Attachment 01-D_Drawings.pdf
PDF 26 MB Posted
- Attached to
- Camp Perry Logistics Complex Federal contract opportunity
- Solicitation number
- W50S8R-22-B-0001
About this file
This solicitation notice is for the Camp Perry Logistics Complex new construction project with an estimated value between $5 million and $10 million. The 179th Airlift Wing, Mansfield Ohio ANG Contracting Office is seeking bids for the project under Solicitation Number W50S8R-22-B-0001. The project is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million average annual revenue for the previous three years. Interested contractors should attend the site visit and follow base access requirements. The bid opening is scheduled for October 31, 2022 at 1:00pm EST. Questions should be submitted using the provided template and directed to Gordon Strom. Bidders must be registered in the System for Award Management. Plans and specifications are available on SAM.gov.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOVERNING CODE:
GC-1. GOVERNING CODE AND REFERENCES:
• INTERNATIONAL BUILDING CODE 2015
• ASCE 7-10 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
• AISC 14TH EDITION STEEL CONSTRUCTION MANUAL
• ACI 318-14- BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
GC-2. DESIGN CRITERIA:
• ASCE 7 BUILDING RISK CATEGORY II
GC-3. SEISMIC LOADS:
• SITE CLASS = D
• Ss = 13.1% g (0.2 SECOND MCE SPECTRAL ACCELERATION)
• S1 = 5.2% G (1.0 SECOND MCE SPECTRAL ACCELERATION)
• SEISMIC DESIGN CATEGORY = B
• Sds = 13.9% g
• Sd1 = 8.3% g
• SEISMIC LOAD RESISTING SYSTEM (SLRS)
• ORDINARY REINFORCED MASONRY SHEAR WALLS
R = 2.0, OVERSTRENGTH = 2.5, DEFL. AMPLIFICATION FACTOR Cd = 2.0
• STEEL SYSTEMS NOT SPECIFICALLY DETAILED FOR SEISMIC RESISTANCE
R = 3.0, OVERSTRENGTH = 3.0, DEFL. AMPLIFICATION FACTOR Cd = 3.0
GC-4. WIND LOADS:
• BASIC WIND SPEED (3 SECOND GUST) = 115 (MPH), STRENGTH WIND SPEED
• WIND EXPOSURE = C
• FOR SERVICEABILITY CALCULATIONS, THE BASIC WIND SPEED = 76 MPH (SERVICE WIND
SPEED BASED ON THE 10 YEAR MEAN REOCCURRENCE INTERVAL).
GC-5. SNOW LOADS:
• GROUND SNOW LOAD = 20 PSF
• SNOW EXPOSURE FACTOR Ce = 1.0
• SNOW LOAD IMPORTANCE FACTOR Is = 1.2
• ROOF THERMAL FACTOR Ct = 1.0
• FLAT ROOF SNOW LOAD Pf = 25 PSF
• COMBINED RAIN ON SNOW ROOF LOAD = 30 PSF
• SEE PLANS FOR DRIFT AND SLIDING SNOW LOADS WHERE APPLICABLE
GC-6. LIVE LOADS:
• ROOF = 20 PSF
• SLAB ON GRADE = 100 PSF
GC-7. DEAD LOADS (INCLUDING FRAMING):
• SELF WEIGHT OF STRUCTURAL SYSTEM
• COLLATERAL LOAD (ROOF) = 10 PSF
• CURTAIN WALL SYSTEMS = 15 PSF
• FUTURE PV ARRAY = 10 PSF
GENERAL NOTES:
G-1. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, COORDINATES AND
EXISTING CONDITIONS PRIOR TO CONSTRUCTION. NOTIFY THE GOVERNMENT OF ANY
DISCREPANCY IMMEDIATELY.
G-2. COORDINATE STRUCTURAL SHEETS WITH ALL OTHER SHEETS FOR PIPE SIZES AND
LOCATIONS, BEAM POCKETS, GRATING LEDGES, BLOCK OUTS, ELECTRICAL
REQUIREMENTS AND ANCHOR BOLT ATTACHMENTS.
G-3. STRUCTURAL SYSTEM IS DESIGNED TO WORK AS A COMPLETED SYSTEM, ANY
TEMPORARY SHORING OR BRACING NEEDED DURING CONSTRUCTION SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR; CONTRACTOR IS RESPONSIBLE FOR
ADEQUACY OF TEMPORARY SHORING.
G-4. SEE ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING PLANS FOR
ADDITIONAL SLEEVES, INSERTS, ETC.
G-5. ALL SUBTERRANEAN STRUCTURES, UTILITIES, PIPING, ETC. IN THE AREA OF ALL
EXCAVATIONS TO BE LOCATED AND MARKED BY CONTRACTOR PRIOR TO EARTH REMOVAL
WORK. FLAGS OR PAINT ARE ACCEPTABLE METHODS. CONTRACTOR TO MAINTAIN
MARKERS UNTIL ALL EXCAVATION ACTIVITIES HAVE CEASED. COORDINATE WITH OWNER.
G-6. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL SITE SAFETY AND ALL
ACCIDENTS WHICH RESULT IN DEATH, PERSONAL INJURY OR DAMAGE TO PROPERTY
ARISING OUT OF OR IN CONNECTION WITH THE PERFORMANCE OF THE WORK, WHETHER
ADJACENT TO OR AT THE SITE.
G-7. NO PIPES OR SLEEVES FOR MECHANICAL TRADES SHALL PASS THROUGH
STRUCTURAL MEMBERS WITHOUT APPROVAL OF THE STRUCTURAL ENGINEER.
G-8. ALL SECTIONS, DETAILS AND NOTES SHOWN ON THE DRAWINGS ARE INTENDED TO BE
TYPICAL AND SHALL APPLY TO SIMILAR SITUATIONS ELSEWHERE UNLESS OTHERWISE
SHOWN.
G-9. SHOP DRAWINGS PREPARED BY SUPPLIERS AND SUBCONTRACTORS SHALL BE
REVIEWED BY THE GENERAL CONTRACTOR PRIOR TO SUBMITTING TO THE ARCHITECT.
STRUCTURAL ENGINEER'S REVIEW SHALL BE FOR SIZES AND GENERAL CONFORMANCE
WITH INFORMATION GIVEN IN CONSTRUCTION DOCUMENTS ONLY. NO WORK SHALL BE
STARTED WITHOUT SUCH REVIEW. BASED ON SUCH REVIEWS, ACTIONS WILL BE NOTED
FOR EACH SHOP DRAWING SUBMITTAL AS LISTED BELOW:
• NO EXCEPTIONS TAKEN: FABRICATION, MANUFACTURING OR CONSTRUCTION MAY
PROCEED ON THE BASIS THAT THE SUBMITTAL IS IN CONFORMANCE WITH THE DESIGN
CONCEPT AND THE CONTRACT DOCUMENTS.
• FURNISH AS CORRECTED: FABRICATION, MANUFACTURING OR CONSTRUCTION MAY
PROCEED AFTER MAKING THE NOTED CORRECTIONS TO SATISFY COMPLIANCE WITH THE
DESIGN CONCEPT AND/OR THE CONTRACT DOCUMENTS.
• REVISE AND SUBMIT: NO FABRICATION, MANUFACTURING OR CONSTRUCTION MAY
PROCEED. RESUBMIT FOR REVIEW AFTER REQUESTED REVISIONS ARE MADE.
• SUBMIT SPECIFIED ITEM: NO FABRICATION, MANUFACTURING OR CONSTRUCTION MAY
PROCEED. SUBMIT SPECIFIED ITEM TO HANSON FOR REVIEW.
• REJECTED-SEE REMARKS: NO FABRICATION, MANUFACTURING OR CONSTRUCTION MAY
OCCUR FOR REASONS STATED IN "REMARKS".
G-10. ALL ASTM DESIGNATIONS SHALL BE THE LATEST UNLESS OTHERWISE NOTED.
G-11. FINISH FIRST FLOOR ELEVATION OF 100'-0" = ELEVATION 576'-0".
FOUNDATION:
F-1. FOUNDATION DESIGN BASED UPON GEOTECHNICAL REPORT: "CAMP PERRY RED
HORSE LOGISTICS COMPLEX GEOTECHNICAL REPORT, DATED JULY 13, 2020, PREPARED
BY MOTT MACDONALD.
• NET ALLOWABLE SOIL BEARING PRESSURE = 1000 PSF.
• ALLOWABLE HP12x74 PILE CAPACITY = 80 KIPS.
F-2. ALL FOOTING EXCAVATIONS SHALL BE CLEAN AND FREE OF DEBRIS, STANDING
WATER AND LOOSE SOIL AND BE INSPECTED AND APPROVED PRIOR TO PLACEMENT OF
CONCRETE.
F-3. ALL FILL MATERIALS SHALL BE APPROVED FOR USE IN ADVANCE OF PLACEMENT. NO
FILL SHALL BE PLACED OVER FROZEN, MUDDY OR OTHER DELETERIOUS MATERIAL. LIFT
THICKNESS SHALL BE MINIMIZED TO ALLOW EFFICIENT COMPACTION. NO FILL MAY BE
PLACED OVER A PREVIOUS LIFT THAT HAS NOT BEEN ADEQUATELY COMPACTED AND
ACCEPTED.
F-4. BACKFILL AGAINST FOUNDATION WALLS SHALL BE PLACED EVENLY ON ALL SIDES IN
ORDER TO ACHIEVE GENERALLY BALANCED LOADINGS. DO NOT BACKFILL AROUND
BASEMENT WALLS UNTIL FIRST FLOOR AND BASEMENT FLOOR SLABS ARE IN PLACE.
F-5. ALL COLUMN FOOTINGS ARE TO BE CENTERED UNDER COLUMN CENTERLINES,
UNLESS NOTED OR DETAILED OTHERWISE.
F-6. THE FOUNDATION CONTRACTOR SHALL FULLY REVIEW UNDERGROUND PLUMBING
DRAWINGS AND SHALL COORDINATE WITH THE PLUMBING CONTRACTOR TO DEPRESS
FOOTINGS AND PROVIDE PIPE SLEEVES THROUGH FOUNDATION WALLS AS NECESSARY
TO ACCOMMODATE PLUMBING LINES OR TRAPS WHICH PENETRATE CONCRETE FOOTINGS
OR FOUNDATIONS.
F-7. COORDINATE WITH ARCHITECTURAL AND CIVIL DRAWINGS FOR MISCELLANEOUS
FOUNDATIONS NOT SHOWN ON STRUCTURAL DRAWINGS.
F-8. REFERENCE THE GEOTECHNICAL REPORT FOR REQUIREMENTS FOR EXCAVATION AND
CONTROL OF GROUND WATER DURING CONSTRUCTION. EXISTING SOILS MAY EXPERIENCE
A LOSS OF STRENGTH IF SURFACE WATER IS ALLOWED TO ACCUMULATE IN THE
EXCAVATIONS; DO NOT ALLOW SURFACE WATER TO ACCUMULATE IN THE BOTTOM OF THE
EXCAVATIONS.
F-9. A LEAN CONCRETE MUD SLAB 3" TO 4" THICK SHALL BE USED IN THE FOOTING
EXCAVATION IF THE BOTTOM OF THE EXCAVATION TENDS TO BECOME MUDDY AND SOFT
DUE TO CONSTRUCTION ACTIVITY. LEAN CONCRETE SHALL HAVE A MINIMUM 28 DAY
COMPRESSIVE STRENGTH OF 2,000 PSI.
CONCRETE:
C-1. MATERIAL PROPERTIES (U.N.O.)
• CONCRETE 28-DAY COMPRESSIVE STRENGTH - f'c = 4,500 psi
• CONCRETE REINFORCEMENT - Fy = 60 ksi (ASTM A615 GR 60)
• WELDED WIRE FABRIC - Fy = 60 ksi (ASTM A185)
C-2. PROTECTIVE COVERING FOR REINFORCEMENT BARS SHALL BE AS FOLLOWS UNLESS
OTHERWISE NOTED ON THE PLANS:
• CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH = 3"
• CONCRETE EXPOSED TO EARTH OR WEATHER = 2"
• CONCRETE NOT EXPOSED TO EARTH OR WEATHER = 1 1/2"
C-3. ALL REINFORCEMENT BARS SHALL BE FABRICATED IN ACCORDANCE WITH THE
LATEST CRSI MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE
STRUCTURES AND SHALL BE CLEAN AND FREE OF GREASE AND SCALING RUST.
C-4. CONTINUOUS TOP AND BOTTOM BARS, WHEN SHOWN IN SECTION ONLY, SHALL BE
LAPPED AS FOLLOWS: TOP BARS NEAR MIDSPANS, BOTTOM BARS DIRECTLY OVER
SUPPORTS.
C-5. A 3/4" x 3/4" CHAMFER SHALL BE PROVIDED AT THE EDGE OF ALL FINISHED WALLS, BEAMS AND COLUMNS.
C-6. FOR SLABS ON GRADE, PROVIDE 1/2" THICK PREMOLDED JOINT FILLER AND SEALANT
TO ISOLATE THE SLAB FROM CONTACT WITH THE STRUCTURES ALONG ITS PERIMETER
UNLESS DETAILED OTHERWISE. REFER TO FOUNDATION DETAILS FOR ADDITIONAL
INFORMATION.
C-7. TWO #5 BARS EACH FACE SHALL BE PROVIDED DIAGONALLY AT ALL CORNERS OF
WALL AND SLAB OPENINGS AND AT ALL REENTRANT CORNERS OF SLABS. BARS SHALL BE
EXTENDED 36" MINIMUM BEYOND CORNERS OF THE OPENINGS.
C-8. PROVIDE CONTROL OR CONSTRUCTION JOINTS IN SLAB-ON-GRADE AT 15 FEET
MAXIMUM SPACES EACH DIRECTION. CONTRACTOR SHALL SUBMIT PLANS OF JOINT
LOCATIONS FOR APPROVAL.
C-9. ALL CONTROL JOINTS SHALL BE TOOLED OR SAWN.
C-10. GRADE WALLS CAN BE CAST UP TO 120 FEET (MAXIMUM) PROVIDED CONSTRUCTION
AND / OR CONTROL JOINT SPACING DOES NOT EXCEED 30 FEET. PROVIDE VERTICAL "V"
GROOVE AT ALL CONSTRUCTION AND CONTROL JOINTS. CONTRACTORS SHALL SUBMIT
PLANS OR JOINT LOCATIONS FOR APPROVAL.
C-11. LAP ALL BARS AS FOLLOWS U.N.O. (CLASS B), FOR EPOXY COATED BARS, PROVIDE
1.3 TIMES THE INDICATED LAP LENGTH. FOR TOP BARS, PROVIDE AN ADDITIONAL 1.3 TIMES
THE INDICATED LAP LENGTH:
#3=1'-7" #4=2'-1" #5=2'-7" #6=3'-1" #7=4'-6" #8=5'-2" #9=5'-10" #10=6'-7" #11=7'-4"
C-12. HOOK REINFORCEMENT BARS AT DISCONTINUOUS ENDS, TYPICAL UNLESS
OTHERWISE NOTED. EXTEND REINFORCEMENT TO FAR FACE OF PEDESTALS AND / OR
COLUMNS UNLESS NOTED OTHERWISE.
C-13. PITCH CONCRETE AS REQUIRED TO FLOOR DRAINS 1/4" PER FOOT UNLESS
OTHERWISE NOTED. SEE ARCHITECTURAL AND PLUMBING DRAWINGS.
C-14. REFER TO DIVISION 03 SPECIFICATION "CAST-IN-PLACE CONCRETE" FOR CONCRETE
PLACEMENT AND FINISH REQUIREMENTS.
C-15. COUPLER AND STRUCTURAL CONNECTORS: WHERE SPECIFIED, PROVIDE COUPLER /
CONNECTOR CAPABLE OF DEVELOPING 125% OF THE YIELD STRENGTH OF THE SPLICED /
CONNECTED BAR. PROVIDE THREADED DOWELS WHERE REQUIRED.
C-16. FORMWORK AND SHORING OF FORMWORK SHALL BE DESIGNED BY THE
CONTRACTOR.
C-17. WELDED WIRE FABRIC:
• WELDED WIRE FABRIC SHALL BE SUPPLIED IN FLAT SHEETS AND SHALL NOT BE ROLLED.
• WELDED WIRE FABRIC SHALL BE SECURELY SUPPORTED ON CHAIRS TO PREVENT
EXCESSIVE DISPLACEMENT DURING CONCRETE PLACEMENT.
• LAP ADJACENT LAYERS OF WELDED WIRE FABRIC 9" MIN. AT SIDES AND ENDS.
MASONRY:
M-1. MATERIAL PROPERTIES (U.N.O.)
• COMPRESSIVE STRENGTH - F'm = 2,000 P.S.I.
• MASONRY REINFORCEMENT - Fy = 60 KSI (A615 GR 60)
• MORTAR - TYPE S
• GROUT AT 28 DAYS - 2,500 P.S.I. (ASTM C476)
M-2. ALL CELLS WITH VERTICAL REINFORCEMENT SHALL BE GROUTED SOLID.
M-3. ALL LINTEL BEARINGS SHALL BE GROUTED TO THE FOUNDATION.
M-4. MASONRY UNITS TO BE PLACED IN ONE-HALF RUNNING BOND, UNLESS OTHERWISE
NOTED.
M-5. MASONRY DESIGN BASED ON INSPECTED WORKMANSHIP.
M-6. LINTELS ARE REQUIRED AT ALL MASONRY WALL OPENINGS WITHOUT EXCEPTION.
MASONRY WALL OPENINGS AND ALL LINTELS REQUIRED ARE NOT SPECIFICALLY NOTED
ON THE STRUCTURAL PLANS. REFER TO ARCHITECTURAL, M.E.P., AND F.P. DRAWINGS,
ETC. FOR SIZES AND LOCATION OF ALL WALL OPENINGS. REFER TO TYPICAL DETAILS FOR
LINTEL DETAILS.
M-7. REFER TO TYPICAL DETAILS AND STRUCTURAL DETAILS FOR TOP AND BOTTOM OF
CMU WALL CONDITIONS.
M-8. ALL MASONRY WALLS ARE TO HAVE HORIZONTAL, 9 GAGE JOINT REINFORCEMENT
WHICH DOES NOT EXCEED 16 INCHES ON CENTER VERTICALLY.
M-9. ALL REINFORCEMENT LAPS SHALL BE 50 BAR DIAMETERS UNLESS NOTED
OTHERWISE.
M-10. HOLLOW MASONRY UNITS SHALL BE LAID WITH FULL HEAD JOINTS AND FULL BED
JOINTS OF THE FACE SHELLS AND UNDER WEBS WHERE THE ADJACENT CELLS ARE TO BE
FILLED WITH GROUT AND AT THE BOTTOM COURSE.
M-11. UNLESS OTHERWISE NOTED OR DETAILED, PROVIDE HORIZONTAL BOND BEAMS
(DIAPHRAGM CHORDS) WITH 2 - #5 BARS CONTINUOUS AT ROOF MEMBER BEARING
ELEVATIONS AND DECK / EDGE PERIMETER.
M-12. UNLESS OTHERWISE SCHEDULED FOR ADDITIONAL REINFORCEMENT, 8 INCH CMU
WALLS, INCLUDED IN THE PLANS SHALL BE REINFORCED AS FOLLOWS:
• REINFORCE WITH #5 VERTICAL BARS AT 32" CENTERS, #5 HORIZONTAL BARS AT 48" O.C., AND HORIZONTAL JOINT REINFORCEMENT OF 2 - #9 GAGE SIDE RODS AT 16" CENTERS.
(NOT CONTINUOUS THROUGH CONTROL JOINTS EXCEPT AT ROOF DIAPHRAGM CHORDS /
ROOF DECK BEARINGS).
• WHERE WALL SECTION BETWEEN OPENINGS IS 32" OR LESS, REINFORCE EACH VERTICAL
CELL WITH 2 - #5 BARS, FULL HEIGHT OF WALL.
• SEE TYPICAL DETAILS FOR LINTEL DETAILS.
• REINFORCED ENDS OF ALL WALLS / PIERS WITH 2 - #5 BARS VERTICAL, FULL HEIGHT AT
DISCONTINUOUS ENDS, EACH SIDE OF CORNERS, AT T-INTERSECTIONS, AND AT EACH
SIDE OF CONTROL JOINTS (TO PROVIDE BOUNDARY ELEMENTS FOR SHEAR WALLS /
PIERS). ALSO PROVIDE DOWELS TO FOUNDATION TO MATCH SIZE AND SPACING OF WALL
REINFORCEMENT.
M-13. ALL CMU CONSTRUCTION BELOW GRADE SHALL BE GROUTED SOLID.
M-14. ALL INTERIOR NON-LOAD BEARING MASONRY PARTITION WALLS SHALL BE
REINFORCED WITH #4 BARS @ 48" O.C. HORIZONTAL & VERTICAL. ALL CELLS CONTAINING
REINFORCEMENT SHALL BE GROUTED SOLID. LAP BARS 50 BAR DIAMETERS UNLESS
NOTED OTHERWISE. PROVIDE #4 DOWELS WITH STANDARD 90o HOOKS INTO THICKENED
SLAB-ON-GRADE. SEE ARCHITECTURAL DRAWINGS FOR MASONRY SIZES AND LOCATIONS.
M-15. PROVIDE 10 GAGE BENT PLATES 4"x4"x8" LONG @ EACH PEMB ROOF PURLIN WITH
MAX SPACING OF 4'-0" O.C. BENT PLATE TO BE ON EACH SIDE OF THE TOP OF ALL NON-
STRUCTURAL MASONRY WALLS. ATTACH BENT PLATES TO PURLINS WITH 2 (MIN.) SELF
DRILLING, SELF THREADING SCREWS (#12) AS REQUIRED BY THICKNESS OF BASE METAL.
MAINTAIN 1" (MIN.) GAP BETWEEN TOP OF MASONRY WALL AND BOTTOM OF STRUCTURE.
M-16. SEE ARCHITECTURAL DRAWINGS FOR CONTROL JOINT LAYOUT. EXTEND BOND
BEAMS AND BOND BEAM REINFORCEMENT CONTINUOUS THROUGH CONTROL JOINTS.
TERMINATE STANDARD HORIZONTAL JOINT REINFORCEMENT AT EACH END SIDE OF
CONTROL JOINT. CUT FACE SHELL OF CMU 3/8" WIDE EACH SIDE OF WALL AND SEAL WITH
FLEXIBLE SEALANT.
METAL BAR JOIST:
J-1. MATERIAL PROPERTIES (U.N.0)
COMPLY WITH SJI'S "SPECIFICATIONS" FOR OPEN WEB AND STEEL-ANGLE CHORD
MEMBERS.
J-2. BAR JOISTS SHALL BE DESIGNED TO RESIST FORCES, INDICATED ON DRAWINGS AND
IN THE SPECIFICATIONS.
J-3. TYPICAL BAR JOISTS ARE NOT DESIGNED FOR CONCENTRATED LOADS. PLACE LOADS
AT PANEL POINTS, OR WELD ADDITIONAL, DOUBLE ANGLE MEMBERS (ONE EACH SIDE OF
WEB) FROM POINT OF CONCENTRATED LOAD TO THE NEAREST PANEL POINT ON THE
OPPOSITE CHORD; MATCH SIZE OF JOIST WEB ELEMENTS OR L2X2X1/4, WHICHEVER IS
GREATER.
J-4. ALL FIELD MODIFICATIONS OR REPAIRS TO THE JOIST, OR JOIST GIRDERS SHALL BE
APPROVED BY THE JOIST MANUFACTURER IN WRITING. THIS LETTER SHALL BE
FORWARDED TO THE ENGINEER FOR REVIEW.
J-5. CUTTING AND DRILLING OF CHORD OR WEB MEMBERS IN BAR JOISTS, OR JOIST
GIRDERS IS NOT PERMITTED.
J-6. ALL BRIDGING SHALL BE EQUALLY SPACED, UNLESS NOTED OTHERWISE, AND
DESIGNED BY JOIST MANUFACTURER.
J-7. CONTRACTOR(S) SHALL PROVIDE MEANS FOR ADEQUATE DISTRIBUTION OF
CONSTRUCTION LOADS SO THAT CARRYING CAPACITY OF ANY BAR JOIST, JOIST GIRDER,
OR OTHER STRUCTURAL MEMBER IS NOT EXCEEDED.
J-8. JOIST SHALL BE CONSIDERED AS UNSTABLE DURING ERECTION. UNDER NO
CIRCUMSTANCES ARE CONSTRUCTION LOADS OF ANY TYPE TO BE PLACED ON
UNBRIDGED JOISTS. THE APPLICATION OF CONSTRUCTION LOADS ON UNBRIDGED JOISTS
IS IN DIRECT VIOLATION OF O.S.H.A. REGULATIONS.
J-9. WHERE X-BRIDGING INTERFERES WITH MECHANICAL PIPING OR DUCT WORK, UTILIZE
HORIZONTAL BRIDGING AS DIRECTED BY JOIST MANUFACTURER.
J-10. ALL BRIDGING, SHALL BE PER SJI AND AS REQUIRED FOR DESIGN LOADS.
J-11. ALL JOIST BEARINGS ARE TO BE DESIGNED FOR A 3 KIP ROLLOVER FORCE
J-12. DESIGN TOP AND BOTTOM CHORDS OF ALL JOISTS FOR A 300 POUND BEND CHECK.
J-13. DESIGN ALL JOISTS FOR A 300 POUND ADD LOAD.
STRUCTURAL STEEL:
S-1. MATERIAL PROPERTIES (U.N.0.)
• W AND WT SHAPES - Fy = 50 KSI - (ASTM A992)
• C-SHAPES - Fy = 36 KSI - (ASTM A36 OR ASTM A572)
• ANGLES - Fy = 36 KSI - (ASTM A36 OR ASTM A572)
• PLATES & BARS - Fy = 36 KSI - (ASTM A36 OR ASTM A572)
• STEEL PIPE - Fy = 35 KSI - (ASTM A53 Gr B)
• HSS SHAPES - Fy = 50 KSI - (ASTM A500 Gr C)
• RODS - Fy = 36 KSI - (ASTM F1554 Gr 36)
• ANCHOR BOLTS - Fy = 36 KSI - (ASTM F1554 Gr 36)
• HEADED STUDS - (ASTM A108)
• HP SHAPES - Fy = 50 KSI - (ASTM A572)
S-2. ALL DETAILING, FABRICATION, AND ERECTION OF STRUCTURAL STEEL MEMBERS
SHALL BE IN ACCORDANCE WITH THE AISC - "STEEL CONSTRUCTION MANUAL",
FOURTEENTH EDITION.
S-3. ALL WELDING SHALL BE DONE IN ACCORDANCE WITH THE LATEST "AWS"
SPECIFICATIONS BY CERTIFIED WELDERS. ALL WELDS SHALL BE MADE WITH E70XX
ELECTRODES UNLESS NOTED OTHERWISE.
S-4. CONNECTIONS NOT DETAILED ON THE PLANS SHALL BE SELECTED IN ACCORDANCE
WITH AISC SPECIFICATIONS, "SIMPLE CONNECTIONS" USING 3/4" DIAMETER ASTM A325 N-
BOLTS (SNUG TIGHT). UNLESS OTHERWISE NOTED, REFER TO TYPICAL DETAILS FOR
CONNECTION TYPES AND MINIMUM NUMBER AND SIZE OF BOLTS.
S-5. OPENINGS REQUIRED IN STRUCTURAL STEEL MEMBERS SHALL BE SHOWN ON THE
DRAWINGS. FIELD CUTTING OF HOLES IN STRUCTURAL STEEL MEMBERS SHALL NOT BE
ALLOWED WITHOUT WRITTEN PERMISSION OF THE ENGINEER.
S-6. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
STRUCTURAL STEEL FABRICATION.
S-7. ALL CONNECTIONS TO PIPE AND TUBE COLUMNS SHALL BE THRU-PLATE TYPE UNLESS
OTHERWISE SHOWN.
S-8. THE CONTRACTOR SHALL FURNISH AND INSTALL MISCELLANEOUS STEEL (CURBS,
HANGERS, BRACING, ETC.) AS CALLED FOR OR AS NECESSARY PER ARCHITECTURAL AND
MECHANICAL / ELECTRICAL DRAWINGS.
S-9. BEAM AND LINTEL BEARING PLATES TO BE FULLY GROUTED WITH 1/2" MINIMUM
THICKNESS NON-SHRINK GROUT.
S-10. ANCHOR BOLTS TO BE PROVIDED AT ALL LINTEL AND BEAM BEARINGS ON MASONRY
OR CONCRETE.
S-11. WHENEVER CONSTRUCTION SCHEDULING REQUIRES THE ERECTION OF
STRUCTURAL MEMBERS WHICH BY THEMSELVES WOULD BE CONSIDERED LATERALLY
UNSTABLE, ADEQUATE TEMPORARY BRACING SHALL BE PROVIDED.
S-12. ALL EXTERIOR MASONRY SHELF ANGLES, LINTEL BEAMS, AND LINTEL PLATES SHALL
BE HOT DIP GALVANIZED ACCORDING TO ASTM A123.
METAL DECK:
MD-1. MATERIAL PROPERTIES (U.N.0)
• ROOF DECK: 20 GAUGE, GALVANIZED, Fy = 33 KSI
MD-2. THE MANUFACTURING, DETAILING AND ERECTION OF METAL DECK SHALL BE IN
ACCORDANCE WITH THE STEEL DECK INSTITUTE SPECIFICATION. STRUCTURAL
DIAPHRAGM ACTION SHALL BE PROVIDED BY THE METAL DECK AND ITS ATTACHMENT.
MD-3. METAL DECK SHALL BE CONTINUOUS OVER AT LEAST 3 SPANS WITH JOINTS OVER
SUPPORTING MEMBERS.
MD-4. BUTTON PUNCHING ROOF DECK IS NOT PERMITTED. REFERENCE DRAWINGS FOR
ROOF DECK ATTACHMENT REQUIREMENTS.
NOTE 1: 4" CONCRETE SLAB ON GRADE WITH 6x6-W2.9xW2.9 WELDED WIRE FABRIC ON 15 MIL VAPOR BARRIER OVER 6" FREE-DRAINING COMPACTED GRANULAR FILL. SEE DETAIL 1/S002 FOR
TYPICAL SLAB CONSTRUCTION JOINT.
NOTE 2: 6" CONCRETE SLAB ON GRADE WITH 4x4-W2.9xW2.9 WELDED WIRE FABRIC ON 15 MIL VAPOR BARRIER OVER 6" FREE-DRAINING COMPACTED GRANULAR FILL. SEE DETAIL 1/S002 FOR
TYPICAL SLAB CONSTRUCTION JOINT.
NOTE 3: 8" CONCRETE SLAB ON GRADE WITH #4 BARS AT 12" O.C. ON 15 MIL VAPOR BARRIER OVER 8" FREE-DRAINING COMPACTED GRANULAR FILL. SEE DETAIL 1/S002 FOR TYPICAL SLAB
CONSTRUCTION JOINT.
NOTE 4: 1/2"x1/2" PREFORMED NOTCH AND SEALANT.
NOTE 5: 1 1/2" WIDE RIB ROOF DECK, 20 GAGE, G90 GALVANIZED. REFER TO TYPICAL DETAILS
FOR DECK ATTACHMENT.
NOTE 6: OPEN WEB STEEL JOIST. SEE PLAN FOR SIZE AND SPACING. WELD TO SUPPORTS
WITH 3/16" FILLET WELD 2" LONG TYPICAL EACH SIDE. PROVIDE CONTINUOUS TOP AND BOTTOM BRACING / BRIDGING AS REQUIRED PER JOIST SUPPLIER AND S.J.I. SEE DETAIL 11/S003 FOR
TYPICAL BRIDGING ATTACHMENT.
NOTE 7: 8" CONCRETE MASONRY UNIT BOND BEAM LINTEL. SEE MASONRY LINTEL SCHEDULE
AND MASONRY BOND BEAM LINTEL SECTIONS (SEE ARCHITECTURAL FOR SIZE AND LOCATIONS
OF MASONRY OPENINGS).
NOTE 8: 8" CONCRETE MASONRY UNIT WITH #5 BARS AT 24" CENTERS VERTICALLY IN SOLID
GROUTED CELLS. SEE MASONRY GENERAL NOTES FOR ADDITIONAL INFORMATION AND
REQUIREMENTS (TYP.).
NOTE 9: 8" CONCRETE MASONRY UNIT BOND BEAM WITH 2-#5 BARS CONTINUOUS. PROVIDE
CONTINUOUS CORNER REINFORCEMENT. MULTIPLE BOND BEAMS MAY BE REQUIRED FOR
MASONRY WALL ANCHORAGE AT ROOF STRUCTURE. COORDINATE WITH ROOF STRUCTURE
ELEVATIONS AND STRUCTURAL DETAILS.
NOTE 10: WIDE FLANGE STEEL SECTION SEE PLAN AND/OR SCHEDULES FOR SIZES. PROVIDE
STANDARD A.I.S.C. CONNECTIONS OR AS REQUIRED FOR DETAILS SHOWN.
NOTE 11: 5 1/2" LIGHT-WEIGHT CONCRETE SLAB (f'c = 4,000 PSI) ON 2" COMPOSITE FORM DECK, 20 GAGE, G-60 GALVANIZED WITH 4x4 W2.9xW2.9 WELDED WIRE FABRIC. SEE PLANS FOR TOP
OF SLAB ELEVATION. REFER TO TYPICAL DETAILS FOR DECK ATTACHMENT. ENDS TO BE
LAPPED.
NOTE 12: 10" CONCRETE MASONRY UNIT BOND BEAM LINTEL. SEE MASONRY LINTEL
SCHEDULE AND MASONRY BOND BEAM LINTEL SECTIONS (SEE ARCHITECTURAL FOR SIZE AND
LOCATIONS OF MASONRY OPENINGS).
NOTE 13: 10" CONCRETE MASONRY UNIT WITH #6 BARS AT 8" CENTERS VERTICALLY IN SOLID
GROUTED CELLS. SEE MASONRY GENERAL NOTES FOR ADDITIONAL INFORMATION AND
REQUIREMENTS (TYP.).
NOTE 14: 10" CONCRETE MASONRY UNIT BOND BEAM WITH 2-#6 BARS CONTINUOUS. PROVIDE
CONTINUOUS CORNER REINFORCEMENT. MULTIPLE BOND BEAMS MAY BE REQUIRED FOR
MASONRY WALL ANCHORAGE AT ROOF STRUCTURE. COORDINATE WITH ROOF STRUCTURE
ELEVATIONS AND STRUCTURAL DETAILS.
NOTE 15: GIRTS, SIDING, AND LINER PANEL BY PEMB MANUFACTURER.
NOTE 16: PEMB FRAMES BY PEMB MANUFACTURER
KEYED NOTES #
KEYNOTE SYMBOL WITH
NOTE NUMBER
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :3
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
STRUCTURAL
GENERAL NOTES
S001
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
STRUCTURAL GENERAL NOTES
'D
6" COMPACTED DRAINAGE COURSE
DOWELS TO BE SECURED TO MAINTAIN
POSITION AND ALIGNMENT DURING THE
CONCRETE PLACEMENT
SLAB NOTES:
1. CONSTRUCTION JOINTS SHALL BE PLACED SO SLAB POURS DO NOT EXCEED 2,500 SQ.
FT. CONTRACTOR SHALL SUBMIT SLAB POURING SEQUENCE AND JOINT PATTERN TO THE
ENGINEER FOR APPROVAL.
2. CONSTRUCTION AND CONTRACTION JOINTS PARALLEL WITH THICKENED SLABS
SHOULD OCCUR OUTSIDE THE LIMITS OF THE THICKENED SLAB.
VAPOR RETARDER
'D '/2
COMPACTED SUBGRADE
1" M
IN
9" 9"
1' - 6"
1 1/4" DIAMETER x 1'-6" LONG
SMOOTH DOWELS AT 1'-0"
CENTERS (GREASED)
SAW CUT FILLED WITH
SEMI-RIGID SEALANT.
'D
6" COMPACTED DRAINAGE COURSE
DOWELS TO BE SECURED TO MAINTAIN
POSITION AND ALIGNMENT DURING THE
CONCRETE PLACEMENT
SLAB NOTES:
1. CONSTRUCTION JOINTS OR CONTROL JOINTS SHALL BE PLACED SO SLAB AREAS DO
NOT EXCEED 400 SQ. FT. CONTRACTOR SHALL SUBMIT SLAB POURING SEQUENCE AND
JOINT PATTERN TO THE ENGINEER FOR APPROVAL.
2. CONTROL JOINTS TO BE SAWED. FILL ALL JOINTS WITH SEMI-RIGID JOINT SEALANT.
SAWING TO BE COMPLETED WITHIN THE FIRST 12 HOURS.
3. CONSTRUCTION AND CONTRACTION JOINTS PARALLEL WITH THICKENED SLABS
SHOULD OCCUR OUTSIDE THE LIMITS OF THE THICKENED SLAB.
VAPOR RETARDER
'D '/2
COMPACTED SUBGRADE
'D '/4
1' - 6"
1 1/4" DIAMETER x 1'-6" LONG
SMOOTH DOWELS AT 1'-0"
CENTERS (GREASED)
SAW CUT FILLED WITH
SEMI-RIGID SEALANT.
9" 9"
HORIZONTAL
REINFORCEMENT WITH STD.
90 DEG. HOOK
VERTICAL
REINFORCEMENT
SEE PLAN
S E
E P
LA
N
CORNER BARS TO MATCH SIZE AND
SPACING OF HORIZONTAL
REINFORCEMENT
HORIZONTAL REINFORCEMENT
WITH STD. 90 DEG. HOOK
VERTICAL
REINFORCEMENT
S E
E P
LA
N
DOWELS WITH STD. 90 DEG. HOOKS
TO MATCH SIZE AND SPACING OF
HORIZONTAL REINFORCEMENT
SEE PLAN
HORIZONTAL REINFORCEMENT
WITH STD. 90 DEG. HOOK
VERTICAL
REINFORCEMENT
SEE PLAN
S E
E P
LA
N
CORNER BARS TO MATCH SIZE AND
SPACING OF HORIZONTAL
REINFORCEMENT
DOWELS WITH STD. 90 DEG. HOOKS
TO MATCH SIZE AND SPACING OF
HORIZONTAL REINFORCEMENT
HORIZONTAL
REINFORCEMENT
VERTICAL
REINFORCEMENT
DOWELS WITH STD. 90 DEG.
HOOKS TO MATCH SIZE AND
SPACING OF HORIZONTAL
REINFORCEMENT
SEE PLAN
S E
E P
LA
N
1-#5 BAR CENTERED IN
SLAB (TYPICAL)
2'- 0"
M
IN
OR LA
RGER
OPENIN
G 4"
(T
YP.)3"
C L.
(T
YP.)
CENTERLINE SPAN
NOTE: CONSTRUCTION JOINTS SHALL BE THOROUGHLY CLEANED
AND ALL LAITANCE REMOVED. IMMEDIATELY BEFORE NEW
CONCRETE IS PLACED THE JOINT SHALL BE WETTED AND COATED
WITH NEAT CEMENT GROUT.
1st POUR 2nd POUR
6" 1'
6"
2' - 0"2' - 0"
1 1/2"
E A
C H
F A
C E
A D
D
IT
IO
N
A L
#5
"D
HOOK TYPICAL WALL REINFORCEMENT
90° AT ALL DISCONTINUOUS ENDS
1-#5 BAR
EACH FACE
(TYPICAL)
OPENINGS (TYP.)
6" OR LARGER
2'-7" (TYP.)
HOOK TYPICAL WALL REINFORCEMENT
90° AT ALL DISCONTINUOUS ENDS
2-#6 BARS
EACH FACE
(TYPICAL)
2-#6 BARS
EACH FACE
(TYPICAL)
2-#5 BAR x 4'-0" LONG
EACH FACE (TYPICAL)
OPENINGS
6" OR LARGER
3'-0" (TYP.)
FINISH FLOOR
SEE PLAN
NON-LOAD BEARING
MASONRY WALL. SEE
ARCH. FOR SIZE AND
LOCATIONS
#5 BARS (CONT.)
WITH MAXIMUM
SPACING @ 12"
O.C.
#4@24" VERT. (TYPICAL)
DOWELS TO MATCH SIZE AND SPACING
OF MASONRY WALL REINF. DRILL AND
EPOXY GROUT 6" MIN. INTO THICKENED
SLAB
LAP SPLICE 48 BAR
DIAMETERS (MIN.)
PROVIDE CONTROL / CONSTRUCTION
JOINTS OUTSIDE THE LIMITS OF
THICKENED SLAB
V A
R
IE
S
8" V
A R
IE
S
8" SEE PLAN 8"
VARIES
V A
R
IE
S
#4@48" HORIZ. (TYPICAL)
3/8"
3 SEE PLAN
NOTE: SEE FOUNDATION PLAN FOR WIDTH OF THICKENED SLAB UNDER MASONRY WALLS
FINISH FLOOR
SEE PLAN
4 33
4-#4 BARS (CONT.)
6"
6" 6"
6"
TRENCH DRAIN SEE
PLUMBING DRAWINGS
V A
R
IE
S
VAPOR RETARDER
COMPACTED DRAINAGE
COURSE
COMPACTED SUBGRADE
#4@18"
V A
R
IE
S
3'-0"
1'-4"
1'-9"
9"
NOTE: ALL STRUCTURAL
STEEL ASSEMBLY SHALL
BE HOT-DIP GALVANIZED.
TOP OF CONCRETE
SEE PLAN
5"2" 2" 1/2" DIAMETER x 4" LONG HEADED STUD
ANCHORS AT 2'-0" CENTERS. (MIN. 2 PER
ANGLE ) WITH 6" MAX. AT EACH END.
BOTTOM OF TRENCH
EL. VARIES
6" M
A X
ANGLE 2x1 1/4x1/4 x CONT.
1" x 1/4", 15-W-4 HEAVY DUTY
STEEL GRATING
1/
4"
9"
2" 1
1'-0"
#3 @ 12" Z-BAR WITH
STD. LAP LENGTH
1" 4"
1"
6"
1" 4" 1"
6"
FENCE POST
BY OTHERS
(4) 1/2" DIA. CONCRETE
SCREW ANCHORS IN
STD. HOLES WITH 3"
EMBEDMENT
PLATE 3/8"x6"x6"
NOTE: FENCE POST TO ATTACH TO 6" OR 8"
S.O.G. REFER TO ARCHITECT FOR LOCATION.
1/4
TYP.
NOTE:
1. COORDINATE OPENING SIZE WITH MECH.
AND ARCH.
2. PROVIDE FRAMING FOR OPENINGS SHOWN
ON PLANS AND AT ROOF DRAIN LOCATIONS.
SEE PLAN - 5'-0" MAX.
ANGLE 2 1/2 x 2 1/2 x 1/4 (TYP.)
ANGLE 2 1/2 x 2 1/2 x 1/4 x 4" LONG (TYP.)
1/ 4" 3/16
3/16
TYP.
3/16
3/16
TYP
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :3
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
STRUCTURAL
TYPICAL DETAILS
S002
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
1" = 1'-0"1
SLAB CONSTRUCTION JOINT ON GRADE
1" = 1'-0"2
SLAB CONTROL JOINT ON GRADE
3/4" = 1'-0"3
TYPICAL 1 LAYER REINF. CORNER WITH DOWELS
3/4" = 1'-0"4
TYPICAL 1 LAYER REINF. INTERSECTION WITH
DOWELS
3/4" = 1'-0"5
TYPICAL 2 LAYER REINF. CORNER WITH DOWELS
3/4" = 1'-0"6
TYPICAL 2 LAYER REINF. INTERSECTION WITH
DOWELS
1" = 1'-0"7
TYPICAL FLOOR SLAB OPENING REINF. CIRCULAR
3/4" = 1'-0"8
TYPICAL GRADE BEAM CONSTRUCTION JOINT
1" = 1'-0"9
TYPICAL WALL OPENING REINF. CIRCULAR
1" = 1'-0"10
TYPICAL WALL OPENING REINF. RECTANGULAR
3/4" = 1'-0"11
TYPICAL THICKENED SLAB AT MASONRY
3/4" = 1'-0"12
TRENCH DRAIN SECTION
1 1/2" = 1'-0"13
TRENCH DRAIN DETAIL
1 1/2" = 1'-0"14
TYPICAL 2" DEPRESSED SLAB
3" = 1'-0"15
TYPICAL CHAINLINK FENCE POST ATTACHMENT
1" = 1'-0"16
TYPICAL ROOF DECK SUPPORT 5'-0" OR LESS
PROVIDE CORNER BARS WITH MIN. LAP
SPLICE AT ALL OUTSIDE HORIZONTAL
BOND BEAM REINFORCEMENT
PROVIDE STANDARD 90 HOOKS
ON ALL INSIDE HORIZONTAL
BOND BEAM REINFORCEMENT.
CONCRETE MASONRY UNIT BOND
BEAM. SEE PLANS AND SECTIONS
FOR SIZE AND LOCATIONS
VERTICAL MASONRY
WALL REINF.
VERTICAL
REINFORCEMENT
GROUT SOLID (TYP.)
8"
N O
M
IN
A L)
AT VERTICAL REINFORCEMENT
REMOVE BOTTOM AND EXTEND
REINFORCEMENT (TYP.)
1" C
L.
NOMINAL C.M.U.
6", 8", 10", OR 12"
SEE SCHEDULE
NOTE:
PROVIDE BOND BEAM AT TOP OF WALLS, AT CONNECTIONS TO BEAMS
AND AS SHOWN ON THE DETAILS.
8" (NOMINAL) BOND BEAM
VERTICAL
REINFORCEMENT
GROUT SOLID (TYP.)
(N O
M
IN
A L)
AT VERTICAL REINFORCEMENT
REMOVE BOTTOM AND EXTEND
REINFORCEMENT (TYP.)
1" C
L.
NOMINAL C.M.U.
6", 8", 10", OR 12"
SEE SCHEDULE
NOTE:
PROVIDE BOND BEAM AT TOP OF WALLS, AT CONNECTIONS TO BEAMS
AND AS SHOWN ON THE DETAILS.
16" (NOMINAL) BOND BEAM
VERTICAL REINFORCING BAR
CONT. LAP SPLICE ALL BARS
50 BAR DIAMETERS (MIN.)
VERTICAL
REINFORCEMENT
CUT WEBS (TYP.)
G R
O U
T S
O
LI
D
1'
(M
IN
1/2" CL.
(T Y
P
1/
2"
HORIZONTAL BOND BEAM
REINFORCING BAR CONT. LAP
SPLICE ALL BARS 50 BAR
DIAMETERS (MIN.)
CONTROL JOINT - RAKE OUT AND
CAULK
3/16" x 1 1/4" x 1'-4" STRAP ANCHORS
WITH 3" RIGHT ANGLE BENDS AT
EACH END, AT 4'-0" CENTERS (MAX.)
VERTICAL
EMBED BENT PLATE IN
CORES FILLED WITH
GROUT
CONTROL JOINT - RAKE OUT AND
CAULK
JOINT REINFORCEMENT AT
1'-4" CENTERS (MAX.)
VERTICAL
NON-LOAD BEARING CMU
WALL SEE ARCH. FOR SIZE
AND LOCATION
VERTICAL REINFORCING BAR
CONT. LAP SPLICE ALL BARS
50 BAR DIAMETERS (MIN.)
EL. SEE ARCH.
TYPICAL VERTICAL WALL
REINFORCEMENT WITH STD. 90
HOOK INTO BOTTOM OF BOND
BEAM LINTEL.
30" MIN.
2-#5 BARS FULL HEIGHT OF WALL. EXTEND 2'-0"
MIN. INTO FOUNDATION. BELOW. TYPICAL AT
ALL LINTELS. LAP AS REQUIRED WITH 2'-7" MIN.
LAP SPLICE.
BOND BEAM
LINTEL REINF.
30" MIN.
2-#5 BARS IN BOND BEAM AT
SILL (TYPICAL ALL OPENINGS)
LI
N
T E
L D
E P
T H
GROUT BEARING SOLID TO
FOUNDATION (TYPICAL)
MASONRY
OPENING
GROUT
DEPTH
8"0'-8" TO 3'-5"
MASONRY LINTEL SCHEDULE
NOTES:
1. SCHEDULE APPLIES TO LINTEL REINFORCING NOT SPECIFIED ELSEWHERE.
2. EXTEND HORIZONTAL REINFORCING A MINIMUM OF 30" BEYOND OPENING, WHERE ANCHORAGE DISTANCE IS
RESTRICTED, TERMINATE WITH STANDARD 90 DEGREE HOOK.
3. ALL MASONRY CONTROL JOINTS (MCJ) SHALL OCCUR A MIN. OF 30" BEYOND OPENING.
16"3'-6" TO 6'-4"
16"6'-5" TO 9'-0"
WALL
TYPE
8" CMU
8" CMU
8" CMU
HORIZONTAL
REINFORCEMENT
2-#5 BARS BOTTOM
2-#5 BARS BOTTOM
2-#6 BARS BOTTOM
VERTICAL
REINFORCEMENT
REFERENCE
DETAIL
2/S003
3/S003
3/S003
8"0'-8" TO 3'-5"
16"3'-6" TO 6'-4"
16"6'-5" TO 9'-0"
10" CMU
10" CMU
10" CMU
2-#5 BARS BOTTOM
2-#5 BARS BOTTOM
2-#6 BARS BOTTOM
--- 2/S003
3/S003
3/S003
GROUT
SOLID
#9 GAGE GALVANIZED
REBAR POSITIONER AT
4'-0" MAX. SPACING
REINFORCING BAR FULL
HEIGHT. LAP SPLICE ALL
BARS 50 BAR DIAMETERS
(MIN.)
*DIMENSIONS ARE NOMINAL
*3
*2
/2
*8
C M
U
*6
*3
*3
*4
*2
/2
*3
*3
*1 0"
C M
U
*1 2"
C M
U
NOTE: BRACE NOT REQUIRED IF WALL
HEIGHT IS LESS THAN 12 FEET.
ROOF PURLIN
10 GAUGE BENT PLATE, REFER
TO MASONRY NOTE M-15
INTERIOR MASONRY WALL
SEE ARCH. FOR SIZE AND
LOCATIONS
CONTINUOUS MASONRY BOND
BEAM
VERTICAL MASONRY WALL
REINFORCEMENT
MISC. STEEL LINTEL SCHEDULE FOR
NON-STRUCTURAL WALLS
WALL
THICKNESS
OPENING WIDTH
SHAPE
4" 1 ANGLE 3 1/2x3 1/2x5/16
0'-0" TO 6'-0"
1 ANGLE 6x3 1/2x5/16
6'-1" TO 8'-0"
6" 2 ANGLE 3 1/2x2 1/2x5/16 1 ANGLE 5x3x5/16
1 ANGLE 3 1/2x3 1/2x5/16
8" 2 ANGLES 3 1/2x3 1/2x5/16 2 ANGLES 6x3 1/2x5/16
10" 2 ANGLES 4x4x5/16 2 ANGLES 6x4x5/16
12" 3 ANGLES 3 1/2x3 1/2x5/16 3 ANGLES 6x3 1/2x5/16
INTERMEDIATE SIDE LAP ATTACH
WITH HILTI S-SLC 01 M HWH SIDE
LAP CONNECTOR OR APPROVED
EQUIVALENT, PROVIDE 3 PER SPAN
AT EDGE OF DECK AT SUPPORT PROVIDE HILTI X-HSN-24
OR APPROVED EQUIVALENT AT 12" CENTERS
1 1/2" WIDE RIB METAL DECK 20
GAGE (G90 GALVANIZED)
3' - 0" COVER
36 / 4 FASTENER LAYOUT WITH HILTI X-
HSN-24 OR APPROVED EQUIVALENT AT
EACH SUPPORTING MEMBER
NOTE: EQUIPMENT BASE AND HOUSEKEEPING PADS TO BE
FURNISHED AND INSTALLED BY RESPECTIVE CONTRACTORS
INSTALLING EQUIPMENT. SEE MECHANICAL & ELECTRICAL
DRAWINGS FOR EQUIPMENT BASE / HOUSEKEEPING PAD SIZES,
THICKNESSES AND LOCATIONS.
#3 DOWELS ON 18" GRID.
EPOXY ANCHOR WITH 3"
EMBEDMENT
SLAB-ON-GRADE
2"
ANCHORAGE BY EQUIPMENT MFR.
EMBED INTO SUPPORTING SLAB
AS REQUIRED PER MIN. EMBEDMENT
SPECIFIED BY SUPPLIER
LAP LENGTH
1'-8" MIN.
3/4" CHAMFER (TYP.)
4"
T Y
P
FINISH FLOOR
SEE PLAN
#4@12" (CENTERED)
#4@12" (CENTERED)
HORIZONTAL
BRIDGING (TYP.)
FIELD WELD BRIDGING TO
STEEL ANGLES (TYP.)
FIELD WELD BRIDGING TO
STEEL ANGLES (TYP.)
1-1/2" DIAMETER
SLEEVE ANCHOR
GROUT SOLID (TYP.)
SEE PLAN
SEE PLAN
VARIES
1/4 4
INFILL WITH
MASONRY AFTER
BEAM PLACEMENT
BEARING PLATE 3/4"x6"x1'-4" U.N.O. WITH
2-1/2" DIAMETER ANCHOR BOLTS IN SHORT
SLOTTED HOLES (8" MIN. EMBEDMENT)
MOTOR BED (TYP.)
2-#5 BARS
OUTSIDE FACE
SEE ARCH.
SEE PLAN
5/8" PUDDLE WELDS
AT 12" CENTERS
SEE PLAN
#4@12"
3'-0''
SEE PLAN
SEE PLAN
3' -0
INTERMEDIATE SIDE LAP
ATTACH WITH 5/8"
PUDDLE WELDS OR
3/8"X1 1/4" ARC SEAM
WELDS
AT EDGE OF DECK AT SUPPORT. PROVIDE
5/8" DIAMETER PUDDLE WELDS AT 12"
CENTERS
2" COMPOSITE METAL
FORM DECK
36/4 FASTENER LAYOUT WITH
HILTI X-ENP-19-L15 FASTENERS
AT EACH SUPPORTING MEMBER
3' - 0" COVER
SEE PLAN
5/8" PUDDLE
WELDS AT 12"
CENTERS 11
7 5/8"SEE PLAN SEE PLAN
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :3
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
STRUCTURAL
TYPICAL DETAILS
S003
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
1 1/2" = 1'-0"1
MASONRY BOND BEAM CORNER
1 1/2" = 1'-0"2
MASONRY BOND BEAM SECTION 8" DEEP
1 1/2" = 1'-0"3
MASONRY BOND BEAM SECTION 16" DEEP
1 1/2" = 1'-0"4
MASONRY HORIZONTAL BAR PLACEMENT
1 1/2" = 1'-0"5
MASONRY INTERSECTION - LOAD BEARING
1 1/2" = 1'-0"6
MASONRY INTERSECTION - NON-LOAD BEARING
1" = 1'-0"7
MASONRY LINTEL BEARING
1 1/2" = 1'-0"8
MASONRY VERTICAL BAR PLACEMENT
1 1/2" = 1'-0"10
MASONRY WALL SUPPORT
1" = 1'-0"15
TYPICAL 1 1/2" ROOF DECK ATTACHMENT
1 1/2" = 1'-0"9
TYPICAL HOUSEKEEPING PAD
1 1/2" = 1'-0"11
TYPICAL JOIST BRIDGING ATTACHMENT MASONRY
1 1/2" = 1'-0"12
MASONRY BEAM BEARING
1 1/2" = 1'-0"13
MASONRY WALL DECK BEARING
1" = 1'-0"16
TYPICAL 2" FLOOR DECK ATTACHMENT
1 1/2" = 1'-0"14
MASONRY WALL DECK BEARING ROOF
A
B
1 2 3 4
C
D
E
F
G
H
I
K
S510
J
S501
S501
S301
S301
S301
S301
S301
SIM.
S301
S301
SIM.
S501
1 ________ S501
S501
S301
HP2
HP2
HP1
HP1 (T)
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1 (T)
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
22'-8" 26'-0" 22'-8"
71'-4"
'-8
110'-8"
'-4
S301
SIM.
S301
SIM.
M
A T
C H
L
IN
E
S E
E P
L A
N V
IE
W
S
'-0
'-0
'-8
'-0
'-4
0'
-0
LOADING DOCK RAMP,
SEE CIVIL
S502
S501
S301
S501
S501
HSS6x 6x
3/
HSS6x 6x
3/
8'-6"
3'-0"
S002
SIM.
S502
9' -4
/8
'-8
12'-8"
HP3
J.3
3' -7
S401
4.84.7
S501
BASE BID STARTS AT COLUMN
B. ALL OF THE ITEMS SHOWN
BETWEEN GRID A AND B SHALL
MOVE SOUTH
S E
E S
H E
E T
G
O P
T
IO
N N
O .1
(I N
C
LU
D E
S T
H E
W H
O
LE
B U
IL
D
IN
G
W
ID
T H
S E
E S
H E
E T
G
O P
T
IO
N N
O . 1
(I N
C
LU
D E
S T
H E
W H
O
LE
B U
IL
D
IN
G
W
ID
T H
BASE BID STARTS AT COLUMN
E. ALL OF THE ITEMS SHOWN
BETWEEN GRID E AND F SHALL
MOVE NORTH
8" FOUNDATION WALLS AND DEPRESSED
SLAB FOR DOCK LEVELER, SEE ARCH.
S502
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :3
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
FOUNDATION PLAN -
AREA 1
S101
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
N
1/8" = 1'-0"1
FOUNDATION PLAN - AREA 1
5 6 7 8
G
H
I
K
J
S501
S501
S301
S301
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
HP1
(T
HP1
HP1
HP1
HP1
HP1HP1
HP1
HP1HP1
S501
26'-0" 25'-4" 26'-0"
77'-4"
'-4
'-8
'-0
'-8
'-0
S301
SIM.
M
A T
C H
L
IN
E
S E
E P
L A
N V
IE
W
S
S301
S501
S301 ________ 6
S301
SIM. SIM.
S301
S301
S301
SIM. SIM.
S301
SIM. SIM.
S301
1'-0" TYP.
S002
5'-0"
S002
SIM.
HP1
'-9
23'-4" 3/16"
5'-0"
5' -0
5'
-0
2' -4
S501
PROVIDE #5 DOWLES
INTO THICKENED SLAB
WITH 90 DEG HOOK
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :3
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
FOUNDATION PLAN -
AREA 2
S102
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
FOUNDATION PLAN - AREA 2 N
1 2 3 4
C
D
E
F
G
H
I
K
S510
J
S301
S301
S301
S301
S301
S301
22'-8" 26'-0" 22'-8"
71'-4"
110'-8"
'-4
'-4
S301
________ SIM.
S301
SIM.
S301
SIM.
S301
SIM.
M
A T
C H
L
IN
E
S E
E P
L A
N V
IE
W
S
S503
7'-0" 33'-0"
'-0
6'
-6
/6 4"
'-0
'-0
'-8
'-0
'-4
0'
-0
S502
HOUSE KEEPING PAD, REFER
TO MECHANICAL FOR SIZE
AND LOCATION
FRAME TIE BARS, TYP.
2" DEPRESSED SLAB FOR SHOWERS.
SEE DETAIL 14 ON SHEET S002.
REFER TO ARCHITECTURAL FOR SIZE
AND LOCATION
'-0
21'-0" +/-
'-8
8' -8
/4
'-0
/8
S003
SIM.
S003
________ SIM.
TOP OF 8" CMU WALLS 10'-0"
FROM FINISHED FLOOR
12'-8"
LOADING DOCK RAMP,
SEE CIVIL
TOP OF SLAB
EL. 576'-0"
TOP OF SLAB
EL. 576'-0"
S501
C.J.
C.J.
S401
J.3
4.84.7
AHU-1 FOUNDATION
CONCRETE ARMS VAULT FOUNDATION
BASE BID STARTS AT COLUMN
B. ALL OF THE ITEMS SHOWN
BETWEEN GRID A AND B SHALL
MOVE SOUTH
S E
E S
H E
E T
G
O P
T
IO
N N
O .1
(I N
C
LU
D E
S T
H E
W H
O
LE
B U
IL
D
IN
G
W
ID
T H
S E
E S
H E
E T
G
O P
T
IO
N N
O .1
(I N
C
LU
D E
S T
H E
W H
O
LE
B U
IL
D
IN
G
W
ID
T H
BASE BID STARTS AT COLUMN
E. ALL OF THE ITEMS SHOWN
BETWEEN GRID E AND F SHALL
MOVE NORTH
8" FOUNDATION WALLS AND DEPRESSED
SLAB FOR DOCK LEVELER, SEE ARCH.
S502
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :3
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
FIRST FLOOR PLAN -
AREA 1
S103
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
FIRST FLOOR PLAN - AREA 1 N
5 6 7 8
G
H
I
K
J
S301
S301
26'-0" 25'-4" 26'-0"
77'-4"
'-4
'-8
'-0
'-8
'-0
'-4
S301
SIM.
M
A T
C H
L
IN
E
S E
E P
L A
N V
IE
W
S
S301
S301
S301
S301
SIM. SIM.
SLAB TIE BARS, TYP.
TRENCH DRAIN, TYP.
S301
S003
TOP OF 10" CMU WALLS
TO UNDERSIDE OF ROOF
DECK. ATTACHMENT PER
10/S003.
TOP OF 8" CMU
WALLS 10'-8 AFF
TOP OF 8" CMU
WALL 10'-8" AFF
COORDINATE EMBEDDED RAIL AND LIMITS
OF EXTERIOR CONCRETE SLAB WITH
ARCHITECTURAL AND CIVIL DRAWINGS
'-0
S502
TOP OF SLAB
EL. 576'-0"
J.3
S401
C.J.
C.J.
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :3
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
FIRST FLOOR PLAN -
AREA 2
S104
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
FIRST FLOOR PLAN - AREA 2 N
1 2 3 4
C
D
E
F
G
H
I
K
S510
J
S301
L H
/1
J
S301
S301
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
L H
/1
J
2'-10" 21 SPACES @ 5'-0" = 105'-0" 2'-10"
22'-8" 26'-0" 22'-8"
71'-4"
0'
-0
'-0
'-0
'-8
'-0
'-4
'-8
110'-8"
'-4
M
A T
C H
L
IN
E
S E
E P
L A
N V
IE
W
S
GV-1 ROOF OPENING, REFER TO MECH.
FOR SIZE AND LOCATION. ADDITIONAL
SUPPORT FRAMING PER 16/S002
J.3
EDGE OF CANOPY
ROOF DECK
S401
4.84.7
DECK / JOIST
RIDGE
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :3
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
ADMIN ROOF PLAN -
AREA 1
S105
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
ADMIN ROOF PLAN N
G
H
I
K
J
S301
S301
W24X117 & MC18x42.7
BRIDGE CRANE SUPPORT
BEAM
W24X117 & MC18x42.7
BRIDGE CRANE SUPPORT
BEAM
WIND COLUMN ONLY, NO AXIAL LOADS
APPLIED FROM PEMB FRAMES
WIND COLUMN ONLY, NO AXIAL
LOADS APPLIED FROM PEMB FRAMES
26'-0" 25'-4" 26'-0"
77'-4"
'-3
3/
'-4
'-8
'-0
'-8
'-0
'-4
/6
4"
M
A T
C H
L
IN
E
S E
E P
L A
N V
IE
W
S
S301
S301
CRANE HOOK SERVICE AREA
S301
J.3
S106
'-0
M
A X
MAX.
3'-0"
PROVIDE ENDSTOP ON
CRANE RUNWAY BEAM, TYP.
W24x117 CENTERED IN
WORK BAY WITH FALL
PROTECTION TRACK SYSTEM
FALL PROTECTION TRACK
SYSTEM WITH (4) TROLLEYS
W24X117 BETWEEN PEMB FRAMES
SHEAR CONNECTION
TO PEMB WEB
SET BOTTOM OF SUPPORT BEAM
FOR TRACK TO CLEAR BOTTOM OF
PEMB FRAME
CONNECTION TO SUPPORT BEAM
BY FALL PROTECTION SYSTEM
PEMB FRAME
S106
FALL PROTECTION TRACK
SYSTEM WITH (4) TROLLEYS
PEMB FRAME
W24X117 BETWEEN
PEMB FRAMES
1/2"xREQ'D PLATE
1/4 12 MIN
1/4
SET BOTTOM OF SUPPORT BEAM
FOR TRACK TO CLEAR BOTTOM OF
PEMB FRAME
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :3
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
CRANE PLAN - AREA
S106
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
1/8" = 1'-0"1
CRANE PLAN N
1 1/2" = 1'-0"2
FALL PROTECTION DETAIL
1 1/2" = 1'-0"3
FALL PROTECTION ELEVATION
C
D
E
F
G
H
I
K
J
S301
S301
S301
S301
WIND COLUMN ONLY, NO AXIAL
LOADS APPLIED FROM PEMB FRAMES
WIND COLUMN ONLY, NO AXIAL
LOADS APPLIED FROM PEMB FRAMES
INSULATED METAL
ROOF PANELS BY
PEMB MANUFACTURER
PEMB FRAME w/ PINNED BASES
ROOF PURLINS BY PEMB
MANUFACTURER
PEMB FRAME w/ PINNED BASES
PEMB FRAME w/ PINNED BASES
PEMB FRAME w/ PINNED BASES
INSULATED METAL
ROOF PANELS BY
PEMB MANUFACTURER
PEMB FRAME w/ PINNED BASES
PEMB FRAME w/ PINNED BASES
22'-8" 26'-0" 22'-8"
71'-4"
0'
-0
'-0
'-0
'-8
'-0
'-4
110'-8"
PROPOSED BRACING BAY LOCATIONS
X -B
R A
C E
D B
A Y
X -B
R A
C E
D B
A Y
X -B
R A
C E
D B
A Y
M
A T
C H
L
IN
E
S E
E P
L A
N V
IE
W
S
J.3
4.84.7
BASE BID STARTS AT COLUMN B. ALL
OF THE ITEMS SHOWN BETWEEN GRID
A AND B SHALL MOVE SOUTH
S E
E S
H E
E T
G
O P
T
IO
N N
O .1
(I N
C
LU
D E
S T
H E
W H
O
LE
B U
IL
D
IN
G
W
ID
T H
S E
E S
H E
E T
G
O P
T
IO
N N
O .1
(I N
C
LU
D E
S T
H E
W H
O
LE
B U
IL
D
IN
G
W
ID
T H
BASE BID STARTS AT COLUMN
E. ALL OF THE ITEMS SHOWN
BETWEEN GRID E AND F SHALL
MOVE NORTH
CANOPY BY PEMB
MANUFACTURER
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :4
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
HIGH ROOF PLAN -
AREA 1
S107
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
HIGH PEMB ROOF - AREA 1 N
G
H
I
K
J
S301
S301
WIND COLUMN ONLY, NO AXIAL LOADS
APPLIED FROM PEMB FRAMES
WIND COLUMN ONLY, NO AXIAL LOADS
APPLIED FROM PEMB FRAMES
PEMB FRAME w/ PINNED BASES
PEMB FRAME w/ PINNED BASES
PEMB FRAME w/ PINNED BASES
INSULATED METAL
ROOF PANELS BY
PEMB MANUFACTURER
INSULATED METAL
ROOF PANELS BY
PEMB MANUFACTURER
ROOF PURLINS BY PEMB
MANUFACTURER
PEMB FRAME w/ PINNED BASES
PEMB FRAME w/ PINNED BASES
26'-0" 25'-4" 26'-0"
77'-4"
'-4
'-8
'-0
'-8
'-0
PROPOSED BRACING BAY LOCATIONS
X -B
R A
C E
D B
A Y
X -B
R A
C E
D B
A Y
M
A T
C H
L
IN
E
S E
E P
L A
N V
IE
W
S
S301
S301
S301
J.3
S003
PROVIDE PURLINS ON EACH
SIDE OF MASONRY WALL FOR
LATERAL WALL SUPPORT
S510
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :4
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
HIGH ROOF PLAN -
AREA 2
S108
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
HIGH PEMB ROOF - AREA 2 N
FIRST FLOOR PLAN
EL 100'-0"
ADMIN ROOF PLAN
EL 112'-8"
S501
S510
FIRST FLOOR PLAN
EL 100'-0"
ADMIN ROOF PLAN
EL 112'-8"
LOW PEMB ROOF
EL 120'-6"
TOP OF RAIL
EL 118'-0"
S501
FIRST FLOOR PLAN
EL 100'-0"
ADMIN ROOF PLAN
EL 112'-8"
LOW PEMB ROOF
EL 120'-6"
TOP OF RAIL
EL 118'-0"
S501
FIRST FLOOR PLAN
EL 100'-0"
ADMIN ROOF PLAN
EL 112'-8"
LOW PEMB ROOF
EL 120'-6"
TOP OF RAIL
EL 118'-0"
S510
S501
FIRST FLOOR PLAN
EL 100'-0"
F
ADMIN ROOF PLAN
EL 112'-8"
LOW PEMB ROOF
EL 120'-6"
TOP OF RAIL
EL 118'-0"
S501
FIRST FLOOR PLAN
EL 100'-0"
ADMIN ROOF PLAN
EL 112'-8"
LOW PEMB ROOF
EL 120'-6"
HIGH PEMB ROOF
EL 125'-8"
G
TOP OF RAIL
EL 118'-0"
S501
S002
FIRST FLOOR PLAN
EL 100'-0"
ADMIN ROOF PLAN
EL 112'-8"
LOW PEMB ROOF
EL 120'-6"
HIGH PEMB ROOF
EL 125'-8"
G
TOP OF RAIL
EL 118'-0"
S501
FIRST FLOOR PLAN
EL 100'-0"
ADMIN ROOF PLAN
EL 112'-8"
LOW PEMB ROOF
EL 120'-6"
HIGH PEMB ROOF
EL 125'-8"
TOP OF RAIL
EL 118'-0"
S501
FIRST FLOOR PLAN
EL 100'-0"
ADMIN ROOF PLAN
EL 112'-8"
LOW PEMB ROOF
EL 120'-6"
HIGH PEMB ROOF
EL 125'-8"
TOP OF RAIL
EL 118'-0"
S501
FIRST FLOOR PLAN
EL 100'-0"
ADMIN ROOF PLAN
EL 112'-8"
LOW PEMB ROOF
EL 120'-6"
HIGH PEMB ROOF
EL 125'-8"
TOP OF RAIL
EL 118'-0"
S003
S501
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :4
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
WALL SECTIONS
S301
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
1/4" = 1'-0"5
WALL SECTION 01
1/4" = 1'-0"1
WAREHOUSE WALL SECTION 01
1/4" = 1'-0"2
WAREHOUSE WALL SECTION 02
1/4" = 1'-0"3
WAREHOUSE WALL SECTION 03
1/4" = 1'-0"4
WAREHOUSE WALL SECTION 04
1/4" = 1'-0"7
SHOP WALL SECTION 02
1/4" = 1'-0"6
SHOP WALL SECTION 01
1/4" = 1'-0"8
SHOP WALL SECTION 03
1/4" = 1'-0"9
SHOP WALL SECTION 04
1/4" = 1'-0"10
SHOP WALL SECTION 05
J
J.3
4.84.7
8'-6"
4'-3" 4'-3"
3' -7
4"
S401 ________ 4
S401
H S S 6X
6X 3/
H S S 6X
6X 3/
HP3
J
S401
J.3
4.84.7
S401
H S
S X
X
/1
H S
S X
X
/1
L3X3X1/4
HSS4X4X1/4
H S
S X
X
/4
H S
S X
X
/4
8'-6"
3' -7
5 5
S002
SIM.
(3) #8 BARS TOP AND (2) #8
BOTTOM BARS WITH STD. 90
DEG. HOOK INTO FAR FACE OF
GRADE BEAM BEYOND
3 - #4 SIDE BARS EACH FACE
WITH STD. 90 DEG. HOOK INTO
FAR FACE OF GRADE BEAM
BEYOND
#4 TIES @ 12" O.C.
TOP OF CONCRETE
STOOP SLAB
FINISHED FLOOR
EL. COORDINATE WITH CIVIL
BOT. GRADE BEAM
EL. 95'-6"
CENTERLINE HSS POST
1'-0" 1'-0"
2'-0"
S510
________ CONCRETE ENCASEMENT
AROUND POST
3' -6
1' -2
(3) #6 BARS TOP AND (2) #6
BOTTOM BARS WITH STD. 90
DEG. HOOK INTO FAR FACE OF
GRADE BEAM BEYOND
3 - #4 SIDE BARS EACH FACE
WITH STD. 90 DEG. HOOK INTO
FAR FACE OF GRADE BEAM
BEYOND
#4 TIES @ 12" O.C.
TOP OF CONCRETE
REFER TO CIVIL
FINISHED FLOOR
EL. 100'-0"
BOT. GRADE BEAM
EL. 95'-6"
CENTERLINE GRADE BEAM
1'-0" 1'-0"
2'-0"
(4) 3/4" DIA. x 6"
LONG SHEAR STUDS
HP PILE, REFER
TO SCHEDULE
6" CONCRETE STOOP WITH
4x4 - W2.9xW2.9
#4 DOWEL, 2'-6"x2'-6" SPACED AT 12"
O.C. AROUND PERIMETER OF STOOP
INTO GRADE BEAM
3' -6
1' -6
ADMIN ROOF PLAN
EL 112'-8"
S401
4.84.7
8'-6"
4'-3"4'-3"6 7/8" 6 7/8"
HSS4x4x1/4, COORDINATE
BOTTOM OF TUBE WITH
SOFFIT FRAMING
HSS3x3x3/16 POST WITH BASE PL1/2"x4"x4"
HSS4x4x1/4, BEYOND HSS4x4x1/4, BEYOND
TYPICAL SPLIT TUBE
CONNECTIONS
HSS3x3x3/16
RIDGE BEAMS
1/4
HSS POST, REFER TO PLANHSS POST, REFER TO PLAN
BENT PL 3/8"x4"xREQD., MITER
TOP OF POST TO MATCH BEND
TYP.
INFILL OF GABLE WITH COLD
FORMED METAL FRAMING,
REFER TO ARCH.
ADMIN ROOF PLAN
EL 112'-8"
JJ.3
S401
6 7/8" 3'-7"
S003
HSS4x4x1/4
(2) HSS3x3x3/16 RIDGE BEAMS
HSS3x3x3/16 POST WITH BASE PL1/2"x4"x4"
HSS4x4x1/4, COORDINATE BOTTOM OF
TUBE WITH SOFFIT ELEVATION
L3x3x1/4 RIDGE BEAM SUPPORT, ATTACH TO JOIST PER 16/S002
1/4
7 8
I
S301
TOP OF SLAB
EL. 587'-1 1/2" W
X
W X
W X
5'-8" 2 EQUAL SPACES 5'-8"
T .O
.S
'-8
T .O
.S
'-8
T .O
.S
'-8
S003
S510
S510
________ SIM.GUARDRAIL POSTS
ANCHORED TO TOP
SLAB, TYP.
'-8
1'-4" 24'-8"
8 3/8"
'-8
3'
-0
S ou th S ix th
S tr ee t
S pr in gf ie ld
, I L
7.
8.
w w w .h an so n-in c.
co m
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
P ro je c t
N o
E
U B
C
P o rt C li n to n
O
H
C am p P er ry th R
E D
H O
R S
E S qu ad ro n
C
B
A
D
C
B
A
54321
R E
D H
O R
S E
L o g is ti c s C o m p le x
S
IG
N E
D
.1
.2
E X
P
IR
E S
.3
.2
/1
/2
:2 :4
P
M
C U s e rs
\c a w le
\D o c u m e n ts
\R S
C
P R
H -L o g is ti c s C o m p le x V c a w le
.r v t
ENLARGED PLANS
S401
APRIL 13, 2022
13D0027055
AGD
JMC
RMF
B-3 SUBMISSION - BID SET
BN
1/2" = 1'-0"1
CANOPY FOUNDATION PLAN
1/2" = 1'-0"2
CANOPY ROOF PLAN
3/4" = 1'-0"3
FOUNDATION SECTION
3/4" = 1'-0"4
FOUNDATION SECTION
1" = 1'-0"5
CANOPY ELEVATION
1" = 1'-0"6
CANOPY SECTION
3/8" = 1'-0"7
ROOM 113 ROOF PLAN
2'
1' - 3" 1' - 3"
2' - 6"
(12)- #8 VERT.
BARS. STD. 90 DEG
HOOK TYP.
#4 TIES @ 6",
ALTERNATE CROSS
TIES
S501
HP PILE, REFER
TO SCHEDULE
FINISH FLOOR
EL. 100'-0"
#5 DOWEL BARS x 5'-4" LONG AT 24"
CENTERS WITH 2'-6" MIN. EMBEDMENT
INTO WALL FOOTING BELOW
6" FREE DRAINING COMPACTED
GRANULAR FILL
10"
#5 BARS @ 10" EACH WAY
CENTER IN WALL
BOT. GRADE BEAM
EL. 95'-6"
2'-6"1'-0"
3'-6"
1' -3
1'
-3
2' -6
10" 1'-8"
(12)- #9 VERT. BARS. STD.
90 DEG HOOK AT TOP
#4 TIES , 2@2", BALANCE
@ 6" ALTERNATE CROSS
TIES
(2) #6 CROSS TIE, THREADED INTO
COUPLERS SPANNING FULL
LENGTH OF SLAB
#6 U-BAR WITH THREADED COUPLERS
(FORMSAVER) AT FACE OF PEDESTAL
S501
PEMB FRAME BY PEMB MFR.
HP PILE, REFER
TO SCHEDULE
PILE
MARK
PILE
SIZE
HP12x73HP1
HP PILE SCHEDULE
HP PILE NOTES:
1. SERVICE CAPACITY EXCLUDES DOWNDRAG AND PILE SELF WEIGHT LOADING, REFERENCE
GEOTECHNICAL REPORT FOR ADDITIONAL CAPACITY REQUIRED FOR DOWNDRAG FORCES.
2. ALL PRODUCTION PILES SHALL BE DRIVEN TO ULTIMATE CAPACITY, ALL TEST PILES SHALL BE
DRIVEN TO 1.1*ULTIMATE CAPACITY.
3. ULTIMATE CAPACITY AS DETERMINED BY PILE DRIVING ANALYSIS >=
F.S. (PER GEOTECH REPORT) * (SERVICE CAPACITY + SEISMIC DOWNDRAG FORCE + SELF WEIGHT)
4. MINIMUM PILE TIP DEPTHS: REFER TO GEOTECHNICAL ENGINEERING REPORT AND TEST PILE
PROGRAM RESULTS FOR ESTIMATED PILE DEPTHS WITH RESPECT TO LOCATION.
5. HP'#'(T) = TEST PILE. CONTRACTOR SHALL INSTALL AND TEST 3 PILES. SEE PLAN FOR LOCATIONS.
TOP OF
PILE
EL. 97'-0"
SERVICE
CAPACITY
80 KIPS EL. 62'-0"
PILE CUTOFF
ELEV.
EL. 55'-0"
MINIMUM PILE
TIP ELEV.
HP12x73HP2 EL. 93'-0" 80 KIPS EL. 62'-0" EL. 55'-0"
HP8x36HP2 EL. 97'-0" 20 KIPS EL. 62'-0" EL. 55'-0"
3'-6"
4 2
FINISH FLOOR
EL. 100'-0"
EQ. 5" EQ.
1'-10" 1'-8"
4' -6
1'-0"
#6 U-BAR WITH THREADED COUPLERS
(FORMSAVER) AT FACE OF PEDESTAL
#4 TIES , 2@2", BALANCE
@ 6" ALTERNATE CROSS
TIES
1' -6
HP PILE, REFER
TO SCHEDULE
(4) 3/4" DIA. x 6"
LONG SHEAR STUDS
(2) #6 CROSS TIE, THREADED INTO COUPLERS
SPANNING FULL LENGTH OF SLAB
PEMB FRAME
(12)- #9 VERT. BARS. STD.
90 DEG HOOK AT TOP
2' -0
NOTE: ANCHOR BOLT SPACING TO BE CONFIRMED
WITH PEMB MANUFACTURER
SEE GRADE BEAM
DETAILS
#4 TIES @ 12" O.C.
6"
2 - #8 BARS TOP
AND BOTTOM
4 - #4 SIDE BARS EACH FACE
#4 TIES @ 12" O.C.
INTERIOR PANEL,
REFER TO ARCH.
EXTERIOR PANEL,
REFER TO ARCH.
1'-0"
3OR REFER TO PLAN
BOT. GRADE BEAM
EL. 95'-6"
6'-0"
1'-0"1'-0"
1' -3
1'
-3
2' -6
2'-0" 2'-0" # 4 TIES @ 2"
BALANCE @ 6"
HP PILE, REFER TO
SCHEDULE
(2) #6 CROSS TIES
@ 2" BALANCE AT 6"
(16) #8 VERT. BARS, STD.
90 DEG. HOOK AT TOP
FINISH FLOOR
EL. 100'-0"
INTERIOR PANEL,
REFER TO ARCH.
INTERIOR PANEL,
REFER TO ARCH.
2 - #8 BARS TOP
AND BOTTOM
4 - #4 SIDE BARS EACH FACE
#4 TIES @ 12" O.C.
#5 DOWEL x 5' 4" LONG WITH 2' 6 "
EMBEDMENT INTO WALL SPACING
TO MATCH MASONRY WALL REINF.
1'-0"
BOT. GRADE BEAM
EL. 95'-6"
FINISH FLOOR
EL. 100'-0"
INTERIOR PANEL,
REFER TO ARCH.EXTERIOR PANEL,
REFER TO ARCH.
#5 DOWEL BARS x 5'-4" LONG AT 24"
CENTERS WITH 2'-6" MIN. EMBEDMENT
INTO WALL FOOTING BELOW
10" 10" 10"
EXTERIOR GRADE
REFER TO CIVIL
6" FREE DRAINING COMPACTED
GRAN…
This is the start of the file's text. The full file is on GovTribe.