Attachment_0014_-_Section_L_Tables_Amendment0001.docx

DOCX document 69 KB Posted

Attached to
Persistent Surveillance Systems - Tethered: Engineering, Logistics, Operations and Program Management Support
Solicitation number
W56KGY-15-R-0016
Issued by

About this file

Updated Attachment 0014

View the file

Other files

File Type Posted
A07_-_W56KGY-15-R-0016_0003_SF33.pdf PDF
Solicitation_QA_2015OCT21.docx DOCX document
Attachment_0014_-_Section_L_Tables_Amendment0002.docx DOCX document
Solicitation_QA_2015OCT20.pdf PDF
A07_-_W56KGY-15-R-0016_0002_SF33.pdf PDF
Attachment_0001_-_BASE_PWS_PSS-T_Amendment0002.docx DOCX document
Attachment_0013_-_FFP_Price_Template_PSS-T_Amendment0001.xlsx XLSX spreadsheet
Attachment_0008_-_TO_PWS_PSS-T_Amendment0001.docx DOCX document
Attachment_0015_-_Section_M_Tables_Amendment0001.docx DOCX document
Solicitation_QA_2015OCT17.docx DOCX document
Attachment_0001_-_BASE_PWS_PSS-T_Amendment0001.docx DOCX document
A07_-_W56KGY-15-R-0016_0001_SF33.pdf PDF
A01_-_ExhibitL_CDRL_SESS.pdf PDF
A01_-_ExhibitE_CDRL_NDTI.pdf PDF
A01_-_ExhibitK_CDRL_MISC.pdf PDF
A01_-_ExhibitN_CDRL_MFFP.pdf PDF
A01_-_ExhibitM_CDRL_QCIC.pdf PDF
A01_-_ExhibitF_CDRL_SAFT.pdf PDF
A01_-_ExhibitA_CDRL_MGMT.pdf PDF
A01_-_ExhibitC_CDRL_ADMN.pdf PDF
A01_-_ExhibitD_CDRL_CMAN.pdf PDF
A01_-_ExhibitH_CDRL_IPSC.pdf PDF
A01_-_ExhibitB_CDRL_FNCL.pdf PDF
A01_-_ExhibitG_CDRL_TMSS.pdf PDF
Solicitation_Q A.pdf PDF
A01_-_ExhibitJ_CDRL_ATTS.pdf PDF
Attachment0012-PPQ_PSS-T.docx DOCX document
Attachment0002-BASE_QASP_PSS-T.pdf PDF
Attachment0010-Data_Tech_NDA_PSS-T.pdf PDF
Attachment0005-PRS_PSST.xlsx XLSX spreadsheet
Attachment0001-BASE_PWS_PSS-T.pdf PDF
Attachment0009-TO_QASP_PSS-T.docx DOCX document
A07_-_W56KGY-15-R-0016_SF33.pdf PDF
Attachment0014-Section_L_Tables.pdf PDF
Attachment0016-PWS_Labor_Hour_Spreadsheet.xlsx XLSX spreadsheet
Attachment0015-Section_M_Tables.pdf PDF
Attachment0008-TO_PWS_PSS-T.docx DOCX document
Attachment0013-FFP_Price_Template_PSS-T.xlsx XLSX spreadsheet
Attachment0011-Tech_Data_Req_Quest.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0014

TABLE OF CONTENTS

Tables

Table 11. Requirements for Submission of Proposal Materials1
Table 12. Proposal Compliance Checklist and Cross Reference Table1
Table 13. IDIQ CLIN Structure11
Table 14. Anticipated CLIN Structure for TO Award11
Table 15. Summary Worksheet for TO 0001 and FFP Cost/Price12
Table 16. Labor CLIN Worksheet Sample13
Table 17. ODCs CLIN Worksheet14
Table 18. Materials Costs16
Table 19. ODCs16

i

Table 11. Requirements for Submission of Proposal Materials

Volume Title
Unsanitized Microsoft (MS) Word Version
Sanitized MS Word Version
Unsanitized PDF Version
Sanitized PDF Version
Unsanitized MS Excel Version
Sanitized MS Excel Version
Max. Pages
I – Technical
1
1
1
1
N/A
N/A
200* per copy
II – Past Performance
1
N/A
1
N/A
N/A
N/A
25
III – Cost/ Price
N/A
N/A
1
1
1
1
N/A

IV – Miscel-laneous**

N/A
N/A
1
1***
N/A
N/A
N/A

*Draft plans are included in the page count; the proposal compliance checklist is not included in the page count.

**The miscellaneous volume shall include terms and conditions documents, non-disclosure agreements, data and software assertions, and representations and certifications, all applicable commercial software license agreements related to commercial software deliverables, the organizational conflict of interest (OCI) mitigation plan, completed Sections H, I, and K, and Standard Form 33. These items are required for determination of responsibility and eligibility for award but are not part of the evaluation factors set forth in Section II.B. of this document.

***Limited to data and software assertions.

Table 12. Proposal Compliance Checklist and Cross Reference Table

PWS Paragraph
Proposal Submission Requirements
Offeror Acknowledges Compliance
Narrative Included in Proposal
Proposal Reference Paragraphs

Section 1 – Program Management and Operations

Section L.2.e.i, Program Management and Operations Support
Provide a narrative to meet RFP requirements
□Yes □No
□Yes □No
1.1 General
Acknowledge compliance
□Yes □No
□Yes □No
1.2 Contract/Order Type
Acknowledge compliance
□Yes □No
□Yes □No
1.3 Period of Performance (PoP)
Acknowledge compliance
□Yes □No
□Yes □No
1.4 Place of Performance
Acknowledge compliance
□Yes □No
□Yes □No
1.5 Contractor Performance Evaluation
Acknowledge compliance
□Yes □No
□Yes □No
1.6 Intellectual Property
Submit data restrictions tables in accordance with DFARS 252.227-7013, 252.227-7014, 252.227-7015
□Yes □No
□Yes □No
1.7 Government Furnished Property (GFP)
Acknowledge compliance
□Yes □No
□Yes □No
1.8 Inspection and Acceptance / Freight on Board (FOB)
Acknowledge compliance
□Yes □No
□Yes □No
1.9.1 Security Clearance Requirements
Acknowledge compliance and provide facility and safeguarding clearance levels
□Yes □No
□Yes □No
1.9.2 Security Training Requirements
Acknowledge compliance
□Yes □No
□Yes □No
1.9.3 Security Procedures
Acknowledge compliance
□Yes □No
□Yes □No
1.9.4 Operations Security (OPSEC)
Acknowledge compliance
□Yes □No
□Yes □No
1.10 Information Systems (IS)
Acknowledge compliance
□Yes □No
□Yes □No
1.11 System Safety and Health Hazards
Acknowledge compliance
□Yes □No
□Yes □No
1.12 Information Assurance (IA)
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
1.13 Program Protection Plan (PPP)
Acknowledge compliance
□Yes □No
□Yes □No
3.1.1 Program Management Support
Acknowledge compliance with OCI requirements and provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.1.2 Contract Transition
Acknowledge compliance and provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.1.3 Reporting
Acknowledge compliance
□Yes □No
□Yes □No
3.1.4 Financial Reporting
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.1.5 Contractor Manpower Reporting
Acknowledge compliance
□Yes □No
□Yes □No
3.1.6 Data Management
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.1.7 Demobilization
Provide an approach to meet Base PWS requirements
□Yes □No
□Yes □No
3.1.8 Earned Value Management System (EVMS)
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.6.1 Operations Support
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.6.2 Operator/User-Level Maintainers
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.6.3 Trainer/Test System
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.6.4 Operations Reporting
Acknowledge compliance
□Yes □No
□Yes □No
3.7 Drawdown and Surge Operations
Acknowledge compliance
□Yes □No
□Yes □No
3.8 Deliverables
Acknowledge compliance
□Yes □No
□Yes □No
4 Travel or Special Requirements
Acknowledge compliance and indicate any requests for travel expected to occur within 45 days after contract award
□Yes □No
□Yes □No
4.1 CONUS Travel
Acknowledge compliance
□Yes □No
□Yes □No
4.2 OCONUS Travel
Acknowledge compliance
□Yes □No
□Yes □No

Section 2 – Engineering

Section L.2.e.i, Engineering Support
Provide a narrative to meet RFP requirements
□Yes □No
□Yes □No
3.2.1 System Technical Support
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.2.2 Aerostat System Integration Laboratory (SIL)
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.2.3 Contractor System Engineering Management Plan
Provide an approach to meet TO PWS requirements.

Submit draft systems engineering management plan

□Yes □No
□Yes □No
3.2.4 Configuration Management (CM)
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.2.5 Engineering Change Proposals (ECP)
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.2.5.1 ECP Approvals
Acknowledge compliance
□Yes □No
□Yes □No
3.2.5.2 ECP Categories
Acknowledge compliance
□Yes □No
□Yes □No
3.2.5.3 ECP Government Notification of Major/Minor Changes
Acknowledge compliance
□Yes □No
□Yes □No
3.2.5.4 Multi-user ECP Automated Review System (MEARS)
Acknowledge compliance
□Yes □No
□Yes □No
3.2.5.5 System Commonality
Provide an approach to meet TO PWS requirements.

Submit draft GCS commonality plan.

□Yes □No
□Yes □No
3.2.6 Product Configuration Documentation
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.2.7 Foreign Military Sales (FMS)
Provide an approach to meet Base PWS requirements
□Yes □No
□Yes □No
3.2.8 Technical Data Package (TDP)
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.2.8.1 Source Controlled Drawings (SCDs)
Acknowledge compliance
□Yes □No
□Yes □No
3.2.8.2 Circuit Card Assembly Drawings
Acknowledge compliance
□Yes □No
□Yes □No
3.2.8.3 Software Control Drawing
Acknowledge compliance
□Yes □No
□Yes □No
3.2.8.4 Test Requirements Document (TRD)
Acknowledge compliance
□Yes □No
□Yes □No
3.2.8.5 Special Tooling Requirements
Acknowledge compliance
□Yes □No
□Yes □No
3.2.8.6 Specification
Acknowledge compliance
□Yes □No
□Yes □No
3.2.8.7 Parts List (Drawing Maintenance)
Acknowledge compliance
□Yes □No
□Yes □No
3.2.8.8 Marking for Government Use
Acknowledge compliance
□Yes □No
□Yes □No
3.2.9.1 Quality Control Plan (QCP)
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.2.9.2 Software Quality Testing (SQT)
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.2.10 Test and Evaluation
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No

Section 3 - Logistics

Section L.2.e.i, Logistics Support
Provide a narrative to meet RFP requirements
□Yes □No
□Yes □No
3.3.1 Performance Based Logistics (PBL) Metrics Monitoring and Reporting Requirements
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.3.1.1 Level 1 Metrics
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.3.1.2 Level 2 Metrics
Acknowledge compliance
□Yes □No
□Yes □No
3.3.1.3 PBL Metric Definitions Applicable to This PWS
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.3.2.1 Procurement
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.3.2.2 Inventory Control
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.3.3 Retrograde
Provide a narrative to meet RFP requirements
□Yes □No
□Yes □No
3.3.4 Relocation
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.3.5 Shipping and Receiving
Acknowledge compliance
□Yes □No
□Yes □No
3.3.6 Above User-Level Maintenance and Depot Repairs
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.3.7 Reset
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.3.8 Depot Public Private Partnership (P3)
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.3.9 Provisioning
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.3.10 Government-Industry Data Exchange Program (GIDEP)
Acknowledge compliance
□Yes □No
□Yes □No
3.4.1 Effectivity of TMs
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.4.2 Maintenance Concept
Acknowledge compliance
□Yes □No
□Yes □No
3.4.3 Safety Changes
Acknowledge compliance
□Yes □No
□Yes □No
3.4.4 Copyright and Proprietary Material
Acknowledge compliance
□Yes □No
□Yes □No
3.4.5 Repair Parts and Special Tools List (RPSTL)
Acknowledge compliance
□Yes □No
□Yes □No
3.4.6.1 In Process Reviews
Acknowledge compliance
□Yes □No
□Yes □No
3.4.6.2 Validation
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.4.6.3 Verification
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No
3.4.7 Final Delivery Reviews
Acknowledge compliance
□Yes □No
□Yes □No
3.5 Training
Provide an approach to meet TO PWS requirements
□Yes □No
□Yes □No

Table 13. IDIQ CLIN Structure

CLINs
CLIN LOCATION/DESCRIPTION
0001
Labor – CPFF-TF
0002
Materials, Travel, Other Direct Costs (ODCs) – COST-No Fee
0003
Key Spare Parts – FFP
0004
Data Items – Not separately priced (NSP)
0005
Contractor Manpower Reporting - NSP

Table 14. Anticipated CLIN Structure for TO Award

TO CLINs
CLIN LOCATION/DESCRIPTION
0001
Base Period – Labor (8 month PoP) – CPFF-TF
0002
Base Period – Materials, Travel, Other Direct Costs (ODCs) (8 month PoP) – COST-No Fee
0004
Base and Option Periods – Data Items – Not separately priced (NSP)
0005
Base and Option Periods – Contractor Manpower Reporting - NSP
1001
Option Period One – Labor (12 month PoP) – CPFF-TF
1002
Option Period One – Materials, Travel, ODCs (12 month PoP) – COST-No Fee
2001
Option Period Two – Labor (12 month PoP) – CPFF-TF
2002
Option Period Two – Materials, Travel, ODCs (12 month PoP) – COST-No Fee

Table 15. Summary Worksheet for TO 0001 and FFP Cost/Price

1. Cost
2. Fee
3. Total

TO 0001 – CPFF

CLIN 0001

CLIN 0002

CLIN 1001

CLIN 1002

CLIN 2001

CLIN 2002

Total CPFF Amount – TO 0001

Base Contract (Years 1-4) – FFP

Total FFP Amount (Yrs 1-4)

N/A

Total Proposed Price

Table 16. Labor CLIN Worksheet Sample

Contractor Fiscal Year

CLIN 000X
DD MON YYYY- DD MON YYYY
Hours/Base
Rate
Dollars

Direct Labor

Labor Category 1
Hours
Rate from Labor Rate Worksheet
Formula

(Hours * Rate) A

Labor Category 2
Hours
Rate from Labor Rate Worksheet
Formula

(Hours * Rate) B

Labor Category 3
Hours
Rate from Labor Rate Worksheet
Formula

(Hours * Rate) C

Subtotal Direct Labor
Sum
Sum
D=A+B+C
Fringe- if applicable
Formula Base (=D)
Rate from Indirect Rate Worksheet
Formula

(Base * Rate) E

Total Direct labor

Sum
F=D+E
Labor Overhead
Formula Base (=F)
Rate from Indirect Rate Worksheet
Formula

(Base *Rate) G

Subtotal Labor

Sum
H=F+G

S/IE

S/IE 1

From S/IE Cost proposal for applicable CLIN
K

S/IE 2

From S/IE Cost proposal for applicable CLIN
L

S/IE 3

From S/IE Cost proposal for applicable CLIN
M

Total S/IE

Sum
N=K+L=M
Subcontractor Handling
Formula Base (=N)
Rate from Indirect Rate Worksheet
Formula

(Base * Rate) O

General and Administrative (G&A)
Formula Base (=O+N+H)
Rate from Indirect Rate Worksheet
Formula

(Base * Rate) P

Total Cost Input (TCI)

Sum
Q=P+O+N+H
Fee- Direct Labor
Formula Base (=Q-N)
Rate from Indirect Rate Worksheet
Formula

(Base * Rate) R

Fee- Subcontract Labor
Formula Base (N)
Rate from Indirect Rate Worksheet
Formula

(Base * Rate) S

DL
Formula Base (D)
Rate from Indirect Rate Worksheet
Formula

(Base * Rate) T

G&A
Formula Base (=O+N+H)
Rate from Indirect Rate Worksheet
Formula

(Base * Rate) U

Total

Sum
V=T+U

Total Proposed

Sum
W=Q+R+S+V

Table 17. ODCs CLIN Worksheet Prime Materials

AA

Prime Material Handling
Formula Base (=AA)
Rate from Indirect Rate Worksheet
Formula (Base*Rate)
BB

Prime ODCs (other than uplifts and travel)

From ODC Worksheet
CC

Prime Uplifts

From Uplift Worksheet
DD

Prime Travel

From Travel Worksheet
EE

Subtotal ODCs

=CC +DD + EE
FF

S/IE

S/IE 1

From S/IE Cost proposal for applicable CLIN
GG

S/IE 2

From S/IE Cost proposal for applicable CLIN
HH

S/IE 3

From S/IE Cost proposal for applicable CLIN
II

Subtotal SI&E

Sum
JJ=GG+HH+II

Subtotal

Sum
JJ=AA+BB+FF+JJ
G&A
Formula Base (=JJ)
Rate from Indirect Rate
Formula (Base*Rate)
KK

Subtotal

Sum
LL=JJ+KK
G&A COM
Formula Base (=JJ)
Rate from Indirect Rate
Formula (Base* Rate)
MM

Total

Sum
NN=LL+MM

Table 18. Materials Costs

Contract Period
Applicable CLINs
NTE Direct Material Costs
Base Period
CLIN 0002
$7,751,080
Option Period 1
CLIN 1002
$10,075,419
Option Period 2
CLIN 2002
$11,759,123

Table 19. ODCs

Contract Period
Applicable CLINs
NTE Direct ODCs
Base Period
CLIN 0002
$14,412,192
Option Period 1
CLIN 1002
$10,933,823
Option Period 2
CLIN 2002
$5,287,266

File details come from the government source that posted it. Updated .