| Attachment 55 - Price Evaluation Worksheet |
| Version 2.0, 12 Jul 2017 |
| Distribution Statmenet A: Approved for Public Release |
| Instructions: |
| Starting with this Summary tab, please fill out only the yellow highlighted cells in all tabs. |
| Solicitation No.: | Offeror: | ………………………….. |
| RCIS | Date of submission | ………………………….. |
| CLIN Number | Description | | | | |
| CPIF, CPFF & CPFF LoE CLINs | | | Proposed Price | Most Probable Cost Adjustment | Evaluated Contract Price | Contract Type |
| 1000AA | ENGINEERING MANUFACTURING DEVELOPMENT | $ - 0 | $ - 0 | $ - 0 | CPIF |
| 5001AA | TOTAL PACKAGE FIELDING OPTION 1 | $ - 0 | $ - 0 | $ - 0 | CPFF LoE |
| 5002AA | TOTAL PACKAGE FIELDING OPTION 2 | $ - 0 | $ - 0 | $ - 0 | CPFF LoE |
| 6001AA | INTERIM CONTRACTOR SUPPORT OPTION 1 | $ - 0 | $ - 0 | $ - 0 | CPFF LoE |
| 6002AA | INTERIM CONTRACTOR SUPPORT OPTION 2 | $ - 0 | $ - 0 | $ - 0 | CPFF LoE |
| 7001AA | SYSTEM TECHNICAL SUPPORT OPTION 1 | $ - 0 | $ - 0 | $ - 0 | CPFF LoE |
| 7002AA | SYSTEM TECHNICAL SUPPORT OPTION 2 | $ - 0 | $ - 0 | $ - 0 | CPFF LoE |
| 1100AA | EMD FSR | $ - 0 | $ - 0 | $ - 0 | CPFF |
| | Total Cost Reimbursement CLINs | $ - 0 | $ - 0 | $ - 0 | |
| FPIF | | | | | | |
| 2001AA | LOW RATE INITIAL PRODUCTION OPTION 1 | | | $ - 0 | FPIF |
| 2002AA | LOW RATE INITIAL PRODUCTION OPTION 2 | | | $ - 0 | FPIF |
| 4001AA | FULL RATE PRODUCTION OPTION 1 | | | $ - 0 | FPIF |
| 4002AA | FULL RATE PRODUCTION OPTION 2 | | | $ - 0 | FPIF |
| | Total Proposed Ceiling Price - FPIF CLINs | | | $ - 0 | |
| FFP CLINS | | | | |
| 3001AA | TECHNICAL MANUALS - FINAL REPRODUCABLE COPIES Option 1 | $ - 0 | FFP |
| 8001AA | TECHNICAL DATA PACKAGE OPTION | $ - 0 | FFP |
| 9000 A001 | CONTRACTOR MANPOWER REPORTING (CMR) | $ - 0 | FFP |
| NSP CLINs | | | |
| 9000 A002 | CONTRACT DATA REQUIREMENTS LIST (CDRLs) | NSP |
| Total Proposed Price: | $ - 0 |
| Most Probable Cost Adjustment for Cost Reimbursable CLINs | $ - 0 |
| Total Evaluated Contract Price: | $ - 0 |
| TDP Adjustments: | | |
| X - Proposed price for TDP CLIN 8001AA | $ - 0 |
| Y - Competitive Utility Multiplier (0.00; 1.00) | 0 |
| Z - Government Baseline Savings | $ 3,400,000 |
| TDP Adjustment: | $ - 0 |
Total Evaluated Price $ - 0
EMD
| ENGINEERING MANUFACTURING DEVELOPMENT (EMD) - CLIN 1000AA |
| Including: 1. Engineering, 2. Test Article Manufacturing, 3. System Test and Evaluation and 4. Data |
| Contract Type: CPIF |
| 1. Engineering |
| Cost Elements | FY2018 | FY2019 | FY2020 |
| Labor Cost | $ - 0 | $ - 0 | $ - 0 |
| Labor Overhead | $ - 0 | $ - 0 | $ - 0 |
| Material | $ - 0 | $ - 0 | $ - 0 |
| Material Overhead | $ - 0 | $ - 0 | $ - 0 |
| Subcontractor | $ - 0 | $ - 0 | $ - 0 |
| Travel | $ - 0 | $ - 0 | $ - 0 |
| Other Direct Cost | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 |
| G&A | $ - 0 | $ - 0 | $ - 0 |
| Target Cost | $ - 0 | $ - 0 | $ - 0 |
| Target Fee | $ - 0 | $ - 0 | $ - 0 |
| FCCM | $ - 0 | $ - 0 | $ - 0 |
| Total Proposed Price | $ - 0 | $ - 0 | $ - 0 |
| Most Probable Cost Adjustment | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 |
2. Test Article Manufacturing (Prototype)
| Cost Elements | FY2018 | FY2019 | FY2020 |
| Labor Cost | $ - 0 | $ - 0 | $ - 0 |
| Labor Overhead | $ - 0 | $ - 0 | $ - 0 |
| Material | $ - 0 | $ - 0 | $ - 0 |
| Material Overhead | $ - 0 | $ - 0 | $ - 0 |
| Subcontractor | $ - 0 | $ - 0 | $ - 0 |
| Travel | $ - 0 | $ - 0 | $ - 0 |
| Other Direct Cost | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 |
| G&A | $ - 0 | $ - 0 | $ - 0 |
| Target Cost | $ - 0 | $ - 0 | $ - 0 |
| Target Fee | $ - 0 | $ - 0 | $ - 0 |
| FCCM | $ - 0 | $ - 0 | $ - 0 |
| Total Proposed Price | $ - 0 | $ - 0 | $ - 0 |
| Most Probable Cost Adjustment | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 |
3. System Test and Evaluation
| Cost Elements | FY2018 | FY2019 | FY2020 |
| Labor Cost | $ - 0 | $ - 0 | $ - 0 |
| Labor Overhead | $ - 0 | $ - 0 | $ - 0 |
| Material | $ - 0 | $ - 0 | $ - 0 |
| Material Overhead | $ - 0 | $ - 0 | $ - 0 |
| Subcontractor | $ - 0 | $ - 0 | $ - 0 |
| Travel | $ - 0 | $ - 0 | $ - 0 |
| Other Direct Cost | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 |
| G&A | $ - 0 | $ - 0 | $ - 0 |
| Target Cost | $ - 0 | $ - 0 | $ - 0 |
| Target Fee | $ - 0 | $ - 0 | $ - 0 |
| FCCM | $ - 0 | $ - 0 | $ - 0 |
| Total Proposed Price | $ - 0 | $ - 0 | $ - 0 |
| Most Probable Cost Adjustment | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 |
4. Data
| Cost Elements | FY2018 | FY2019 | FY2020 |
| Labor Cost | $ - 0 | $ - 0 | $ - 0 |
| Labor Overhead | $ - 0 | $ - 0 | $ - 0 |
| Material | $ - 0 | $ - 0 | $ - 0 |
| Material Overhead | $ - 0 | $ - 0 | $ - 0 |
| Subcontractor | $ - 0 | $ - 0 | $ - 0 |
| Travel | $ - 0 | $ - 0 | $ - 0 |
| Other Direct Cost | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 |
| G&A | $ - 0 | $ - 0 | $ - 0 |
| Target Cost | $ - 0 | $ - 0 | $ - 0 |
| Target Fee | $ - 0 | $ - 0 | $ - 0 |
| FCCM | $ - 0 | $ - 0 | $ - 0 |
| Total Proposed Price | $ - 0 | $ - 0 | $ - 0 |
| Most Probable Cost Adjustment | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 |
Total Price
| Target Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Target Fee | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| FCCM | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Proposed Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Most Probable Cost Adjustment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Evaluated Contract Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Cost under-run share ratio Gov 70% / Contractor 30% |
| Cost over-run share ratio: Gov 50% / Contractor 50% |
| Min Fee percentage: 2% |
| Max Fee percentage: 12% |
EMD-FSR
| EMD - FSR - CLIN 1100AA | | | | | | | | | | |
| Contract Type | CPFF | | | | | | | | | |
| 2018 | | | 2019 | | | 2020 | | | 2018-2020 |
| Cost Elements | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Total |
| FSR | 0 | $0.00 | $ - 0 | 0 | $0.00 | $ - 0 | 0 | $0.00 | $ - 0 | |
| Total Labor | | | $ - 0 | | | $ - 0 | | | $ - 0 | |
| Labor Overhead | | | $ - 0 | | | $ - 0 | | | $ - 0 | |
| Subcontractor Labor | 0 | $0.00 | $ - 0 | 0 | $0.00 | $ - 0 | 0 | $0.00 | $ - 0 | |
| Subtotal | | | $ - 0 | | | $ - 0 | | | $ - 0 | |
| G&A | | | $ - 0 | | | $ - 0 | | | $ - 0 | |
| Total Cost | | | $ - 0 | | | $ - 0 | | | $ - 0 | |
| Fee | | | $ - 0 | | | $ - 0 | | | $ - 0 | |
| FCCM | | | | | | | | | | |
| Proposed Price | | | $ - 0 | | | $ - 0 | | | $ - 0 | $ - 0 |
| Cost Realism Adjustment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Most Probable Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
LRIP
| LOW RATE INITIAL PRODUCTION (LRIP) | | |
| Contract Type: FPIF | | |
| LRIP Option 1 - CLIN 2001AA | LRIP Option 2 - CLIN 2002AA |
| Cost Elements | Per Unit Amount | Per Unit Amount |
| Labor Cost | $ - 0 | $ - 0 |
| Labor Overhead | $ - 0 | $ - 0 |
| Material | $ - 0 | $ - 0 |
| Material Overhead | $ - 0 | $ - 0 |
| Subcontractor | $ - 0 | $ - 0 |
| Travel | $ - 0 | $ - 0 |
| Other Direct Cost | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 |
| G&A | $ - 0 | $ - 0 |
| Target Cost | $ - 0 | $ - 0 |
| Target Profit | $ - 0 | $ - 0 |
| FCCM | $ - 0 | $ - 0 |
| Target Price | $ - 0 | $ - 0 |
Ceiling Price (120% of Target Cost) $ - 0 $ - 0
| Quantity | 10 | 12 |
| Extended Target Price | $ - 0 | $ - 0 |
| Extended Ceiling Price | $ - 0 | $ - 0 |
| Cost under-run share ratio Gov 30% / Contractor 70% |
| Cost over-run share ratio Gov 30% / Contractor 70% |
FRP
| FULL RATE PRODUCTION | | |
| Contract Type: FPIF | | |
| FRP Option 1 - CLIN 4001AA | FRP Option 2 - CLIN 4002AA |
| Cost Elements | Per Unit Amount | Per Unit Amount |
| Labor Cost | $ - 0 | $ - 0 |
| Labor Overhead | $ - 0 | $ - 0 |
| Material | $ - 0 | $ - 0 |
| Material Overhead | $ - 0 | $ - 0 |
| Subcontractor | $ - 0 | $ - 0 |
| Travel | $ - 0 | $ - 0 |
| Other Direct Cost | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 |
| G&A | $ - 0 | $ - 0 |
| Target Cost | $ - 0 | $ - 0 |
| Target Profit | $ - 0 | $ - 0 |
| FCCM | $ - 0 | $ - 0 |
| Target Price | $ - 0 | $ - 0 |
Ceiling Price (120% of Target Cost) $ - 0 $ - 0
| Quantity | 48 | 56 |
| Extended Target Price | $ - 0 | $ - 0 |
| Extended Ceiling Price | $ - 0 | $ - 0 |
| Cost under-run share ratio Gov 30% / Contractor 70% |
| Cost over-run share ratio Gov 30% / Contractor 70% |
TPF
| TOTAL PACKAGE FIELDING (TPF) | | | | | | |
| Contract Type | CPFF LoE | | | | | |
| TPF Option 1 - CLIN 5001AA | | | TPF Option 2 - CLIN 5002AA | | |
| Cost Elements | Hours | Rate | Total | Hours | Rate | Total |
| Composite labor category | 20,000 | $0.00 | $ - 0 | 20,000 | $0.00 | $ - 0 |
| Total Labor | | | $ - 0 | | | $ - 0 |
| Labor Overhead | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 |
| G&A | $ - 0 | $ - 0 |
| Total Cost | $ - 0 | $ - 0 |
| Fee | $ - 0 | $ - 0 |
| FCCM | $ - 0 | $ - 0 |
| Proposed Price | $ - 0 | $ - 0 |
| Cost Realism Adjustment | $ - 0 | $ - 0 |
| Most Probable Cost | $ - 0 | $ - 0 |
| Separate labor Categories: | Hourly Cost | | |
| Composite labor category | $ - 0 | $ - 0 |
| Hourly Fee | | |
| Composite labor category | $ - 0 | $ - 0 |
| Hourly Total Price | | |
| Composite labor category | $ - 0 | $ - 0 |
ICS
| INTERIM CONTRACTOR SUPPORT (ICS) | | | | | | |
| Contract Type | CPFF LoE | | | | | |
| ICS Option 1 - CLIN 6001AA | | | ICS Option 2 - CLIN 6002AA | | |
| Cost Elements | Hours | Rate | Total | Hours | Rate | Total |
| Composite labor category | 15,000 | $0.00 | $ - 0 | 15,000 | $0.00 | $ - 0 |
| Total Labor | | | $ - 0 | | | $ - 0 |
| Labor Overhead | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 |
| G&A | $ - 0 | $ - 0 |
| Total Cost | $ - 0 | $ - 0 |
| Fee | $ - 0 | $ - 0 |
| FCCM | $ - 0 | $ - 0 |
| Proposed Price | $ - 0 | $ - 0 |
| Cost Realism Adjustment | $ - 0 | $ - 0 |
| Most Probable Cost | $ - 0 | $ - 0 |
| Separate labor Categories: | Hourly Cost | | |
| Composite labor category | $ - 0 | $ - 0 |
| Hourly Fee | | |
| Composite labor category | $ - 0 | $ - 0 |
| Hourly Total Price | | |
| Composite labor category | $ - 0 | $ - 0 |
STS
| SYSTEM TECHNICAL SUPPORT (STS) | | | | | | |
| Contract Type | CPFF LoE | | | | | |
| STS Option 1 - CLIN 7001AA | | | STS Option 2 - CLIN 7002AA | | |
| Cost Elements | Hours | Rate | Total | Hours | Rate | Total |
| Composite labor category | 7,500 | $0.00 | $ - 0 | 7,500 | $0.00 | $ - 0 |
| Total Labor | | | $ - 0 | | | $ - 0 |
| Labor Overhead | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 |
| G&A | $ - 0 | $ - 0 |
| Total Cost | $ - 0 | $ - 0 |
| Fee | $ - 0 | $ - 0 |
| FCCM | $ - 0 | $ - 0 |
| Proposed Price | $ - 0 | $ - 0 |
| Cost Realism Adjustment | $ - 0 | $ - 0 |
| Most Probable Cost | $ - 0 | $ - 0 |
| Separate labor Categories: | Hourly Cost | | |
| Composite labor category | $ - 0 | $ - 0 |
| Hourly Fee | | |
| Composite labor category | $ - 0 | $ - 0 |
| Hourly Total Price | | |
| Composite labor category | $ - 0 | $ - 0 |
TM
| TECHNICAL MANUALS - FINAL REPRODUCABLE COPIES OPTION 1 - CLIN 3001AA | |
| Contract Type | FFP |
| Total |
| Technical Manuals - 1 | $ - 0 |
CMR
| Contract Manpower Reporting OPTION 1 - CLIN 9000 A001 | |
| Contract Type | FFP |
| Total |
| Contract Manpower Reporting | $ - 0 |
TDP
| TECHNICAL DATA PACKAGE OPTION - CLIN 8001AA | |
| Contract Type | FFP |
For SBP only
Small Business Total Contract Amount Calculation
| CLIN Number | Description | | |
| CPIF, CPFF LoE & CR CLINs | | | Proposed Price | Contract Type |
| 1000AA | ENGINEERING MANUFACTURING DEVELOPMENT | $ - 0 | CPIF |
| 1100AA | EMD - FSR | $ - 0 | CPFF |
| 5001AA | TOTAL PACKAGE FIELDING OPTION 1 | $ - 0 | CPFF LoE |
| 5002AA | TOTAL PACKAGE FIELDING OPTION 2 | $ - 0 | CPFF LoE |
| 6001AA | INTERIM CONTRACTOR SUPPORT OPTION 1 | $ - 0 | CPFF LoE |
| 6002AA | INTERIM CONTRACTOR SUPPORT OPTION 2 | $ - 0 | CPFF LoE |
| 7001AA | SYSTEM TECHNICAL SUPPORT OPTION 1 | $ - 0 | CPFF LoE |
| 7002AA | SYSTEM TECHNICAL SUPPORT OPTION 2 | $ - 0 | CPFF LoE |
| | Total Cost Reimbursement CLINs | $ - 0 | |
| FPIF | | | | |
| 2001AA | LOW RATE INITIAL PRODUCTION OPTION 1 | $ - 0 | FPIF |
| 2002AA | LOW RATE INITIAL PRODUCTION OPTION 2 | $ - 0 | FPIF |
| 4001AA | FULL RATE PRODUCTION OPTION 1 | $ - 0 | FPIF |
| 4002AA | FULL RATE PRODUCTION OPTION 2 | $ - 0 | FPIF |
| | Total Proposed Target Price - FPIF CLINs | $ - 0 | |
| FFP CLINS | | | | |
| 3001AA | TECHNICAL MANUALS - FINAL REPRODUCABLE COPIES Option 1 | $ - 0 | FFP |
| 8001AA | TECHNICAL DATA PACKAGE OPTION | $ - 0 | FFP |
| 9000 A001 | CONTRACTOR MANPOWER REPORTING (CMR) | $ - 0 | FFP |
Small Business Total Contract Amount: $ - 0