Attachment_0008_Price_Model_2017-12-13.xlsx
XLSX spreadsheet 201 KB Posted
- Solicitation number
- W909MY17R0016
About this file
Attachment 0008-Prce Model
View the file
Other files
Show 40 more
Latest 50 of 86 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total EOIR Pricing Model
| Total Contract Cost ($K) | ||||||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | Total |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Maintenance Cost ($K) | ||||||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | Total |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Year 1
| CLIN | PWS | Material Description | Quantity Description | Quantity Type | Quantity | Unit Price ($) | Extended Price | Notes (optional) | Key | ||
| 0001 | 3.2.1 | Payload | Fixed Quantities ordered with range pricing | each | 11.0 | $0 | $0 | Cell Requires Vendor Input | |||
| Qty 1-5 | 1.1 | $0 | 10% | Cell is Auto-Calculated | |||||||
| Qty 6-10 | 3.3 | $0 | 30% | ||||||||
| Qty 11-20 | 4.4 | $0 | 40% | ||||||||
| Qty 21-100 | 2.2 | $0 | 20% |
| 0002 | 3.6.7.1.1.2.1 | Minor Repair - Field Level Repair | Cost of single field level repair | each | ||
| Basic | 0.0 | $0 | ||||
| Intermediate | 0.0 | $0 |
| 0003 | 3.6.7.1.1.2.2 | Moderate Repair - Depot Level Repair | Cost of a single depot level Moderate Repair | each | ||
| Standard Depot Level Repair | 0.0 | $0 | ||||
| Depot Level 01 | ||||||
| 0.0 | $0 | |||||
| Depot Level 02 | ||||||
| 0.0 | $0 | |||||
| Depot Level 03 | ||||||
| 0.0 | $0 | |||||
| Depot Level 04 | ||||||
| 0.0 | $0 | |||||
| Depot Level 05 | ||||||
| 0.0 | $0 |
| 0004 | 3.6.7.1.1.2.3 | Major Repair | Cost of a single major repair | each |
| Depot Level 06 | ||||
| 0.0 | $0 | |||
| Depot Level 07 | ||||
| 0.0 | $0 |
| 0005 | 3.2.1 | Spares | |||||
| MWIR IR Sensor | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Color EO Camera | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Range Finder | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Designator | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Pointer | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Inertial Measurement Unit | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Gimbaled Turret | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Processing and Command / Control Electronics | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Optical element assemblies | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| External cabling and connectors | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% |
| 0006 | CDRL # | CDRL Description | Quantity Description | Quantity Type | Quantity | Unit Price | Extended Price |
| B001 | B001 | Contractor’s Progress, Status and Management Report | Monthly report, priced per year | lot | 1.0 | $0 | |
| B002 | B002 | Integrated Master Schedule | Develop and maintain per PWS 3.1.1, priced per year | lot | 1.0 | $0 | |
| B003 | B003 | Conference Agenda | To be priced with each meeting CLIN | ||||
| B004 | B004 | Presentation Material | To be priced with each meeting CLIN | ||||
| B005 | B005 | Report, Record of Meeting/Minutes | To be priced with each meeting CLIN | ||||
| B006 | B006 | Trip Report | NSP | ||||
| B007 | B007 | Government Furnished Property and Contrator Acquired Property Master Report | Develop and maintain per PWS 3.1.6, priced per year | lot | 1.0 | $0 | |
| B008 | B008 | Contract Work Breakdown Structure (CWBS) | 1 in Year 1 | each | 1.0 | $0 | |
| B009 | B009 | Cost Data Summary Report (DD Form 1921) | 1 per year, priced per report | each | 1.0 | $0 | |
| B010 | B010 | Functional Cost-Hour Report (DD Form 1921-1) | 1 per year, priced per report | each | 1.0 | $0 | |
| B011 | B011 | Contractor Business Data Report (Form DD 1921-3) | 1 per year, priced per report | each | 1.0 | $0 | |
| A001 | A001 | Scientific and Technical Report / Retrofits of Fielded Systems | Negotiated at TO level | ||||
| A002 | A002 | Engineering Change Proposal – Class I, Major | NSP - Negotiated at TO Level upon Approval | ||||
| A003 | A003 | Engineering Change Proposal – Class II, Minor | NSP - Negotiated at TO Level upon Approval | ||||
| A004 | A004 | Request for Variance (RFV) | NSP | ||||
| A005 | A005 | Notice of Revision | NSP | ||||
| A006 | A006 | Environmental Stress Screening Report | 1 in Year 1 | each | 1.0 | $0 | |
| A007 | A007 | Acceptance Test Procedure | 1 in Year 1 | each | 1.0 | $0 | |
| A008 | A008 | Quality Assurance Plan | 1 in Year 1 | each | 1.0 | $0 | |
| A009 | A009 | Specification Requirement Verification Matrix (SRVM) | 1 in Year 1 | each | 1.0 | $0 | |
| A010 | A010 | Systems Engineering Management Plan | 1 in Year 1 | each | 1.0 | $0 | |
| A011 | A011 | Risk Analysis | 1 in Year 1 | each | 1.0 | $0 | |
| A012 | A012 | First Article Test Plans - Pre-PBR | 1 in Year 1 | each | 1.0 | $0 | |
| A013 | A013 | Reliability Test Plan - Pre-PBR | 1 in Year 1 | each | 1.0 | $0 | |
| A014 | A014 | Risk Analysis-Update | None in Year 1 | each | 0.0 | $0 | |
| A015 | A015 | Systems Engineering Management Plan-Update | None in Year 1 | each | 0.0 | $0 | |
| A016 | A016 | First Article Test Plans - Post-PBR | 1 in Year 1 | each | 1.0 | $0 | |
| A017 | A017 | Reliability Test Plan - Post-PBR | 1 in Year 1 | each | 1.0 | $0 | |
| A018 | A018 | Specification Requirement Verification Matrix (SRVM) Update | 1 in Year 1 | each | 1.0 | $0 | |
| A019 | A019 | Configuration Management Plan | 1 in Year 1 | each | 1.0 | $0 | |
| A020 | A020 | Configuration Status Accounting Information-As Built Data | 1 in Year 1 | each | 1.0 | $0 | |
| A021 | A021 | EO/IR/LD Payload Product Specification | 1 in Year 1 | each | 1.0 | $0 | |
| A022 | A022 | Interface Control Document | 1 in Year 1 | each | 1.0 | $0 | |
| A023 | A023 | Software Requirements Specification | 1 in Year 1 | each | 1.0 | $0 | |
| A024 | A024 | Software Version Description | 1 in Year 1 | each | 1.0 | $0 | |
| A025 | A025 | Reliability and Maintainability Predictions Report | Negotiated at TO level | ||||
| A026 | A026 | Reliability Centered Maintenance (RCM) Analysis | 1 in Year 1 | each | 1.0 | $0 | |
| A027 | A027 | Failure Reporting Analysis and Corrective Action Report | Priced per report | each | 1.0 | $0 | |
| A028 | A028 | Technology Insertion | Negotiated at TO level | ||||
| A029 | A029 | Payload Cybersecurity Posture | Priced per report | each | 1.0 | $0 | |
| A030 | A030 | Certificate of Volatility | NSP | ||||
| A031 | A031 | First Article Test Procedures | 1 in Year 1 | each | 1.0 | $0 | |
| A032 | A032 | First Article Test Reports | 1 in Year 1 | each | 1.0 | $0 | |
| A033 | A033 | Reliability Test Procedures | 1 in Year 1 | each | 1.0 | $0 | |
| A034 | A034 | Reliability Test Report | 1 in Year 1 | each | 1.0 | $0 | |
| A035 | A035 | Failure Item Analysis Report | Priced per report | each | 1.0 | $0 | |
| A036 | A036 | Software Product Specification | 1 in Year 1 | each | 1.0 | $0 | |
| C001 | C001 | Field Service Representative Spare Parts List | 1 in Year 1 | each | 1.0 | $0 | |
| D001 | D001 | Level of Repair Analysis (LORA) | Develop and maintain per PWS 3.6.1.1, priced per year | lot | 1.0 | $0 | |
| D002 | D002 | Depot Maintenance Study | Negotiated at TO level | ||||
| D003 | D003 | Bill of Materials | 1 in Year 1 | each | 1.0 | $0 | |
| D004 | D004 | Inventory Reports | Negotiated at TO level | ||||
| D005 | D005 | Provisioning Parts Data | Negotiated at TO level | ||||
| D006 | D006 | Maintenance Allocation Chart | Negotiated at TO level | ||||
| D007 | D007 | Diminishing Manufacturing sources and Material Shortages (DMSMS) Management Plan | 1 in Year 1 | each | 1.0 | $0 | |
| D008 | D008 | Diminishing Manufacturing sources and Material Shortages (DMSMS) Implementation Plan | Quarterly report, priced per year | lot | 1.0 | $0 | |
| D009 | D009 | Obsolescence Alert Notice | 1 in Year 1 | each | 1.0 | $0 | |
| D010 | D010 | Integrated Logistics Support Plan | Develop and maintain per PWS 3.6.4, priced per year | lot | 1.0 | $0 | |
| D011 | D011 | Software Transition Plan | 1 in Year 1 | each | 1.0 | $0 | |
| D012 | D012 | Item Unique Identification (IUID) Marking Plan | 1 in Year 1 | each | 1.0 | $0 | |
| D013 | D013 | Item Unique Identification Marking and Verification Report | 1 in Year 1 | each | 1.0 | $0 | |
| D014 | D014 | Maintenance Plan | 0 in Year 1 | each | 0.0 | $0 | |
| D015 | D015 | Depot Repair Inspection Report | 1 per repair | each | 0.0 | $0 | |
| D016 | D016 | Repair Data Report | Negotiated at TO level | ||||
| D017 | D017 | Reach Back Call Log | 1 in Year 1 | each | 1.0 | $0 | |
| D018 | D018 | Training Plan | 1 in Year 1 | each | 1.0 | $0 | |
| D019 | D019 | Technical Manuals | 1 in Year 1 | each | 1.0 | $0 | |
| D020 | D020 | Repair Parts and Special Tools List | 1 in Year 1 | each | 1.0 | $0 | |
| D021 | D021 | Training Materials | 1 in Year 1 | each | 1.0 | $0 | |
| D022 | D022 | Logistics Product Data Summaries | Negotiated at TO level | ||||
| D023 | D023 | Data Accession List (DAL) | 1 in Year 1 | each | 1.0 | $0 | |
| D024 | D024 | Operations Security (OPSEC) Plan | 1 in Year 1 | each | 1.0 | $0 | |
| D025 | D025 | Program Protection Implementation Plan | Negotiated at TO level | ||||
| D026 | D026 | Safety Assessment Report (SAR) | 1 in Year 1 | each | 1.0 | $0 | |
| CLIN | PWS # | PWS Description | Quantity Description | Quantity Type | Quantity | Unit Price | Extended Price |
| 0007 | 3.1.2 | Post Award Meeting (PAM) | One Post Award Meeting NLT 10 Days after order | each | 1 | $0 | |
| 0008 | 3.1.3 | Program Management Review (PMR) | Four Quarterly PMRs per year | each | 4 | $0 | |
| 0009 | 3.1.4 | Integrated Product Teams (IPT) | Monthly IPTs | each | 12 | $0 | |
| 0010 | 3.1.5 | Technical Interchange Meeting | 1 in Year 1 | each | 1 | $0 | |
| 0011 | 3.1.6 | Government Furnished Property | 1 in Year 1 | each | 1 | $0 | |
| 0012 | 3.2.2 | Payload Associated Deliverable Materiel | NSP | ||||
| 0013 | 3.2.3 | Retrofits of Fielded Systems | NSP | ||||
| 0014 | 3.3.1 | Product Baseline Review (PBR) | One PBR NLT 40 days after order | each | 1 | $0 | |
| 0015 | 3.3.4 | Software Engineering Support | Incremental order, 10 labor hours per order, 10% FTE per year | each | 19 | $0 | |
| 0016 | 3.4.1 | Technology Insertion | Negotiated at TO Level | ||||
| 0017 | 3.4.2 | Platform Integration Support | Priced per integration event, see PWS | each | 1 | $0 | |
| 0018 | 3.5.1 | Test & Evaluation Support | Priced per test event, see PWS | each | 1 | $0 | |
| 0019 | 3.5.2 | Test Readiness Review (TRR) | Priced per TRR event, see PWS | each | 1 | $0 | |
| 0020 | 3.5.3 | First Article Test (FAT) | Priced per test event | each | 1 | $0 | |
| 0021 | 3.5.4 | Reliability Testing | One event, see PWS | lot | 1 | $0 | |
| 0022 | 3.6 | Integrated Product Support | NSP | ||||
| 0023 | 3.6.1.2 | Depot Analysis | None in Year 1 | each | 0 | $0 | |
| 0024 | 3.6.2.2 | Inventory Report | 1 in Year 1 | each | 1 | $0 | |
| 0025 | 3.6.2.3 | Provisioning | Annual updates to | Annual order | 1 | $0 | |
| 0026 | 3.6.3 | Disposal | Disposal for One BER EOIRLD Payload Unit | each | 1 | $0 | |
| 0027 | 3.6.4 | Supply Chain Transition | Negotiated at TO Level | ||||
| 0028 | 3.6.7.1.1.4 | Field Service Representatives (FSR) | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | ||||
| FSR - CONUS | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - AFRICOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - CENTCOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - EUCOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - PACOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - SOUTHCOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| 0029 | 3.6.7.1.1.5 | Reach Back Support | Priced per month | Monthly | 12 | $0 | |
| 0030 | 3.6.7.2.2 | Validation / Verification | None in Year 1 | each | 0 | $0 | |
| 0031 | 3.6.7.2.4 | Logistics Demonstration | CTR to perform up to two events for integration | each | 1 | $0 | |
| 0032 | 3.6.7.2.5 | Training Course | 1 Class per year | each | 1 | $0 | |
| 0033 | 3.6.7.2.6 | Property Accountability | Annual support | Annual order | 1 | $0 | |
| 0034 | 3.6.7.2.8 | Human Systems Integration | Annual support | Annual order | 1 | $0 | |
| 0035 | 3.6.7.2.9 | Product Support Management Integrated Product Team (PSMIPT) | Monthly IPTs | Monthly | 12 | $0 | |
| 0036 | 7.0 | Program Protection Plan | 1 in Year 1 | each | 1 | $0 | |
| 0037 | Special Tooling & Test Equipment | a Lot of all special tooling and test IAW PWS | Lot | 3 | $0 | ||
| 0038 | Contractor Manpower Reporting | NSP |
| SUBTOTAL COST | |
| Material - Payload | $0.00 |
| Material - Total Maintenance | $0.00 |
| Material - Minor Repair - Field Level Repair | $0.00 |
| Material - Moderate Repair - Depot Level Repair | $0.00 |
| Material - Major Repair | $0.00 |
Material - Spares $0.00
CDRLs $0.00
PWS $0.00
TOTAL COST $0.00
Year 2
| CLIN | PWS | Material Description | Quantity Description | Quantity Type | Quantity | Unit Price ($) | Extended Price | Notes (optional) | Key | ||
| 0001 | 3.2.1 | Payload | Fixed Quantities ordered with range pricing | each | 0.0 | $0 | $0 | Cell Requires Vendor Input | |||
| Qty 1-5 | 0.0 | $0 | 10% | Cell is Auto-Calculated | |||||||
| Qty 6-10 | 0.0 | $0 | 30% | ||||||||
| Qty 11-20 | 0.0 | $0 | 40% | ||||||||
| Qty 21-100 | 0.0 | $0 | 20% |
| 0002 | 3.6.7.1.1.2.1 | Minor Repair - Field Level Repair | Cost of single field level repair | each | ||
| Basic | 1.0 | $0 | ||||
| Intermediate | 1.0 | $0 |
| 0003 | 3.6.7.1.1.2.2 | Moderate Repair - Depot Level Repair | Cost of a single depot level Moderate Repair | each | ||
| Standard Depot Level Repair | 1.0 | $0 | ||||
| Depot Level 01 | ||||||
| 1.0 | $0 | |||||
| Depot Level 02 | ||||||
| 1.0 | $0 | |||||
| Depot Level 03 | ||||||
| 1.0 | $0 | |||||
| Depot Level 04 | ||||||
| 1.0 | $0 | |||||
| Depot Level 05 | ||||||
| 1.0 | $0 |
| 0004 | 3.6.7.1.1.2.3 | Major Repair | Cost of a single major repair | each |
| Depot Level 06 | ||||
| 1.0 | $0 | |||
| Depot Level 07 | ||||
| 1.0 | $0 |
| 0005 | 3.2.1 | Spares | |||||
| MWIR IR Sensor | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Color EO Camera | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Range Finder | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Designator | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Pointer | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Inertial Measurement Unit | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Gimbaled Turret | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Processing and Command / Control Electronics | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Optical element assemblies | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| External cabling and connectors | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% |
| 0006 | CDRL # | CDRL Description | Quantity Description | Quantity Type | Quantity | Unit Price | Extended Price |
| B001 | B001 | Contractor’s Progress, Status and Management Report | Monthly report, priced per year | lot | 1.0 | $0 | |
| B002 | B002 | Integrated Master Schedule | Develop and maintain per PWS 3.1.1, priced per year | lot | 1.0 | $0 | |
| B003 | B003 | Conference Agenda | To be priced with each meeting CLIN | ||||
| B004 | B004 | Presentation Material | To be priced with each meeting CLIN | ||||
| B005 | B005 | Report, Record of Meeting/Minutes | To be priced with each meeting CLIN | ||||
| B006 | B006 | Trip Report | NSP | ||||
| B007 | B007 | Government Furnished Property and Contrator Acquired Property Master Report | Develop and maintain per PWS 3.1.6, priced per year | lot | 1.0 | $0 | |
| B008 | B008 | Contract Work Breakdown Structure (CWBS) | 0 in Year 2+ | each | 0.0 | $0 | |
| B009 | B009 | Cost Data Summary Report (DD Form 1921) | 1 per year, priced per report | each | 1.0 | $0 | |
| B010 | B010 | Functional Cost-Hour Report (DD Form 1921-1) | 1 per year, priced per report | each | 1.0 | $0 | |
| B011 | B011 | Contractor Business Data Report (Form DD 1921-3) | 1 per year, priced per report | each | 1.0 | $0 | |
| A001 | A001 | Scientific and Technical Report / Retrofits of Fielded Systems | Negotiated at TO level | ||||
| A002 | A002 | Engineering Change Proposal – Class I, Major | NSP - Negotiated at TO Level upon Approval | ||||
| A003 | A003 | Engineering Change Proposal – Class II, Minor | NSP - Negotiated at TO Level upon Approval | ||||
| A004 | A004 | Request for Variance (RFV) | NSP | ||||
| A005 | A005 | Notice of Revision | NSP | ||||
| A006 | A006 | Environmental Stress Screening Report | 0 in Year 2+ | each | 0.0 | $0 | |
| A007 | A007 | Acceptance Test Procedure | 0 in Year 2+ | each | 0.0 | $0 | |
| A008 | A008 | Quality Assurance Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| A009 | A009 | Specification Requirement Verification Matrix (SRVM) | 0 in Year 2+ | each | 0.0 | $0 | |
| A010 | A010 | Systems Engineering Management Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| A011 | A011 | Risk Analysis | 0 in Year 2+ | each | 0.0 | $0 | |
| A012 | A012 | First Article Test Plans - Pre-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A013 | A013 | Reliability Test Plan - Pre-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A014 | A014 | Risk Analysis-Update | 1 in Year 2+ | each | 1.0 | $0 | |
| A015 | A015 | Systems Engineering Management Plan-Update | 1 in Year 2+ | each | 1.0 | $0 | |
| A016 | A016 | First Article Test Plans - Post-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A017 | A017 | Reliability Test Plan - Post-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A018 | A018 | Specification Requirement Verification Matrix (SRVM) Update | 0 in Year 2+ | each | 0.0 | $0 | |
| A019 | A019 | Configuration Management Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| A020 | A020 | Configuration Status Accounting Information-As Built Data | 0 in Year 2+ | each | 0.0 | $0 | |
| A021 | A021 | EO/IR/LD Payload Product Specification | 0 in Year 2+ | each | 0.0 | $0 | |
| A022 | A022 | Interface Control Document | 0 in Year 2+ | each | 0.0 | $0 | |
| A023 | A023 | Software Requirements Specification | 0 in Year 2+ | each | 0.0 | $0 | |
| A024 | A024 | Software Version Description | 0 in Year 2+ | each | 0.0 | $0 | |
| A025 | A025 | Reliability and Maintainability Predictions Report | Negotiated at TO level | ||||
| A026 | A026 | Reliability Centered Maintenance (RCM) Analysis | 0 in Year 2+ | each | 0.0 | $0 | |
| A027 | A027 | Failure Reporting Analysis and Corrective Action Report | Priced per report | each | 1.0 | $0 | |
| A028 | A028 | Technology Insertion | Negotiated at TO level | ||||
| A029 | A029 | Payload Cybersecurity Posture | Priced per report | each | 1.0 | $0 | |
| A030 | A030 | Certificate of Volatility | NSP | ||||
| A031 | A031 | First Article Test Procedures | 0 in Year 2+ | each | 0.0 | $0 | |
| A032 | A032 | First Article Test Reports | 0 in Year 2+ | each | 0.0 | $0 | |
| A033 | A033 | Reliability Test Procedures | 0 in Year 2+ | each | 0.0 | $0 | |
| A034 | A034 | Reliability Test Report | 0 in Year 2+ | each | 0.0 | $0 | |
| A035 | A035 | Failure Item Analysis Report | Priced per report | each | 1.0 | $0 | |
| A036 | A036 | Software Product Specification | 0 in Year 2+ | each | 0.0 | $0 | |
| C001 | C001 | Field Service Representative Spare Parts List | 0 in Year 2+ | each | 0.0 | $0 | |
| D001 | D001 | Level of Repair Analysis (LORA) | Develop and maintain per PWS 3.6.1.1, priced per year | lot | 1.0 | $0 | |
| D002 | D002 | Depot Maintenance Study | Negotiated at TO level | ||||
| D003 | D003 | Bill of Materials | 0 in Year 2+ | each | 0.0 | $0 | |
| D004 | D004 | Inventory Reports | Negotiated at TO level | ||||
| D005 | D005 | Provisioning Parts Data | Negotiated at TO level | ||||
| D006 | D006 | Maintenance Allocation Chart | Negotiated at TO level | ||||
| D007 | D007 | Diminishing Manufacturing sources and Material Shortages (DMSMS) Management Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D008 | D008 | Diminishing Manufacturing sources and Material Shortages (DMSMS) Implementation Plan | Quarterly report, priced per year | lot | 1.0 | $0 | |
| D009 | D009 | Obsolescence Alert Notice | 0 in Year 2+ | each | 0.0 | $0 | |
| D010 | D010 | Integrated Logistics Support Plan | Develop and maintain per PWS 3.6.4, priced per year | lot | 1.0 | $0 | |
| D011 | D011 | Software Transition Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D012 | D012 | Item Unique Identification (IUID) Marking Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D013 | D013 | Item Unique Identification Marking and Verification Report | 0 in Year 2+ | each | 0.0 | $0 | |
| D014 | D014 | Maintenance Plan | 1 in Year 2 | each | 1.0 | $0 | |
| D015 | D015 | Depot Repair Inspection Report | 1 per repair | each | 10.0 | $0 | |
| D016 | D016 | Repair Data Report | Negotiated at TO level | ||||
| D017 | D017 | Reach Back Call Log | 0 in Year 2+ | each | 0.0 | $0 | |
| D018 | D018 | Training Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D019 | D019 | Technical Manuals | 0 in Year 2+ | each | 0.0 | $0 | |
| D020 | D020 | Repair Parts and Special Tools List | 0 in Year 2+ | each | 0.0 | $0 | |
| D021 | D021 | Training Materials | 0 in Year 2+ | each | 0.0 | $0 | |
| D022 | D022 | Logistics Product Data Summaries | Negotiated at TO level | ||||
| D023 | D023 | Data Accession List (DAL) | 0 in Year 2+ | each | 0.0 | $0 | |
| D024 | D024 | Operations Security (OPSEC) Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D025 | D025 | Program Protection Implementation Plan | Negotiated at TO level | ||||
| D026 | D026 | Safety Assessment Report (SAR) | 0 in Year 2+ | each | 0.0 | $0 | |
| CLIN | PWS # | PWS Description | Quantity Description | Quantity Type | Quantity | Unit Price | Extended Price |
| 0007 | 3.1.2 | Post Award Meeting (PAM) | One Post Award Meeting NLT 10 Days after order | each | 1 | $0 | |
| 0008 | 3.1.3 | Program Management Review (PMR) | Four Quarterly PMRs per year | each | 4 | $0 | |
| 0009 | 3.1.4 | Integrated Product Teams (IPT) | Monthly IPTs | each | 12 | $0 | |
| 0010 | 3.1.5 | Technical Interchange Meeting | 0 in Year 2+ | each | 0 | $0 | |
| 0011 | 3.1.6 | Government Furnished Property | 0 in Year 2+ | each | 0 | $0 | |
| 0012 | 3.2.2 | Payload Associated Deliverable Materiel | NSP | ||||
| 0013 | 3.2.3 | Retrofits of Fielded Systems | NSP | ||||
| 0014 | 3.3.1 | Product Baseline Review (PBR) | One PBR NLT 40 days after order | each | 1 | $0 | |
| 0015 | 3.3.4 | Software Engineering Support | Incremental order, 10 labor hours per order, 10% FTE per year | each | 19 | $0 | |
| 0016 | 3.4.1 | Technology Insertion | Negotiated at TO Level | ||||
| 0017 | 3.4.2 | Platform Integration Support | Priced per integration event, see PWS | each | 1 | $0 | |
| 0018 | 3.5.1 | Test & Evaluation Support | Priced per test event, see PWS | each | 1 | $0 | |
| 0019 | 3.5.2 | Test Readiness Review (TRR) | Priced per TRR event, see PWS | each | 1 | $0 | |
| 0020 | 3.5.3 | First Article Test (FAT) | Priced per test event | each | 0 | $0 | |
| 0021 | 3.5.4 | Reliability Testing | One event, see PWS | lot | 1 | $0 | |
| 0022 | 3.6 | Integrated Product Support | NSP | ||||
| 0023 | 3.6.1.2 | Depot Analysis | 1 in Year 2+ | each | 1 | $0 | |
| 0024 | 3.6.2.2 | Inventory Report | 0 in Year 2+ | each | 0 | $0 | |
| 0025 | 3.6.2.3 | Provisioning | Annual updates to | Annual order | 1 | $0 | |
| 0026 | 3.6.3 | Disposal | Disposal for One BER EOIRLD Payload Unit | each | 1 | $0 | |
| 0027 | 3.6.4 | Supply Chain Transition | Negotiated at TO Level | ||||
| 0028 | 3.6.7.1.1.4 | Field Service Representatives (FSR) | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | ||||
| FSR - CONUS | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - AFRICOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - CENTCOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - EUCOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - PACOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - SOUTHCOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| 0029 | 3.6.7.1.1.5 | Reach Back Support | Priced per month | Monthly | 12 | $0 | |
| 0030 | 3.6.7.2.2 | Validation / Verification | 1 in Year 2+ | each | 1 | $0 | |
| 0031 | 3.6.7.2.4 | Logistics Demonstration | CTR to perform up to two events for integration | each | 1 | $0 | |
| 0032 | 3.6.7.2.5 | Training Course | 1 Class per year | each | 1 | $0 | |
| 0033 | 3.6.7.2.6 | Property Accountability | Annual support | Annual order | 1 | $0 | |
| 0034 | 3.6.7.2.8 | Human Systems Integration | Annual support | Annual order | 1 | $0 | |
| 0035 | 3.6.7.2.9 | Product Support Management Integrated Product Team (PSMIPT) | Monthly IPTs | Monthly | 12 | $0 | |
| 0036 | 7.0 | Program Protection Plan | 0 in Year 2+ | each | 0 | $0 | |
| 0037 | Special Tooling & Test Equipment | 1 per payload | each | 0 | $0 | ||
| 0038 | Contractor Manpower Reporting | NSP |
| SUBTOTAL COST | |
| Material - Payload | $0.00 |
| Material - Total Maintenance | $0.00 |
| Material - Minor Repair - Field Level Repair | $0.00 |
| Material - Moderate Repair - Depot Level Repair | $0.00 |
| Material - Major Repair | $0.00 |
Material - Spares $0.00
CDRLs $0.00
PWS $0.00
TOTAL COST $0.00
Year 3
| CLIN | PWS | Material Description | Quantity Description | Quantity Type | Quantity | Unit Price ($) | Extended Price | Notes (optional) | Key | ||
| 0001 | 3.2.1 | Payload | Fixed Quantities ordered with range pricing | each | 0.0 | $0 | $0 | Cell Requires Vendor Input | |||
| Qty 1-5 | 0.0 | $0 | 10% | Cell is Auto-Calculated | |||||||
| Qty 6-10 | 0.0 | $0 | 30% | ||||||||
| Qty 11-20 | 0.0 | $0 | 40% | ||||||||
| Qty 21-100 | 0.0 | $0 | 20% |
| 0002 | 3.6.7.1.1.2.1 | Minor Repair - Field Level Repair | Cost of single field level repair | each | ||
| Basic | 1.0 | $0 | ||||
| Intermediate | 1.0 | $0 |
| 0003 | 3.6.7.1.1.2.2 | Moderate Repair - Depot Level Repair | Cost of a single depot level Moderate Repair | each | ||
| Standard Depot Level Repair | 1.0 | $0 | ||||
| Depot Level 01 | ||||||
| 1.0 | $0 | |||||
| Depot Level 02 | ||||||
| 1.0 | $0 | |||||
| Depot Level 03 | ||||||
| 1.0 | $0 | |||||
| Depot Level 04 | ||||||
| 1.0 | $0 | |||||
| Depot Level 05 | ||||||
| 1.0 | $0 |
| 0004 | 3.6.7.1.1.2.3 | Major Repair | Cost of a single major repair | each |
| Depot Level 06 | ||||
| 1.0 | $0 | |||
| Depot Level 07 | ||||
| 1.0 | $0 |
| 0005 | 3.2.1 | Spares | |||||
| MWIR IR Sensor | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Color EO Camera | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Range Finder | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Designator | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Pointer | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Inertial Measurement Unit | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Gimbaled Turret | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Processing and Command / Control Electronics | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Optical element assemblies | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| External cabling and connectors | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% |
| 0006 | CDRL # | CDRL Description | Quantity Description | Quantity Type | Quantity | Unit Price | Extended Price |
| B001 | B001 | Contractor’s Progress, Status and Management Report | Monthly report, priced per year | lot | 1.0 | $0 | |
| B002 | B002 | Integrated Master Schedule | Develop and maintain per PWS 3.1.1, priced per year | lot | 1.0 | $0 | |
| B003 | B003 | Conference Agenda | To be priced with each meeting CLIN | ||||
| B004 | B004 | Presentation Material | To be priced with each meeting CLIN | ||||
| B005 | B005 | Report, Record of Meeting/Minutes | To be priced with each meeting CLIN | ||||
| B006 | B006 | Trip Report | NSP | ||||
| B007 | B007 | Government Furnished Property and Contrator Acquired Property Master Report | Develop and maintain per PWS 3.1.6, priced per year | lot | 1.0 | $0 | |
| B008 | B008 | Contract Work Breakdown Structure (CWBS) | 0 in Year 2+ | each | 0.0 | $0 | |
| B009 | B009 | Cost Data Summary Report (DD Form 1921) | 1 per year, priced per report | each | 1.0 | $0 | |
| B010 | B010 | Functional Cost-Hour Report (DD Form 1921-1) | 1 per year, priced per report | each | 1.0 | $0 | |
| B011 | B011 | Contractor Business Data Report (Form DD 1921-3) | 1 per year, priced per report | each | 1.0 | $0 | |
| A001 | A001 | Scientific and Technical Report / Retrofits of Fielded Systems | Negotiated at TO level | ||||
| A002 | A002 | Engineering Change Proposal – Class I, Major | NSP - Negotiated at TO Level upon Approval | ||||
| A003 | A003 | Engineering Change Proposal – Class II, Minor | NSP - Negotiated at TO Level upon Approval | ||||
| A004 | A004 | Request for Variance (RFV) | NSP | ||||
| A005 | A005 | Notice of Revision | NSP | ||||
| A006 | A006 | Environmental Stress Screening Report | 0 in Year 2+ | each | 0.0 | $0 | |
| A007 | A007 | Acceptance Test Procedure | 0 in Year 2+ | each | 0.0 | $0 | |
| A008 | A008 | Quality Assurance Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| A009 | A009 | Specification Requirement Verification Matrix (SRVM) | 0 in Year 2+ | each | 0.0 | $0 | |
| A010 | A010 | Systems Engineering Management Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| A011 | A011 | Risk Analysis | 0 in Year 2+ | each | 0.0 | $0 | |
| A012 | A012 | First Article Test Plans - Pre-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A013 | A013 | Reliability Test Plan - Pre-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A014 | A014 | Risk Analysis-Update | 0 in Year 3+ | each | 0.0 | $0 | |
| A015 | A015 | Systems Engineering Management Plan-Update | 1 in Year 2+ | each | 1.0 | $0 | |
| A016 | A016 | First Article Test Plans - Post-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A017 | A017 | Reliability Test Plan - Post-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A018 | A018 | Specification Requirement Verification Matrix (SRVM) Update | 0 in Year 2+ | each | 0.0 | $0 | |
| A019 | A019 | Configuration Management Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| A020 | A020 | Configuration Status Accounting Information-As Built Data | 0 in Year 2+ | each | 0.0 | $0 | |
| A021 | A021 | EO/IR/LD Payload Product Specification | 0 in Year 2+ | each | 0.0 | $0 | |
| A022 | A022 | Interface Control Document | 0 in Year 2+ | each | 0.0 | $0 | |
| A023 | A023 | Software Requirements Specification | 0 in Year 2+ | each | 0.0 | $0 | |
| A024 | A024 | Software Version Description | 0 in Year 2+ | each | 0.0 | $0 | |
| A025 | A025 | Reliability and Maintainability Predictions Report | Negotiated at TO level | ||||
| A026 | A026 | Reliability Centered Maintenance (RCM) Analysis | 0 in Year 2+ | each | 0.0 | $0 | |
| A027 | A027 | Failure Reporting Analysis and Corrective Action Report | Priced per report | each | 1.0 | $0 | |
| A028 | A028 | Technology Insertion | Negotiated at TO level | ||||
| A029 | A029 | Payload Cybersecurity Posture | Priced per report | each | 1.0 | $0 | |
| A030 | A030 | Certificate of Volatility | NSP | ||||
| A031 | A031 | First Article Test Procedures | 0 in Year 2+ | each | 0.0 | $0 | |
| A032 | A032 | First Article Test Reports | 0 in Year 2+ | each | 0.0 | $0 | |
| A033 | A033 | Reliability Test Procedures | 0 in Year 2+ | each | 0.0 | $0 | |
| A034 | A034 | Reliability Test Report | 0 in Year 2+ | each | 0.0 | $0 | |
| A035 | A035 | Failure Item Analysis Report | Priced per report | each | 1.0 | $0 | |
| A036 | A036 | Software Product Specification | 0 in Year 2+ | each | 0.0 | $0 | |
| C001 | C001 | Field Service Representative Spare Parts List | 0 in Year 2+ | each | 0.0 | $0 | |
| D001 | D001 | Level of Repair Analysis (LORA) | Develop and maintain per PWS 3.6.1.1, priced per year | lot | 1.0 | $0 | |
| D002 | D002 | Depot Maintenance Study | Negotiated at TO level | ||||
| D003 | D003 | Bill of Materials | 0 in Year 2+ | each | 0.0 | $0 | |
| D004 | D004 | Inventory Reports | Negotiated at TO level | ||||
| D005 | D005 | Provisioning Parts Data | Negotiated at TO level | ||||
| D006 | D006 | Maintenance Allocation Chart | Negotiated at TO level | ||||
| D007 | D007 | Diminishing Manufacturing sources and Material Shortages (DMSMS) Management Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D008 | D008 | Diminishing Manufacturing sources and Material Shortages (DMSMS) Implementation Plan | Quarterly report, priced per year | lot | 1.0 | $0 | |
| D009 | D009 | Obsolescence Alert Notice | 0 in Year 2+ | each | 0.0 | $0 | |
| D010 | D010 | Integrated Logistics Support Plan | Develop and maintain per PWS 3.6.4, priced per year | lot | 1.0 | $0 | |
| D011 | D011 | Software Transition Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D012 | D012 | Item Unique Identification (IUID) Marking Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D013 | D013 | Item Unique Identification Marking and Verification Report | 0 in Year 2+ | each | 0.0 | $0 | |
| D014 | D014 | Maintenance Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D015 | D015 | Depot Repair Inspection Report | 1 per repair | each | 10.0 | $0 | |
| D016 | D016 | Repair Data Report | Negotiated at TO level | ||||
| D017 | D017 | Reach Back Call Log | 0 in Year 2+ | each | 0.0 | $0 | |
| D018 | D018 | Training Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D019 | D019 | Technical Manuals | 0 in Year 2+ | each | 0.0 | $0 | |
| D020 | D020 | Repair Parts and Special Tools List | 0 in Year 2+ | each | 0.0 | $0 | |
| D021 | D021 | Training Materials | 0 in Year 2+ | each | 0.0 | $0 | |
| D022 | D022 | Logistics Product Data Summaries | Negotiated at TO level | ||||
| D023 | D023 | Data Accession List (DAL) | 0 in Year 2+ | each | 0.0 | $0 | |
| D024 | D024 | Operations Security (OPSEC) Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D025 | D025 | Program Protection Implementation Plan | Negotiated at TO level | ||||
| D026 | D026 | Safety Assessment Report (SAR) | 0 in Year 2+ | each | 0.0 | $0 | |
| CLIN | PWS # | PWS Description | Quantity Description | Quantity Type | Quantity | Unit Price | Extended Price |
| 0007 | 3.1.2 | Post Award Meeting (PAM) | One Post Award Meeting NLT 10 Days after order | each | 1 | $0 | |
| 0008 | 3.1.3 | Program Management Review (PMR) | Four Quarterly PMRs per year | each | 4 | $0 | |
| 0009 | 3.1.4 | Integrated Product Teams (IPT) | Monthly IPTs | each | 12 | $0 | |
| 0010 | 3.1.5 | Technical Interchange Meeting | 0 in Year 2+ | each | 0 | $0 | |
| 0011 | 3.1.6 | Government Furnished Property | 0 in Year 2+ | each | 0 | $0 | |
| 0012 | 3.2.2 | Payload Associated Deliverable Materiel | NSP | ||||
| 0013 | 3.2.3 | Retrofits of Fielded Systems | NSP | ||||
| 0014 | 3.3.1 | Product Baseline Review (PBR) | One PBR NLT 40 days after order | each | 1 | $0 | |
| 0015 | 3.3.4 | Software Engineering Support | Incremental order, 10 labor hours per order, 10% FTE per year | each | 19 | $0 | |
| 0016 | 3.4.1 | Technology Insertion | Negotiated at TO Level | ||||
| 0017 | 3.4.2 | Platform Integration Support | Priced per integration event, see PWS | each | 1 | $0 | |
| 0018 | 3.5.1 | Test & Evaluation Support | Priced per test event, see PWS | each | 1 | $0 | |
| 0019 | 3.5.2 | Test Readiness Review (TRR) | Priced per TRR event, see PWS | each | 1 | $0 | |
| 0020 | 3.5.3 | First Article Test (FAT) | Priced per test event | each | 0 | $0 | |
| 0021 | 3.5.4 | Reliability Testing | One event, see PWS | lot | 1 | $0 | |
| 0022 | 3.6 | Integrated Product Support | NSP | ||||
| 0023 | 3.6.1.2 | Depot Analysis | 1 in Year 2+ | each | 1 | $0 | |
| 0024 | 3.6.2.2 | Inventory Report | 0 in Year 2+ | each | 0 | $0 | |
| 0025 | 3.6.2.3 | Provisioning | Annual updates to | Annual order | 1 | $0 | |
| 0026 | 3.6.3 | Disposal | Disposal for One BER EOIRLD Payload Unit | each | 1 | $0 | |
| 0027 | 3.6.4 | Supply Chain Transition | Negotiated at TO Level | ||||
| 0028 | 3.6.7.1.1.4 | Field Service Representatives (FSR) | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | ||||
| FSR - CONUS | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - AFRICOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - CENTCOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - EUCOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - PACOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - SOUTHCOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| 0029 | 3.6.7.1.1.5 | Reach Back Support | Priced per month | Monthly | 12 | $0 | |
| 0030 | 3.6.7.2.2 | Validation / Verification | 1 in Year 2+ | each | 1 | $0 | |
| 0031 | 3.6.7.2.4 | Logistics Demonstration | CTR to perform up to two events for integration | each | 1 | $0 | |
| 0032 | 3.6.7.2.5 | Training Course | 1 Class per year | each | 1 | $0 | |
| 0033 | 3.6.7.2.6 | Property Accountability | Annual support | Annual order | 1 | $0 | |
| 0034 | 3.6.7.2.8 | Human Systems Integration | Annual support | Annual order | 1 | $0 | |
| 0035 | 3.6.7.2.9 | Product Support Management Integrated Product Team (PSMIPT) | Monthly IPTs | Monthly | 12 | $0 | |
| 0036 | 7.0 | Program Protection Plan | 0 in Year 2+ | each | 0 | $0 | |
| 0037 | Special Tooling & Test Equipment | 1 per payload | each | 0 | $0 | ||
| 0038 | Contractor Manpower Reporting | NSP |
| SUBTOTAL COST | |
| Material - Payload | $0.00 |
| Material - Total Maintenance | $0.00 |
| Material - Minor Repair - Field Level Repair | $0.00 |
| Material - Moderate Repair - Depot Level Repair | $0.00 |
| Material - Major Repair | $0.00 |
Material - Spares $0.00
CDRLs $0.00
PWS $0.00
TOTAL COST $0.00
Year 4
| CLIN | PWS | Material Description | Quantity Description | Quantity Type | Quantity | Unit Price ($) | Extended Price | Notes (optional) | Key | ||
| 0001 | 3.2.1 | Payload | Fixed Quantities ordered with range pricing | each | 0.0 | $0 | $0 | Cell Requires Vendor Input | |||
| Qty 1-5 | 0.0 | $0 | 10% | Cell is Auto-Calculated | |||||||
| Qty 6-10 | 0.0 | $0 | 30% | ||||||||
| Qty 11-20 | 0.0 | $0 | 40% | ||||||||
| Qty 21-100 | 0.0 | $0 | 20% |
| 0002 | 3.6.7.1.1.2.1 | Minor Repair - Field Level Repair | Cost of single field level repair | each | ||
| Basic | 1.0 | $0 | ||||
| Intermediate | 1.0 | $0 |
| 0003 | 3.6.7.1.1.2.2 | Moderate Repair - Depot Level Repair | Cost of a single depot level Moderate Repair | each | ||
| Standard Depot Level Repair | 1.0 | $0 | ||||
| Depot Level 01 | ||||||
| 1.0 | $0 | |||||
| Depot Level 02 | ||||||
| 1.0 | $0 | |||||
| Depot Level 03 | ||||||
| 1.0 | $0 | |||||
| Depot Level 04 | ||||||
| 1.0 | $0 | |||||
| Depot Level 05 | ||||||
| 1.0 | $0 |
| 0004 | 3.6.7.1.1.2.3 | Major Repair | Cost of a single major repair | each |
| Depot Level 06 | ||||
| 1.0 | $0 | |||
| Depot Level 07 | ||||
| 1.0 | $0 |
| 0005 | 3.2.1 | Spares | |||||
| MWIR IR Sensor | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Color EO Camera | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Range Finder | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Designator | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Pointer | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Inertial Measurement Unit | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Gimbaled Turret | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Processing and Command / Control Electronics | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Optical element assemblies | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| External cabling and connectors | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% |
| 0006 | CDRL # | CDRL Description | Quantity Description | Quantity Type | Quantity | Unit Price | Extended Price |
| B001 | B001 | Contractor’s Progress, Status and Management Report | Monthly report, priced per year | lot | 1.0 | $0 | |
| B002 | B002 | Integrated Master Schedule | Develop and maintain per PWS 3.1.1, priced per year | lot | 1.0 | $0 | |
| B003 | B003 | Conference Agenda | To be priced with each meeting CLIN | ||||
| B004 | B004 | Presentation Material | To be priced with each meeting CLIN | ||||
| B005 | B005 | Report, Record of Meeting/Minutes | To be priced with each meeting CLIN | ||||
| B006 | B006 | Trip Report | NSP | ||||
| B007 | B007 | Government Furnished Property and Contrator Acquired Property Master Report | Develop and maintain per PWS 3.1.6, priced per year | lot | 1.0 | $0 | |
| B008 | B008 | Contract Work Breakdown Structure (CWBS) | 0 in Year 2+ | each | 0.0 | $0 | |
| B009 | B009 | Cost Data Summary Report (DD Form 1921) | 1 per year, priced per report | each | 1.0 | $0 | |
| B010 | B010 | Functional Cost-Hour Report (DD Form 1921-1) | 1 per year, priced per report | each | 1.0 | $0 | |
| B011 | B011 | Contractor Business Data Report (Form DD 1921-3) | 1 per year, priced per report | each | 1.0 | $0 | |
| A001 | A001 | Scientific and Technical Report / Retrofits of Fielded Systems | Negotiated at TO level | ||||
| A002 | A002 | Engineering Change Proposal – Class I, Major | NSP - Negotiated at TO Level upon Approval | ||||
| A003 | A003 | Engineering Change Proposal – Class II, Minor | NSP - Negotiated at TO Level upon Approval | ||||
| A004 | A004 | Request for Variance (RFV) | NSP | ||||
| A005 | A005 | Notice of Revision | NSP | ||||
| A006 | A006 | Environmental Stress Screening Report | 0 in Year 2+ | each | 0.0 | $0 | |
| A007 | A007 | Acceptance Test Procedure | 0 in Year 2+ | each | 0.0 | $0 | |
| A008 | A008 | Quality Assurance Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| A009 | A009 | Specification Requirement Verification Matrix (SRVM) | 0 in Year 2+ | each | 0.0 | $0 | |
| A010 | A010 | Systems Engineering Management Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| A011 | A011 | Risk Analysis | 0 in Year 2+ | each | 0.0 | $0 | |
| A012 | A012 | First Article Test Plans - Pre-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A013 | A013 | Reliability Test Plan - Pre-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A014 | A014 | Risk Analysis-Update | 1 in Year 2+ | each | 0.0 | $0 | |
| A015 | A015 | Systems Engineering Management Plan-Update | 1 in Year 2+ | each | 1.0 | $0 | |
| A016 | A016 | First Article Test Plans - Post-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A017 | A017 | Reliability Test Plan - Post-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A018 | A018 | Specification Requirement Verification Matrix (SRVM) Update | 0 in Year 2+ | each | 0.0 | $0 | |
| A019 | A019 | Configuration Management Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| A020 | A020 | Configuration Status Accounting Information-As Built Data | 0 in Year 2+ | each | 0.0 | $0 | |
| A021 | A021 | EO/IR/LD Payload Product Specification | 0 in Year 2+ | each | 0.0 | $0 | |
| A022 | A022 | Interface Control Document | 0 in Year 2+ | each | 0.0 | $0 | |
| A023 | A023 | Software Requirements Specification | 0 in Year 2+ | each | 0.0 | $0 | |
| A024 | A024 | Software Version Description | 0 in Year 2+ | each | 0.0 | $0 | |
| A025 | A025 | Reliability and Maintainability Predictions Report | Negotiated at TO level | ||||
| A026 | A026 | Reliability Centered Maintenance (RCM) Analysis | 0 in Year 2+ | each | 0.0 | $0 | |
| A027 | A027 | Failure Reporting Analysis and Corrective Action Report | Priced per report | each | 1.0 | $0 | |
| A028 | A028 | Technology Insertion | Negotiated at TO level | ||||
| A029 | A029 | Payload Cybersecurity Posture | Priced per report | each | 1.0 | $0 | |
| A030 | A030 | Certificate of Volatility | NSP | ||||
| A031 | A031 | First Article Test Procedures | 0 in Year 2+ | each | 0.0 | $0 | |
| A032 | A032 | First Article Test Reports | 0 in Year 2+ | each | 0.0 | $0 | |
| A033 | A033 | Reliability Test Procedures | 0 in Year 2+ | each | 0.0 | $0 | |
| A034 | A034 | Reliability Test Report | 0 in Year 2+ | each | 0.0 | $0 | |
| A035 | A035 | Failure Item Analysis Report | Priced per report | each | 1.0 | $0 | |
| A036 | A036 | Software Product Specification | 0 in Year 2+ | each | 0.0 | $0 | |
| C001 | C001 | Field Service Representative Spare Parts List | 0 in Year 2+ | each | 0.0 | $0 | |
| D001 | D001 | Level of Repair Analysis (LORA) | Develop and maintain per PWS 3.6.1.1, priced per year | lot | 1.0 | $0 | |
| D002 | D002 | Depot Maintenance Study | Negotiated at TO level | ||||
| D003 | D003 | Bill of Materials | 0 in Year 2+ | each | 0.0 | $0 | |
| D004 | D004 | Inventory Reports | Negotiated at TO level | ||||
| D005 | D005 | Provisioning Parts Data | Negotiated at TO level | ||||
| D006 | D006 | Maintenance Allocation Chart | Negotiated at TO level | ||||
| D007 | D007 | Diminishing Manufacturing sources and Material Shortages (DMSMS) Management Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D008 | D008 | Diminishing Manufacturing sources and Material Shortages (DMSMS) Implementation Plan | Quarterly report, priced per year | lot | 1.0 | $0 | |
| D009 | D009 | Obsolescence Alert Notice | 0 in Year 2+ | each | 0.0 | $0 | |
| D010 | D010 | Integrated Logistics Support Plan | Develop and maintain per PWS 3.6.4, priced per year | lot | 1.0 | $0 | |
| D011 | D011 | Software Transition Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D012 | D012 | Item Unique Identification (IUID) Marking Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D013 | D013 | Item Unique Identification Marking and Verification Report | 0 in Year 2+ | each | 0.0 | $0 | |
| D014 | D014 | Maintenance Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D015 | D015 | Depot Repair Inspection Report | 1 per repair | each | 10.0 | $0 | |
| D016 | D016 | Repair Data Report | Negotiated at TO level | ||||
| D017 | D017 | Reach Back Call Log | 0 in Year 2+ | each | 0.0 | $0 | |
| D018 | D018 | Training Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D019 | D019 | Technical Manuals | 0 in Year 2+ | each | 0.0 | $0 | |
| D020 | D020 | Repair Parts and Special Tools List | 0 in Year 2+ | each | 0.0 | $0 | |
| D021 | D021 | Training Materials | 0 in Year 2+ | each | 0.0 | $0 | |
| D022 | D022 | Logistics Product Data Summaries | Negotiated at TO level | ||||
| D023 | D023 | Data Accession List (DAL) | 0 in Year 2+ | each | 0.0 | $0 | |
| D024 | D024 | Operations Security (OPSEC) Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D025 | D025 | Program Protection Implementation Plan | Negotiated at TO level | ||||
| D026 | D026 | Safety Assessment Report (SAR) | 0 in Year 2+ | each | 0.0 | $0 | |
| CLIN | PWS # | PWS Description | Quantity Description | Quantity Type | Quantity | Unit Price | Extended Price |
| 0007 | 3.1.2 | Post Award Meeting (PAM) | One Post Award Meeting NLT 10 Days after order | each | 1 | $0 | |
| 0008 | 3.1.3 | Program Management Review (PMR) | Four Quarterly PMRs per year | each | 4 | $0 | |
| 0009 | 3.1.4 | Integrated Product Teams (IPT) | Monthly IPTs | each | 12 | $0 | |
| 0010 | 3.1.5 | Technical Interchange Meeting | 0 in Year 2+ | each | 0 | $0 | |
| 0011 | 3.1.6 | Government Furnished Property | 0 in Year 2+ | each | 0 | $0 | |
| 0012 | 3.2.2 | Payload Associated Deliverable Materiel | NSP | ||||
| 0013 | 3.2.3 | Retrofits of Fielded Systems | NSP | ||||
| 0014 | 3.3.1 | Product Baseline Review (PBR) | One PBR NLT 40 days after order | each | 1 | $0 | |
| 0015 | 3.3.4 | Software Engineering Support | Incremental order, 10 labor hours per order, 10% FTE per year | each | 19 | $0 | |
| 0016 | 3.4.1 | Technology Insertion | Negotiated at TO Level | ||||
| 0017 | 3.4.2 | Platform Integration Support | Priced per integration event, see PWS | each | 1 | $0 | |
| 0018 | 3.5.1 | Test & Evaluation Support | Priced per test event, see PWS | each | 1 | $0 | |
| 0019 | 3.5.2 | Test Readiness Review (TRR) | Priced per TRR event, see PWS | each | 1 | $0 | |
| 0020 | 3.5.3 | First Article Test (FAT) | Priced per test event | each | 0 | $0 | |
| 0021 | 3.5.4 | Reliability Testing | One event, see PWS | lot | 1 | $0 | |
| 0022 | 3.6 | Integrated Product Support | NSP | ||||
| 0023 | 3.6.1.2 | Depot Analysis | 1 in Year 2+ | each | 1 | $0 | |
| 0024 | 3.6.2.2 | Inventory Report | 0 in Year 2+ | each | 0 | $0 | |
| 0025 | 3.6.2.3 | Provisioning | Annual updates to | Annual order | 1 | $0 | |
| 0026 | 3.6.3 | Disposal | Disposal for One BER EOIRLD Payload Unit | each | 1 | $0 | |
| 0027 | 3.6.4 | Supply Chain Transition | Negotiated at TO Level | ||||
| 0028 | 3.6.7.1.1.4 | Field Service Representatives (FSR) | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | ||||
| FSR - CONUS | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - AFRICOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - CENTCOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - EUCOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - PACOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| FSR - OCONUS - SOUTHCOM | 52 weeks, 12 hours per day / 7 days a week, priced per FSR | each | 1 | $0 | |||
| 0029 | 3.6.7.1.1.5 | Reach Back Support | Priced per month | Monthly | 12 | $0 | |
| 0030 | 3.6.7.2.2 | Validation / Verification | 1 in Year 2+ | each | 1 | $0 | |
| 0031 | 3.6.7.2.4 | Logistics Demonstration | CTR to perform up to two events for integration | each | 1 | $0 | |
| 0032 | 3.6.7.2.5 | Training Course | 1 Class per year | each | 1 | $0 | |
| 0033 | 3.6.7.2.6 | Property Accountability | Annual support | Annual order | 1 | $0 | |
| 0034 | 3.6.7.2.8 | Human Systems Integration | Annual support | Annual order | 1 | $0 | |
| 0035 | 3.6.7.2.9 | Product Support Management Integrated Product Team (PSMIPT) | Monthly IPTs | Monthly | 12 | $0 | |
| 0036 | 7.0 | Program Protection Plan | 0 in Year 2+ | each | 0 | $0 | |
| 0037 | Special Tooling & Test Equipment | 1 per payload | each | 0 | $0 | ||
| 0038 | Contractor Manpower Reporting | NSP |
| SUBTOTAL COST | |
| Material - Payload | $0.00 |
| Material - Total Maintenance | $0.00 |
| Material - Minor Repair - Field Level Repair | $0.00 |
| Material - Moderate Repair - Depot Level Repair | $0.00 |
| Material - Major Repair | $0.00 |
Material - Spares $0.00
CDRLs $0.00
PWS $0.00
TOTAL COST $0.00
Year 5
| CLIN | PWS | Material Description | Quantity Description | Quantity Type | Quantity | Unit Price ($) | Extended Price | Notes (optional) | Key | ||
| 0001 | 3.2.1 | Payload | Fixed Quantities ordered with range pricing | each | 72.0 | $0 | $0 | Cell Requires Vendor Input | |||
| Qty 1-5 | 7.2 | $0 | 10% | Cell is Auto-Calculated | |||||||
| Qty 6-10 | 21.6 | $0 | 30% | ||||||||
| Qty 11-20 | 28.8 | $0 | 40% | ||||||||
| Qty 21-100 | 14.4 | $0 | 20% |
| 0002 | 3.6.7.1.1.2.1 | Minor Repair - Field Level Repair | Cost of single field level repair | each | ||
| Basic | 1.0 | $0 | ||||
| Intermediate | 1.0 | $0 |
| 0003 | 3.6.7.1.1.2.2 | Moderate Repair - Depot Level Repair | Cost of a single depot level Moderate Repair | each | ||
| Standard Depot Level Repair | 1.0 | $0 | ||||
| Depot Level 01 | ||||||
| 1.0 | $0 | |||||
| Depot Level 02 | ||||||
| 1.0 | $0 | |||||
| Depot Level 03 | ||||||
| 1.0 | $0 | |||||
| Depot Level 04 | ||||||
| 1.0 | $0 | |||||
| Depot Level 05 | ||||||
| 1.0 | $0 |
| 0004 | 3.6.7.1.1.2.3 | Major Repair | Cost of a single major repair | each |
| Depot Level 06 | ||||
| 1.0 | $0 | |||
| Depot Level 07 | ||||
| 1.0 | $0 |
| 0005 | 3.2.1 | Spares | |||||
| MWIR IR Sensor | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Color EO Camera | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Range Finder | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Designator | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Laser Pointer | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Inertial Measurement Unit | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Gimbaled Turret | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Processing and Command / Control Electronics | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| Optical element assemblies | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% | ||||
| External cabling and connectors | each | 1.0 | $0.00 | $0 | |||
| Qty 1-5 | 0.5 | $0 | 50% | ||||
| Qty 6-10 | 0.3 | $0 | 30% | ||||
| Qty 11-20 | 0.2 | $0 | 20% |
| 0006 | CDRL # | CDRL Description | Quantity Description | Quantity Type | Quantity | Unit Price | Extended Price |
| B001 | B001 | Contractor’s Progress, Status and Management Report | Monthly report, priced per year | lot | 1.0 | $0 | |
| B002 | B002 | Integrated Master Schedule | Develop and maintain per PWS 3.1.1, priced per year | lot | 1.0 | $0 | |
| B003 | B003 | Conference Agenda | To be priced with each meeting CLIN | ||||
| B004 | B004 | Presentation Material | To be priced with each meeting CLIN | ||||
| B005 | B005 | Report, Record of Meeting/Minutes | To be priced with each meeting CLIN | ||||
| B006 | B006 | Trip Report | NSP | ||||
| B007 | B007 | Government Furnished Property and Contrator Acquired Property Master Report | Develop and maintain per PWS 3.1.6, priced per year | lot | 1.0 | $0 | |
| B008 | B008 | Contract Work Breakdown Structure (CWBS) | 0 in Year 2+ | each | 0.0 | $0 | |
| B009 | B009 | Cost Data Summary Report (DD Form 1921) | 1 per year, priced per report | each | 1.0 | $0 | |
| B010 | B010 | Functional Cost-Hour Report (DD Form 1921-1) | 1 per year, priced per report | each | 1.0 | $0 | |
| B011 | B011 | Contractor Business Data Report (Form DD 1921-3) | 1 per year, priced per report | each | 1.0 | $0 | |
| A001 | A001 | Scientific and Technical Report / Retrofits of Fielded Systems | Negotiated at TO level | ||||
| A002 | A002 | Engineering Change Proposal – Class I, Major | NSP - Negotiated at TO Level upon Approval | ||||
| A003 | A003 | Engineering Change Proposal – Class II, Minor | NSP - Negotiated at TO Level upon Approval | ||||
| A004 | A004 | Request for Variance (RFV) | NSP | ||||
| A005 | A005 | Notice of Revision | NSP | ||||
| A006 | A006 | Environmental Stress Screening Report | 0 in Year 2+ | each | 0.0 | $0 | |
| A007 | A007 | Acceptance Test Procedure | 0 in Year 2+ | each | 0.0 | $0 | |
| A008 | A008 | Quality Assurance Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| A009 | A009 | Specification Requirement Verification Matrix (SRVM) | 0 in Year 2+ | each | 0.0 | $0 | |
| A010 | A010 | Systems Engineering Management Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| A011 | A011 | Risk Analysis | 0 in Year 2+ | each | 0.0 | $0 | |
| A012 | A012 | First Article Test Plans - Pre-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A013 | A013 | Reliability Test Plan - Pre-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A014 | A014 | Risk Analysis-Update | 0 in Year 3+ | each | 0.0 | $0 | |
| A015 | A015 | Systems Engineering Management Plan-Update | 1 in Year 2+ | each | 1.0 | $0 | |
| A016 | A016 | First Article Test Plans - Post-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A017 | A017 | Reliability Test Plan - Post-PBR | 0 in Year 2+ | each | 0.0 | $0 | |
| A018 | A018 | Specification Requirement Verification Matrix (SRVM) Update | 0 in Year 2+ | each | 0.0 | $0 | |
| A019 | A019 | Configuration Management Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| A020 | A020 | Configuration Status Accounting Information-As Built Data | 0 in Year 2+ | each | 0.0 | $0 | |
| A021 | A021 | EO/IR/LD Payload Product Specification | 0 in Year 2+ | each | 0.0 | $0 | |
| A022 | A022 | Interface Control Document | 0 in Year 2+ | each | 0.0 | $0 | |
| A023 | A023 | Software Requirements Specification | 0 in Year 2+ | each | 0.0 | $0 | |
| A024 | A024 | Software Version Description | 0 in Year 2+ | each | 0.0 | $0 | |
| A025 | A025 | Reliability and Maintainability Predictions Report | Negotiated at TO level | ||||
| A026 | A026 | Reliability Centered Maintenance (RCM) Analysis | 0 in Year 2+ | each | 0.0 | $0 | |
| A027 | A027 | Failure Reporting Analysis and Corrective Action Report | Priced per report | each | 1.0 | $0 | |
| A028 | A028 | Technology Insertion | Negotiated at TO level | ||||
| A029 | A029 | Payload Cybersecurity Posture | Priced per report | each | 1.0 | $0 | |
| A030 | A030 | Certificate of Volatility | NSP | ||||
| A031 | A031 | First Article Test Procedures | 0 in Year 2+ | each | 0.0 | $0 | |
| A032 | A032 | First Article Test Reports | 0 in Year 2+ | each | 0.0 | $0 | |
| A033 | A033 | Reliability Test Procedures | 0 in Year 2+ | each | 0.0 | $0 | |
| A034 | A034 | Reliability Test Report | 0 in Year 2+ | each | 0.0 | $0 | |
| A035 | A035 | Failure Item Analysis Report | Priced per report | each | 1.0 | $0 | |
| A036 | A036 | Software Product Specification | 0 in Year 2+ | each | 0.0 | $0 | |
| C001 | C001 | Field Service Representative Spare Parts List | 0 in Year 2+ | each | 0.0 | $0 | |
| D001 | D001 | Level of Repair Analysis (LORA) | Develop and maintain per PWS 3.6.1.1, priced per year | lot | 1.0 | $0 | |
| D002 | D002 | Depot Maintenance Study | Negotiated at TO level | ||||
| D003 | D003 | Bill of Materials | 0 in Year 2+ | each | 0.0 | $0 | |
| D004 | D004 | Inventory Reports | Negotiated at TO level | ||||
| D005 | D005 | Provisioning Parts Data | Negotiated at TO level | ||||
| D006 | D006 | Maintenance Allocation Chart | Negotiated at TO level | ||||
| D007 | D007 | Diminishing Manufacturing sources and Material Shortages (DMSMS) Management Plan | 0 in Year 2+ | each | 0.0 | $0 | |
| D008 | D008 | Diminishing Manufacturing sources and Material Shortages (DMSMS) Implementation Plan | Quarterly report, priced per year | lot | 1.0 | $0 | |
| D009 | D009 | Obsolescence Alert Notice | 0 in Year 2+ | each | 0.0 | $0 | |
| D010 | D010 | Integrated Logistics Support Plan | Develop and maintain per PWS 3.6.4, priced per year | lot | 1.0 | $0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.