CDRL_A005_First_Production_Vehicle_Final_Report.pdf

PDF 216 KB Posted

Attached to
Heavy Duty Variants (HDV) Federal contract opportunity
Solicitation number
W56HZV19R0079
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

CDRL A005 - First Production Vehicle

View the file

Other files for this federal contract opportunity

Other files attached to Heavy Duty Variants (HDV), newest first.
File Type Posted
HDV_QAs_SET_5_-_08_OCT_2019.XLSX XLSX spreadsheet
W56HZV19R0079-0003.pdf PDF
Copy_of_HDV_QAs_SET_4_-_07_OCT_2019.xlsx XLSX spreadsheet
Copy_of_HDV_QAs_SET_3_-_19_SEP_2019.XLSX XLSX spreadsheet
AMEND_Spec_-_Heavy_Duty_Water_and_Fuel_Truck.doc DOC document
AMEND_TIQ_-_Heavy_Duty_Flatbed_&_Personnel_Carrier_Truck.docx DOCX document
W56HZV19R0079-0002.pdf PDF
AMEND_Spec_-_Heavy_Duty_Flatbed_&_Personnel_Carrier_Truck.doc DOC document
AMEND_TIQ_-_Heavy_Duty_Water_and_Fuel_Truck.docx DOCX document
HDV_QAs_SET_2_-_11_SEP_2019_AZ.XLSX XLSX spreadsheet
HDV_Q&As_SET_1_-_26_AUG_2019.xlsx XLSX spreadsheet
AMEND_TIQ_-_Heavy_Duty_Flatbed_&_Personnel_Carrier_Truck.docx DOCX document
W56HZV19R0079-0001.pdf PDF
AMEND_Spec_-_Heavy_Duty_Water_and_Fuel_Truck.doc DOC document
Attachment_0005_-_Pricing_FINAL.xlsx XLSX spreadsheet
AMEND_Spec_-_Heavy_Duty_Flatbed_&_Personnel_Carrier_Truck.doc DOC document
AMEND_TIQ_-_Heavy_Duty_Water_and_Fuel_Truck.docx DOCX document
Attachment_0004_TIQ_Flatbed_&_Personel_Carrier_HDV_Variants_(07_AUG_2019).docx DOCX document
Attachment_0007_Critical_Components_List_Flatbed_&_Personel_Carrier_Truck_Variants.xlsx XLSX spreadsheet
CDRL_A003_Start_of_Production.pdf PDF
W56HZV19R0079.pdf PDF
Attachment_0002_Specification_Flatbed_&_Personel_Carrier_HDV_Variants.pdf PDF
CDRL_A002_Start_of_Work_Meeting_.pdf PDF
Attachment_0001_Specification_Water_&_Fuel_HDV_Variants.pdf PDF
Attachment_0005_-_Pricing_&_Spares.xlsx XLSX spreadsheet
Attachment_0008_Offeror_Compliance_Checklist.xlsx XLSX spreadsheet
Attachment_0003_TIQ_Water_and_Fuel_HDV_Variants_(07_AUG_2019).docx DOCX document
CDRL_A004_Final_Inspection_Report.pdf PDF
Attachment_0006_Critical_Components_List_Water_&_Fuel_Variants.xlsx XLSX spreadsheet
CDRL_A001_Photographs.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

1_DATA_ITEM_NO: A005
2_TITLE_OF_DATA_ITEM: First Production Vehicle Final Report
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: DI-NDTI-80809B
5_CONTRACT_REFERENCE: E.3.3
6_REQUIRING_OFFICE: SAMD
7_DID_250_REQ: LT
8_APP_CODE: A
DIST_STATEMENT: C
10_FREQUENCY: See Block 16
11_AS_OF_DATE: See Block 16
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: PCO
draft1:
reg1: 1
repro1:
addressee2: SAMD
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 0
16_REMARKS: The contractor shall submit the final report to the Government no less than 14 calendar days following the completion of the first production vehicle inspection and testing requirements.The report shall, at a minimum, include:

1. Variant inspected and tested

2. Documented results of the TIQ review (see E.3.4.1)

3. Deficiencies and corrective actions from the TIQ review

4. A copy of the completed Final Inspection Report (FIR), including inspection, road test, and control test results. (see E.3.4.2)

5. Deficiencies and corrective actions from the FIR, road test, and control test.

6. Deficiencies and corrective actions from the variant-specific first production requirements, if applicable.

7. Plan and schedule to implement corrective actions from items 3, 5, and 6 into design and production to prevent re-occurrence, including implementation on other variants and at other facilities.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY: David Tipp
H_DATE: 27 Dec 18
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 2
A_CONTRACT_LINE_ITEM_NO: A005
B_EXHIBIT:
TDP:
TM:
OTHER: X
DSYSTEMITEM: Heavy Duty Truck Variants
E_CONTRACTPR_NO: W56HZV19CXXXX
FCONTRACTOR: TBD
16_REMARKS_Continued:
Page2:
of_pages: 1
Reset:

File details come from the government source that posted it.