Attachment_0009_-_GFP.xlsx

XLSX spreadsheet 9 MB Posted

Attached to
ERACC Type II Hardware and Services
Solicitation number
W56HZV-19-R-0034
Issued by

About this file

Attachment_0009_-_GFP

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT INFO

ERROR:#REF! GOVERNMENT FURNISHED PROPERTY * denotes a required field

Attachment Number* 10 Attachment Date* 2019-03-21

GOVERNMENT CONTRACTING OFFICER

Name Shane Strehler Email shane.c.strehler.civ@mail.mil Phone 586-282-6681

Document Description* Contract Award Mod Number Amendment No.

CUSTODIAL PROCUREMENT INSTRUMENT IDENTIFICATION

Contract Number Type* DoD Contract (FAR)

SOLICITATION, CONTRACT or UNIFORM PIID NUMBER*Order NumberOR
PIID FORMAT (FY16+)Old Order Format

Issuing Office DoDAAC Issuing Year Contract Type Sequence Number Issuing Office DoDAAC Issuing Year Contract Type Sequence Number

Consolidated GFP Attachment Version 2.1

Requisitioned /xl/drawings/drawing1.xml#Requisition!A1NON-Serially Managed /xl/drawings/drawing1.xml#'NON-Serially%20Managed%20Items'!A1Serially Managed /xl/drawings/drawing1.xml#'Serially%20Managed%20Items'!A1 Serially Managed Items

* denotes a required field † A minimum of one of these fields is required for each item record †† If either "Mfr CAGE" or "Part Number" is entered, the other is required.

If any one of duration, time unit, or delivery event are populated, all 3 must be populated.

Serially Managed Items

LINE NUMBER* ITEM NAME* ITEM DESCRIPTION* NSN† MFR CAGE†,†† PART NUMBER†,†† MODEL NUMBER† QTY* UNIT OF MEASURE* UNIT ACQ COST USE AS-IS* DELIVERY DATE DURATION TIME UNIT DELIVERY EVENT NOTES

Requisitioned /xl/drawings/drawing2.xml#Requisition!A1NON-Serially Managed /xl/drawings/drawing2.xml#'NON-Serially%20Managed%20Items'!A1Contract Information /xl/drawings/drawing2.xml#'CONTRACT%20INFO'!A1 Non-Serially Managed Items

* denotes a required field † A minimum of one of these fields is required for each item record †† If either "Mfr CAGE" or "Part Number" is entered, the other is required.

If any one of duration, time unit, or delivery event are populated, all 3 must be populated.

NON-Serially Managed Items

LINE NUMBER*ITEM NAME*ITEM DESCRIPTION*NSN†MFR CAGE†,††PART NUMBER†,††MODEL NUMBER†QTY*UNIT OF MEASURE*UNIT ACQ COSTUSE AS-IS*DELIVERY DATEDURATIONTIME UNITDELIVERY EVENTNOTES
1120M Grader A KitWiring and brackets3MJN092656413Each5322.73true365Work DaysOther120M Grader A Kits are provided to the contractor to complete MWO 55-1
2T-5 Dozer A KitWiring and brackets3MJN0102861123Each6540.12true365Work DaysOtherT-5 A Kits are provided to the contractor to complete MWO 55-1
3613C ScraperWiring and brackets3MJN010344878Each11009.88true365Work DaysOther613C Scraper A Kits are provided to the contractor to complete MWO 55-1
4DEUCEWiring and brackets3MJN010413836Each10688.43true365Work DaysOther120M Grader A Kits are provided to the contractor to complete MWO 55-1

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.