Solicitation # W56KGY-15-R-0016 / TO 0001 Performance Work Statement (PWS) 20 August 2015
PERFORMANCE WORK STATEMENT (PWS)
for
Persistent Surveillance Systems - Tethered (PSS-T) Engineering/Technical, Logistics, and Operations Support Solicitation Number W56KGY-15-R-0016 Task Order (TO) 0001 Version 1.0
20 August 2015
Product Director (PD) Aerostats 6006 Combat Drive Aberdeen Proving Ground, MD 21005
PAGE INTENTIONALLY BLANK
Table of Contents
| Table of Contents | i | |
| 1. | Scope | 1 |
| 1.1 | General | 1 |
| 1.2 | Order Type | 2 |
| 1.3 | Period of Performance (PoP) | 2 |
| 1.4 | Place of Performance | 2 |
| 1.5 | Contractor Performance Evaluation | 3 |
| 1.6 | Intellectual Property | 3 |
| 1.7 | Government Furnished Property (GFP) | 3 |
| 1.8 | Inspection and Acceptance / Freight on Board (FOB) | 3 |
| 1.9 | Security | 4 |
| 1.9.1 | Security Clearance Requirements | 4 |
| 1.9.2 | Security Training Requirements | 4 |
| 1.9.3 | Security Procedures | 5 |
| 1.9.4 | Operations Security (OPSEC) | 6 |
| 1.10 | Information Systems (IS) | 7 |
| 1.11 | System Safety and Health Hazards | 7 |
| 1.12 | Information Assurance (IA) | 7 |
| 1.13 | Program Protection Plan (PPP) | 9 |
| 2. | Applicable Documents | 11 |
| 3. | General Requirements | 11 |
| 3.1 | Program Management | 11 |
| 3.1.1 | Program Management Support | 11 |
| 3.1.2 | Contract Transition | 11 |
| 3.1.3 | Reporting | 11 |
| 3.1.4 | Financial Reporting | 11 |
| 3.1.5 | Contractor Manpower Reporting | 11 |
| 3.1.6 | Data Management | 11 |
| 3.1.7 | Demobilization | 12 |
| 3.1.8 | Earned Value Management System (EVMS) | 12 |
| 3.2 | Engineering Services | 12 |
| 3.2.1 | System Technical Support | 12 |
| 3.2.2 | Aerostat System Integration Laboratory (SIL) | 12 |
| 3.2.3 | Contractor System Engineering Management Plan | 12 |
| 3.2.4 | Configuration Management (CM) | 12 |
| 3.2.5 | Engineering Change Proposals (ECP) | 12 |
| 3.2.5.1 | ECP – Approvals | 12 |
| 3.2.5.2 | ECP Categories | 12 |
| 3.2.5.3 | ECP – Government Notification of Major/Minor Changes | 12 |
| 3.2.5.4 | Multi-User ECP Automated Review System (MEARS) | 12 |
| 3.2.5.5 | System Commonality | 12 |
| 3.2.6 | Product Configuration Documentation | 13 |
| 3.2.7 | Foreign Military Sales (FMS) | 13 |
| 3.2.8 | Technical Data Package (TDP) | 13 |
| 3.2.8.1 | Source Controlled Drawings (SCDs) | 13 |
| 3.2.8.2 | Circuit Card Assembly Drawings | 13 |
| 3.2.8.3 | Software Control Drawing | 13 |
| 3.2.8.4 | Test Requirement Document (TRD) | 13 |
| 3.2.8.5 | Special Tooling Requirements | 13 |
| 3.2.8.6 | Specification | 14 |
| 3.2.8.7 | Parts List (Drawing Maintenance) | 14 |
| 3.2.8.8 | Marking for Government Use | 14 |
| 3.2.9 | Quality Control Plan (QCP)/ Quality Assurance (QA) | 14 |
| 3.2.9.1 | QCP | 14 |
| 3.2.9.2 | Software Quality Testing | 14 |
| 3.2.10 | Test and Evaluation | 14 |
| 3.3 | Logistics | 14 |
| 3.3.1 | Performance Based Logistics (PBL) Metrics Monitoring and Reporting Requirements | 14 |
| 3.3.1.1 | Level 1 Metrics | 14 |
| 3.3.1.2 | Level 2 Metrics | 14 |
| 3.3.1.3 | PBL Metric Definitions Applicable to This PWS | 14 |
| 3.3.2 | Repair Parts and Spares | 14 |
| 3.3.2.1 | Procurement | 14 |
| 3.3.2.2 | Inventory Control | 15 |
| 3.3.3 | Retrograde | 15 |
| 3.3.4 | Relocation | 15 |
| 3.3.5 | Shipping and Receiving | 15 |
| 3.3.6 | Above User-Level Maintenance and Depot Repairs | 15 |
| 3.3.7 | Reset | 15 |
| 3.3.8 | Depot Public Private Partnership (P3) | 15 |
| 3.3.9 | Provisioning | 15 |
| 3.3.10 | Government-Industry Data Exchange Program (GIDEP). | 16 |
| 3.4 | Equipment Technical Manuals (TMs) | 16 |
| 3.4.1 | Effectivity of TMs | 16 |
| 3.4.2 | Maintenance Concept | 16 |
| 3.4.3 | Safety Changes | 16 |
| 3.4.4 | Copyright and Proprietary Material | 16 |
| 3.4.5 | Repair Parts and Special Tools List (RPSTL) | 16 |
| 3.4.6 | Reviews | 16 |
| 3.4.6.1 | In-process Reviews (IPR) | 16 |
| 3.4.6.2 | Validation | 16 |
| 3.4.6.3 | Verification | 16 |
| 3.4.7 | Final Delivery Reviews | 17 |
| 3.5 | Training | 17 |
| 3.6 | Operations | 17 |
| 3.6.1 | Operations Support | 17 |
| 3.6.2 | Operator/User-Level Maintainers | 17 |
| 3.6.3 | Trainer/Test System | 18 |
| 3.6.4 | Operations Reporting | 18 |
| 3.7 | Drawdown and Surge Operations | 18 |
| 3.8 | Contract Deliverables | 18 |
| 4. | Travel or Special Requirements | 18 |
| 4.1 | CONUS Travel | 18 |
| 4.2 | OCONUS Travel | 18 |
Performance Work Statement (PWS) 20 August 2015 iii Scope This PWS identifies the requirements for PSS-T. The Contractor shall provide engineering, logistics, operations, and program management support to PSS-T aerostats. The Contractor is responsible for procuring, integrating, and providing all sources of support, as defined within the scope of this PWS and to achieve the PD Aerostats required outcomes.
The current aerostat fleet is comprised of PSS-T medium, developed as Persistent Ground Surveillance System (PGSS); PSS-T large, developed as Persistent Threat Detection System (PTDS); and as-is contingency stock. The PSS-T medium and PSS-T large aerostat systems satisfy many of the same capabilities but were developed independently under different methodologies This PWS supports PD Aerostats’ mission requirements to support Combatant Commanders (COCOMs) and joint agency requirements. It requires the Contractor to have a detailed understanding of aerostat technical capabilities and the ability to operate a fleet of aerostats in the continental United States (CONUS) and outside the continental United States (OCONUS).
The PSS-T program of record (PoR) is primarily a stored capability that can be activated, as needed, to support mission operations. These required services shall focus on maximizing operational availability (Ao) and providing quality and reliable data and services for up to 24 hours a day/seven (7) days a week.
General PSS-T medium and large are aerostats with scalable capabilities, initially developed as quick reaction capability programs. The PSS-T aerostats are capable of persistent, integrated, networked, and multi-sensor information collection by operating for long periods of time at an altitude to maximize the line of sight and field of regard of on-board systems. PSS-T will have the ability to be employed during all phases of joint operations. PSS-T will be responsive to the ground component of a joint warfighting force by providing weather-dependent, continuous support at operating locations throughout the joint operational area and directly enhancing the commander’s situational understanding.
The following subsystems will make up the PSS-T medium system baseline: one (1) aerostat envelope, one (1) mobile mooring platform, one (1) ground control shelter (GCS) (S-280), three (3) 15kW generators, one (1) 20 foot office shelter, one (1) 20 foot support container and one (1) 10 foot consumables container.
The following subsystems will make up the PSS-T large system baseline: one (1) aerostat envelope, one (1) mobile mooring platform, one (1) 20 foot GCS, three (3) 20 foot support containers, three (3) 60kW generators, one (1) power distribution platform, one (1) Sellick 120 forklift and one (1) boom lift.
Both the PSS-T medium and PSS-T large are fielded with: two (2) MX-series cameras, one (1) unattended transient acoustic measurement and signature intelligence system, and one (1) high antenna for radio communications system.
The PSS-T medium and PSS-T large may also be fielded with additional authorized list (AAL) payloads that provide capability sets above and beyond the baseline. AAL payloads are deployed as mission requirements dictate. These AAL items include: two (2) dismounted and ground moving target indicator radar systems, wide area surveillance and wide area motion indicator sensors, full motion video and coded laser designator sensors, which provide laser designating capability and a tactical data communications link, which provides video broadcast capability. Other AAL items include a tactical maintenance office shelter, expendable unattended ground sensors and support utility vehicles (gator). The PSS-T medium and PSS-T large may also be fielded with intelligence, surveillance, and reconnaissance and/or chemical, biological, radiological, and nuclear sensor equipment as specified at the TO/DO level. The PD Aerostats systems are baselined with communications platforms and transmitters; navigation systems; reconnaissance, surveillance, and target acquisition systems. The systems are capable of detecting hostile fire, providing target coordinates to appropriate command and control/fire control centers, and capable of marking ground targets for rapid reaction forces for engagement. In addition to baseline systems, as-is contingency stock may be activated to support PD Aerostats mission requirements.
Order Type This TO will include cost-plus-fixed-fee term form (CPFF-TF), cost-no fee, and firm-fixed price (FFP) line items. Services shall be awarded on a CPFF-TF basis. Key spare parts will be awarded on a FFP basis. Travel, other direct costs (ODCs) and material shall beporting proposed on a cost-no fee basis, in accordance with (IAW) Federal Acquisition Regulation (FAR) 16.302.
Period of Performance (PoP) The period of performance (PoP) shall be one (1) 8-month base period, with two (2) 12-month options, to be exercised at the discretion of the Government.
Place of Performance This TO shall provide support up to 27 PSS-T systems (16 PSS-T large and 11 PSS-T medium) in multiple CONUS and OCONUS locations. Performance locations may include, but shall not be limited to, Government and Contractor facilities located throughout the following areas of responsibility (AORs): US Central Command (CENTCOM) and US Northern Command (NORTHCOM). The breakout number of systems supported, by contract period and expected location, is listed in Table 1.
Performance Work Statement (PWS) 20 August 2015
Table 1: System Location Breakout Base
| AoR |
| Number of PSS-T large |
| Number of PSS-T medium |
| CENTCOM |
| 14 |
| 9 |
| NORTHCOM |
| 2 |
| 2 |
Option Period One (1)
| AoR |
| Number of PSS-T large |
| Number of PSS-T medium |
| CENTCOM |
| 14 |
| 9 |
| NORTHCOM |
| 2 |
| 2 |
Option Period Two (2)
| AoR |
| Number of PSS-T large |
| Number of PSS-T medium |
| CENTCOM |
| 14 |
| 9 |
| NORTHCOM |
| 2 |
| 2 |
Contractor Performance Evaluation The Government shall evaluate the Contractor’s performance under this TO IAW the TO quality assurance surveillance plan (QASP).
Intellectual Property The Contractor shall adhere to the requirements in the base PWS.
Government Furnished Property (GFP) The Contractor shall adhere to the requirements in the base PWS.
Inspection and Acceptance / Freight on Board (FOB) The Contractor shall adhere to the requirements in the base PWS.
Security Security Clearance Requirements The Contractor shall be required to have a TOP SECRET facility clearance with SECRET safeguarding capability. The Contractor shall require access to sensitive compartmented information (SCI), Non-SCI and For Official Use Only (FOUO) information. Electronic processing of SCI will be required on a Government-owned system for integration of future signal intelligence sensor capability. The Contractor shall access SCI only at the Government facility at Aberdeen Proving Ground, MD. The Contractor shall also require access to secret internet protocol router network (SIPRNet) but only at a Government facility. The Contractor will generate and receive classified materials, and have access to classified information at CONUS and OCONUS locations, as defined in paragraph 1.4 of this PWS. The Contractor is authorized to use the Defense Courier Service (DCS).
The Contractor shall adhere to security guidelines as found in the Defense Department (DD) Form 254 for this effort and as contained in the security classification guides (SCGs) listed in paragraph 2 of the base PWS. The Contractor shall extend all relevant security guidelines to their Subcontractors.
The Contractor shall develop, conduct, and implement an annual security training and awareness program IAW DD Form 254 and the SCGs for guidance for all Contractor personnel with a need to know. The training program will address security objectives and responsibilities for these personnel. The Contractor will require access to North Atlantic Treaty Organization and communications security (COMSEC) information.
Security Training Requirements All Contractor employees, to include Subcontractor employees, requiring access to Government installations, facilities and controlled access areas shall complete anti-terrorism (AT) level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and Subcontractor employee, to the COR or to the PCO, if a COR is not assigned, within 30 calendar days after completion of training by all employees and Subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.
Contractor personnel traveling OCONUS require overseas AT awareness training. U.S. based Contractor employees and associated Subcontractor employees shall receive Government provided AOR specific AT awareness training as directed by Army Regulation (AR) 525-13. Specific AOR training content is directed by the combatant commander with the unit antiterrorism officer (ATO) being the local point of contact. US based contractor employees and associated sub-contractor employees will submit an Isolated Personnel Report (ISOPREP) prior to deployment, in accordance with AR 525-28, Personnel Recovery. The contractor is required to fill out the survey on NIPRNET at https://prmsglobal.prms.af.mil/prmsconv/Profile/Survey/start.aspx prior to deployment.
iWATCH training is required for Contractor employees with an area of performance within an Army controlled installation, facility or area. The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR no later than (NLT) 30 calendar days after contract award.
Per AR 381-12, Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b of AR 381-12.
Security Procedures Contractor employees with an area of performance within an Army controlled installation, facility or area must adhere to access and general protection/security policy and procedures. Contractor and all associated Subcontractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative). The Contractor and all associated Subcontractor employees shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation provost marshal office, Director of emergency services or security office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA), and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the force protection condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
This TO requires handling and access to classified information. The Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “CONFIDENTIAL,” “SECRET,” or “TOP SECRET” (to include SCI). The Contractor shall comply with the security agreement (DD Form 441), including the national industrial security program operating manual (NISPOM), DoD 5220.22-M, and any revisions to DoD 5220.22-M, notice of which has been furnished to the Contractor.
This TO requires handling and access to FOUO information. The Contractor shall have the ability to send and receive electronic information using approved Government encryption methods.
Before CAC issuance, the Contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The Contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
Contractor and all associated Subcontractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
For contractors authorized to accompany the force, DFARS Clause 252.225-7040 (DFARS Clause 252-225-7995 for CENTCOM), Contractor Personnel Authorized to Accompany U.S. Armed Forces Deployed Outside the United States. The clause shall be used in solicitations and contracts that authorize contractor personnel to accompany US Armed Forces deployed outside the US in contingency operations; humanitarian or peacekeeping operations; or other military operations or exercises, when designated by the combatant commander. The clause discusses the following AT/OPSEC related topics: required compliance with laws and regulations, pre-deployment requirements, required training (per combatant command guidance), and personnel data required.
For Contract Requiring Performance or Delivery in a Foreign Country: DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors Outside the US. The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’s compliance with combatant commander and subordinate task force commander policies and directives.
Operations Security (OPSEC) The Contractor shall adhere to the PD Aerostats OPSEC Plan dated 26 February 2014. The Contractor shall develop an OPSEC standard operating procedure (SOP) within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, IAW CDRL A003, DI-MGMT-80934C, “Operations Security (OPSEC) Plan.” This SOP will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The Contractor shall implement OPSEC measures as ordered by the cognizant commander or combatant commander at each place of performance. In addition, the Contractor shall have an identified certified level II OPSEC coordinator per AR 530-1.
Per AR 530-1, “Operations Security,” new Contractor employees must complete level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter. All Contractor employees must complete annual OPSEC awareness training. Level I OPSEC training is available at the following website: http://cdse.edu/catalog/elearning/GS130.html (Duration: 45 minutes).
Information Systems (IS) Contractor employees who require access to Government information systems must be registered in the Army training certification tracking system (ATCTS) at commencement of services, and must successfully complete the DoD IA awareness prior to access to the IS and then annually thereafter.
For IA/information technology (IT) training, all Contractor employees and associated Subcontractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All Contractor employees working IA/IT functions must comply with DoD and Army training requirements in Department of Defense Directive (DoDD) 8570.01, DoD 8570.01-M and AR 25-2 within six (6) months of appointment to IA/IT functions.
System Safety and Health Hazards The Contractor shall identify and evaluate system safety and health hazards, define risk levels, and establish a program that manages the probability and severity of all hazards associated with contractual tasks. Safety and health hazards shall be managed consistently with mission requirements. All inherent hazards shall be identified, evaluated, and either eliminated or controlled to ensure minimum risk to the environment and personnel. Records shall be kept for the life of the contract plus two (2) years. These records shall be made available to the Government upon request. The Contractor shall use the Government and industry standard practice for system safety, MIL-STD-882E, in all developmental and sustaining activities. The Contractor shall integrate the environment, safety, and occupational health (ESOH) risk management strategy into the systems engineering process.
The Contractor shall provide services to ensure proper care of hazardous material (HAZMAT) as delineated in the Environmental Protection Agency (EPA) manual 17. The Contractor shall maintain the material safety data sheets (MSDS) library on every HAZMAT procured, stored, or used within their AOR. The Contractor shall reduce excess hazardous waste disposal by optimizing procedures for reuse of material, rotation of stocks to ensure the use prior to expiration date, and protecting stocks from damage by weather and poor handling. The Contractor shall maintain container labeling and storage labeling throughout its areas of responsibility. The Contractor will ensure they have qualified, licensed/certified personnel familiar with OCONUS requirements, to prepare/package HAZMAT for transport on military airlift IAW Air Force Manual (AFMAN) 24-204. The Contractor shall be required to turn in HAZMAT and associated waste to the installation/site collection points IAW regulations and policies of the sites. A HAZMAT reference list is found in section 2.0(b) of the PWS.
The Contractor shall maintain HAZMAT container labeling and storage labeling throughout its AORs. The Contractor shall transport, store and dispose of HAZMAT and associated waste IAW laws and regulations.
Information Assurance (IA) The Contractor shall be compliant with AR 25-2, “Army Information Assurance” IA best business practices, DoD 8500 series of directives and instructions.
The Contractor shall be responsible for maintaining the PSS-T approved hardware/software baseline. It is the Government’s intent to maintain a SIL located at Aberdeen Proving Ground (APG), MD for the purposes of maintaining software builds, implementation of actions required to address all outstanding information assurance vulnerability alerts (IAVAs), and IAVAs issued within 60 days of start of intra-Army interoperability certification (IAIC) at the central technical support facility (CTSF). The Contractor, at the request of the Government, shall provide integration support at the APG SIL either directly or by third party software subject matter experts (SMEs).
Per DoD 8570.01-M, DFARS 252.239.7001 and AR 25-2, all Contractor employees supporting IA functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
Based on the authority to operate expiration date, future accreditation efforts supported by the Contractor may include:
| a. | Establishing and using an enterprise decision structure for cyber security risk management that includes and integrates DoD mission areas (MAs) pursuant to Department of Defense Directive (DoDD) 8115.01 and the governance process prescribed in this instruction. |
| b. | Managing the cyber security requirements for DoD information technologies through an integrated enterprise-wide risk management framework (RMF) consistent with the principles established in National Institute of Standards and Technology (NIST) special publication (SP) 800-37. |
| c. | Satisfying the RMF requirements of Subchapter III of Chapter 35 of Title 44, United States Code (U.S.C.), also known and referred to in this instruction as the “Federal Information Security Management Act (FISMA) of 2002.” The Contractor must meet or exceed the standards required by the Office of Management and Budget (OMB) and the Secretary of Commerce, pursuant to FISMA and Section 11331 of Title 40, U.S.C. |
| d. | Categorizing all DoD IS and platform information technology (PIT) systems IAW committee on national security systems instruction (CNSSI) 1253, implementing a corresponding set of security controls from NIST SP 800-53, and using DoD-specific assignment values, overlays, implementation guidance, and validation procedures. As supporting reference security control documents are updated, DoD’s implementation of these updates will be coordinated through the RMF technical advisory group (TAG). |
| e. | Supporting identification of resources for implementing the RMF and allocated as part of the Defense planning, programming, budgeting, and execution process. |
| f. | Ensuring all information technologies identified in this PWS, section 1.14, paragraph b, are authorized for operations through enterprise processes for identifying, evaluating, mitigating, and accepting cyber security risks. |
| g. | Supporting validation that all DoD-owned or DoD-controlled IT is under the governance of a DoD component cyber security program IAW DoDI 8500.01. The DoD component cyber security program will be the primary mechanism for ensuring enterprise synchronization of the RMF. |
| h. | Developing and maintaining a plan of action and milestones (POA&M) to record specific measures planned to correct deficiencies and address known deficiencies in the IS. |
| i. | Providing continuous monitoring capabilities to be implemented to the greatest extent possible. |
j. Incorporating the Defense Information Systems Agency’s application security and development security technical implementation guides (STIGs).
Program Protection Plan (PPP) The Contractor shall implement and adhere to PPP requirements to control access and protection to critical, classified, and sensitive information. Transmission of classified and/or FOUO materials to and from the Government is to be accomplished via approved methods for transmission of SECRET and/or FOUO material as appropriate.
The Contractor shall provide technical support for the Government PPP process performed IAW DoDI 5000.02, DoDI 5200.39, DoDD 5200.1-M, Defense Acquisition Guidebook, Chapter 13, and key practices and implementation guide for the DoD comprehensive national cyber security initiative supply chain risk management.
The Contractor shall implement countermeasures to mitigate supply chain risks that can be introduced through critical components (CC).
The Contractor shall develop, document and update Table 2, Application of Countermeasures, IAW the table description provided in the Defense Acquisition Guidebook, Chapter 13, PPP, Section 13.7.3. Updates shall be provided to the Government within 60 calendar days of contract award, with updates as required, IAW CDRL C001, DI-ADMN-81306, “Program Protection Implementation Plan.”
Table 2: Application of Countermeasures Development Process
Software
(CPI & CC)
Static Analysis p/a (%)
| Design Inspect |
| Code Inspect |
p/a (%) Common Vulnerabilities and Exposures (CVE) p/a (%) Common attack Pattern Enumeration and Classification (CAPEC) p/a (%) Common Weakness Enumeration (CWE) p/a (%)
| Pen Test |
| Test Coverage |
p/a (%)
CPI software (SW)
Level I Critical Component SW
Level II Critical Component SW
Operational System
| Failover Multiple Supplier Redundancy (%) |
| Fault Isolation |
| Least Privilege |
| System Element Isolation |
| Input Checking / Validation |
| SW Load Key |
CPI SW
Level I Critical Component SW
Level II Critical Component SW
Development Environment
| SW Products |
| Source |
| Release Testing |
| Generated Code Inspection |
p/a (%) Original Equipment Manufacturer (OEM) or Authorized Dealer
List the Commercial off the shelf (COTS) products used in the software development environment
Compiler
Runtime Libraries
Automated Test System
Configuration Management System
Database
Development Environment Access
*Note: p is for planned and a is for actual.
As defined in DoDI 5200.44, “Protection of Mission Critical Functions to Achieve Trusted Systems and Networks,” the term ‘supply chain risk’ means the risk that an adversary may sabotage, maliciously introduce unwanted function, or otherwise subvert the design, integrity, manufacturing, production, distribution, installation, operation, or maintenance of a system so as to surveil, deny, disrupt, or otherwise degrade the function, use, or operation of such system.
Applicable Documents The Contractor shall adhere to the requirements in the base PWS.
General Requirements The Contractor shall provide PSS-T CONUS and OCONUS engineering/technical, logistics, operations, and technical support to operations of the PSS-T aerostat systems IAW paragraph 1.4 of this PWS and the requirements dictated below.
Program Management The Contractor shall adhere to the requirements in the base PWS.
Program Management Support The Contractor shall adhere to the requirements in the base PWS.
Contract Transition The Contractor shall adhere to the requirements in the base PWS.
Reporting The Contractor shall adhere to the requirements in the base PWS.
Financial Reporting The Contractor shall adhere to the requirements in the base PWS.
Contractor Manpower Reporting The Contractor shall report all Contractor labor hours (including Subcontractor labor hours) required for performance of services provided under this TO for PD Aerostats via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/.
Reporting inputs will be for the labor executed during the PoP during each Government fiscal year (FY), which runs 01 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year, beginning with 2016. Contractors may direct questions to the help desk at http://www.ecmra.mil/. Reference CDRL B001, DI-FNCL-80331A, “Funds and Man-Hours Expenditure Report.”
The Contractor shall provide manpower information IAW CDRL K001, DI-MISC-81419, “Personnel Report,” as required by the Government, including changes in overall manpower structure, personnel responsibilities, and manpower cost information.
Data Management The Contractor shall adhere to the requirements in the base PWS.
Demobilization Not applicable at this time.
Earned Value Management System (EVMS) The Contractor shall adhere to the requirements in the base PWS.
Engineering Services System Technical Support The Contractor shall adhere to the requirements in the base PWS.
Aerostat System Integration Laboratory (SIL) The Contractor shall adhere to the requirements in the base PWS.
Contractor System Engineering Management Plan The Contractor shall adhere to the requirements in the base PWS.
Configuration Management (CM) The Contractor shall adhere to the requirements in the base PWS.
Engineering Change Proposals (ECP) The Contractor shall adhere to the requirements in the base PWS.
ECP – Approvals The Contractor shall adhere to the requirements in the base PWS.
ECP Categories The Contractor shall adhere to the requirements in the base PWS.
ECP – Government Notification of Major/Minor Changes The Contractor shall adhere to the requirements in the base PWS.
Multi-User ECP Automated Review System (MEARS) The Contractor shall adhere to the requirements in the base PWS.
System Commonality The Contractor shall provide a detailed plan, IAW CDRL L004, DI-SESS-81625, “Contractor Integrated Technical Information System Implementation Plan (CITIS-IP)” to explain how it would approach a common GCS solution, including: software evaluation and selection, hardware architecture and design, validation, and deployment plans. The Contractor shall submit a draft plan as part of the proposal. This plan will be evaluated as part of the Contractor’s technical approach. The Contractor shall submit a final plan for Government approval within 60 days of the TO award. The plan shall include a schedule to complete the upgrade for the specific system.
At a minimum, the plan shall include the following:
1. Common command and control system
1. Hardware / software re-use
1. Reduced logistical footprint
1. Minimized workflow
1. Net centric flexibility
1. Distributed Common Ground System interoperability
1. ISR interoperability
1. Acquisition cost
1. Sustainment cost
1. Implementation timeline
1. Information assurance
Product Configuration Documentation The Contractor shall adhere to the requirements in the base PWS.
Foreign Military Sales (FMS) Not applicable at this time.
Technical Data Package (TDP) The Contractor shall adhere to the requirements in the base PWS.
Source Controlled Drawings (SCDs) The Contractor shall adhere to the requirements in the base PWS.
Circuit Card Assembly Drawings The Contractor shall adhere to the requirements in the base PWS.
Software Control Drawing The Contractor shall adhere to the requirements in the base PWS.
Test Requirement Document (TRD) The Contractor shall adhere to the requirements in the base PWS.
Special Tooling Requirements The Contractor shall adhere to the requirements in the base PWS.
Specification The Contractor shall adhere to the requirements in the base PWS.
Parts List (Drawing Maintenance) The Contractor shall adhere to the requirements in the base PWS.
Marking for Government Use The Contractor shall adhere to the requirements in the base PWS.
Quality Control Plan (QCP)/ Quality Assurance (QA) The Contractor shall adhere to the requirements in the base PWS.
QCP
The Contractor shall adhere to the requirements in the base PWS.
Software Quality Testing The Contractor shall adhere to the requirements in the base PWS.
Test and Evaluation The Contractor shall adhere to the requirements in the base PWS.
Logistics Performance Based Logistics (PBL) Metrics Monitoring and Reporting Requirements The Contractor shall adhere to the requirements in the base PWS.
Level 1 Metrics The Contractor shall adhere to the requirements in the base PWS.
Level 2 Metrics The Contractor shall adhere to the requirements in the base PWS.
PBL Metric Definitions Applicable to This PWS The Contractor shall adhere to the requirements in the base PWS.
Repair Parts and Spares The Contractor shall adhere to the requirements in the base PWS.
Procurement The Contractor shall adhere to the requirements in the base PWS.
Inventory Control The Contractor shall adhere to the requirements in the base PWS.
Retrograde The Contractor shall adhere to the requirements in the base PWS.
Relocation The Contractor shall adhere to the requirements in the base PWS.
Shipping and Receiving The Contractor shall adhere to the requirements in the base PWS.
Above User-Level Maintenance and Depot Repairs The Contractor shall adhere to the requirements in the base PWS.
Reset The Contractor shall adhere to the requirements in the base PWS.
Depot Public Private Partnership (P3) The Government does not anticipate having an established core requirement resultant to a core depot assessment at the time of award of this TO. The Contractor shall adhere to the requirements in the base PWS.
Provisioning The Contractor shall be responsible for the development and/or maintenance of the AN/DSY1(V)1 and AN/DSY-2(V)1 PTD. The PTD shall be maintained and updated to reflect all Government approved ECPs to include obsolescence, technology insertions, modifications, upgrades, FMS configurations, and other PSS-T product baseline configuration changes. The PTD shall be developed and maintained using PowerLog-J, a Government owned software application, in a format that is compliant with GEIA-STD-0007-B and is capable of exporting the data deliverables required within this TO in the required Government format(s). The PTD shall be delivered in the format of a provisioning parts list (PPL) (LSAR 036). Each provisioning contract control number (PCCN) (as applicable) shall be delivered on separate media. The PTD shall be loadable to the Army’s logistics modernization program (LMP) in MIL-STD-1388-2B format with an accuracy rate of 100 percent for both content and data download as verified by sampling techniques and automated LMP tools. Any exceptions to loadable requirements or accuracy rate shall be approved by the Government provisioning activity. The PCCN and usable on code (UOC) for PSS-T are assigned as follows:
a. AN/DSY-1(V)1 Surveillance System, Elevated Sensor (PTDS/PSS-T large)
1. PCCN: G14ECK
2. UOC: 7MH
b. AN/DSY-2(V)1 Surveillance System, Elevated Sensor (PGSS/PSS-T medium)
1. PCCN: G14ECZ
2. UOC: 7MY
The Contractor shall minimize materiel readiness risks, by developing a Diminishing Manufacturing Sources and Material Shortages (DMSMS) strategy, based on Standardization Directory (SD)-22 – DMSMS Guidebook (August 2012), IAW CDRL A009, DI-MGMT-81948, “Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan.” This strategy shall identify items with immediate or near-term obsolescence issues; assess the items to prioritize those most likely to affect readiness or availability; analyze possible resolutions; and make recommendations to the Government to receive approval to implement the most cost-effective solutions.
Government-Industry Data Exchange Program (GIDEP).
The Contractor shall adhere to the requirements in the base PWS.
Equipment Technical Manuals (TMs) Effectivity of TMs The Contractor shall adhere to the requirements in the base PWS.
Maintenance Concept The Contractor shall adhere to the requirements in the base PWS.
Safety Changes The Contractor shall adhere to the requirements in the base PWS.
Copyright and Proprietary Material The Contractor shall adhere to the requirements in the base PWS.
Repair Parts and Special Tools List (RPSTL) The Contractor shall adhere to the requirements in the base PWS.
Reviews In-process Reviews (IPR) The Contractor shall adhere to the requirements in the base PWS.
Validation The Contractor shall adhere to the requirements in the base PWS.
Verification The Contractor shall adhere to the requirements in the base PWS.
Final Delivery Reviews The Contractor shall adhere to the requirements in the base PWS.
Training The Contractor shall adhere to the requirements in the base PWS.
Operations Operations Support The Contractor shall adhere to the requirements in the base PWS.
Operator/User-Level Maintainers The Contractor shall provide operators support 24 hours a day / seven (7) days a week of aerostat operations in accordance with systems detailed in section 3.0 of this PWS. The Contractor shall perform all functions to operate the systems in support of a variety of activities that shall include, but are not limited to, tactical operations, training, testing and evaluation activities. The Contractor shall provide crews to operate the aerostat safely, meet all command mission requirements, and maintain an Ao of 90%.
The Contractor shall perform field/user level preventive maintenance on associated PSS-T support equipment, e.g., boom lift, forklift, environmental control unit (ECU), all-terrain vehicles, generators, etc. The Contractor shall perform field/user level preventive maintenance on site of the deployed system. The Contractor shall ensure that the deployed operators are capable of performing these functions. The Contractor shall electronically record user level maintenance actions to include all consumables and parts using repair center web data, and/or the ASTS program depending on PSS-T large or medium.
The Contractor shall optimize crew size to operate the aerostat safely, meet all command mission requirements, and maintain an Ao of 90%.
The Contractor shall maintain 100% accountability IAW AR 735-5 for all Government provided items. The Contractor shall provide all maintenance records in near real time, using repair center web data and/or the ASTS program.
The Contractor shall conduct site surveys, install equipment, set up and/or tear down PSS-T systems as required.
The PSS-T systems shall be gradually transitioned to a Government operated system during the PoP of this TO. If this occurs, the Contractor shall be required to deliver a transition plan to ensure there is no loss of operational effectiveness, IAW CDRL A010, DI-MGMT-81945, “Phase-Out Transition Plan.”
The Contractor shall assume operator support IAW Table 3, PSS-T Operator Support.
Table 3: PSS-T Operator Support
| PoP |
| Total Number of Systems |
| Number of Contractor Operated Systems |
| Number of Government Operated, Contractor Supported Systems |
| Date of award plus 15 months |
| Up to 27 systems |
| 27 |
| 0 |
| Months 16 – 21 |
| Up to 27 systems |
| 16 |
| 11 |
| Months 22 – 27 |
| Up to 27 systems |
| 7 |
| 20 |
| Months 28 – 32 |
| Up to 27 systems |
| 0 |
| 27 |
Note: This transition shall apply only to operator positions. The Contractor shall continue to perform all other activities outlined in this PWS.
Trainer/Test System The Contractor shall adhere to the requirements in the base PWS.
Operations Reporting The Contractor shall adhere to the requirements in the base PWS.
Drawdown and Surge Operations The Contractor shall adhere to the requirements in the base PWS.
Contract Deliverables The Contractor shall adhere to the requirements in the base PWS.
Travel or Special Requirements The Contractor shall adhere to the requirements in the base PWS.
CONUS Travel The Contractor shall adhere to the requirements in the base PWS.
OCONUS Travel The Contractor shall adhere to the requirements in the base PWS.