About this file

Section L Table

View the file

Other files

File Type Posted
A07_-_W56KGY-15-R-0016_0003_SF33.pdf PDF
Solicitation_QA_2015OCT21.docx DOCX document
Attachment_0001_-_BASE_PWS_PSS-T_Amendment0002.docx DOCX document
Attachment_0014_-_Section_L_Tables_Amendment0002.docx DOCX document
Solicitation_QA_2015OCT20.pdf PDF
A07_-_W56KGY-15-R-0016_0002_SF33.pdf PDF
Attachment_0015_-_Section_M_Tables_Amendment0001.docx DOCX document
Solicitation_QA_2015OCT17.docx DOCX document
Attachment_0001_-_BASE_PWS_PSS-T_Amendment0001.docx DOCX document
A07_-_W56KGY-15-R-0016_0001_SF33.pdf PDF
Attachment_0013_-_FFP_Price_Template_PSS-T_Amendment0001.xlsx XLSX spreadsheet
Attachment_0008_-_TO_PWS_PSS-T_Amendment0001.docx DOCX document
Attachment_0014_-_Section_L_Tables_Amendment0001.docx DOCX document
A01_-_ExhibitG_CDRL_TMSS.pdf PDF
Solicitation_Q A.pdf PDF
A01_-_ExhibitJ_CDRL_ATTS.pdf PDF
A01_-_ExhibitL_CDRL_SESS.pdf PDF
A01_-_ExhibitE_CDRL_NDTI.pdf PDF
A01_-_ExhibitK_CDRL_MISC.pdf PDF
A01_-_ExhibitN_CDRL_MFFP.pdf PDF
A01_-_ExhibitM_CDRL_QCIC.pdf PDF
A01_-_ExhibitF_CDRL_SAFT.pdf PDF
A01_-_ExhibitA_CDRL_MGMT.pdf PDF
A01_-_ExhibitC_CDRL_ADMN.pdf PDF
A01_-_ExhibitD_CDRL_CMAN.pdf PDF
A01_-_ExhibitH_CDRL_IPSC.pdf PDF
A01_-_ExhibitB_CDRL_FNCL.pdf PDF
Attachment0015-Section_M_Tables.pdf PDF
Attachment0008-TO_PWS_PSS-T.docx DOCX document
Attachment0013-FFP_Price_Template_PSS-T.xlsx XLSX spreadsheet
Attachment0011-Tech_Data_Req_Quest.docx DOCX document
Attachment0012-PPQ_PSS-T.docx DOCX document
Attachment0002-BASE_QASP_PSS-T.pdf PDF
Attachment0010-Data_Tech_NDA_PSS-T.pdf PDF
Attachment0005-PRS_PSST.xlsx XLSX spreadsheet
Attachment0001-BASE_PWS_PSS-T.pdf PDF
Attachment0009-TO_QASP_PSS-T.docx DOCX document
A07_-_W56KGY-15-R-0016_SF33.pdf PDF
Attachment0016-PWS_Labor_Hour_Spreadsheet.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0014 i

TABLE OF CONTENTS

Tables Table 11. Requirements for Submission of Proposal Materials Table 12. Proposal Compliance Checklist and Cross Reference Table Table 13. IDIQ CLIN Structure Table 14. Anticipated CLIN Structure for TO Award Table 15. Summary Worksheet for TO 0001 and FFP Cost/Price Table 16. Labor CLIN Worksheet Sample Table 17. ODCs CLIN Worksheet Table 18. Materials Costs Table 19. ODCs

Table 11. Requirements for Submission of Proposal Materials

Volume Title Unsanitized Microsoft

(MS) Word Version

Sanitized MS Word Version

Unsanitized PDF Version

Sanitized

PDF

Version

Unsanitized MS Excel Version

Sanitized MS Excel Version

Max.

Pages

I – Technical 1 1 1 1 N/A N/A

200* per copy II – Past Performance

1 N/A 1 N/A N/A N/A 25

III – Cost/ Price

N/A N/A 1 1 1 1 N/A

IV – Miscel-laneous**

N/A N/A 1 1*** N/A N/A N/A

*Draft plans and proposal compliance checklist are included in the page count.

**The miscellaneous volume shall include terms and conditions documents, non-disclosure agreements, data and software assertions, and representations and certifications, all applicable commercial software license agreements related to commercial software deliverables, the organizational conflict of interest (OCI) mitigation plan, completed Sections B, H, and K, and Standard Forms 30 and 33. These items are required for determination of responsibility and eligibility for award but are not part of the evaluation factors set forth in Section II.B. of this document.

***Limited to data and software assertions.

Table 12. Proposal Compliance Checklist and Cross Reference Table

PWS Paragraph Proposal

Submission Requirements

Offeror Acknowledges

Compliance

Narrative Included in Proposal

Proposal Reference

Paragraphs

Section 1 – Program Management and Operations

1.1 General

Acknowledge compliance

□Yes □No □Yes □No

1.2 Contract/Order

Type

Acknowledge

1.3 Period of

Performance (PoP)

Acknowledge

1.4 Place of

Performance

Acknowledge

Proposal

Submission Requirements

Offeror Acknowledges

Compliance

Narrative Included in Proposal

Proposal Reference

Paragraphs

1.5 Contractor

Performance Evaluation

Acknowledge

1.6 Intellectual

Property

Submit data restrictions tables in accordance with DFARS

252.227-7013, 252.227-7014, 252.227-7015

1.7 Government

Furnished Property

(GFP)

Acknowledge

1.8 Inspection and

Acceptance / Freight on Board

(FOB)

Acknowledge

1.9.1 Security

Clearance Requirements

Acknowledge compliance and provide facility and safeguarding clearance levels

1.9.2 Security

Training Requirements

Acknowledge

1.9.3 Security

Procedures

Acknowledge

1.9.4 Operations

Security (OPSEC)

Acknowledge

1.10 Information

Systems (IS)

Acknowledge

Proposal

Submission Requirements

Offeror Acknowledges

Compliance

Narrative Included in Proposal

Proposal Reference

Paragraphs

1.11 System Safety

and Health Hazards

Acknowledge

1.12 Information

Assurance (IA)

Provide an approach to meet TO PWS requirements

1.13 Program

Protection Plan

(PPP)

Acknowledge

3.1.1 Program

Management Support

Acknowledge compliance with OCI requirements and provide an approach to meet TO PWS requirements.

Submit a management plan

3.1.2 Contract

Transition

Acknowledge compliance and provide an approach to meet TO PWS

3.1.3 Reporting

Acknowledge

3.1.4 Financial

Reporting

Provide an approach to meet TO PWS

3.1.5 Contractor

Manpower Reporting

Acknowledge

Proposal

Submission Requirements

Offeror Acknowledges

Compliance

Narrative Included in Proposal

Proposal Reference

Paragraphs

3.1.6 Data

Management

Provide an approach to meet TO PWS

3.1.7 Demobilization

Provide an approach to meet Base

PWS

3.1.8 Earned Value

Management System (EVMS)

Provide an approach to meet TO PWS

3.6.1 Operations

Support

Provide an approach to meet TO PWS

3.6.2 Operator/User- Level Maintainers

Provide an approach to meet TO PWS

3.6.3 Trainer/Test

System

Provide an approach to meet TO PWS

3.6.4 Operations

Reporting

Acknowledge

3.7 Drawdown and

Surge Operations

Acknowledge

3.8 Deliverables

Acknowledge

4 Travel or Special Requirements

Acknowledge compliance and indicate any requests for travel expected to occur within 45

Proposal

Submission Requirements

Offeror Acknowledges

Compliance

Narrative Included in Proposal

Proposal Reference

Paragraphs days after contract award

4.1 CONUS Travel

Acknowledge

4.2 OCONUS

Travel

Acknowledge

Section 2 – Engineering

3.2.1 System

Technical Support

Provide an approach to meet TO PWS

3.2.2 Aerostat

System Integration Laboratory (SIL)

Provide an approach to meet TO PWS

3.2.3 Contractor

System Engineering Management Plan

Provide an approach to meet TO PWS requirements.

Submit draft systems engineering management plan

3.2.5 Engineering

Change Proposals

(ECP

Provide an approach to meet TO PWS

3.2.5.1 ECP

Approvals

Acknowledge

3.2.5.2 ECP

Categories

Acknowledge

Proposal

Submission Requirements

Offeror Acknowledges

Compliance

Narrative Included in Proposal

Proposal Reference

Paragraphs

3.2.5.3 ECP

Government Notification of Major/Minor Changes

Acknowledge

3.2.5.4 Multi-user

ECP Automated Review System

(MEARS)

Acknowledge

3.2.5.5 System

Commonality

Provide an approach to meet TO PWS requirements.

Submit draft

GCS

commonality plan.

3.2.6 Product

Configuration Documentation

Provide an approach to meet TO PWS

3.2.7 Foreign

Military Sales

(FMS)

Provide an approach to meet Base

PWS

3.2.8 Technical

Data Package

(TDP)

Provide an approach to meet TO PWS

3.2.8.1 Source

Controlled Drawings (SCDs)

Acknowledge

3.2.8.2 Circuit Card

Assembly Drawings

Acknowledge

Proposal

Submission Requirements

Offeror Acknowledges

Compliance

Narrative Included in Proposal

Proposal Reference

Paragraphs

3.2.8.3 Software

Control Drawing

Acknowledge

3.2.8.4 Test

Requirements Document (TRD)

Acknowledge

3.2.8.5 Special

Tooling Requirements

Acknowledge

3.2.8.6 Specification

Acknowledge

3.2.8.7 Parts List

(Drawing Maintenance)

Acknowledge

3.2.8.8 Marking for

Government Use

Acknowledge

3.2.9.1 Quality

Control Plan (QCP)

Provide an approach to meet TO PWS

3.2.9.2 Software

Quality Testing

(SQT)

Provide an approach to meet TO PWS

3.2.10 Test and

Evaluation

Provide an approach to meet TO PWS

Section 3 - Logistics

3.3.1 Performance

Based Logistics (PBL) Metrics Monitoring and

Provide an approach to meet TO PWS

Proposal

Submission Requirements

Offeror Acknowledges

Compliance

Narrative Included in Proposal

Proposal Reference

Paragraphs

Reporting Requirements

3.3.1.1 Level 1

Metrics

Provide an approach to meet TO PWS

3.3.1.2 Level 2

Metrics

Acknowledge

3.3.1.3 PBL Metric

Definitions Applicable to This

PWS

Provide an approach to meet TO PWS

3.3.2.1 Procurement

Provide an approach to meet TO PWS

3.3.2.3 Inventory

Control

Provide an approach to meet TO PWS

3.3.3 Retrograde

Provide an approach to meet TO PWS

3.3.4 Relocation

approach to meet TO PWS

3.3.5 Shipping and

Receiving

Acknowledge

3.3.6 Above User-

Level Maintenance and Depot Repairs

Provide an approach to meet TO PWS

Proposal

Submission Requirements

Offeror Acknowledges

Compliance

Narrative Included in Proposal

Proposal Reference

Paragraphs

3.3.7 Reset

Provide an approach to meet TO PWS

3.3.8 Depot Public

Private Partnership (P3)

Provide an approach to meet TO PWS

3.3.9 Provisioning

approach to meet TO PWS

3.3.10 Government-

Industry Data Exchange Program

(GIDEP)

Acknowledge

3.4.1 Effectivity of

TMs

Provide an approach to meet TO PWS

3.4.2 Maintenance

Concept

Acknowledge

3.4.3 Safety

Changes

Acknowledge

3.4.4 Copyright and

Proprietary Material

Acknowledge

3.4.5 Repair Parts

and Special Tools List (RPSTL)

Acknowledge

3.4.6.1 In Process

Reviews

Acknowledge

3.4.6.2 Validation Provide an

approach to

Proposal

Submission Requirements

Offeror Acknowledges

Compliance

Narrative Included in Proposal

Proposal Reference

Paragraphs meet TO PWS requirements

3.4.6.3 Verification

Provide an approach to meet TO PWS

3.4.7 Final Delivery

Reviews

Acknowledge

3.5 Training

approach to meet TO PWS

Table 13. IDIQ CLIN Structure

CLINs CLIN LOCATION/DESCRIPTION 0001 Labor – CPFF-TF 0002 Materials, Travel, Other Direct Costs (ODCs) – COST-No Fee 0003 Key Spare Parts – FFP 0004 Data Items – Not separately priced (NSP) 0005 Contractor Manpower Reporting - NSP

Table 14. Anticipated CLIN Structure for TO Award

TO

CLINs CLIN LOCATION/DESCRIPTION 0001 Base Period – Labor (8 month PoP) – CPFF-TF 0002 Base Period – Materials, Travel, Other Direct Costs (ODCs) (8 month PoP) – COST-No Fee 0004 Base and Option Periods – Data Items – Not separately priced (NSP) 0005 Base and Option Periods – Contractor Manpower Reporting - NSP 1001 Option Period One – Labor (12 month PoP) – CPFF-TF 1002 Option Period One – Materials, Travel, ODCs (12 month PoP) – COST-No Fee 2001 Option Period Two – Labor (12 month PoP) – CPFF-TF 2002 Option Period Two – Materials, Travel, ODCs (12 month PoP) – COST-No Fee

Table 15. Summary Worksheet for TO 0001 and FFP Cost/Price

1. Cost 2. Fee 3. Total

TO 0001 – CPFF

CLIN 0001

CLIN 0002

CLIN 1001

CLIN 1002

CLIN 2001

CLIN 2002

Total CPFF Amount –

TO 0001

Base Contract (Years

1-4) – FFP

Total FFP Amount (Yrs 1-4)

N/A

Total Proposed Price

Table 16. Labor CLIN Worksheet Sample

Contractor Fiscal Year

CLIN 000X DD MON YYYY- DD MON YYYY

Hours/Base Rate Dollars

Direct Labor

Labor Category 1 Hours Rate from Labor Rate Worksheet

Formula (Hours * Rate)

A

Labor Category 2 Hours Rate from Labor Rate

Worksheet

Formula (Hours * Rate)

B

Labor Category 3 Hours Rate from Labor Rate

Worksheet

Formula (Hours * Rate)

C

Subtotal Direct Labor Sum Sum D=A+B+C

Fringe- if applicable Formula Base (=D)

Rate from Indirect Rate Worksheet

Formula (Base * Rate)

E

Total Direct labor Sum F=D+E

Labor Overhead Formula Base (=F)

Rate from Indirect Rate Worksheet

Formula (Base *Rate)

G

Subtotal Labor Sum H=F+G

S/IE

S/IE 1 From S/IE Cost proposal for applicable CLIN

K

S/IE 2 From S/IE Cost proposal for applicable CLIN

L

S/IE 3 From S/IE Cost proposal for applicable CLIN

M

Contractor Fiscal Year

CLIN 000X DD MON YYYY- DD MON YYYY

Hours/Base Rate Dollars

Total S/IE Sum N=K+L=M

Subcontractor Handling

Formula Base (=N)

Rate from Indirect Rate Worksheet

Formula (Base * Rate)

O

General and Administrative (G&A)

Formula Base (=O+N+H)

Rate from Indirect Rate Worksheet

Formula (Base * Rate)

P

Total Cost Input (TCI) Sum Q=P+O+N+H

Fee- Direct Labor Formula Base (=Q-N)

Rate from Indirect Rate Worksheet

Formula (Base * Rate)

R

Fee- Subcontract Labor Formula Base (N)

Rate from Indirect Rate Worksheet

Formula (Base * Rate)

S

DL Formula Base (D)

Rate from Indirect Rate Worksheet

Formula (Base * Rate)

T

G&A Formula Base (=O+N+H)

Rate from Indirect Rate Worksheet

Formula (Base * Rate)

U

Total Sum V=T+U

Total Proposed Sum W=Q+R+S+V

Table 17. ODCs CLIN Worksheet

Prime Materials AA

Prime Material Handling

Formula Base (=AA)

Rate from Indirect Rate Worksheet

Formula (Base*Rate) BB

Prime ODCs (other than uplifts and travel) From ODC Worksheet CC

Prime Uplifts From Uplift Worksheet DD

Prime Travel From Travel Worksheet EE

Subtotal ODCs =CC +DD + EE FF

S/IE

S/IE 1

From S/IE Cost proposal for applicable CLIN

GG

S/IE 2

From S/IE Cost proposal for applicable CLIN

HH

S/IE 3

From S/IE Cost proposal for applicable CLIN

II

Subtotal SI&E Sum JJ=GG+HH+II

Subtotal Sum JJ=AA+BB+FF+JJ

G&A Formula

Base (=JJ) Rate from Indirect

Rate Formula (Base*Rate) KK

Subtotal Sum LL=JJ+KK

G&A COM

Formula

Base (=JJ) Rate from Indirect

Rate Formula (Base* Rate) MM

Total Sum NN=LL+MM

Table 18. Materials Costs

Contract Period Applicable CLINs NTE Direct Material Costs

Base Period CLIN 0002 $7,751,080

Option Period 1 CLIN 1002 $10,075,419

Option Period 2 CLIN 2002 $11,759,123

Table 19. ODCs

Contract Period Applicable CLINs NTE Direct ODCs

Base Period CLIN 0002 $14,412,192

Option Period 1 CLIN 1002 $10,933,823

Option Period 2 CLIN 2002 $5,287,266

File details come from the government source that posted it. Updated .