Abstract_Complex.pdf
PDF 271 KB Posted
- Attached to
- Camp Perry Logistics Complex Federal contract opportunity
- Solicitation number
- W50S8R-22-B-0001
About this file
This abstract of offers document summarizes bids received in response to solicitation number W50S8R-22-B-0001 for construction of the Camp Perry Logistics Complex project. The solicitation was issued by the 179th Airlift Wing, Mansfield Ohio ANG Contracting Office for a new construction project with a magnitude between $5-10 million. The project is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million average annual revenue. Five bids were received by the 7 November 2022 bid opening from contractors Dawn Inc., QBS Inc., Nisou LGC JV, Midwest Contracting, with bid amounts ranging from $8.419 to $8.760 million. The document lists bid amounts and responses to options for each bidder. Award will be made following evaluation without discussions in accordance with FAR 14.101.
The related federal contract opportunity provides additional details on solicitation W50S8R-22-B-0001. Interested contractors are required to attend a site visit and register in SAM.gov to access solicitation documents posted at https://www.sam.gov. Questions may be submitted using the template in Section 00100. The project site is located at 200th Camp Perry OHANG, Port Clinton, Ohio. The bid opening is scheduled for 31 October 2022 with award to follow evaluation. The opportunity is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million average annual revenue.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
SIGNATURE DATE SIGNED
5. PROJECT TITLE
6. NUMBER
7A.
ITEM NO. 7B. DESCRIPTION OF OFFERED ITEMS 7C. EST.
QUANTITY
8. GOVERNMENT ESTIMATE
(Check A, B, or C and complete D, E, and F.)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without profit)
C. REASONABLE CONTRACT
(Including profit)
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
9. OFFERS
NO. 1
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
NSN 7540-01-150-0987 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 11-88 Prescribed by GSA-FAR (48 CFR 53.236-1)
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when, more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
3. CONTRACT ITEMS
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT
4. OFFERS (Continued)
NO.
A. OFFEROR
B. BID SECURITY (Type and Amount)
C. AMENDMENTS ACKNOWLEDGED
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
NO.
A. OFFEROR
B. BID SECURITY (Type and Amount)
C. AMENDMENTS ACKNOWLEDGED
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
NO.
A. OFFEROR
B. BID SECURITY (Type and Amount)
C. AMENDMENTS ACKNOWLEDGED
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
NO.
A. OFFEROR
B. BID SECURITY (Type and Amount)
C. AMENDMENTS ACKNOWLEDGED
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
NSN 7540-01-280-5502 501419-101 OPTIONAL FORM 1419A 11-88
Prescribed by GSA-FAR (48 CFR 53.236-1)
| JF01: W50S8R-22-B-0001 | |
| JF02: 20 SEP 22 | |
| JF03: 07 NOV 22 | |
| JF04: 1 | |
| JF05: 2 | |
| JF06: 179TH CONTRACTING OFFICE | |
| JF07: CAMP PERRY LOGISTICS COMPLEX | |
| JF08: EUBC 009109 | |
| JF09: 0001 | |
| JF10: BASE BID-CP COMPLEX | |
| JF11: 1 | |
| JF12: JOB | |
| JF13: | |
| JF14: 6601566 | |
| JF09_2: 1001 | |
| JF10_2: OPT.01-WAREHOUSE ADDITION | |
| JF11_2: 1 | |
| JF12_2: JOB | |
| JF13_2: | |
| JF14_2: 199560 | |
| JF09_3: 1002 | |
| JF10_3: OPT.02-CHAIN FENCE, LOCKERS | |
| JF11_3: 1 | |
| JF12_3: JOB | |
| JF13_3: | |
| JF14_3: 167644 | |
| JF09_4: 1003 | |
| JF10_4: OPT.03-BLDG 04 DEMOLITION | |
| JF11_4: 1 | |
| JF12_4: JOB | |
| JF13_4: | |
| JF14_4: 188281 | |
| JF09_5: 1004 | |
| JF10_5: OPT.04-BRIDGE CRANE | |
| JF11_5: 1 | |
| JF12_5: JOB | |
| JF13_5: | |
| JF14_5: 81253 | |
| JF09_6: 1005 | |
| JF10_6: OPT.05-CONCRETE PAVEMENT | |
| JF11_6: 1 | |
| JF12_6: JOB | |
| JF13_6: | |
| JF14_6: 124015 | |
| JF09_7: 1006 | |
| JF10_7: OPT.06-TRANSLUCENT WALL PANELS | |
| JF11_7: 1 | |
| JF12_7: JOB | |
| JF13_7: | |
| JF14_7: 35767 | |
| JF09_8: 1007 | |
| JF10_8: OPT.07-CIRCULATING FANS | |
| JF11_8: 1 | |
| JF12_8: JOB | |
| JF13_8: | |
| JF14_8: 27263 | |
| JF09_9: 1008 | |
| JF10_9: OPT.08-ROOF FALL PROTECTION | |
| JF11_9: 1 | |
| JF12_9: JOB | |
| JF13_9: | |
| JF14_9: 47625 | |
| JF09_10: | |
| JF10_10: | |
| JF11_10: | |
| JF12_10: | |
| JF13_10: | |
| JF14_10: | |
| JF09_11: | |
| JF10_11: | |
| JF11_11: | |
| JF12_11: | |
| JF13_11: | |
| JF14_11: | |
| JF09_12: | |
| JF10_12: | |
| JF11_12: | |
| JF12_12: | |
| JF13_12: | |
| JF14_12: | |
| JF09_13: | |
| JF10_13: | |
| JF11_13: | |
| JF12_13: | |
| JF13_13: | |
| JF14_13: | |
| JF09_14: | |
| JF10_14: | |
| JF11_14: | |
| JF12_14: | |
| JF13_14: | |
| JF14_14: | |
| JF15: | |
| JF16: | |
| JF17: X | |
| JF18: GORDON STROM, CIV | |
| JF19: 09 NOV 22 | |
| JF20: V-LINE | |
| JF22: SF 24/20% of bid $ | |
| JF23: SF 24/20% of bid $ | |
| JF22_2: YES | |
| JF23_2: YES | |
| JF24: | |
| JF25: 7998000 | |
| JF26: | |
| JF27: 8016433 | |
| JF24_2: | |
| JF25_2: 241300 | |
| JF26_2: | |
| JF27_2: 403933 | |
| JF24_3: | |
| JF25_3: 329000 | |
| JF26_3: | |
| JF27_3: 167095 | |
| JF24_4: | |
| JF25_4: 58000 | |
| JF26_4: | |
| JF27_4: 123585 | |
| JF24_5: | |
| JF25_5: 270000 | |
| JF26_5: | |
| JF27_5: 199083 | |
| JF24_6: | |
| JF25_6: 183600 | |
| JF26_6: | |
| JF27_6: 191648 | |
| JF24_7: | |
| JF25_7: 250500 | |
| JF26_7: | |
| JF27_7: 56415 | |
| JF24_8: | |
| JF25_8: 15000 | |
| JF26_8: | |
| JF27_8: 14328 | |
| JF24_9: | |
| JF25_9: 83250 | |
| JF26_9: | |
| JF27_9: 135243 | |
| JF24_10: | |
| JF25_10: | |
| JF26_10: | |
| JF27_10: | |
| JF24_11: | |
| JF25_11: | |
| JF26_11: | |
| JF27_11: | |
| JF24_12: | |
| JF25_12: | |
| JF26_12: | |
| JF27_12: | |
| JF24_13: | |
| JF25_13: | |
| JF26_13: | |
| JF27_13: | |
| JF24_14: | |
| JF25_14: | |
| JF26_14: | |
| JF27_14: | |
| 2022-11-09T01:10:10-0500 | |
| STROM.GORDON.M.1134104100 |
| JF21: DAWN, INC. |
| AJF01: W50S8R-22-B-0001 |
| AJF02: 2 |
| AJF03: 2 |
| AJF04: CAMP PERRY LOGISTICS COMPLEX |
| AJF05: 3 |
| AJF06: QBS, INC. |
| AJF07: SF 24/20% of bid $ |
| AJF08: YES |
| AJF09: 0001 |
| AJF09_2: 1 |
| AJF28: JOB |
| AJF13: |
| AJF14: $8,419,767 |
| AJF09_3: 1001 |
| AJF09_4: 1 |
| AJF28_2: JOB |
| AJF13_2: |
| AJF14_2: $290,059 |
| AJF09_5: 1002 |
| AJF09_6: 1 |
| AJF28_3: JOB |
| AJF13_3: |
| AJF14_3: $330,515 |
| AJF09_7: 1003 |
| AJF09_8: 1 |
| AJF28_4: JOB |
| AJF13_4: |
| AJF14_4: $173,687 |
| AJF09_9: 1004 |
| AJF09_10: 1 |
| AJF28_5: JOB |
| AJF13_5: |
| AJF14_5: $387,644 |
| AJF09_11: 1005 |
| AJF09_12: 1 |
| AJF28_6: JOB |
| AJF13_6: |
| AJF14_6: $167,404 |
| AJF09_13: 1006 |
| AJF09_14: 1 |
| AJF28_7: JOB |
| AJF13_7: |
| AJF14_7: $42,924 |
| AJF09_15: 1007 |
| AJF09_16: 1 |
| AJF28_8: JOB |
| AJF13_8: |
| AJF14_8: $12,877 |
| AJF09_17: 1008 |
| AJF09_18: 1 |
| AJF28_9: JOB |
| AJF13_9: |
| AJF14_9: $66,185 |
| AJF09_19: |
| AJF09_20: |
| AJF28_10: |
| AJF13_10: |
| AJF14_10: |
| AJF09_21: |
| AJF09_22: |
| AJF28_11: |
| AJF13_11: |
| AJF14_11: |
| AJF09_23: |
| AJF09_24: |
| AJF28_12: |
| AJF13_12: |
| AJF14_12: |
| AJF09_25: |
| AJF09_26: |
| AJF28_13: |
| AJF13_13: |
| AJF14_13: |
| AJF09_27: |
| AJF09_28: |
| AJF28_14: |
| AJF13_14: |
| AJF14_14: |
| AJF05_2: 4 |
| AJF06_2: NISOU LGC JV |
| AJF07_2: SF 24/20% of bid $ |
| AJF08_2: YES |
| AJF13_15: |
| AJF14_15: $8,491,302 |
| AJF13_16: |
| AJF14_16: $431,869 |
| AJF13_17: |
| AJF14_17: $165,811 |
| AJF13_18: |
| AJF14_18: $74,610 |
| AJF13_19: |
| AJF14_19: $424,670 |
| AJF13_20: |
| AJF14_20: $127,121 |
| AJF13_21: |
| AJF14_21: $45,378 |
| AJF13_22: |
| AJF14_22: $15,306 |
| AJF13_23: |
| AJF14_23: $109,900 |
| AJF13_24: |
| AJF14_24: |
| AJF13_25: |
| AJF14_25: |
| AJF13_26: |
| AJF14_26: |
| AJF13_27: |
| AJF14_27: |
| AJF13_28: |
| AJF14_28: |
| AJF05_3: 5 |
| AJF06_3: MIDWEST CONTRACTING |
| AJF07_3: SF 24/20% of bid $ |
| AJF08_3: YES |
| AJF24: |
| AJF25: $8,760,000 |
| AJF24_2: |
| AJF25_2: $293,950 |
| AJF24_3: |
| AJF25_3: $337,200 |
| AJF24_4: |
| AJF25_4: $146,950 |
| AJF24_5: |
| AJF25_5: $125,980 |
| AJF24_6: |
| AJF25_6: $112,250 |
| AJF24_7: |
| AJF25_7: $40,700 |
| AJF24_8: |
| AJF25_8: $13,300 |
| AJF24_9: |
| AJF25_9: $54,900 |
| AJF24_10: |
| AJF25_10: |
| AJF24_11: |
| AJF25_11: |
| AJF24_12: |
| AJF25_12: |
| AJF24_13: |
| AJF25_13: |
| AJF24_14: |
| AJF25_14: |
| AJF05_4: |
| AJF06_4: |
| AJF07_4: |
| AJF08_4: |
| AJF26: |
| AJF27: |
| AJF26_2: |
| AJF27_2: |
| AJF26_3: |
| AJF27_3: |
| AJF26_4: |
| AJF27_4: |
| AJF26_5: |
| AJF27_5: |
| AJF26_6: |
| AJF27_6: |
| AJF26_7: |
| AJF27_7: |
| AJF26_8: |
| AJF27_8: |
| AJF26_9: |
| AJF27_9: |
| AJF26_10: |
| AJF27_10: |
| AJF26_11: |
| AJF27_11: |
| AJF26_12: |
| AJF27_12: |
| AJF26_13: |
| AJF27_13: |
| AJF26_14: |
| AJF27_14: |
| LF__User: |
| LF__FormID: |
| Reset: |