Exhibit A - Contract Data Requirements list

View the file

Other files

File Type Posted
W56HZV15R0156_Conformed_Copy_thru_Amend_0006.pdf PDF
W56HZV15R0156-0006.pdf PDF
W56HZV15R0156_Conformed_Copy.pdf PDF
W56HZV15R0156-0005.pdf PDF
Attachment_0061_-_Identification_and_Assertion_of_Restrictions.xlsx XLSX spreadsheet
Attachment_0033_-_RCIS_Technical_Data_and_Software_Rights_Evaluation_Spreadsheet.xlsx XLSX spreadsheet
Attachment_0050_-_Attribute_Selection_Worksheet_-_7_JUL_2017_-_v2.xlsx XLSX spreadsheet
Exhibit_A_-_Contract_Data_Requirements_List_12_Jul_2017.pdf PDF
Attachment_0033_-_RCIS_Technical_Data_and_Computer_Software_Rights_Evaluation_Spreadsheet_ver2.xlsx XLSX spreadsheet
W56HZV15R0156-0004.pdf PDF
Attachment_0055_-_Pricing_Attachment_-_12_JUL_17_-_v2.xlsx XLSX spreadsheet
Exhibit_A_-_Contract_Data_Requirements_List_29_Jun_2017.doc DOC document
W56HZV15R0156-0003.pdf PDF
Attachment_0008_-_Government_Furnished_Property_(GFP)_List_6-23-17_v2.pdf PDF
Attachment_0015_-_RCIS_Program_Plan_v2.xlsx XLSX spreadsheet
Exhibit_A_-_Contract_Data_Requirements_List__15_Jun_2017.pdf PDF
W56HZV15R0156-_Amendment_0002.pdf PDF
Attachment_0035_-_Past_Performance_Relevancy_Matrix_15_Jun_2017.xls XLS spreadsheet
RCIS_RFP_Q&A_Tracker_(1-10).pdf PDF
FCL_Orientation_Handbook_18FEB15.pdf PDF
W56HZV15R0156_Conformed_Copy.pdf PDF
Facility_Clearance_(FCL)__Notice.docx DOCX document
W56HZV15R0156-0001.pdf PDF
FCL_Sponsorship_Letter_OCT15.pdf PDF
Distribution_A.zip ZIP file
W56HZV-15-R-0156_5-16-17.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RCIS SAC System

Contract Data Requirements List 16 Dec 2016 DISTRIBUTION STATEMENT A: Approved for Public Release

CDRL
Title
A001
Integrated Master Schedule (IMS)
A002
Contract Work Breakdown Structure (CWBS)
A003
Contract Funds Status Report (CFSR)
A004
Systems Engineering Management Plan (SEMP)
A005
System/Subsystem/Component Specification (SSS)
A006
Requirements Compliance Matrix (RCM)
A007
System/Subsystem Design Description (SSDD)
A008
Interface Control Documents (ICDs)
A009
Interoperability Profile (IOP)-Contractor Standards
A010
Reserved
A011
Frequency Allocation Data
A012
Proposed Vehicle Modifications
A013
Military (MIL) Grade Connector Waiver Request
A014
Software Development Plan (SDP)
A015
Software Requirements Specification (SRS)
A016
Reliability Centered Maintenance (RCM) Analysis
A017
Interface Design Document (IDD)
A018
Software Design Description (SDD)
A019
Software Test Plan (STP)
A020
Software Test Description (STD)
A021
Software Test Report (STR)
A022
Software Version Description (SVD)
A023
SAC System Computer Software
A024
Software Licenses
A025
Cybersecurity Authorization Package
A026
Baseline Description Document
A027
Engineering Change Proposal (ECP)
A028
EMD Technical Data Package (TDP)
A029
Risk Management Status Reports
A030
Reliability & Maintainability Program Plan (RPP)
A031
R&M Case Report (RCR)
A032
System Safety Program Plan (SSPP)
A033
Safety Assessment Report (SAR)
A034
Hazard Tracking System (HTS)
A035
Hazardous Material Management Report (HMMR)
A036
Human Systems Integration Plan (HSIP)
A037
HSI Issue Database
A038
HSI Event Plan
A039
HSI Event Report
A040
Human Factors Engineering Analysis (HFEA)
A041
Soldier Performance and Workload
A042
Soldier Survivability (SSv) Assessment Report
A043
Logistics Management Information (LMI) Data Summaries
A044
Level of Repair Analysis (LORA)
A045
Fault Tree Analysis (FTA)
A046
Engineering Data for Provisioning (EDFP)
A047
Provisioning and Other Pre-Procurement Screening Data
A048
Technical Manuals (TMs)
A049
Item Unique Identification (IUID) Marking Plan
A050
Reserved
A051
Training Aids, Devices, Simulators, and Simulations (TADSS) analysis
A052
Program of Instruction (POI)
A053
Course Management Plan (CMP)
A054
Individual Student Assessment Plan (ISAP)
A055
Test Administrative Guide (TAG)
A056
Training Program Structure Document
A057
Risk Management Worksheets
A058
Advance Sheets
A059
Multi-Media
A060
Operator Course Testing Plan (CTP)
A061
Contractor Verification Test Plan
A062
Test Inspection Report
A063
Certifications
A064
Analysis Reports
A065
System Support Package Component List (SSPCL)
A066
Failure Analysis and Corrective Action Report (FACAR)
A067
Manufacturing Plan
A068
Instructor and Key Personnel Training (I&KPT)
A069
Anti-Tamper Plan
A070
Meeting Minutes
A071
Conference Agenda
A072
Configuration Audit Plan
A073
Configuration Audit Summary Report
A074
Maintainer Instructor and Key Personnel Training (I&KPT) Training Material and Aides
A075
LRIP Technical Data Package (TDP)
A076
OPTION Technical Data Package (TDP)
A077
Quality Program Plan
A078
Final Inspection Report (FIR
A079
Provisioning Parts List (PPL)
A080
Long Lead Item List (LLIT)
A081
Basis of Issue Item (BII) List
A082
Expendable & Durable Item List (EDIL)
A083
Component of the End Item (COEI) List
A084
Authorized Stockage List (ASL)
A085
Item Unique Identification (IUID) Validation Verification Plan and Report
A086
Failure Mode, Effects and Criticality Analysis (FMECA)
A087
Transportability and Deployment Data Report
A088
Performance Based Logistics (PBL) Implementation Plan System
A089
Interim Contractor Support Management Plan (ICSMP)
A090
Maintenance Allocation Chart (MAC)
A091
Reserved
A092
Transition Support Data
A093
Reserved
A094
Engineering Release Record (ERR)
A095
Reserved
A096
Request for Variance (RFV)
A097
Material and Equipment Purchases - Supporting Data
A098
Phase-Out Plan
A099
Current Inventory Report
A100
DA Form 3161 Submittal
A101
Total Package Fielding (TPF) Database
A102
Post Fielding Status Report
A103
Post Fielding TPF Documentation
A104
Weekly Fielding Reports
A105
Joint Inventory Report
A106
After Action Report
A107
Deficiency Reports
A108
Deprocessing Checklist
A109
Reserved
A110
Integrated Program Management Report (IPMR)
A111
Software Transition Plan (STrP)
A112
Component Warranty List
A113
Technical Manual Crosswalk
A114
Technical Manual Status Report
A115
Validation Plan and Report
A116
LOG Support Items List (LSA-009)
A117
Acceptance Test Plan
A118
Calibration and Measurement Requirements Summary (CMRS)
A119
Critical Task Analysis Report
A120
Logistics Product Data (Critical Stockage List (CSL))
A121
Logistics Product Data Plan
A122
Maintenance Task Analysis (MTA)
A123
Maintenance, Test, and Support Equipment Requirements List (MTSERL)
A124
National Maintenance Work Requirement (NMWR) Data Summary
A125
Packaging Logistics Management Information (LMI) Coded Data
A126
Product Baseline Index (PBLI)
A127
Special Packaging Instructions (SPI)
A128
Storage, Exercise, Care, and Maintenance Plan
A129
Validation Testing of Packaging
A130
Non-conformance Report (NR)
A131
Product Support Analysis
A132
STS Technical Report

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER

D. SYSTEM/ITEM

RCIS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Integrated Master Schedule (IMS)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81861A

5. CONTRACT REFERENCE

C.2.3, C.3.4.1, C.3.4.9, C.6.10.1, C.13.2.7.1, C.13.2.7.2, C.15, C.17.1, C.21.2.1, C.21.2.3, C.21.3.4,4, C.21.13.36.2, C.21.15.1, C.21.17.1, C.21.17.3, C.21.17.5, C.22.2.1, C.22.2.3, C.22.3.4.4, C.22.15.1, C.22.17.3, C.22.17.8, C.25.1.2

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

Monthly

12. DATE OF 1ST SUBMISSION

20 DAC

14.

DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

Monthly

Draft
Final
Reg
Repro

16. REMARKS:

Block 4: The IMS shall be prepared IAW DI-MGMT-81861A as specified except for the following tailored paragraphs.

References to planning packages are not applicable. The contractor shall not utilize planning packages in the creation or update of the IMS. A formal Integrated Master Plan (IMP) is not required by the PWS. References to the IMP are not applicable.

The IMS shall be delivered electronically in an electronic file produced by the contractor's scheduling tool that is compatible with Microsoft Project version 2010.

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Blocks 12, 13: To be submitted 5 business days prior to the monthly PM IPT meetings IAW PWS C.3.5.1. The Government will provide comments at the monthly PM IPT meetings. The Contractor shall deliver the revised IMS no later than 5 business days after Government comments are provided.

Block 14:

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

Repro = Electronic Delivery

COR IDE

-
-
1
15. TOTAL
-
-
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

01 Jun 2016

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract Work Breakdown Structure (CWBS)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81334D

5. CONTRACT REFERENCE

C.2.4, C.21.2.4,

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4: DI-MGMT-81334D tailored as follows: Submittals to the Cost and Software Data Reporting (CSDR) Submit-Review System are not required.

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10, 12:

FOR EMD: The Contractor shall deliver the draft CWBS at the Start of Work Meeting (SOWM). The Government requires up to 15 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised CWBS at the LRIP Option Start of Work Meeting (SOWM). The Government requires up to 15 business days for review and comment.

Block 13:

FOR EMD: The Contractor shall deliver the final CWBS no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the final CWBS no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

01 Jun 2016

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Contract Funds Status Report (CFSR)

3. SUBTITLE

4. AUTHORITY
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81468
C.2.5, C.21.2.5, C.22.2.5, C.23.1.2, C.23.4.1.2, C.25.1.1.3
PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DISTRIBUTION STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
D
Quarterly
See Block 16
a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

Draft
Final
See Block 16
See Block 16
Reg
Repro

16. REMARKS:

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 12: The initial submission shall be within 20 business days after the end of the Calendar Quarter following Contract Award.

Block13: Subsequent submission shall be submitted within 20 business days after the end of each Calendar Quarter.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE

15. TOTAL

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Systems Engineering Management Plan (SEMP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81785

5. CONTRACT REFERENCE

C.4.1, C.7.2, , C.21.4.1, , C.21.7.2, , C.22.4.1,

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10, 12:

FOR EMD: The Contractor shall deliver the draft SEMP no later than 30 business days after contract award. The Government requires up to 15 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised SEMP no later than 30 business days after LRIP Option contract award. The Government requires up to 15 business days for review and comment.

FOR FRP: The Contractor shall deliver the revised SEMP no later than 30 business days after FRP Option contract award. The Government requires up to 15 business days for review and comment.

Block 13:

FOR EMD: The Contractor shall deliver the revised SEMP no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the revised SEMP no later than 15 business days after Government comments are provided.

FOR FRP: The Contractor shall deliver the revised SEMP no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

System/Subsystem/Component Specification (SSS)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81431A

5. CONTRACT REFERENCE

C.4.2, C.21.4.2

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4: This CDRL applies to system, subsystem and component level specifications. DI-IPSC-81431A tailored as follows: It is preferred (but not required) the specifications be submitted IAW DOORS Project Archive (DPA) in addition to Microsoft Office 2013 compatible format. See Attachment 0046 for DOORS DPA format.

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10, 12:

FOR EMD: The Contractor shall deliver the draft Specification no later than 30 business days prior to the Preliminary Design Review (PDR). The Government requires up to 15 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised Specification with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.

Block 13:

FOR EMD: The Contractor shall deliver the final Specification no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the final Specification no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format and optionally DOORS DPA format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Requirements Compliance Matrix (RCM)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

C.4.3, C.21.4.2, C.21.4.3

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10, 12:

FOR EMD: The Contractor shall deliver the draft RCM no later than 30 business days prior to the Preliminary Design Review (PDR). Preliminary analysis is acceptable. The Government requires up to 15 business days for review and comment. The Contractor shall deliver the revised draft RCM no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the revised RCM with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.

Block 13:

FOR EMD: The Contractor shall deliver the final RCM no later than 45 business days prior to the Critical Design Review (CDR). Complete final analysis and related data to support assessment of compliance is required. The Government requires up to 30 business days for review and comment. The Contractor shall deliver the revised final RCM no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the final RCM no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

System/Subsystem Design Description (SSDD)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81432A

5. CONTRACT REFERENCE

C.4.4, C.21.4.2, C.21.4.4

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10, 12:

FOR EMD: The Contractor shall deliver the draft SSDD no later than 45 business days prior to the Critical Design Review (CDR). The Government requires up to 30 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised SSDD with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.

Block 13:

FOR EMD: The Contractor shall deliver the final SSDD no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the final SSDD no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Interface Control Document (ICD)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-81248A

5. CONTRACT REFERENCE

C.4.5, C.21.4.2, C.21.4.5

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4: DI-CMAN-81248A tailored as follows: Submittal in Extensible Markup Language (XML) is subject to prior Government approval.

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10, 12:

FOR EMD: The Contractor shall deliver the draft ICD no later than 45 business days prior to the Critical Design Review (CDR). The Government requires up to 30 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised ICD with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.

Block 13:

FOR EMD: The Contractor shall deliver the final ICD no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the final ICD no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

Interoperability Profile (IOP) – Contractor Standards

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

C.4.7, C.21.4.2, C.21.4.7

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10, 12:

FOR EMD: The Contractor shall deliver the draft IOP documentation no later than 30 business days prior to the Preliminary Design Review (PDR). The Government requires up to 15 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised IOP documentation with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.

Block 13:

FOR EMD: The Contractor shall deliver the final IOP documentation no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the final IOP documentation no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A010

2. TITLE OF DATA ITEM

Reserved

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST STATEMENT

10. FREQUENCY

12. DATE OF 1ST SUBMISSION

14.

a. ADDRESSEE
b. COPIES

8. APP CODE

Draft
Final
Reg
Repro

Reserved

15. TOTAL

G. PREPARED BY
H. DATE
I. APPROVED BY

J. DATE

1. DATA ITEM NO

A011

2. TITLE OF DATA ITEM

Frequency Allocation Data

3. SUBTITLE

Preparation of DD Form 1494, Application for

Equipment Frequency Allocation.

4. AUTHORITY (Data Acquisition Document No.)

DI-EMCS-81827

5. CONTRACT REFERENCE

C.4.8, C.4.9, C.21.4.2

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST

STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10, 12:

FOR EMD: The Contractor shall deliver the draft DD1494 form, Application for Equipment Frequency Allocation, no later than 30 business days prior to the Preliminary Design Review (PDR). The Government requires up to 60 business days for review and comment. Acceptance will be based on Army Spectrum Management Office (ASMO) concurrence and PCO approval.

FOR LRIP: The Contractor shall deliver the revised DD1494 with the associated Engineering Change Proposal (ECP). The Government requires up to 60 business days for review and comment. Acceptance will be based on ASMO concurrence and PCO approval.

Block 13:

FOR EMD: The Contractor shall deliver the final DD1494 no later than 15 business days after Government comments are provided. Acceptance will be based on ASMO concurrence and PCO approval.

FOR LRIP: The Contractor shall deliver the final DD1494 no later than 15 business days after Government comments are provided. Acceptance will be based on ASMO concurrence and PCO approval.

Block 14:

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL ---------(
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A012

2. TITLE OF DATA ITEM

Proposed Vehicle Modifications

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

C.4.10, C.21.4.2

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10, 12:

FOR EMD: The Contractor shall deliver the draft Vehicle Modification documentation no later than 30 business days prior to the Preliminary Design Review (PDR). The Government requires up to 15 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised Vehicle Modification documentation with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.

Block 13:

FOR EMD: The Contractor shall deliver the final Vehicle Modification documentation no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the final Vehicle Modification documentation no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A013

2. TITLE OF DATA ITEM

Military (MIL) Grade Connector Waiver Request

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

C.4.11, C.21.4.2

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10, 12:

FOR EMD: The Contractor shall deliver the draft Waiver Request documentation no later than 30 business days prior to the Preliminary Design Review (PDR). The Government requires up to 15 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised Waiver Request documentation with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.

Block 13:

FOR EMD: The Contractor shall deliver the final Waiver Request documentation no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the final Waiver Request documentation no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A014

2. TITLE OF DATA ITEM

Software Development Plan (SDP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81427A

5. CONTRACT REFERENCE

C.5.1, C.5.13, C.5.14, C.21.5.1, C.21.5.13, C.21.5.14, C.22.5.1, C.22.5.2, C.22.5.3

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Software Documentation; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10, 12:

FOR EMD: The Contractor shall deliver the draft Software Development Plan (SDP) no later than 30 business days after contract award. The Government requires up to 15 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised SDP no later than 30 business days after LRIP Option contract award. The Government requires up to 15 business days for review and comment.

FOR FRP: The Contractor shall deliver the revised SDP no later than 30 business days after FRP Option contract award. The Government requires up to 15 business days for review and comment.

Block 13:

FOR EMD: The Contractor shall deliver the revised SDP no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the revised SDP no later than 15 business days after Government comments are provided.

FOR FRP: The Contractor shall deliver the revised SDP no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A015

2. TITLE OF DATA ITEM

Software Requirements Specification (SRS)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81433A

5. CONTRACT REFERENCE

C.5.2, C.21.5.2

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Software Documentation; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10: The Contractor shall deliver a separate SRS for each Computer Software Configuration Item (CSCI) identified in the System/Subsystem Design Description (SSDD) (PWS Section C.4.4, C.21.4.4 and CDRL A007).

Block 12:

FOR EMD: The Contractor shall deliver the draft Software Requirements Specification (SRS) documents no later than 30 business days prior to the Preliminary Design Review (PDR). The Government requires up to 15 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised SRS documents no later than 30 business days prior to the Physical Configuration Audit (PCA). The Government requires up to 15 business days for review and comment

Block 13:

FOR EMD: The Contractor shall deliver the revised SRS documents no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the revised SRS documents no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A016

2. TITLE OF DATA ITEM

Reliability Centered Maintenance (RCM)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ILSS-80111A

5. CONTRACT REFERENCE

C.13.2.3

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

LT

9. DIST STATEMENT

D

10. FREQUENCY

ONE/R

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Software Documentation; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10: The contractor will provide an RCM outline of its strategy at the Start of Work meeting.

Block 12, 13: The Reliability Centered Maintenance (RCM) shall be delivered 15 calendar days prior to the CDR. The Government will review the draft report and provide comments within 45 calendar days after receipt. The contractor shall correct and provide final copy including all changes or deletions to the Government NLT 30 calendar days after receipt of government comments.

Government receipt of documentation does not constitute acceptance.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1

15. TOTAL

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A017

2. TITLE OF DATA ITEM

Interface Design Description (IDD)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81436A

5. CONTRACT REFERENCE

C.5.3, C.21.5.3

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Software Documentation; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10: The Contractor shall deliver a separate IDD for each CSCI identified in the SSDD (PWS Section C.4.4, C.21.4.4 and CDRL A007).

Block 12:

FOR EMD: The Contractor shall deliver the draft Interface Design Description (IDD) documents no later than 45 business days prior to the Critical Design Review (CDR). The Government requires up to 30 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised IDD documents no later than 30 business days prior to the Physical Configuration Audit (PCA). The Government requires up to 15 business days for review and comment

Block 13:

FOR EMD: The Contractor shall deliver the revised IDD documents no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the revised IDD documents no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

1. DATA ITEM NO.

A018

2. TITLE OF DATA ITEM

Software Design Description (SDD)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81435A

5. CONTRACT REFERENCE

C.5.4, C.21.5.4

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Software Documentation; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10: The Contractor shall deliver a separate SDD for each CSCI identified in the SSDD (PWS Section C.4.4, C.21.4.4 and CDRL A007).

Block 12:

FOR EMD: The Contractor shall deliver the draft Software Design Description (SDD) documents no later than 45 business days prior to the Critical Design Review (CDR). The Government requires up to 30 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised SDD documents no later than 30 business days prior to the Physical Configuration Audit (PCA). The Government requires up to 15 business days for review and comment.

Block 13:

FOR EMD: The Contractor shall deliver the revised SDD documents no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the revised SDD documents no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.

Repro = Electronic Delivery

COR IDE
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

Product Officer

H. DATE

01 Jun 2016

I. APPROVED BY

PdM ALUGS

J. DATE

01 Jun 2016

1. DATA ITEM NO.

A019

2. TITLE OF DATA ITEM

Software Test Plan (STP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81438A

5. CONTRACT REFERENCE

C.5.7, C.21.5.7

6. REQUIRING OFFICE

PM FP, PdM ALUGS

7. DD 250 REQ

NO

9. DIST STATEMENT

D

10. FREQUENCY

See Block 16

12. DATE OF 1ST SUBMISSION

See Block 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Software Documentation; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Block 10, 12:

FOR EMD: The Contractor shall deliver the draft Software Test Plan (STP) no later than 45 business days prior to the Critical Design Review (CDR). The Government requires up to 30 business days for review and comment.

FOR LRIP: The Contractor shall deliver the revised STP no later than 30 business days after LRIP Option contract award. The Government requires up to 15 business days for review and comment.

Block 13:

FOR EMD: The Contractor shall deliver the revised STP no later than 15 business days after Government comments are provided.

FOR LRIP: The Contractor shall deliver the revised STP no later than 15 business days after Government comments are provided.

Block 14: Deliver documents in Microsoft Office 2013 compatible format.

This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2).