Abstract REV01_Complex.pdf

PDF 273 KB Posted

Attached to
Camp Perry Logistics Complex Federal contract opportunity
Solicitation number
W50S8R-22-B-0001
Issued by
Department of the Army Ohio Army National Guard

About this file

This abstract of offers summarizes bids received in response to Solicitation Number W50S8R-22-B-0001 issued by the 179th Airlift Wing, Mansfield Ohio ANG Contracting Office for the Camp Perry Logistics Complex project. The solicitation is set aside for small businesses and seeks bids for the new construction of the Camp Perry Logistics Complex located at the 200th Camp Perry OHANG in Port Clinton, Ohio with a magnitude between $5-10 million. Bids were received from five contractors and ranged from $8,419,767 to $9,907,763. The apparent low bid was submitted by QBS, Inc. at $8,419,767. The bid opening was held on November 7th, 2022 and award is expected to be made in accordance with FAR 14.101(e).

View the file

Other files for this federal contract opportunity

Other files attached to Camp Perry Logistics Complex, newest first.
File Type Posted
Abstract_Complex.pdf PDF
Sign in sheet_Complex.pdf PDF
W50S8R-22-B-0001 0008.pdf PDF
Request for Information (RFI) document_06.pdf PDF
Request for Information (RFI) document_05.pdf PDF
W50S8R-22-B-0001 0007.pdf PDF
W50S8R-22-B-0001 0006.pdf PDF
Request for Information (RFI) document_04.pdf PDF
Request for Information (RFI) document_03.pdf PDF
W50S8R-22-B-0001 0005.pdf PDF
W50S8R-22-B-0001 0004.pdf PDF
Request for Information (RFI) document_02.pdf PDF
W50S8R-22-B-0001 0003.pdf PDF
RFI 01_Red Horse Site Plan.pdf PDF
RFI 01_Geotechnical Report.pdf PDF
RFI 01_Environmental Report.pdf PDF
Request for Information (RFI) document_01.pdf PDF
W50S8R-22-B-0001 0002.pdf PDF
sign in sheet.pdf PDF
Pre-Bid Conference minutes_Complex.pdf PDF
Pre-Bid Conference-slides.pptx PPTX presentation
W50S8R-22-B-0001 0001.pdf PDF
Attachment 01-G_Drawings.pdf PDF
Exhibit A_Sealed Bid Checklist Reminders.pdf PDF
Attachment 01-D_Drawings.pdf PDF
Attachment 01-B_Drawings.pdf PDF
Attachment 03_Specifications Vol 02.pdf PDF
Attachment 02_Specifications Vol 01.pdf PDF
Attachment 01-I_Drawings.pdf PDF
Attachment 01-H_Drawings.pdf PDF
Attachment 01-F_Drawings.pdf PDF
Attachment 01-E_Drawings.pdf PDF
Attachment 01-C_Drawings.pdf PDF
Attachment 01-A_Drawings.pdf PDF
Exhibit B_Checklist for Bid Bonds.pdf PDF
W50S8R-22-B-0001.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

SIGNATURE DATE SIGNED

5. PROJECT TITLE

6. NUMBER

7A.

ITEM NO. 7B. DESCRIPTION OF OFFERED ITEMS 7C. EST.

QUANTITY

8. GOVERNMENT ESTIMATE

(Check A, B, or C and complete D, E, and F.)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without profit)

C. REASONABLE CONTRACT

(Including profit)

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

9. OFFERS

NO. 1

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

NSN 7540-01-150-0987 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 11-88 Prescribed by GSA-FAR (48 CFR 53.236-1)

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when, more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

3. CONTRACT ITEMS

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT

4. OFFERS (Continued)

NO.

A. OFFEROR

B. BID SECURITY (Type and Amount)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

NO.

A. OFFEROR

B. BID SECURITY (Type and Amount)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

NO.

A. OFFEROR

B. BID SECURITY (Type and Amount)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

NO.

A. OFFEROR

B. BID SECURITY (Type and Amount)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

NSN 7540-01-280-5502 501419-101 OPTIONAL FORM 1419A 11-88

Prescribed by GSA-FAR (48 CFR 53.236-1)

JF01: W50S8R-22-B-0001
JF02: 20 SEP 22
JF03: 07 NOV 22
JF04: 1
JF05: 2
JF06: 179TH CONTRACTING OFFICE
JF07: CAMP PERRY LOGISTICS COMPLEX
JF08: EUBC 009109
JF09: 0001
JF10: BASE BID-CP COMPLEX
JF11: 1
JF12: JOB
JF13:
JF14: 6601566
JF09_2: 1001
JF10_2: OPT.01-WAREHOUSE ADDITION
JF11_2: 1
JF12_2: JOB
JF13_2:
JF14_2: 199560
JF09_3: 1002
JF10_3: OPT.02-CHAIN FENCE, LOCKERS
JF11_3: 1
JF12_3: JOB
JF13_3:
JF14_3: 167644
JF09_4: 1003
JF10_4: OPT.03-BLDG 04 DEMOLITION
JF11_4: 1
JF12_4: JOB
JF13_4:
JF14_4: 188281
JF09_5: 1004
JF10_5: OPT.04-BRIDGE CRANE
JF11_5: 1
JF12_5: JOB
JF13_5:
JF14_5: 81253
JF09_6: 1005
JF10_6: OPT.05-CONCRETE PAVEMENT
JF11_6: 1
JF12_6: JOB
JF13_6:
JF14_6: 124015
JF09_7: 1006
JF10_7: OPT.06-TRANSLUCENT WALL PANELS
JF11_7: 1
JF12_7: JOB
JF13_7:
JF14_7: 35767
JF09_8: 1007
JF10_8: OPT.07-CIRCULATING FANS
JF11_8: 1
JF12_8: JOB
JF13_8:
JF14_8: 27263
JF09_9: 1008
JF10_9: OPT.08-ROOF FALL PROTECTION
JF11_9: 1
JF12_9: JOB
JF13_9:
JF14_9: 47625
JF09_10:
JF10_10: BID TOTAL
JF11_10:
JF12_10:
JF13_10:
JF14_10:
JF09_11:
JF10_11:
JF11_11:
JF12_11:
JF13_11:
JF14_11:
JF09_12:
JF10_12:
JF11_12:
JF12_12:
JF13_12:
JF14_12:
JF09_13:
JF10_13:
JF11_13:
JF12_13:
JF13_13:
JF14_13:
JF09_14:
JF10_14:
JF11_14:
JF12_14:
JF13_14:
JF14_14:
JF15:
JF16:
JF17: X
JF18: GORDON STROM, CIV
JF19: 28 NOV 22
JF20: DAWN, INC.
JF22: SF 24/20% of bid $
JF23: SF 24/20% of bid $
JF22_2: YES
JF23_2: YES
JF24:
JF25: 8016433
JF26:
JF27: 7998000
JF24_2:
JF25_2: 403933
JF26_2:
JF27_2: 241300
JF24_3:
JF25_3: 167095
JF26_3:
JF27_3: 329000
JF24_4:
JF25_4: 123585
JF26_4:
JF27_4: 58000
JF24_5:
JF25_5: 199083
JF26_5:
JF27_5: 270000
JF24_6:
JF25_6: 191648
JF26_6:
JF27_6: 183600
JF24_7:
JF25_7: 56415
JF26_7:
JF27_7: 250500
JF24_8:
JF25_8: 14328
JF26_8:
JF27_8: 15000
JF24_9:
JF25_9: 135243
JF26_9:
JF27_9: 83250
JF24_10:
JF25_10: $9,307,763.00
JF26_10:
JF27_10: $9,428,650
JF24_11:
JF25_11:
JF26_11:
JF27_11:
JF24_12:
JF25_12:
JF26_12:
JF27_12:
JF24_13:
JF25_13:
JF26_13:
JF27_13:
JF24_14:
JF25_14:
JF26_14:
JF27_14:
2022-11-28T23:22:43-0500
STROM.GORDON.M.1134104100
JF21: V-LINE
AJF01: W50S8R-22-B-0001
AJF02: 2
AJF03: 2
AJF04: CAMP PERRY LOGISTICS COMPLEX
AJF05: 3
AJF06: MIDWEST CONTRACTING
AJF07: SF 24/20% of bid $
AJF08: YES
AJF09: 0001
AJF09_2: 1
AJF28: JOB
AJF13:
AJF14: $8,760,000
AJF09_3: 1001
AJF09_4: 1
AJF28_2: JOB
AJF13_2:
AJF14_2: $293,950
AJF09_5: 1002
AJF09_6: 1
AJF28_3: JOB
AJF13_3:
AJF14_3: $337,200
AJF09_7: 1003
AJF09_8: 1
AJF28_4: JOB
AJF13_4:
AJF14_4: $146,950
AJF09_9: 1004
AJF09_10: 1
AJF28_5: JOB
AJF13_5:
AJF14_5: $125,980
AJF09_11: 1005
AJF09_12: 1
AJF28_6: JOB
AJF13_6:
AJF14_6: $112,250
AJF09_13: 1006
AJF09_14: 1
AJF28_7: JOB
AJF13_7:
AJF14_7: $40,700
AJF09_15: 1007
AJF09_16: 1
AJF28_8: JOB
AJF13_8:
AJF14_8: $13,300
AJF09_17: 1008
AJF09_18: 1
AJF28_9: JOB
AJF13_9:
AJF14_9: $54,900
AJF09_19:
AJF09_20: BID TOTAL
AJF28_10:
AJF13_10:
AJF14_10: $9,885,230
AJF09_21:
AJF09_22:
AJF28_11:
AJF13_11:
AJF14_11:
AJF09_23:
AJF09_24:
AJF28_12:
AJF13_12:
AJF14_12:
AJF09_25:
AJF09_26:
AJF28_13:
AJF13_13:
AJF14_13:
AJF09_27:
AJF09_28:
AJF28_14:
AJF13_14:
AJF14_14:
AJF05_2: 4
AJF06_2: NISOU LGC JV
AJF07_2: SF 24/20% of bid $
AJF08_2: YES
AJF13_15:
AJF14_15: $8,491,302
AJF13_16:
AJF14_16: $431,869
AJF13_17:
AJF14_17: $165,811
AJF13_18:
AJF14_18: $74,610
AJF13_19:
AJF14_19: $424,670
AJF13_20:
AJF14_20: $127,121
AJF13_21:
AJF14_21: $45,378
AJF13_22:
AJF14_22: $15,306
AJF13_23:
AJF14_23: $109,900
AJF13_24:
AJF14_24: $9,885,967
AJF13_25:
AJF14_25:
AJF13_26:
AJF14_26:
AJF13_27:
AJF14_27:
AJF13_28:
AJF14_28:
AJF05_3: 5
AJF06_3: QBS, INC.
AJF07_3: SF 24/20% of bid $
AJF08_3: YES
AJF24:
AJF25: $8,419,767
AJF24_2:
AJF25_2: $290,059
AJF24_3:
AJF25_3: $330,515
AJF24_4:
AJF25_4: $173,687
AJF24_5:
AJF25_5: $387,644
AJF24_6:
AJF25_6: $167,404
AJF24_7:
AJF25_7: $42,924
AJF24_8:
AJF25_8: $12,877
AJF24_9:
AJF25_9: $66,185
AJF24_10:
AJF25_10: $9,891,062
AJF24_11:
AJF25_11:
AJF24_12:
AJF25_12:
AJF24_13:
AJF25_13:
AJF24_14:
AJF25_14:
AJF05_4:
AJF06_4:
AJF07_4:
AJF08_4:
AJF26:
AJF27:
AJF26_2:
AJF27_2:
AJF26_3:
AJF27_3:
AJF26_4:
AJF27_4:
AJF26_5:
AJF27_5:
AJF26_6:
AJF27_6:
AJF26_7:
AJF27_7:
AJF26_8:
AJF27_8:
AJF26_9:
AJF27_9:
AJF26_10:
AJF27_10:
AJF26_11:
AJF27_11:
AJF26_12:
AJF27_12:
AJF26_13:
AJF27_13:
AJF26_14:
AJF27_14:
LF__User:
LF__FormID:
Reset:

File details come from the government source that posted it. Updated .