Exhibit A CONTRACT DATA REQUIREMENTS LIST (CDRLs)
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RCIS SAC System
Contract Data Requirements List 29 Jun 2017 DISTRIBUTION STATEMENT A: Approved for Public Release
| CDRL |
| Title |
| A001 |
| Integrated Master Schedule (IMS) |
| A002 |
| Contract Work Breakdown Structure (CWBS) |
| A003 |
| Contract Funds Status Report (CFSR) |
| A004 |
| Systems Engineering Management Plan (SEMP) |
| A005 |
| System/Subsystem/Component Specification (SSS) |
| A006 |
| Requirements Compliance Matrix (RCM) |
| A007 |
| System/Subsystem Design Description (SSDD) |
| A008 |
| Interface Control Documents (ICDs) |
| A009 |
| Interoperability Profile (IOP)-Contractor Standards |
| A010 |
| Reserved |
| A011 |
| Frequency Allocation Data |
| A012 |
| Proposed Vehicle Modifications |
| A013 |
| Military (MIL) Grade Connector Waiver Request |
| A014 |
| Software Development Plan (SDP) |
| A015 |
| Software Requirements Specification (SRS) |
| A016 |
| Reliability Centered Maintenance (RCM) Analysis |
| A017 |
| Interface Design Document (IDD) |
| A018 |
| Software Design Description (SDD) |
| A019 |
| Software Test Plan (STP) |
| A020 |
| Software Test Description (STD) |
| A021 |
| Software Test Report (STR) |
| A022 |
| Software Version Description (SVD) |
| A023 |
| SAC System Computer Software |
| A024 |
| Software Licenses |
| A025 |
| Cybersecurity Authorization Package |
| A026 |
| Baseline Description Document |
| A027 |
| Engineering Change Proposal (ECP) |
| A028 |
| EMD Technical Data Package (TDP) |
| A029 |
| Risk Management Status Reports |
| A030 |
| Reliability & Maintainability Program Plan (RPP) |
| A031 |
| R&M Case Report (RCR) |
| A032 |
| System Safety Program Plan (SSPP) |
| A033 |
| Safety Assessment Report (SAR) |
| A034 |
| Hazard Tracking System (HTS) |
| A035 |
| Hazardous Material Management Report (HMMR) |
| A036 |
| Human Systems Integration Plan (HSIP) |
| A037 |
| HSI Issue Database |
| A038 |
| HSI Event Plan |
| A039 |
| HSI Event Report |
| A040 |
| Human Factors Engineering Analysis (HFEA) |
| A041 |
| Soldier Performance and Workload |
| A042 |
| Soldier Survivability (SSv) Assessment Report |
| A043 |
| Logistics Management Information (LMI) Data Summaries |
| A044 |
| Level of Repair Analysis (LORA) |
| A045 |
| Fault Tree Analysis (FTA) |
| A046 |
| Engineering Data for Provisioning (EDFP) |
| A047 |
| Provisioning and Other Pre-Procurement Screening Data |
| A048 |
| Technical Manuals (TMs) |
| A049 |
| Item Unique Identification (IUID) Marking Plan |
| A050 |
| Reserved |
| A051 |
| Training Aids, Devices, Simulators, and Simulations (TADSS) analysis |
| A052 |
| Program of Instruction (POI) |
| A053 |
| Course Management Plan (CMP) |
| A054 |
| Individual Student Assessment Plan (ISAP) |
| A055 |
| Test Administrative Guide (TAG) |
| A056 |
| Training Program Structure Document |
| A057 |
| Risk Management Worksheets |
| A058 |
| Advance Sheets |
| A059 |
| Multi-Media |
| A060 |
| Operator Course Testing Plan (CTP) |
| A061 |
| Contractor Verification Test Plan |
| A062 |
| Test Inspection Report |
| A063 |
| Certifications |
| A064 |
| Analysis Reports |
| A065 |
| System Support Package Component List (SSPCL) |
| A066 |
| Failure Analysis and Corrective Action Report (FACAR) |
| A067 |
| Manufacturing Plan |
| A068 |
| Instructor and Key Personnel Training (I&KPT) |
| A069 |
| Anti-Tamper Plan |
| A070 |
| Meeting Minutes |
| A071 |
| Conference Agenda |
| A072 |
| Configuration Audit Plan |
| A073 |
| Configuration Audit Summary Report |
| A074 |
| Maintainer Instructor and Key Personnel Training (I&KPT) Training Material and Aides |
| A075 |
| LRIP Technical Data Package (TDP) |
| A076 |
| OPTION Technical Data Package (TDP) |
| A077 |
| Quality Program Plan |
| A078 |
| Final Inspection Report (FIR |
| A079 |
| Provisioning Parts List (PPL) |
| A080 |
| Long Lead Item List (LLIT) |
| A081 |
| Basis of Issue Item (BII) List |
| A082 |
| Expendable & Durable Item List (EDIL) |
| A083 |
| Component of the End Item (COEI) List |
| A084 |
| Authorized Stockage List (ASL) |
| A085 |
| Item Unique Identification (IUID) Validation Verification Plan and Report |
| A086 |
| Failure Mode, Effects and Criticality Analysis (FMECA) |
| A087 |
| Transportability and Deployment Data Report |
| A088 |
| Performance Based Logistics (PBL) Implementation Plan System |
| A089 |
| Interim Contractor Support Management Plan (ICSMP) |
| A090 |
| Maintenance Allocation Chart (MAC) |
| A091 |
| Reserved |
| A092 |
| Transition Support Data |
| A093 |
| Reserved |
| A094 |
| Engineering Release Record (ERR) |
| A095 |
| Reserved |
| A096 |
| Request for Variance (RFV) |
| A097 |
| Material and Equipment Purchases - Supporting Data |
| A098 |
| Phase-Out Plan |
| A099 |
| Current Inventory Report |
| A100 |
| DA Form 3161 Submittal |
| A101 |
| Total Package Fielding (TPF) Database |
| A102 |
| Post Fielding Status Report |
| A103 |
| Post Fielding TPF Documentation |
| A104 |
| Weekly Fielding Reports |
| A105 |
| Joint Inventory Report |
| A106 |
| After Action Report |
| A107 |
| Deficiency Reports |
| A108 |
| Deprocessing Checklist |
| A109 |
| Reserved |
| A110 |
| Integrated Program Management Report (IPMR) |
| A111 |
| Software Transition Plan (STrP) |
| A112 |
| Component Warranty List |
| A113 |
| Technical Manual Crosswalk |
| A114 |
| Technical Manual Status Report |
| A115 |
| Validation Plan and Report |
| A116 |
| LOG Support Items List (LSA-009) |
| A117 |
| Acceptance Test Plan |
| A118 |
| Calibration and Measurement Requirements Summary (CMRS) |
| A119 |
| Critical Task Analysis Report |
| A120 |
| Logistics Product Data (Critical Stockage List (CSL)) |
| A121 |
| Logistics Product Data Plan |
| A122 |
| Maintenance Task Analysis (MTA) |
| A123 |
| Maintenance, Test, and Support Equipment Requirements List (MTSERL) |
| A124 |
| National Maintenance Work Requirement (NMWR) Data Summary |
| A125 |
| Packaging Logistics Management Information (LMI) Coded Data |
| A126 |
| Product Baseline Index (PBLI) |
| A127 |
| Special Packaging Instructions (SPI) |
| A128 |
| Storage, Exercise, Care, and Maintenance Plan |
| A129 |
| Validation Testing of Packaging |
| A130 |
| Non-conformance Report (NR) |
| A131 |
| Product Support Analysis |
| A132 |
| STS Technical Report |
| A133 |
| Key and Certificate Management Architecture (KCMA) |
| A134 |
| Key and Certificate Management Plan (KCMP) |
CONTRACT DATA REQUIREMENTS LIST
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER
D. SYSTEM/ITEM
RCIS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Integrated Master Schedule (IMS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81861A
5. CONTRACT REFERENCE
C.2.3, C.3.4.1, C.3.4.9, C.6.10.1, C.13.2.7.1, C.13.2.7.2, C.15, C.17.1, C.21.2.1, C.21.2.3, C.21.3.4,4, C.21.13.36.2, C.21.15.1, C.21.17.1, C.21.17.3, C.21.17.5, C.22.2.1, C.22.2.3, C.22.3.4.4, C.22.15.1, C.22.17.3, C.22.17.8, C.25.1.2
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
Monthly
12. DATE OF 1ST SUBMISSION
20 DAC
14.
DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT
Monthly
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS:
Block 4: The IMS shall be prepared IAW DI-MGMT-81861A as specified except for the following tailored paragraphs.
References to planning packages are not applicable. The contractor shall not utilize planning packages in the creation or update of the IMS. A formal Integrated Master Plan (IMP) is not required by the PWS. References to the IMP are not applicable.
The IMS shall be delivered electronically in an electronic file produced by the contractor's scheduling tool that is compatible with Microsoft Project version 2010.
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Blocks 12, 13: To be submitted 5 business days prior to the monthly PM IPT meetings IAW PWS C.3.5.1. The Government will provide comments at the monthly PM IPT meetings. The Contractor shall deliver the revised IMS no later than 5 business days after Government comments are provided.
Block 14:
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
Repro = Electronic Delivery
COR IDE
| - |
| - |
| 1 |
| 15. TOTAL |
| - |
| - |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
01 Jun 2016
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Contract Work Breakdown Structure (CWBS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81334D
5. CONTRACT REFERENCE
C.2.4, C.21.2.4,
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4: DI-MGMT-81334D tailored as follows: Submittals to the Cost and Software Data Reporting (CSDR) Submit-Review System are not required.
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10, 12:
FOR EMD: The Contractor shall deliver the draft CWBS at the Start of Work Meeting (SOWM). The Government requires up to 15 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised CWBS at the LRIP Option Start of Work Meeting (SOWM). The Government requires up to 15 business days for review and comment.
Block 13:
FOR EMD: The Contractor shall deliver the final CWBS no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the final CWBS no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
01 Jun 2016
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Contract Funds Status Report (CFSR)
3. SUBTITLE
| 4. AUTHORITY |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-81468 |
| C.2.5, C.21.2.5, C.22.2.5, C.23.1.2, C.23.4.1.2, C.25.1.1.3 |
| PM FP, PdM ALUGS |
7. DD 250 REQ
NO
| 9. DISTRIBUTION STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| D |
| Quarterly |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
| Draft |
| Final |
| See Block 16 |
| See Block 16 |
| Reg |
| Repro |
16. REMARKS:
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 12: The initial submission shall be within 20 business days after the end of the Calendar Quarter following Contract Award.
Block13: Subsequent submission shall be submitted within 20 business days after the end of each Calendar Quarter.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
COR IDE
15. TOTAL
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Systems Engineering Management Plan (SEMP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81785
5. CONTRACT REFERENCE
C.4.1, C.7.2, , C.21.4.1, , C.21.7.2, , C.22.4.1,
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10, 12:
FOR EMD: The Contractor shall deliver the draft SEMP no later than 30 business days after contract award. The Government requires up to 15 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised SEMP no later than 30 business days after LRIP Option contract award. The Government requires up to 15 business days for review and comment.
FOR FRP: The Contractor shall deliver the revised SEMP no later than 30 business days after FRP Option contract award. The Government requires up to 15 business days for review and comment.
Block 13:
FOR EMD: The Contractor shall deliver the revised SEMP no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the revised SEMP no later than 15 business days after Government comments are provided.
FOR FRP: The Contractor shall deliver the revised SEMP no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
System/Subsystem/Component Specification (SSS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81431A
5. CONTRACT REFERENCE
C.4.2, C.21.4.2
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4: This CDRL applies to system, subsystem and component level specifications. DI-IPSC-81431A tailored as follows: It is preferred (but not required) the specifications be submitted IAW DOORS Project Archive (DPA) in addition to Microsoft Office 2013 compatible format. See Attachment 0046 for DOORS DPA format.
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10, 12:
FOR EMD: The Contractor shall deliver the draft Specification no later than 30 business days prior to the Preliminary Design Review (PDR). The Government requires up to 15 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised Specification with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.
Block 13:
FOR EMD: The Contractor shall deliver the final Specification no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the final Specification no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format and optionally DOORS DPA format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Requirements Compliance Matrix (RCM)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
C.4.3, C.21.4.2, C.21.4.3
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10, 12:
FOR EMD: The Contractor shall deliver the draft RCM no later than 30 business days prior to the Preliminary Design Review (PDR). Preliminary analysis is acceptable. The Government requires up to 15 business days for review and comment. The Contractor shall deliver the revised draft RCM no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the revised RCM with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.
Block 13:
FOR EMD: The Contractor shall deliver the final RCM no later than 45 business days prior to the Critical Design Review (CDR). Complete final analysis and related data to support assessment of compliance is required. The Government requires up to 30 business days for review and comment. The Contractor shall deliver the revised final RCM no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the final RCM no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
System/Subsystem Design Description (SSDD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81432A
5. CONTRACT REFERENCE
C.4.4, C.21.4.2, C.21.4.4
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10, 12:
FOR EMD: The Contractor shall deliver the draft SSDD no later than 45 business days prior to the Critical Design Review (CDR). The Government requires up to 30 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised SSDD with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.
Block 13:
FOR EMD: The Contractor shall deliver the final SSDD no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the final SSDD no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Interface Control Document (ICD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-81248A
5. CONTRACT REFERENCE
C.4.5, C.21.4.2, C.21.4.5
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4: DI-CMAN-81248A tailored as follows: Submittal in Extensible Markup Language (XML) is subject to prior Government approval.
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10, 12:
FOR EMD: The Contractor shall deliver the draft ICD no later than 45 business days prior to the Critical Design Review (CDR). The Government requires up to 30 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised ICD with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.
Block 13:
FOR EMD: The Contractor shall deliver the final ICD no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the final ICD no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Interoperability Profile (IOP) – Contractor Standards
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
C.4.7, C.21.4.2, C.21.4.7
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10, 12:
FOR EMD: The Contractor shall deliver the draft IOP documentation no later than 30 business days prior to the Preliminary Design Review (PDR). The Government requires up to 15 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised IOP documentation with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.
Block 13:
FOR EMD: The Contractor shall deliver the final IOP documentation no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the final IOP documentation no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Reserved
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF 1ST SUBMISSION
14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
| Draft |
| Final |
| Reg |
| Repro |
Reserved
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
1. DATA ITEM NO
A011
2. TITLE OF DATA ITEM
Frequency Allocation Data
3. SUBTITLE
Preparation of DD Form 1494, Application for
Equipment Frequency Allocation.
4. AUTHORITY (Data Acquisition Document No.)
DI-EMCS-81827
5. CONTRACT REFERENCE
C.4.8, C.4.9, C.21.4.2
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST
STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10, 12:
FOR EMD: The Contractor shall deliver the draft DD1494 form, Application for Equipment Frequency Allocation, no later than 30 business days prior to the Preliminary Design Review (PDR). The Government requires up to 60 business days for review and comment. Acceptance will be based on Army Spectrum Management Office (ASMO) concurrence and PCO approval.
FOR LRIP: The Contractor shall deliver the revised DD1494 with the associated Engineering Change Proposal (ECP). The Government requires up to 60 business days for review and comment. Acceptance will be based on ASMO concurrence and PCO approval.
Block 13:
FOR EMD: The Contractor shall deliver the final DD1494 no later than 15 business days after Government comments are provided. Acceptance will be based on ASMO concurrence and PCO approval.
FOR LRIP: The Contractor shall deliver the final DD1494 no later than 15 business days after Government comments are provided. Acceptance will be based on ASMO concurrence and PCO approval.
Block 14:
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL ---------( |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Proposed Vehicle Modifications
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
C.4.10, C.21.4.2
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10, 12:
FOR EMD: The Contractor shall deliver the draft Vehicle Modification documentation no later than 30 business days prior to the Preliminary Design Review (PDR). The Government requires up to 15 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised Vehicle Modification documentation with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.
Block 13:
FOR EMD: The Contractor shall deliver the final Vehicle Modification documentation no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the final Vehicle Modification documentation no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Military (MIL) Grade Connector Waiver Request
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
C.4.11, C.21.4.2
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10, 12:
FOR EMD: The Contractor shall deliver the draft Waiver Request documentation no later than 30 business days prior to the Preliminary Design Review (PDR). The Government requires up to 15 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised Waiver Request documentation with the associated Engineering Change Proposal (ECP). The Government requires up to 20 business days for review and comment.
Block 13:
FOR EMD: The Contractor shall deliver the final Waiver Request documentation no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the final Waiver Request documentation no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Software Development Plan (SDP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81427A
5. CONTRACT REFERENCE
C.5.1, C.5.13, C.5.14, C.21.5.1, C.21.5.13, C.21.5.14, C.22.5.1, C.22.5.2, C.22.5.3
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Software Documentation; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10, 12:
FOR EMD: The Contractor shall deliver the draft Software Development Plan (SDP) no later than 30 business days after contract award. The Government requires up to 15 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised SDP no later than 30 business days after LRIP Option contract award. The Government requires up to 15 business days for review and comment.
FOR FRP: The Contractor shall deliver the revised SDP no later than 30 business days after FRP Option contract award. The Government requires up to 15 business days for review and comment.
Block 13:
FOR EMD: The Contractor shall deliver the revised SDP no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the revised SDP no later than 15 business days after Government comments are provided.
FOR FRP: The Contractor shall deliver the revised SDP no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
Software Requirements Specification (SRS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81433A
5. CONTRACT REFERENCE
C.5.2, C.21.5.2
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Software Documentation; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10: The Contractor shall deliver a separate SRS for each Computer Software Configuration Item (CSCI) identified in the System/Subsystem Design Description (SSDD) (PWS Section C.4.4, C.21.4.4 and CDRL A007).
Block 12:
FOR EMD: The Contractor shall deliver the draft Software Requirements Specification (SRS) documents no later than 30 business days prior to the Preliminary Design Review (PDR). The Government requires up to 15 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised SRS documents no later than 30 business days prior to the Physical Configuration Audit (PCA). The Government requires up to 15 business days for review and comment
Block 13:
FOR EMD: The Contractor shall deliver the revised SRS documents no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the revised SRS documents no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
Reliability Centered Maintenance (RCM)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80111A
5. CONTRACT REFERENCE
C.13.2.3
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
LT
9. DIST STATEMENT
D
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Software Documentation; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10: The contractor will provide an RCM outline of its strategy at the Start of Work meeting.
Block 12, 13: The Reliability Centered Maintenance (RCM) shall be delivered 15 calendar days prior to the CDR. The Government will review the draft report and provide comments within 45 calendar days after receipt. The contractor shall correct and provide final copy including all changes or deletions to the Government NLT 30 calendar days after receipt of government comments.
Government receipt of documentation does not constitute acceptance.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
15. TOTAL
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A017
2. TITLE OF DATA ITEM
Interface Design Description (IDD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81436A
5. CONTRACT REFERENCE
C.5.3, C.21.5.3
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Software Documentation; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10: The Contractor shall deliver a separate IDD for each CSCI identified in the SSDD (PWS Section C.4.4, C.21.4.4 and CDRL A007).
Block 12:
FOR EMD: The Contractor shall deliver the draft Interface Design Description (IDD) documents no later than 45 business days prior to the Critical Design Review (CDR). The Government requires up to 30 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised IDD documents no later than 30 business days prior to the Physical Configuration Audit (PCA). The Government requires up to 15 business days for review and comment
Block 13:
FOR EMD: The Contractor shall deliver the revised IDD documents no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the revised IDD documents no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
1. DATA ITEM NO.
A018
2. TITLE OF DATA ITEM
Software Design Description (SDD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81435A
5. CONTRACT REFERENCE
C.5.4, C.21.5.4
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Software Documentation; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10: The Contractor shall deliver a separate SDD for each CSCI identified in the SSDD (PWS Section C.4.4, C.21.4.4 and CDRL A007).
Block 12:
FOR EMD: The Contractor shall deliver the draft Software Design Description (SDD) documents no later than 45 business days prior to the Critical Design Review (CDR). The Government requires up to 30 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised SDD documents no later than 30 business days prior to the Physical Configuration Audit (PCA). The Government requires up to 15 business days for review and comment.
Block 13:
FOR EMD: The Contractor shall deliver the revised SDD documents no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the revised SDD documents no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2, C.22.8.2). Upon submission, the Contractor shall notify the Contracting Officer Representative (COR) of the submission via email. The COR is identified in FAR clause 52.242-4016 “Communications” located in Section G of the contract.
Repro = Electronic Delivery
| COR IDE |
| 1 |
| 1 |
| 1 |
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
Product Officer
H. DATE
01 Jun 2016
I. APPROVED BY
PdM ALUGS
J. DATE
01 Jun 2016
1. DATA ITEM NO.
A019
2. TITLE OF DATA ITEM
Software Test Plan (STP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81438A
5. CONTRACT REFERENCE
C.5.7, C.21.5.7
6. REQUIRING OFFICE
PM FP, PdM ALUGS
7. DD 250 REQ
NO
9. DIST STATEMENT
D
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16 14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Software Documentation; 21-MAY-2015). Other requests shall be referred to PdM ALUGS, Building 1414 West Perimeter Road, SFAE-CSS-FP-RA; MS 901, Harrison Township MI 48045.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
Block 10, 12:
FOR EMD: The Contractor shall deliver the draft Software Test Plan (STP) no later than 45 business days prior to the Critical Design Review (CDR). The Government requires up to 30 business days for review and comment.
FOR LRIP: The Contractor shall deliver the revised STP no later than 30 business days after LRIP Option contract award. The Government requires up to 15 business days for review and comment.
Block 13:
FOR EMD: The Contractor shall deliver the revised STP no later than 15 business days after Government comments are provided.
FOR LRIP: The Contractor shall deliver the revised STP no later than 15 business days after Government comments are provided.
Block 14: Deliver documents in Microsoft Office 2013 compatible format.
This deliverable shall be submitted to the RCIS Integrated Data Environment (IDE) (reference C.8.2, C.21.8.2,…