CDRL_A004_Final_Inspection_Report.pdf
PDF 235 KB Posted
- Attached to
- Heavy Duty Variants (HDV) Federal contract opportunity
- Solicitation number
- W56HZV19R0079
About this file
CDRL A004 - Final Inspection Report
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
| 1_DATA_ITEM_NO: A004 |
| 2_TITLE_OF_DATA_ITEM: Final Inspection Report (FIR) |
| 3_SUBTITLE: |
| 4_AUTHORITY_Data_Acquisit: DI-NDTI-80809B |
| 5_CONTRACT_REFERENCE: C.3.3 E.2.2.1, E.2.2.1.1, E.2.2.2, E.2.3.1 |
| 6_REQUIRING_OFFICE: SAMD |
| 7_DID_250_REQ: LT |
| 8_APP_CODE: A |
| DIST_STATEMENT: C |
| 10_FREQUENCY: See Block 16 |
| 11_AS_OF_DATE: See Block 16 |
| 12_DATE_OF_FIRST_SUBMISSI: 60 DARO |
| 13_DATE_OF_SUBSEQUENT_SUB: See Block 16 |
| addressee1: SAMD |
| draft1: 1 |
| reg1: 1 |
| repro1: |
| addressee2: PCO |
| draft2: |
| reg2: 1 |
| repro2: |
| addressee3: DCMA |
| draft3: |
| reg3: 1 |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 1 |
| total_repro: 0 |
| 16_REMARKS: FIRs shall be submitted electronically to the Government for review and approval of the content. |
The contractor shall submit each variant-specific FIR for each variant being produced.
The initial submission of the draft FIRs shall be at the Start of Work Meeting. The Government will review and approve or reject the FIR content. If rejected, the Government will provide reasons for rejection. The contractor shall address all rejection issues and resubmit electronically for approval until the Government approves each FIR.
A validation and Verification of the FIR shall take place during the Start of Production Meeting at the contractor final manufacturing facility. Each variant-specific FIR must be validated and verified by TACOM, the contractor and DCMA.
Following Government approval, the contractor shall submit any subsequent modifications to the FIRs to the Government for approval in accordance with initial submission approval process.
A copy of each completed FIR shall be submitted to the Government following the inspection and acceptance of each vehicle.
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| G_PREPARED_BY: David Tipp |
| H_DATE: 27 Dec 18 |
| 1_APPROVED_BY: |
| J_DATE: |
| Page: 1 |
| reg38t: 3 |
| A_CONTRACT_LINE_ITEM_NO: A004 |
| B_EXHIBIT: |
| TDP: |
| TM: |
| OTHER: X |
| DSYSTEMITEM: Heavy Duty Truck Variants |
| E_CONTRACTPR_NO: W56HZV19CXXXX |
| FCONTRACTOR: TBD |
| 16_REMARKS_Continued: |
| Page2: |
| of_pages: 1 |
| Reset: |
File details come from the government source that posted it.