W58RGZ-17-R-0043_DRAFT.pdf
PDF 168 KB Posted
- Solicitation number
- W58RGZ-17-R-0043
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W58RGZ-17-R-0043
X
DOA1
SEE SCHEDULE
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
ASHLEY WILBOURN
(256)842-4771
CCAM-AR-D
ASHLEY.R.WILBOURN.CIV@MAIL.MIL
ARMY CONTRACTING COMMAND-REDSTONE
BLDG 5303
REDSTONE ARSENAL, AL 35898
1 92
X 1
X 4 X 25
X 34 X 35
X 41
X 43
X 44
X 63
X 64
X 72
X 87
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ASHLEY WILBOURN
Buyer Office Symbol/Telephone Number: CCAM-AR-D/(256)842-4771
Type of Contract 1: Firm Fixed Price
Type of Contract 2: Cost Plus Fixed Fee
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A-1. The Army Contracting Command - Redstone Arsenal (ACC-RSA) issues this DRAFT Request for Proposal (RFP) for a new Indefinite
Delivery, Indefinite Quantity (IDIQ) Cost Plus Fixed Fee (CPFF) and Firm Fixed Price (FFP) Contract Line Item Numbers (CLINs) for the
Common Helmet Mounted Display (CHMD). As a result of this solicitation, the United States Government (USG) anticipates a single contract award and reserves the right to award without discussions.
A-2. Government plans to award on best value trade-off and reserves the right to not award a contract depending upon the quality of proposals received and availability of funds.
A-3. The USG anticipates the award of the basic contract with CLINs as follows:
CLIN 0001AA - Government Flight Test Units - FFP
CLIN 0001AB - CHMD First Article Test - FFP
CLIN 0002 - CHMD Support Equipment - FFP
CLIN 0003AB - Carrying Case - FFP
CLIN 0004 - Repair Parts - FFP
CLIN 0005AA - System Integration Activities/Qualifications - CPFF
CLIN 0005AB - Post Production Support - CPFF
CLIN 0006 - Tear Down/Inspect/Repair/Return - FFP
CLIN 0007 - Contract Data Requirements List (CDRLs) - Not Separately Priced
CLIN 0008 - Contractor Manpower Reporting - FFP
CLIN 0009 - Travel - Cost No Fee
A-4. Delivery shall be in accordance with Schedule B of this solicitation. A proposed delivery schedule earlier than stated herein is acceptable.
A-5. Offerors shall submit proposals to the following address:
United States Army Contracting Command - Redstone Arsenal
CCAM-ARD
ATTN: Mr. Christopher Williams or Ms. Ashley Wilbourn
TBD
Electronic submissions (email, fax, etc.) are NOT authorized. Offerors are responsible for submitting proposals and any revisions or amendments so as to reach the Government by the time designated herein. Any proposal and revision or amendment received by the
Government after the exact time specified herein is late and will not be considered for award.
A-6. The source selection evaluation will be a combination best-value source selection using the following factors: Technical/System
Performance, Production, Price/Cost, Past Performance, and Small Business. Technical/System Performance Factor is equal to Production which is more important than the Price/Cost Factor which is more important than the Past Performance Factor which is equal to Small
Business. The combination of Technical/System Performance, Production, Past Performance, and Small Business is more important than
Price/Cost.
A-7. To be eligible for award of this contract, the offeror must be deemed responsible IAW FAR 9.104, as supplemented by DFARS 209.104;
meet all requirements of the solicitation; conform to all required terms and conditions; and include all required certifications. The source selections will be conducted IAW the DoD Source Selection Procedures dated 31 March 2016. If an offeror is rated Unacceptable for any non-Cost/Price factor or sub-factor, the offeror shall be ineligible for award.
A-8. No contract award will be made until appropriate funds are available.
A-9. A final RFP is anticipated to be released by 11 July 2017. Proposal due date is anticipated to be 11 August 2017 unless otherwise extended by the Contracting Officer.
A-10. Any comments or questions associated with this draft RFP shall be provided to Mr. Christopher Williams, via email at christopher.b.williams94.civ@mail.mil and Ms. Ashley Wilbourn via email at ashley.r.wilbourn.civ@mail.mil. Comments and questions may
2 92
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
be submitted incrementally; however, all comments and questions must be received no later than 3:00 PM Central Standard Time on 20 June
2017. All correspondence associated with comments and/or questions shall specifically annotate the exact location of the information within the draft RFP relative to the comment and/or question to include the page number(s) and paragraph number(s).
*** END OF NARRATIVE A0001 ***
3 92
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 CHMD SYSTEM
0001AA GOVERNMENT FLIGHT TEST UNITS $ $ ____________________________ ______________ __________________
COMMODITY NAME: CHMD SYSTEM
CLIN CONTRACT TYPE:
Firm Fixed Price
The Contractor shall deliver four (4) CHMDs for the
Government conducted flight testing.
Government Flight Test Units shall be delivered no later than seven (7) months after contract award. The offeror shall provide a master program production schedule that shows the events/activities to be completed by the offeror for this CLIN, IAW Section L para 3.0.
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW SECTION C PARA 7.0
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0001AB CHMD FIRST ARTICLE TEST $ $ _______________________ ______________ __________________
COMMODITY NAME: CHMD PRODUCTION
CLIN CONTRACT TYPE:
Firm Fixed Price
First Article Test unit shall be delivered no later
4 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
than twelve (12) months after contract award. The offeror shall provide a master program production schedule that shows the events/activities to be completed by the offeror for this CLIN, IAW Section L para 3.0.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(W91Q3P) PR W6DS PEO SOLDIER REDSTONE
PM AIR WARRIOR
6726 ODYSSEY
HUNTSVILLE,AL,35806-3302
0001AC CHMD $ $ ____ ______________ __________________
COMMODITY NAME: CHMD
CLIN CONTRACT TYPE:
Firm Fixed Price
CHMD first lot Units shall be delivered no later than fifteen (15) months after contract award. The offeror shall provide a master program production schedule that shows the events/activities to be completed by the offeror for this CLIN, IAW Section L para 3.0.
Orders placed against this CLIN will be at the unit price identified in the Quantity Range Pricing below:
Range Quantity______________
Year 1 (1-365 DACA (Days After Contract Award))
QTY UNIT PRICE DACA
1-100 $_________ ________
101-250 $_________ ________
251-400 $_________ ________
Year 2 (366-730 DACA)
QTY UNIT PRICE DACA
5 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
1-100 $_________ ________
101-250 $_________ ________
251-400 $_________ ________
Year 3 (731-1095 DACA)
QTY UNIT PRICE DACA
1-100 $_________ ________
101-250 $_________ ________
251-400 $_________ ________
Year 4 (1096-1460 DACA)
QTY UNIT PRICE DACA
1-100 $_________ ________
101-250 $_________ ________
251-400 $_________ ________
Year 5 (1461-1825 DACA)
QTY UNIT PRICE DACA
1-100 $_________ ________
101-250 $_________ ________
251-400 $_________ ________
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW SOW SECTION C, PARA 7.0
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
6 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
REQUISITION.
0002 CHMD SUPPORT EQUIPMENT $ $ ______________________ ______________ __________________
COMMODITY NAME: CHMD SUPPORT EQUIPMENT
CLIN CONTRACT TYPE:
Firm Fixed Price
Year 1 (1-356 DACA)
Item No. QTY Unit Price DACA
Year 2 (366-730 DACA)
Item No. QTY Unit Price DACA
Year 3 (731-1095 DACA)
Item No. QTY Unit Price DACA
Year 4 (1096-1460 DACA)
Item No. QTY Unit Price DACA
7 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Year 5 (1461-1825 DACA)
Item No. QTY Unit Price DACA
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SECTION C, SOW PARA 7.1-7.4
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
(End of narrative F001)
0003 CARRYING CASE
0003AB CARRYING CASE $ $ ______________ ______________ __________________
COMMODITY NAME: CARRYING CASE
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities________________
8 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
FROM____ TO__ UNIT PRICE__________
1 400
Orders placed against this CLIN will be at the unit price identified in the Quantity Range Pricing below:
Range Quantity______________
Year 1 (1-365 DACA)
QTY UNIT PRICE DACA
1-100 $_________ ________
101-250 $_________ ________
251-400 $_________ ________
Year 2 (366-730 DACA)
QTY UNIT PRICE DACA
1-100 $_________ ________
101-250 $_________ ________
251-400 $_________ ________
Year 3 (731-1095 DACA)
QTY UNIT PRICE DACA
1-100 $_________ ________
101-250 $_________ ________
251-400 $_________ ________
Year 4 (1096-1460 DACA)
QTY UNIT PRICE DACA
1-100 $_________ ________
101-250 $_________ ________
251-400 $_________ ________
Year 5 (1461-1825 DACA)
QTY UNIT PRICE DACA
1-100 $_________ ________
101-250 $_________ ________
251-400 $_________ ________
9 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0004 REPAIR PARTS $ $ ____________ ______________ __________________
COMMODITY NAME: REPAIR PARTS
CLIN CONTRACT TYPE:
Firm Fixed Price
Year 1 (1-356 DACA)
Item No. QTY Unit Price DACA
Year 2 (366-730 DACA)
Item No. QTY Unit Price DACA
Year 3 (731-1095 DACA)
Item No. QTY Unit Price DACA
10 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Year 4 (1096-1460 DACA)
Item No. QTY Unit Price DACA
Year 5 (1461-1825 DACA)
Item No. QTY Unit Price DACA
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW SECTION C SOW
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
11 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0005 CHMD SERVICES
0005AA SYSTEM INTEGRATION ACTIVITIES/QUALIFICATION $ ___________________________________________ __________________
SERVICE REQUESTED: CHMD SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Offerors should enter their pricing for integration activities and qualifications done IAW Section C
Statement of Work para 3.2. This pricing shall include the cost of any CHMD hardware used for these activities. Travel should be priced at cost separately in CLIN 0009.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0005AB POST PRODUCTION SUPPORT $ _______________________ __________________
SERVICE REQUESTED: PPS
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Post Production Support may include engineering studies and analyses, or follow-on testing and evaluation. This should include labor pool categories and labor rates. Travel should be priced at cost separately in CLIN 0009.
For each hourly labor rate, provide the following: ____
Year 1 (1-365 DACA)___________________
Identification of Labor Category*
Estimated Cost ____________
Fixed Fee ____________
Total CPFF ____________
Year 2 (366-730 DACA)_____________________
12 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Identification of Labor Category*
Estimated Cost ____________
Fixed Fee ____________
Total CPFF ____________
Year 3 (731-1095 DACA)______________________
Identification of Labor Category*
Estimated Cost ____________
Fixed Fee ____________
Total CPFF ____________
Year 4 (1096-1460 DACA)_______________________
Identification of Labor Category*
Estimated Cost ____________
Fixed Fee ____________
Total CPFF ____________
Year 5 (1461-1825 DACA)_______________________
Identification of Labor Category*
Estimated Cost ____________
Fixed Fee ____________
Total CPFF ____________
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0006 TEAR DOWN/INSPECT/REPAIR/RETURN $ $ _______________________________ ______________ __________________
COMMODITY NAME: TIRR
CLIN CONTRACT TYPE:
Firm Fixed Price
TIRR is to contain a brief report to the government and an authorization to repair request if the estimated repair cost is greater than the threshold contained in SOW paragraphs 8.5.2, 8.5.2.1, and
8.5.1.6. Training, Maintenance and Support includes
13 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
activities included in SOW paragraphs 8.2, 8.4, 8.5, 8.5.1, and 8.5.1.1. The classification of level of repair along with the associated FFP should be provided.
The offeror shall provide teardown, inspection, repair, and return IAW Section C, paragraph 8.5.1 through 8.5.1.6.
TIRR____
For each repair category, the offeror shall provide pricing to complete repair and return of repaired items to the Government. The offeror shall define the repair categories in the offeror's Production
Volume proposal. For any repair category not used by the offeror, the offeror shall fill in "N/A".
Year 1 (1-365 DACA)___________________
Category I Repair __________
Category II Repair __________
Category III Repair __________
Year 2 (366-730 DACA)_____________________
Category I Repair __________
Category II Repair __________
Category III Repair __________
Year 3 (731-1095 DACA)______________________
Category I Repair __________
Category II Repair __________
Category III Repair __________
Year 4 (1096-1460 DACA)_______________________
Category I Repair __________
Category II Repair __________
Category III Repair __________
Year 5 (1461-1825 DACA)_______________________
Category I Repair __________
Category II Repair __________
Category III Repair __________
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
14 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0007 CONTRACT DATA REQUIREMENTS LIST (CDRLS) _______________________________________
A001 INTEGRATION TEST PLAN $ ** NSP ** _____________________ __________________
SERVICE REQUESTED: CDRL A001
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A002 TEST/INSPECTION REPORT $ ** NSP ** ______________________ __________________
SERVICE REQUESTED: CDRL A002
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A003 REPORT, RECORD OF MEETING/MINUTES $ ** NSP ** _________________________________ __________________
SERVICE REQUESTED: CDRL A003
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
15 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
A004 CONTRACTOR VALIDATION PLAN $ ** NSP ** __________________________ __________________
SERVICE REQUESTED: CDRL A004
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A005 TEST PROCEDURE AND REPORT $ ** NSP ** _________________________ __________________
SERVICE REQUESTED: CDRL A005
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A006 FIRST ARTICLE INSPECTION, TEST PLAN AND PROCEDURES $ ** NSP ** __________________________________________________ __________________
SERVICE REQUESTED: CDRL A006
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A007 TEST/INSPECTION REPORT $ ** NSP ** ______________________ __________________
SERVICE REQUESTED: CDRL A007
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
16 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
A008 TEST PLAN - RE-QUALIFICATION PLAN $ ** NSP ** _________________________________ __________________
SERVICE REQUESTED: CDRL A008
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A009 TEST/INSPECTION REPORT - RE-QUALIFICATION REPORT $ ** NSP ** ________________________________________________ __________________
SERVICE REQUESTED: CDRL A009
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A010 PARTS MANAGEMENT PLAN - LEAD FREE CONTROL PLAN $ ** NSP ** ______________________________________________ __________________
SERVICE REQUESTED: CDRL A010
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A011 ENGINEERING CHANGE PROPOSAL (ECP) $ ** NSP ** _________________________________ __________________
SERVICE REQUESTED: CDRL A011
Inspection and Acceptance _________________________
17 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A012 NOTICE OF REVISION (NOR) $ ** NSP ** ________________________ __________________
SERVICE REQUESTED: CDRL A012
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A013 ENGINEERING RELEASE RECORD (ERR) $ ** NSP ** ________________________________ __________________
SERVICE REQUESTED: CDRL A013
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A014 TECHNICAL REPORT - STUDY/SERVICES $ ** NSP ** _________________________________ __________________
SERVICE REQUESTED: CDRL A014
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A015 CONFIGURATION AUDIT SUMMARY REPORT AND ______________________________________
CERTIFICATION $ ** NSP ** _____________ __________________
SERVICE REQUESTED: CDRL A015
18 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A016 PRESERVATION AND PACKAGING DATA $ ** NSP ** _______________________________ __________________
SERVICE REQUESTED: CDRL A016
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A017 PRESERVATION AND PACKAGING DATA $ ** NSP ** _______________________________ __________________
SERVICE REQUESTED: CDRL A017
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A018 TECHINCAL REPORT - STUDY/SERVICES - SHIPPING ____________________________________________
REPORT $ ** NSP ** ______ __________________
SERVICE REQUESTED: CDRL A018
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A019 LOGISTICS PRODUCT DATA $ ** NSP ** ______________________ __________________
SERVICE REQUESTED: CDRL A019
19 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A020 ENGINEERING DATA FOR PROVISIONING (EDFP) $ ** NSP ** ________________________________________ __________________
SERVICE REQUESTED: CDRL A020
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A021 COTS MANUALS AND ASSOCIATED SUPPLEMENTAL DATA $ ** NSP ** _____________________________________________ __________________
SERVICE REQUESTED: CDRL A021
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A022 VALIDATION REPORT $ ** NSP ** _________________ __________________
SERVICE REQUESTED: CDRL A022
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A023 INSTRUCTIONAL MEDIA DESIGN PACKAGE $ ** NSP ** __________________________________ __________________
20 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: CDRL A023
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A024 TRAINING CONDUCT SUPPORT DOCUMENT $ ** NSP ** _________________________________ __________________
SERVICE REQUESTED: CDRL A024
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A025 INSTURCTIONAL MEDIA PACKAGE $ ** NSP ** ___________________________ __________________
SERVICE REQUESTED: CDRL A025
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A026 GOVERNEMNT FURNISHED EQUIPMENT REPAIR STATUS ____________________________________________
REPORT $ ** NSP ** ______ __________________
SERVICE REQUESTED: CDRL A026
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A027 SAFETY ASSESSMENT REPORT $ ** NSP ** ________________________ __________________
21 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: CDRL A027
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A028 SYSTEM SAFETY HAZARD ANALYSIS REPORT $ ** NSP ** ____________________________________ __________________
SERVICE REQUESTED: CDRL A028
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A029 HEALTH HAZARD ASSESSMENT REPORT $ ** NSP ** _______________________________ __________________
SERVICE REQUESTED: CDRL A029
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A030 SCIENTIFIC AND TECHNICAL REPORT $ ** NSP ** _______________________________ __________________
SERVICE REQUESTED: CDRL A030
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
22 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A031 HAZARDOUS MATERIALS MANAGEMENT PROGRAM (HMMP) _____________________________________________
REPORT $ ** NSP ** ______ __________________
SERVICE REQUESTED: CDRL A031
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0008 CONTRACTOR MANPOWER REPORTING $ $ _____________________________ ______________ __________________
COMMODITY NAME: MANPOWER
CLIN CONTRACT TYPE:
Firm Fixed Price
The prime contractor is required to provide the information addressed in the contractor user guide at the following web address: https://cmra.army.mil.
Subcontractors are required to provide the informaiton addressed in the subcontractor user guide at the web address provided above. Referenced in SOW paragraph 12.1, 12.1.1, and 12.1.2.
Year 1 (1-365 DACA)
AMOUNT
Year 2 (366-730 DACA)
AMOUNT
Year 3 (731-1095 DACA)
AMOUNT
Year 4 (1096-1460 DACA)
AMOUNT
Year 5 (1461-1825 DACA)
AMOUNT
23 92
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0009 TRAVEL $ ______ __________________
SERVICE REQUESTED: TRAVEL
CLIN CONTRACT TYPE:
Cost No Fee
Travel should exclude application of profit/fee and statement limiting allowable travel expenses to the
Joint Travel Regulations (JTR).
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
24 92
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Air Soldier Common Helmet Mounted Display
PRODUCTION STATEMENT OF WORK
24 April 2017
1.0 (U) SCOPE. This Statement of Work (SOW) describes the efforts required for production of the Air Soldier Common Helmet Mounted
Display (CHMD). PM AW plans to procure a Non Developmental Item (NDI) display capable of satisfying the Air Soldier System CHMD requirements, Support Equipment, Repair Parts, and Carrying Case hardware items in addition to post production support. This scope includes the completion of First Article Test (FAT) and the delivery of Logistics product data for training and provisioning. The scope includes provisions for Teardown, Inspect, Repair and Return (TIRR) capability.
2.0 (U) APPLICABLE DOCUMENTS. Applicable top documents are contained in the contract Document Summary List (DSL), in Section J, by number, title, and date. The document versions in the DSL take precedence over the generic references (without revision letters) cited in this SOW.
3.0 (U) REQUIREMENTS
3.1 (U) Production. The contractor, as an independent contractor and not as an agent of the Government, shall furnish the personnel, facilities, equipment and materials necessary to fabricate or purchase, assemble, test, and deliver the items as defined in Section B of the contract. Delivery shall be as set forth in Section B of the contract. The contractor shall manufacture, test and deliver the following hardware and any corresponding software or firmware:
a) Common Helmet Mounted Display IAW AVNS-DTL-10868;
b) CHMD Support Equipment (vendor unique/defined);
c) CHMD Carrying Case (vendor unique/defined) IAW drawing #1050008; and
d) Repair Parts (vendor unique/defined).
3.2 (U) Integration activities/Qualification. The contractor shall complete qualification and integration of the display to meet the requirements of AVNS-DTL-10868. For any AVNS-DTL-10868 requirement not proven as verified, the contractor shall perform the qualification testing or analysis to complete verification. The contractor shall present the proposed schedule for all activities needed to complete integration and qualification of the CHMD system at the contract Start of Work meeting. Any test/demonstration used to prove verification of requirements shall use production representative hardware. Once the contractor has completed Safety of Flight and Integration requirements and received Airworthiness Release, the Government will perform flight testing of the CHMD to support final release of the CHMD for fielding. The contractor shall provide technical support by telephonic means for this flight testing activity for up to a three month period.
3.2.1 (U) Safety of Flight and Integration Data. For Safety of Flight and Integration data, the contractor shall prepare test plans IAW
DI-NDTI-80566 and deliver IAW CDRL A001. The contractor shall prepare test reports IAW DI-NDTI-80809 and deliver IAW CDRL A002. The contractor shall conduct the tests that constitute Safety of Flight Qualification and Integration as the first testing to be completed.
The following AVNS-PRF-10868 requirements constitute the Safety of Flight tests:
AVNS-PRF-10868 3.6.8 Combined Environmental Effects
AVNS-PRF-10868 3.6.10 Vibration Low Pressure (Non-Operational)
AVNS-PRF-10868 3.6.11 Explosive Atmosphere
AVNS-PRF-10868 3.6.12.1.1 CE101
AVNS-PRF-10868 3.6.12.1.2 CE102
AVNS-PRF-10868 3.6.12.1.4 RE102
The following AVNS-PRF-10868 requirements constitute the Integration requirements test:
AVNS-PRF-10868 3.1.4.1 Impact Protection, Crown & Headband
AVNS-PRF-10868 3.1.4.2 Impact Protection Ear
AVNS-PRF-10868 3.3.20 Day/Night Transition
AVNS-PRF-10868 3.5.1.2 Stow/Deploy
AVNS-PRF-10868 3.5.1.4 CHMD Compatibility with Visors (Day Configuration)
AVNS-PRF-10868 3.5.1.5 Non-Interference with ALSE Equipment
AVNS-PRF-10868 3.5.1.6 ANVIS Compatibility
AVNS-PRF-10868 3.5.1.7 ANVIS Look Around Capability
AVNS-PRF-10868 3.5.1.8 ANVIS Attribute Compatibility
AVNS-PRF-10868 3.5.1.9 ANVIS Operation with Failed CHMD
AVNS-PRF-10868 3.5.2 ASDC Interface
AVNS-PRF-10868 3.5.3 Non-Interference with Helmet Tracker Kit (HTK)
AVNS-PRF-10868 3.8.3.2 Crash Injury Risk
25 92
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
The US Government will conduct Center of Mass (Neck Fatigue) (AVNS-PRF-10868 paragraph 3.1.2.1); Center of Mass (Neck Injury) (AVNS-PRF-
10868 paragraph 3.1.2.2); Electromagnetic Compatibility (AVNS-PRF-10868 paragraph 3.6.12.3); Electromagnetic Vulnerability (AVNS-PRF-
10868 paragraph 3.6.12.4); Ingress/Emergency Egress (AVNS-PRF-10868 paragraph 3.8.37); and Night Vision Compatibility (AVNS-PRF-10868 paragraph 3.4) as part of the Government Flight Test.
3.2.2 (U) Verification Cross-Reference Matrix (VCRM). For any qualification testing beyond the SOF testing and Integration testing, the contractor shall provide test plans IAW DI-NDTI-80566 and deliver IAW CDRL A001 as necessary to substantiate the compliance of the display system with the requirements of AVNS-DTL-10868. The contractor shall prepare test report(s) IAW DI-NDTI-80809 and deliver IAW
CDRL A002. The contractor shall develop a VCRM IAW DI-MISC-81283 and deliver IAW CDRL A003. The VCRM shall list each AVNS-PRF-10868
Section 3 requirement and corresponding Section 4 Verification method with a link to the data proving verification. For any verification wherein the test item part number does not match the part number being procured on this contract, the contractor shall provide Qualification by Similarity reports that document any differences between the part number configurations, to include bill of material, and provides rationale as to why the configuration differences do not affect verification results.
3.3 (U) Government Furnished Equipment (GFE). The Government will provide equipment to support integration of the display with the helmet and associated flight equipment. The contractor shall manage GFE. When GFE is no longer required the contractor shall request disposition instructions from the Government. The Government will provide the following items as GFE:
a) Rotary Wing Helmet Sizes S, M, L, XL, P/N A14093-X;
b) Joint Service Aircrew Mask Large - 806799-02, Extra Large - 806699-02;
c) ANVIS Night Vision goggle (NSN: 5855-01-475-7061) /w mounting hardware (NSN: 5855-01-451-7389); (This is an
ITAR controlled item.)
d) Laser Eye protection in the standard Aviators spectacles; NSN/8475-ND-050-568P-LS, F41624-00-C-1001;
e) Cannula and mount for Personal Helicopter Oxygen Delivery System (PHODS): cannula w/out Mount P/N 102980
(NSN: 4720-01-594-6815) and Mounting clip kit for HGU-56/P P/N 102907 (NSN: 1660-01-572-7982);
f) Oral-Nasal Mask Assembly for PHODS (P/N 102971 Small (NSN 1660-01-603-6477), 102972 Medium (NSN 1660-01-603-
6479), 102973 Medium Wide (NSN 1660-01-603-6483), 102974 Large (NSN 1660-01-603-6486)).
Unique tooling, support equipment and associated hardware and software developed utilizing Government funding shall be considered property of the U.S. Government.
4.0 (U) PROGRAM MANAGEMENT
The contractor shall prepare a record of meeting minutes IAW DI-ADMN-81505 and deliver IAW CDRL A004 for the starts of work meeting, program reviews, and technical interchange meetings.
4.1 (U) Start of Work Meeting. The contractor shall host a Start of Work meeting within 30 days of contract award at the contractor facility. The purpose of this meeting is to establish requirements for Program Reviews and to discuss contractual requirements, delivery schedules and contract data. The contractor shall include a schedule that demonstrates how the contractor shall meet the requirements of the contract and any delivery orders. The schedule shall include ordering of parts, completion of integration testing activities, receipt of material and parts, manufacture, completion of FAT inspection and acceptance. The contractor shall introduce the team and shall describe the labor, tasks, roles and responsibilities to include those of subcontractors. The contractor shall describe the parts obsolescence program, parts management program, quality program, and configuration management program.
4.2 (U) Program Reviews. Program Reviews shall be held once per year at the prime contractors facility and may be combined with other reviews or meetings. The contractor shall provide in-depth information on program progress and status to include schedule and manufacturing issues. During the Program Review, the contractor shall report to the Government the progress toward meeting the manufacturing performance goals and deliveries. The contractor shall present the progress and performance of major subcontractors and critical suppliers.
4.3 (U) Teleconferences (Telecons). The contractor shall participate in teleconference calls with the Government every two weeks.
During the teleconferences, the contractor shall address progress and any issues to include subcontractors progress and issues. The contractor shall track the assigned actions identified until the action is resolved. The teleconference calls shall continue from contract award until the delivery and acceptance of the second production lot of each product item. After these events, monthly telecons will be held, on an as needed basis, but at least one telecon shall be held after the award of each delivery order.
5.0 (U) PRODUCT ASSURANCE\~
5.1 (U) Quality Assurance Program. The contractor shall employ a quality system that meets AS 9100 or equivalent, and calibration that meets ANSI Z540.3 or equivalent. The contractor shall provide the Government an overview of their quality system at the start of work meeting. The contractor shall make available, for review by the Government, quality system procedures, planning and all other documentation and data that comprise the contractor's quality system for both hardware and software/firmware. The Government will review the documents that comprise the quality system, and may perform any necessary inspections, or evaluations to confirm conformance to requirements and adequacy of the quality system.
26 92
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
5.2 (U) Non-conforming Material. The contractor shall utilize a documented system for evaluating and disposition of non-conforming materiel. This system shall be used for tracking, analyzing to determine root cause, and assuring effective preventative/corrective action implementation. The contractor shall ensure that all products meet contractual requirements. Installation or use of non-conforming products without specific Government authorization is not permitted. Non-conformances shall not be given a disposition of use as is or repair through contractor action without Government approval. Rework to print is acceptable. The contractor shall maintain a procedure to control the identification, documentation, evaluation, disposition, and segregation requirements of non-conforming products. The contractor shall notify the Government of any non-conforming products via the Request for Variance (RFV) process IAW Section H.
5.3 (U) Quality Conformance. The contractor shall develop and implement a product acceptance system that demonstrates compliance of the items listed in paragraph 3.1 to the items specifications and drawings and incorporate this into the hardware/software/firmware acceptance test plan. The product acceptance system shall address system and subsystem component requirement verification, in-process inspection, and final acceptance testing at all levels, including lower tier subcontractors and suppliers. The contractor shall provide the Government with access to this information for onsite review upon request. End item acceptance test procedures (ATPs) and equipment, including Special Inspection Equipment (SIE) and Special Test Equipment (STE), shall be validated prior to use for delivery of hardware.
The Government shall be given the opportunity to participate in the validation. The contractor shall prepare validation plans IAW DI-
MISC-80759 and deliver IAW CDRL A005. The contractor shall develop hardware Acceptance Test Procedure (ATP) IAW DI-NDTI-80603 and deliver IAW CDRL A006. The contractor shall perform production conformance tests IAW the Government approved Acceptance Test Procedure
(ATP). The contractor shall prepare ATPs which are adequate to ensure that the production articles meet the requirements of the drawings and specifications. The contractor shall control any deviations from, or changes to the Government-approved ATPs IAW approved
Configuration Management (CM) procedures as defined in paragraph 6.0. The Government will review changes to acceptance test procedures or associated equipment, vendor changes, line relocations, production disruptions, or downtime exceeding 12 months for determination of re-validation requirements.
5.4 (U) Subcontractor/Supplier Quality Assurance. The contractor shall ensure that all applicable quality requirements, associated specifications, and any other contractual agreements are flowed down to their lower tier subcontractors/suppliers and that compliance is verified.
5.5 (U) Management of Subcontractor/Supplier Quality. The contractors procedures and policies for managing subcontractor/supplier quality shall be documented. The document shall identify processes for selecting, qualifying and managing subcontractors/suppliers, managing product and processes, flowing applicable requirements to subcontractors/suppliers, assessing subcontractor/suppliers capabilities, verifying compliance of subcontractors/suppliers and establishing metrics for continuously monitoring and rating supplier performance. The document shall identify key subassembly manufacturing or processes to be performed by the sub-tier suppliers and the contractor shall maintain a list of qualified suppliers and the current rating for that supplier. The supplier rating system, documented procedures, and policies shall be made available for Government review via in-plant reviews or on-line quality system. The document shall address product acceptance requirements for suppliers and emphasis shall be placed on product verification at the supplier level in order to reduce the amount of incoming receiving inspection and test. The contractor shall identify key features, characteristics and performance requirements that shall be verified at the component acceptance test level. The contractor shall develop and have available for Government review, a flow chart showing the supply chain (once sub-contractors/suppliers are selected) for the item being manufactured. Manufacturers of any Critical or Key components/assemblies shall be specifically identified on the flow chart.
5.6 (U) Pilot Line Validation Support. The contractor shall support a Pilot Line Validation (PLV) conducted by the Government at the contractors manufacturing facility. The PLV will consist of one visit by the Government at the selected manufacturers facility. The
PLV shall be scheduled at a mutually agreed upon date. The contractor shall notify the Government technical representative two weeks prior to readiness for the PLVs. The PLVs shall include, but are not limited to:
a. Review of Production Facility.
b. Hardware evaluation.
c. Work instruction review.
d. Review of process controls and documentation.
e. Verification of automated and/or manual processes.
f. Statistical Process Controls (SPC) Data and/or corrective action system evaluation.
g. Validation of Automatic Test Equipment.
h. Other program/contractor standard operation procedures/data review.
The Government will perform additional PLVs, if deemed appropriate. The basis for additional PLVs include, but are not limited to changes to contractor suppliers, methods of production, production processes, relocation of production lines, or 180-day shutdown of production lines.
5.7 (U) First Article Test (FAT). The contractor shall perform FAT on the CHMD displays. The contractor shall prepare and submit for
Government approval, FAT plan/procedures IAW DI-NDTI-81307 and deliver IAW CDRL A007. This plan shall define the contractor's methodology for conducting FATs both in-house and at subcontractor's/supplier's facilities, if applicable, and satisfy the conditional requirements as defined in SAE AS9102. The FAT plan/procedures shall provide detailed operational test procedures to demonstrate the functionality of the selected unit(s) and allow tear down of the unit(s). The contractor shall not initiate FAT prior to Government
27 92
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
approval of the test plan and shall perform FAT IAW the Government approved plan. The contractor shall notify the Government 20 calendar days (60 calendar days for contractors located outside the continental United States) prior to initiation of the FAT. The contractor shall conduct a FAT on units manufactured prior to the first production lot. The FAT shall be witnessed and approved by the
Government. The FAT test unit(s) shall utilize the same manufacturing techniques and facilities used to produce the contract quantity.
The contractor shall successfully complete the FAT prior to producing and submitting the first production lot hardware for Government acceptance. The contractor shall provide a FAT report after successful completion of the FAT IAW DI-NDTI-80809 and deliver IAW CDRL
A008. The report shall include AS9102 referenced forms, or equivalent, and address the results and findings of the test. First Article
Test units shall not be retained as manufacturing standards.
5.8 (U) Verification of Changes to a Qualified Baseline. The contractor shall establish the qualified baseline for the CHMD Carrying
Case and Support Equipment as the configuration audited at Physical Configuration Audit (PCA). The contractor shall establish the qualified baseline for the CHMD and the lower level parts that comprise the CHMD as the configuration verified at FAT. The contractor shall submit changes to these qualified baselines using the Configuration Control process in paragraph 6.1.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .