A01_-_ExhibitA_CDRL_MGMT.pdf
PDF 271 KB Posted
- Solicitation number
- W56KGY-15-R-0016
About this file
Exhibit A - MGMT CDRLs
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0004 A
MGMT
Persistent Surveillance Systems – Tethered TBD TBD
A001 Contractor's Progress and Status Report
DI-MGMT-81928 PWS Para 3.1.3 SFAE-IEW-TA
LT
N/A D
MTHLY
30 DAC
MTHLY
See Block 6 1
CCAP-CCC 1
DCMA 1
0 3 0
BLOCK 4: Deliverables shall provide information required by Block 5 PWS reference and shall be submitted electronically in editable Microsoft Word/Excel/Powerpoint/Project file format. Contractor format is acceptable. The requiring office in Block 6 may specify alternate or additional formats.
BLOCK 8: The Government will have the opportunity to review and provide comments within 30 days of receipt of the deliverable.
29May2015 29May2015FRANK.THOMAS.M.1370138814 Digitally signed by FRANK.THOMAS.M.1370138814 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FRANK.THOMAS.M.1370138814 Date: 2015.05.29 10:54:47 -04'00'
CHELLIN.MATTHEW.D.1266374
Digitally signed by CHELLIN.MATTHEW.D.1266374131 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=CHELLIN.MATTHEW.D.1266374131 Date: 2015.05.29 16:37:45 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0004 A
MGMT
Persistent Surveillance Systems – Tethered TBD TBD
A002 Contract Work Breakdown Structure
DI-MGMT-81334D PWS Para 3.1.3 SFAE-IEW-TA
LT
A D
MTHLY
30DAC
MTHLY
See Block 6 1
CCAP-CCC 1
DCMA 1
0 3 0
BLOCK 4: Deliverables shall provide information required by Block 5 PWS reference and shall be submitted electronically in editable Microsoft Word/Excel/Powerpoint/Project file format. Contractor format is acceptable. The requiring office in Block 6 may specify alternate or additional formats.
BLOCK 8: The Government will have the opportunity to review and provide comments within 30 days of receipt of the deliverable.
29May2015 29May2015FRANK.THOMAS.M.1370138814 Digitally signed by FRANK.THOMAS.M.1370138814 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FRANK.THOMAS.M.1370138814 Date: 2015.05.29 10:58:09 -04'00'
CHELLIN.MATTHEW.D.1266374
Digitally signed by CHELLIN.MATTHEW.D.1266374131 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, Date: 2015.05.29 16:38:12 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0004 A
MGMT
Persistent Surveillance Systems – Tethered TBD TBD
A003 Operations Security (OPSEC) Plan OPSEC Plan
DI-MGMT-80934C PWS Para 1.9.4 SFAE-IEW-TA
LT
A D
ONE/R
90DAC
DFDEL
See Block 6 1
CCAP-CCC 1
DCMA 1
0 3 0
BLOCK 4: Reports shall provide information required by Block 5 PWS reference and shall be submitted electronically in Microsoft Word file format. Contractor format is acceptable. The requiring office in Block 6 must approve all subsequent revisions to the OPSEC plan prior to initiation of work. The CDRL must specifically state the Contractor shall comply with PD Aerostats OPSEC Plans when at government facilities. The Contractor OSPEC plan will address OPSEC at contractor facilities in accordance with AR 530-1.
BLOCK 8: The Government will have the opportunity to review and provide comments within 30 days of receipt of all reports.
BLOCK 13: The Contractor will update the OPSEC Plan to comply with any PD Aerostats changing OPSEC requirements. The Government will notify the Contractor in writing and the Contractor will have 30 days to submit a change to the OPSEC plan, for Government review and approval.
29May2015 29May2015FRANK.THOMAS.M.1370138814 Digitally signed by FRANK.THOMAS.M.1370138814 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FRANK.THOMAS.M.1370138814 Date: 2015.05.29 11:04:26 -04'00'
CHELLIN.MATTHEW.D.1266374
Digitally signed by CHELLIN.MATTHEW.D.1266374131 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, Date: 2015.05.29 16:38:33 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0004 A
MGMT
Persistent Surveillance Systems – Tethered TBD TBD
A004 Contractor's Risk Management Plan
DI-MGMT-81808 PWS Para 3.1.1 SFAE-IEW-TA
LT
N/A D
ONE/P
60 DAC
DFDEL
See Block 6 1
CCAP-CCC 1
DCMA 1
0 3 0
BLOCK 4: Deliverables shall provide information required by BLOCK 5 PWS reference and shall be submitted electronically in editable Microsoft Word/Excel/Powerpoint/Project file format. Contractor format is acceptable. The requiring office in BLOCK 6 may specify alternate or additional formats.
BLOCK 8: The Government will have the opportunity to review and provide comments within 30 days of receipt of all reports.
29May2015 29May2015FRANK.THOMAS.M.1370138814 Digitally signed by FRANK.THOMAS.M.1370138814 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FRANK.THOMAS.M.1370138814 Date: 2015.05.29 11:04:54 -04'00'
CHELLIN.MATTHEW.D.1266374
Digitally signed by CHELLIN.MATTHEW.D.1266374131 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, Date: 2015.05.29 16:39:02 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0004 A
MGMT
Persistent Surveillance Systems – Tethered TBD TBD
A005 Management Plan
DI-MGMT-80004A PWS Para 3.1.1, 3.1.2, & 3.1.6 SFAE-IEW-TA
LT
N/A D
ONE/P
15DAC
DFDEL
See Block 6 1
CCAP-CCC 1
DCMA 1
0 3 0
BLOCK 4: Deliverables shall provide information required by BLOCK 5 PWS reference and shall be submitted electronically in editable Microsoft Word/Excel/Powerpoint/Project file format. Contractor format is acceptable. The requiring office in BLOCK 6 may specify alternate or additional formats.
BLOCK 8: The Government will have the opportunity to review and provide comments within 30 days of receipt of all reports.
24Sep2015 24Sep2015FRANK.THOMAS.M.1370138814 Digitally signed by FRANK.THOMAS.M.1370138814 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FRANK.THOMAS.M.1370138814 Date: 2015.05.29 11:05:33 -04'00'
CHELLIN.MATTHEW.D.1266374
Digitally signed by CHELLIN.MATTHEW.D.1266374131 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, Date: 2015.05.29 16:39:20 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0004 A
MGMT
Persistent Surveillance Systems – Tethered TBD TBD
A006 Status Report Weekly Status Report
DI-MGMT-80368A PWS Para 3.1.2, 3.6.1 SFAE-IEW-TM
LT
N/A D
WEKLY
7DAC
WEKLY
See Block 6 1
CCAP-CCC 1
DCMA 1
0 3 0
BLOCK 4: Deliverables shall provide information required by BLOCK 5 PWS reference and shall be submitted electronically in editable Microsoft Word/Excel/Powerpoint/Project file format. Contractor format is acceptable. The requiring office in BLOCK 6 may specify alternate or additional formats.
BLOCK 8: The Government will have the opportunity to review and provide comments within 30 days of receipt of all reports.
BLOCK 11, 12 & 13: Submit reports, via a Government furnished operations database management program, as follows:
- Daily Operations Status Report: Submit information daily.
- Mean Time Between Failures: Submit information as required.
- Site Configuration Status Report: Submit information as required.
- Daily Operational Status Teleconference: Submit information daily via telecon and electronically.
29May2015 29May2015FRANK.THOMAS.M.1370138814 Digitally signed by FRANK.THOMAS.M.1370138814 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FRANK.THOMAS.M.1370138814 Date: 2015.05.29 11:06:32 -04'00'
CHELLIN.MATTHEW.D.1266374
Digitally signed by CHELLIN.MATTHEW.D.1266374131 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, Date: 2015.05.29 16:39:42 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0004 A
MGMT
Persistent Surveillance Systems – Tethered TBD TBD
A007 Integrated Program Management Report (IPMR) Management Report
DI-MGMT-81861 PWS Para 3.1.8 SFAE-IEW-TM
LT
N/A D
MTHLY
30DAC
MTHLY
See Block 6 1
CCAP-CCC 1
DCMA 1
0 3 0
BLOCK 4: Deliverables shall provide information required by BLOCK 5 PWS reference and shall be submitted electronically in editable Microsoft Word/Excel/Powerpoint/Project file format. Contractor format is acceptable. The requiring office in BLOCK 6 may specify alternate or additional formats.
BLOCK 8: The Government will have the opportunity to review and provide comments within 30 days of receipt of all reports.
29May2015 29May2015FRANK.THOMAS.M.1370138814 Digitally signed by FRANK.THOMAS.M.1370138814 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FRANK.THOMAS.M.1370138814 Date: 2015.05.29 11:07:26 -04'00'
CHELLIN.MATTHEW.D.1266374
Digitally signed by CHELLIN.MATTHEW.D.1266374131 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, Date: 2015.05.29 16:41:31 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0004 A
MGMT
Persistent Surveillance Systems – Tethered TBD TBD
A008 Repair Procedure
DI-MGMT-81910 PWS Para 3.3.7 SFAE-IEW-TA
LT
A D
ONE/P
See Item 16
See Block 6 1
CCAP-CCC 1
DCMA 1
0 3 0
BLOCK 4: Deliverables shall provide information required by BLOCK 5 PWS reference and shall be submitted electronically in editable Microsoft Word/Excel/Powerpoint/Project file format. Contractor format is acceptable. The requiring office in BLOCK 6 may specify alternate or additional formats.
BLOCK 8: The Government will have the opportunity to review and provide comments within 30 days of receipt of all reports.
BLOCK 12: The Contractor will submit a preliminary draft of a recommended parts list, for review and approval by the Government, no less than 45 days prior to execution of any reset plans. The Government will review and must approve prior to execution of any reset plans.
BLOCK 13: If additional recommended parts lists are required, the Contractor will follow the time line/guidance in "Block 12" notes above.
29May2015 29May2015FRANK.THOMAS.M.1370138814 Digitally signed by FRANK.THOMAS.M.1370138814 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FRANK.THOMAS.M.1370138814 Date: 2015.05.29 11:08:01 -04'00'
CHELLIN.MATTHEW.D.1266374
Digitally signed by CHELLIN.MATTHEW.D.1266374131 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, Date: 2015.05.29 16:41:55 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0004 A
MGMT
Persistent Surveillance Systems - Tethered TBD TBD
A009 Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan
DMSMS
DI-MGMT-81948 PWS Para 3.3.9 SFAE-IEW-TA
LT
N/A D
SEMIA
60DAC
SEMIA
See Block 6 1
CCAP-CCC 1
DCMA 1
0 3 0
BLOCK 4: Deliverables shall provide information required by BLOCK 5 PWS reference and shall be submitted electronically in editable Microsoft Word/Excel/Powerpoint/Project file format. Contractor format is acceptable. The requiring office in BLOCK 6 may specify alternate or additional formats.
BLOCK 8: The Government will have the opportunity to review and provide comments within 30 days of receipt of all reports.
BLOCKS 10 & 13: The Contractor will submit a DMSMS plan to the Government, for review and approval. Revisions will be made and delivered on a Semi-annual basis. The Government will have the opportunity to review and provide comments within 30 days of receipt of all reports.
29May2015 29May2015FRANK.THOMAS.M.1370138814 Digitally signed by FRANK.THOMAS.M.1370138814 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FRANK.THOMAS.M.1370138814 Date: 2015.05.29 11:08:52 -04'00'
CHELLIN.MATTHEW.D.1266374
Digitally signed by CHELLIN.MATTHEW.D.1266374131 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, Date: 2015.05.29 16:42:17 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0004 A
MGMT
Persistent Surveillance Systems – Tethered TBD TBD
A010 Phase-Out Transition Plan
DI-MGMT-81945 PWS Para 3.6.2 SFAE-IEW-TA
LT
N/A D
ONE/P
DFDEL
DFDEL
See Block 6 1
CCAP-CCC 1
DCMA 1
0 3 0
BLOCK 4: Deliverables shall provide information required by BLOCK 5 PWS reference and shall be submitted electronically in editable Microsoft Word/Excel/Powerpoint/Project file format. Contractor format is acceptable. The requiring office in BLOCK 6 may specify alternate or additional formats.
BLOCK 8: The Government will have the opportunity to review and provide comments within 30 days of receipt of all reports.
29May2015 29May2015FRANK.THOMAS.M.1370138814 Digitally signed by FRANK.THOMAS.M.1370138814 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FRANK.THOMAS.M.1370138814 Date: 2015.05.29 11:09:37 -04'00'
CHELLIN.MATTHEW.D.1266374
Digitally signed by CHELLIN.MATTHEW.D.1266374131 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, Date: 2015.05.29 16:42:35 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
Daily Status Report
FRANK.THOMAS.M.1370138814
Digitally signed by FRANK.THOMAS.M.1370138814 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FRANK.THOMAS.M.1370138814 Date: 2015.05.29 11:06:32 -04'00'
CHELLIN.MATTHEW.D.1266374
Digitally signed by CHELLIN.MATTHEW.D.1266374131 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, (1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
FRANK.THOMAS.M.1370138814
Digitally signed by FRANK.THOMAS.M.1370138814 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FRANK.THOMAS.M.1370138814 Date: 2015.05.29 11:06:32 -04'00'
CHELLIN.MATTHEW.D.1266374
Digitally signed by CHELLIN.MATTHEW.D.1266374131 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA,
| SignedMC_Base CDRL-A001 Ctr's Progress and Status Rpt |
| SignedMC_Base CDRL-A002 Contract Work Breakdown Structure PSST |
| SignedMC_Base CDRL-A003 Operations Security (OPSEC) Plan PSST |
| SignedMC_Base CDRL-A004 Contractor's Risk Management Plan PSST |
| SignedMC_Base CDRL-A005 Management Plan |
| SignedMC_Base CDRL-A006 Status Report Weekly PSST |
| SignedMC_Base CDRL-A007 Integrated Program Management Report PSST |
| SignedMC_Base CDRL-A008 Repair Procedure PSST |
| SignedMC_Base CDRL-A009 DMSMS PSST |
| SignedMC_Base CDRL-A010 Phase-out Transition Plan PSST |
| ExhibitA_CDRL_A005_MGMT_PLAN.pdf |
| SignedMC_Base CDRL-A001 Ctr's Progress and Status Rpt |
| SignedMC_Base CDRL-A002 Contract Work Breakdown Structure PSST |
| SignedMC_Base CDRL-A003 Operations Security (OPSEC) Plan PSST |
| SignedMC_Base CDRL-A004 Contractor's Risk Management Plan PSST |
| SignedMC_Base CDRL-A005 Management Plan |
| SignedMC_Base CDRL-A006 Status Report Weekly PSST |
| SignedMC_Base CDRL-A007 Integrated Program Management Report PSST |
| SignedMC_Base CDRL-A008 Repair Procedure PSST |
| SignedMC_Base CDRL-A009 DMSMS PSST |
| SignedMC_Base CDRL-A010 Phase-out Transition Plan PSST |
File details come from the government source that posted it. Updated .