.pdf PDF
Amendment_0004-Questions_and_Answers_20180123.pdf PDF
W909MY17R0016-Amendment_0004.pdf PDF
Attachment_0002_-_Performance_Based_Specification_20180123_Revised.pdf PDF
Attachment_0008_Price_Model_Amendment_0004-22_Jan_2018.xlsx XLSX spreadsheet
Amendment_0004-Questions_and_Answers.pdf PDF
W909MY17R0016-Amendment_0003-20180118.pdf PDF
Amendment_0003_-_Consolidated_Questions_and_Answers_20180110.pdf PDF
Attachment_0008_Price_Model_Amendment_0003-17_Jan_2018.xlsx XLSX spreadsheet
Attachment_0001_-__Performance_Work_Statement_20180104_Revised.pdf PDF
Attachment_0005_DD254.pdf PDF
Attachment_0002_-_Performance_Based_Specification_20180103_Revised.pdf PDF
W909MY17R0016-Amendment_0002.pdf PDF
Attachment_0008_Price_Model_2018-01-03_Revised.xlsx XLSX spreadsheet
alignment_tool-Response_to_Q._45.pdf PDF
Stanchion_rigid-Response_to_Q.45.pdf PDF
Amendment_0002_-_Consolidated_Questions_and_Answers_20180110.pdf PDF
main_plate-Response_to_Q.45.pdf PDF
CSP_camera_arm-Response_to_Q.45.PDF PDF
W909MY17R0016-Amendment_0001.pdf PDF
Questions_and_Answers-Amendment_0001.pdf PDF
Attachment_0002_-_Performance_Based_Specification_171117_FINAL.pdf PDF
Attachment_0006-Test_Plan-20171207.PDF PDF
Attachment_0001_-__Performance_Work_Statement_20171213.pdf PDF
0-W909MY17R0016.pdf PDF
Attachment_0009_Past_Performance_Questionairre.docx DOCX document
Attachment_0007_Integration_Schedule_Events.pdf PDF
Attachment_0005_DD254.pdf PDF
Attachment_0010_-_Non_disclosure_Agreement_(NDA)-for_ICD_W909MY-17-R-0016.pdf PDF
Attachment_0004-QASP.pdf PDF
Exhibit_A-20171212.pdf PDF
Attachment_0008_Price_Model_2017-12-13.xlsx XLSX spreadsheet
Industry_Day_at_Yuma_Proving_Ground_Questions_and_Answers-Final.pdf PDF
21-25_of_132.pdf PDF
71-75_of_132.pdf PDF
31-35_of_132.pdf PDF
A07_-_Pre-Proposal_Conference_-_Shadow_Industry_Slides_at_YPG.PPTX PPTX presentation
91-95_of_132.pdf PDF
Photos_Industry_Day-YPG_6-10_of_132.pdf PDF
106-110_of_132.pdf PDF
61-65_of_132.pdf PDF
101-105_of_132.pdf PDF
26-30_of_132.pdf PDF
Industry_Day_at_Yuma_Proving_Ground_Questions_and_Answers.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electro-Optic/Infrared/Laser Designator Payload Production and System Support Contract

ELECTRO-OPTIC / INFRARED / LASER DESIGNATOR (EO/IR/LD) PAYLOAD

PRODUCTION AND SYSTEM SUPPORT BASE CONTRACT

Appendix C Deliverables

C-1.0 Data Deliverables

The Government shall develop Contract Data Requirements List (CDRLs) (DD Form 1423) requirements for base contract and each individual Task Order/Delivery Order (TO/DO) as required.

The Contractor shall then deliver CDRLs per DD Form 1423 and Data Item Deliverable (DID) requirements, as specified in their corresponding TOs/DOs. The CDRLs associated with this effort are listed in Table C-1 and included in Section J of the contract. This list does not preclude the Government from adding CDRLs to subsequent TOs/DOs based upon specific TO/DO requirements;

any additional CDRLs shall be included and addressed through TO/DO negotiations.

CDRL No. CDRL Title Date Item

Description (DID)Title

DID #

PWS Reference

Paragraph

B001

Contractor’s Progress, Status, and Management Report (CPSMR)

Contractor’s Progress, Status and Management Report

DI-MGMT-

80227

3.1

B002 Integrated Master Schedule (IMS)

Integrated Master Schedule

DI-MGMT-

81650

3.1.1, 3.3.1.1, 3.3.1.2

B003 Conference Agenda Conference Agenda

DI-ADMN-

81249B

3.1.2, 3.1.3, 3.1.4, 3.3.1, 3.5.2, 3.6.7.2.9

B004 Presentation Material

Presentation Material

DI-ADMN-

81373

3.1.2, 3.1.3, 3.1.4, 3.3.1, 3.5.2, 3.6.7.2.9

B005 Report, Record of Meeting/Minutes

Report, Record of Meeting/Minutes

DI-ADMN-

81505

3.1.2, 3.1.3, 3.1.4, 3.1.5, 3.3.1, 3.5.2, 3.6.7.2.9

B006 Trip Report Trip / Travel Report

DI-MISC-

81943

3.1.5, 3.4.2, 3.6.7.1.1.4, 3.6.7.2.4, 6.

B007

Government Furnished Property (GFP) and Contractor Acquired Property (CAP) Master Report

Government Furnished Property and Contractor Acquired Property Master Report

DI-MGMT-

80441B

3.1.6, 3.2.3

B008 Contract Work Breakdown Structure (CWBS)

Contract Work Breakdown Structure

DI-MGMT-

81334D

3.1.7.1

B009 Cost Data Summary Report (DD Form 1921)

Cost Data Summary Report (DD Form 1921)

DI-FNCL-

81565C

3.1.7.2

B010 Functional Cost- Hour Report (DD Form 1921-1)

Functional Cost-Hour Report (DD Form 1921-1)

DI-FNCL-

81566C

3.1.7.2

B011 Contractor Business Data Report (Form

DD 1921-3)

Contractor Business Data Report (Form DD 1921-3)

DI-FNCL-

81765B

3.1.7.2

A001

Scientific and Technical Report / Retrofits of Fielded Systems

Scientific and Technical Reports

DI-MISC-

80711A

3.2.2, 3.2.3

A002 Engineering Change Proposal-Class I, Major

Engineering Change Proposal

DI-SESS-

80639D

3.3.4.1, 3.2.4.3

A003 Engineering Change Proposal- Class II, Minor

Engineering Change Proposal

DI-SESS-

80639D

3.3.4.2

A004 Request for Variance

Request for Variance

(RFV)

DI-SESS-

80640D

3.3.4.4

A005 Notice of Revision Notice of Revision

(NOR)

DI-SESS-

80642D

3.3.4.4

A006 Environmental Stress Screening Report (ESS)

Environmental Stress Screening Report

DI-ENVR-

81663

3.2.5

A007 Acceptance Test Procedure

Test Procedure

DI-NDTI-

80603A

3.2.5

A008 Quality Assurance Plan (QAP)

Quality Assurance Program Plan

DI-QCIC-

81794 NOT 1

3.2.6

A009

Specification Requirement Verification Matrix (SRVM) (Pre—PBR)

Specification Requirement Verification Matrix

DI-MISC-

81283

3.3, 3.3.1.1

A010

Systems Engineering Management Plan (SEMP) (Pre-PBR)

Systems Engineering Management Plan

(SEMP)

DI-SESS-

81785

3.3, 3.3.1.1

A011 Risk Analysis (Pre-

PBR)

Contractor’s Risk Management Plan

DI-MGMT-

81808

3.3.1.1

A012 First Article Test Plans – Pre-PBR

Test Plan

DI-NDTI-

80566A

3.3.1.1, 3.5.3

A013 Reliability Test Plan

- Pre-PBR

Test Plan

DI-NDTI-

80566A

3.3.1.1, 3.5.4

A014 Risk Analysis (Update) (Post-

PBR)

Contractor’s Risk Management Plan - Update

DI-MGMT-

81808

3.3.1.2

A015

Systems Engineering Management Plan (SEMP) Update (Post PBR)

Systems Engineering Management Plan

(SEMP)

DI-SESS-

81785

3.3. 3.3.1.2

A016 First Article Test Plans – Post-PBR

Test Plan

DI-NDTI-

80566A

3.3.1.2, 3.5.3

A017 Reliability Test Plan

- Post-PBR

Test Plan

DI-NDTI-

80566A

3.3.1.2, 3.5.4

A018

Specification Requirement Verification Matrix (SRVM) Update (Post –PBR)

Specification Requirement Verification Matrix

DI-MISC-

81283

3.3.1.2, 3.5.3

A019 Configuration Management Plan

Configuration Management Plan

(MIL-STD-3046)

DI-SESS-

81875

3.3.3

A020

Configuration Status Accounting (CSA) Information-As Built Data

Configuration Status Accounting Information

DI-SESS-

81253C

3.3.3

A021 EO/IR/LD Payload Product Specification

Baseline Description Document

DI-SESS-

81121A

3.3.3

A022 Interface Control Document (ICD)

Interface Control Document

DI-SESS-

81248B

3.3.3

A023 Software Requirements Specification (SRS)

Software Requirements Specification

DI-IPSC-

81433A NOT

3.3.4

A024 Software Version Description (SVD)

Software Version Description)

DI-IPSC-

81442A NOT

3.3.4

A025 Reliability and Maintainability Predictions Report

Reliability and Maintainability Predictions Report

DI-SESS-

81497A

3.3.5

A026 Reliability Centered Maintenance (RCM) Analysis

Reliability-Centered Maintenance (RM) Analysis Report

DI-PSSS-

82114

3.3.5

A027

Failure Reporting Analysis and Corrective Action Report

Failure Summary and Analysis Report

DI-SESS-

80255A

3.6.6

A028 Technology Insertion

Scientific and Technical Reports

DI-MISC-

80711A

3.4.1

A029 Payload Cybersecurity Posture

Scientific and Technical Reports

DI-MISC-

80711A

3.4.3

A030 Certificate of Volatility

Technical Report- Study/Services, DI-MISC-

80508

3.4.4

A031 First Article Test Procedures

Test Procedure

DI-NDTI-

80603A

3.5.3

A032 First Article Test Reports

Test / Inspection Report

DI-NDTI-

80809B NOT

3.5.3

A033 Reliability Test Procedures

Test Procedure

DI-NDTI-

80603A

3.5.4

A034 Reliability Test Report

Test / Inspection Report

DI-NDTI-

80809B NOT

3.5.4

A035 Failure Item Analysis Report

Failure Summary and Analysis Report

DI-SESS-

80255A

3.5.5

A036 Software Product Specification

DI-IPSC-

81441A

3.3.4

C001 Field Service Representative Spares Parts List

Field Services Representative Consumables/Repairs, and Spares Parts List

OT-18-10002 3.6.7.1.1

D001 Level of Repair Analysis (LORA) Input Data

Level of Repair Analysis (LORA) Report

DI-PSSS-

81873A

3.6.1.1

D002 Depot Maintenance Study

Depot Maintenance Study

DI-ILSS-

80739

3.6.1.2

D003 Bill of Materials

(BOM)

Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

DI-PSSS-

81656B

3.6.2.1

D004 Inventory Reports

Consumable Parts Bond Room / Inventory and Parts Usage Report

DI-ILSS-

80834

3.6.2.2

D005 Provisioning Parts Data

Engineering Data for Provisioning (EDFP)

DI-SESS-

81874

3.6.2.3

D006 Maintenance Allocation Chart

(MAC)

LSA-004,

Maintenance Allocation Chart

DI-ILSS-

81140A

3.6.2.4

D007

Diminishing Manufacturing Sources and Material Shortages

(DMSMS)

Management Plan

Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan

DI-MGMT-

81948

3.6.2.5

D008

DMSMS

Implementation Plan

Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation Plan

DI-MGMT-

81949

3.6.2.5

D009 Obsolescence Alert Notice

Obsolescence Alert Notice

DI-MGMT-

81941

3.6.2.5

D010 Integrated Logistics Support Plan

Integrated Logistics Support Plan

DI-ILSS-

80095

3.6.4

D011 Software Transition Plan

Software Transition Plan (STRP)

DI-IPSC-

81429A

3.6.5

D012 Item Unique Identification (IUID) Marking Plan

Item Unique Identification (IUID) Marking Plan

DI-MGMT-

81803

3.6.6.1

D013

Item Unique Identification (IUID) Marking and Verification Report

Item Unique Identification (IUID) Marking and Verification Report

DI-MGMT-

81858

3.6.6.1

D014 Maintenance Plan Logistics Product Data Summaries

DI-SESS-

81759A

3.6.7

D015 Depot Repair Inspection Report

Repairable Item Inspection Report

DI-PSSS-

80386A

3.6.7.1.1.2

D016 Repair Data Report Technical Report- Study/Services

DI-MISC-

80508B

3.6.7.1.1.3

D017 Reach Back Call Log

Technical Report- Study/Services

DI-MISC-

80508B

3.6.7.1.1.5

D018 Training Plan Training Program Development and Management Plan

DI-ILSS-

81070

3.6.7.1.2

D019 Technical Manuals

Preparation of Digital Technical Information for Page-Based Technical Manuals (TMs) & Department of Defense Handbook:

Guide to the General Style and Format of U.S. Army Work Package Technical Manuals

MIL-STD-

40051-2C &

MIL-HDBK-

1222F

3.6.7.1.2.1

D020 Repair Parts and Special Tools List

Parts List

DI-SESS-

81359B

3.6.7.2.3

D021 Training Materials Training Materials

DI-ILSS-

80872

3.6.7.2.5

D022 Logistics Product Data Summaries

Logistics Product Data

DI-SESS-

81758A

3.6.7.2.7

D023 Data Accession List

(DAL)

Data Accession List

(DAL)

DI-MGMT-

81453B

D024 Operations Security (OPSEC) Plan

Operations Security (OPSEC) Plan

DI-MGMT-

80934C

D025 Program Protection Implementation Plan

Program Protection Implementation Plan

DI-ADMN-

81306

D026 Safety Assessment Report (SAR)

Safety Assessment Report

DI-SAFT-

80102C

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Administration / Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B001 Contractor's Progress, Status and Management Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-80227 PWS Section 3.1, 6.0 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

MTHLY 30 DADO

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE Draft Final

N/A

SEE BLOCK 16 ^

Reg

Repro

16. REMARKS:

Block 4: Files shall be in the Microsoft Office Suite of products. Contractor format is acceptable.

The report shall include the following, at a minimum: Progress of testing events; components and materials deliveries; reach back support and travel;

depot repair status data; and beyond economical repair data.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 13: The Government will have ten (10) business days to review and respond back to Contractor with comments/updates. The Contractor shall have ten (10) business days to reply with updates to Government.

Block 14: Report emailed to the Contracting Officer and the Contracting Officer Representative

SFAE-IEW-TE

CCAP-CCV-A

15. TOTAL 2 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Joseph Maheady PM EO/IR, Shadow PL

11 Dec 2017

Jerord E. Wilson Deputy PdM EO/IR Payloads

DD Form 1423-1, Feb 2001

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Administration / Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

B002 Integrated Master Schedule

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81650 PWS Sections 3.1.1, 3.3.1.1, 3.3.1.2 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

MTHLY 30 DADO

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

See Block 16 ^

Block 4: Files shall be in the Microsoft Office Project. Contractor format is acceptable.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 12: The Government requires ten (10) business days for review and approval of the draft submission. The Contractor shall have ten (10) business days to reply with updates to Government.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Administration / Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

B003 Conference Agenda

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ADMN-81249B PWS Sections 3.1.2, 3.1.3, 3.1.4, 3.3.1, 3.5.3, 3.6.7.2.9

SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

ASREQ See Block 16

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Block 4: Files shall be in the Microsoft Office Suite of products. Contractor format is acceptable.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 12 and 13: Draft to be provided at a minimum of eight (8) business days prior to the meeting event. The Government requires three (3) business days to review and provide comments.

Block 13: Five (5) business days after receipt of comments

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Administration / Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

B004 Presentation Material

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ADMN-81373 PWS Sections 3.1.2, 3.1.3 3.1.4, 3.3.1, 3.5.3, 3.6.7.2.9

SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

SEE BLOCK

SEE BLOCK 16

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SEE BLOCK 16 ^

Block 4: Files shall be in the Microsoft Office Suite of products. Contractor format is acceptable.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 10 and 12: Draft to be provided at a minimum of eight (8) business days prior to the meeting event. The Government requires three (3) business days to review and provide comments.

Block 13: Five (5) business days after receipt of comments

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Administration / Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

B005 Report, Record of Meeting/Minutes

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ADMN-81505 PWS Sections 3.1.2, 3.1.3, 3.1.4, 3.3.1, 3.5.3, 3.6.7.2.4, 3.6.7.2.9

SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

ASREQ See Block 16

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Block 4: Files shall be in the Microsoft Office Suite of products. Contractor format is acceptable.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 12: To be provided three (3) business days after the meeting event.

Government requires three (3) business days to review and provide comments.

Block 13: Three (3) business days after receipt of comments.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Administrative / Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

B006 Trip / Travel Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-81943 PWS Sections 3.1.5, 3.4.2, 3.6.7.1.1.6, 3.6.7.2.4

SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

ASREQ See Block 16

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Block 4: Files shall be in the Microsoft Office Suite of products. Contractor format is acceptable.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 12: To be provided three (3) business days after travel completed.

Government requires three (3) business days to review and provide comments.

Block 13: Three (3) business days after receipt of comments

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Administrative / Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B007 Government Furnished Property and Contractor Acquired Property Master Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-80441 PWS Section 3.1.6 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

MTHLY 30 DADO

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Block 4: Files shall be in the Microsoft Office Excel. Contractor format is acceptable.

Separate tabs within the excel spreadsheet shall be utilized; one tab will be used to report GFP and one tab will be used to report CAP.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 13: The Government requires ten (10) business days for review and approval of the draft submission. The Contractor shall have ten (10) business days to reply with updates to Government.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Administrative / Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

B008 Contract Work Breakdown Structure (CWBS)

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81334D

PWS Section 3.1.7.1 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

AS REQ 100 DADO

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE Draft Final

N/A 60 DADO See Block 16 ^

Block 4: Files shall be in Microsoft Office Suite of products.

Contractor is required to be in compliance with the structure defined in the

PWS.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 13: Government requires ten (10) business days to review and provide comments. The Contractor is required to submit updated report to the DCARC Portal as defined in DOD 5000.4-M-1 NLT 120 DADO.

04 Jan 2018

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Administrative / Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

B009 Cost Data Summary Report (DD Form 1921)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-FNCL-81565C PWS Section 3.1.7.2 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

Annual

100 DADO

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE Draft Final

Block 4: Files shall be in Microsoft Office Suite of products.

Contractor is required to be in compliance with the structure defined in Appendix A of the PWS.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 13: Government requires ten (10) business days to review and provide comments. The Contractor is required to submit updated report to the DCARC Portal as defined in DOD 5000.4-M-1 NLT 120 DADO.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Administrative / Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

B010 Functional Cost-Hour Report (DD Form 1921-1)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-FNCL-81566C PWS Section 3.1.7.2 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

Annual 100 DADO

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE Draft Final

Block 4: Files shall be in Microsoft Office Suite of products.

Contractor is required to be in compliance with the structure defined in Appendix A of the PWS.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 13: Government requires ten (10) business days to review and provide comments. The Contractor is required to submit updated report to the DCARC Portal as defined in DOD 5000.4-M-1 NLT 120 DADO.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Administrative / Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

B011 Contractor Business Data Report (Form DD 1921-3)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-FNCL-81765B PWS Section 3.1.7.2 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

Annual 100 DADO

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE Draft Final

Block 4: Files shall be in Microsoft Office Suite of products.

Contractor is required to be in compliance with the structure defined in Appendix A of the PWS.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 13: Government requires ten (10) business days to review and provide comments. The Contractor is required to submit updated report to the DCARC Portal as defined in DOD 5000.4-M-1 NLT 120 DADO.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Engineering Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A001 Scientific and Technical Reports Retrofits of Fielded Systems

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80711A PWS Section 3.2.3 SFAE-IEW-TE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

ASREQ 30 DADO

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Block 4: Files shall be in Microsoft Office Suite of products.

The report shall document, at a minimum, the purpose, scope, technical interdependencies, performance impacts, sustainment impacts, cost, and schedule of the modification.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 13: The Government requires ten (10) business days for review and approval of the draft submission. The Contractor shall have ten (10) business days to reply with updates to Government.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Engineering Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 Engineering Change Proposal (ECP) Engineering Change Proposal (ECP) Class I, Major

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80639D PWS Sections 3.3.4.1, 3.3.4.3 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

ASREQ See Block 16

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Block 4: Files shall be in Microsoft Office Suite of products

ECP Class I are for system changes that affect form, fit, function, performance, reliability, logistic baseline, logistics infrastructure to include depot capability and delivered Logistics Management Information (LMI) data, and any system certifications such as but not limited to airworthiness, Information Assurance (IA), and anti-tamper. Class I vs. Class II - In instances where the Contractor cannot determine the classification of the change, the change must be designated Class I and must be reviewed /approved by the Government prior to implementation.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 12: Ten (10) days after the change is known

Block 13: The Government requires ten (10) business days for review and approval of the draft submission. The Contractor shall have ten (10) business days to reply with updates to Government.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Engineering Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003 Engineering Change Proposal (ECP) Engineering Change Proposal (ECP) Class II, Minor

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80639D PWS Section 3.3.4.2 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

ASREQ See Block 16

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Block 4: Files shall be in Microsoft Office Suite of products

ECPs not classified as Class I are Class II. Class II changes may be processed by the Contractor-No Government approval required.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 12: Ten (10) days after the change is known

Block 13: The Government requires ten (10) business days for review and approval of the draft submission. The Contractor shall have ten (10) business days to reply with updates to Government.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Engineering Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

A004 Request for Variance (RFV) Major Request for Variance (RFV)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80640D PWS Section 3.3.4.4 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

AS REQ See Block 16

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Block 4: Files shall be in Microsoft Office Suite of products.

Contractor format acceptable. Variation or exception to any Government approved test procedure (ex., acceptance test procedure or environmental test screening) shall necessitate a Major Request for Variance.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 12: Ten (10) days after the change is known

Block 13: The Government requires ten (10) business days for review and approval of the draft submission. The Contractor shall have ten (10) business days to reply with updates to Government.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Engineering Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

A005 Notice of Revision (NOR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80642D PWS Section 3.3.4.4 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

AS REQ See Block 16

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Block 4: Files shall be in Microsoft Office Suite of products.

Contractor format acceptable. Contractor shall submit for each instance of change initiated by the Contractor.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 12: Ten (10) days after the change is known

Block 13: The Government requires ten (10) business days for review and approval of the draft submission. The Contractor shall have ten (10) business days to reply with updates to Government.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Logistics Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

A006 Environmental Stress Screening Report

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ENVR-81663

PWS Section 3.2.5 SFAE-IEW-TE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

ANNUAL/REVISI

ON AS

REQUIRED

60 DADO

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE Draft Final

N/A 90 DADO See Block 16 ^

Block 4: Files shall be in Microsoft Office Suite of products. Contractor format acceptable.

Environmental stress screening (ESS) is a cost effective means of improving quality and reliability of electrical, electronic, electro-optical, electro-mechanical and electrochemical assemblies and systems at a time when defect removal is relatively inexpensive. CDRL shall detail procedures related to MIL-

STD-810G.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 13: Government requires ten (10) business days to review and approval of the draft submission. The Contractor shall have ten (10) business days to reply with updates to Government.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A007 Test Procedure Acceptance Test Procedure

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80603A PWS Section 3.2.5 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

ONE See Block 16

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Block 4: Files shall be in Microsoft Office Suite of products. Contractor format acceptable.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 13: The Government requires ten (10) business days for review and approval of the draft submission. The Contractor shall have ten (10) business days to reply with updates to Government.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Engineering Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

A008 Quality Assurance Program Plan Quality Control Plan (QCP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-QCIC-81794 PWS Section 3.2.6 SFAE-IEW-TE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

ONE 30 DADO

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Block 4: Files shall be in Microsoft Office Suite of products. Contractor format acceptable.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 13: The Government requires ten (10) business days for review and approval of the draft submission. The Contractor shall have ten (10) business days to reply with updates to Government.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Engineering Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A009 Specification Requirement Verification Matrix Specification Requirement Verification Matrix (Pre PBR Submission)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-81283 PWS Sections 3.3, 3.3.1.1 SFAE-IEW-TE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD

D

ONE 20 DADO

b. COPIES

SECT B

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

The Requirements Verification Test Matrix (RVTM) shall detail traceability between all PBS requirements and Contractor documentation that the system meets (or will meet) the requirements.

Block 9: DISTRIBUTION STATEMENT D. "Distribution authorized to DoD and U.S. DoD Contractors only.”

Block 13: The Government requires five (5) business days for review and approval of the draft submission. The Contractor shall have five (5) business days to reply with updates to Government.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN TBD A Engineering Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Electro-Optic/Infrared/Laser Designator Payload

TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A010 Systems Engineering Management Plan Systems Engineering Management Plan (Pre PBR Submission)

4. AUTHORITY (Data Acquisition Document No.)…