About this file

This document contains a checklist and instructions for bidders responding to a federal solicitation notice for construction services. The solicitation is for the Camp Perry Logistics Complex project with an estimated value between $5-10 million. The 179th Airlift Wing of the Ohio Army National Guard is the contracting office issuing this notice. The NAICS code is 236220 with a size standard of $39.5 million. The bid opening is scheduled for October 31, 2022 at 1:00pm EST. Interested contractors must register in SAM and access solicitation documents through the SAM.gov website. Questions should be submitted using the provided template and emailed to the point of contact, Gordon Strom, by the specified due date.

View the file

Other files for this federal contract opportunity

Other files attached to Camp Perry Logistics Complex, newest first.
File Type Posted
Abstract REV01_Complex.pdf PDF
Abstract_Complex.pdf PDF
Sign in sheet_Complex.pdf PDF
Request for Information (RFI) document_06.pdf PDF
W50S8R-22-B-0001 0008.pdf PDF
Request for Information (RFI) document_05.pdf PDF
W50S8R-22-B-0001 0007.pdf PDF
W50S8R-22-B-0001 0006.pdf PDF
Request for Information (RFI) document_04.pdf PDF
Request for Information (RFI) document_03.pdf PDF
W50S8R-22-B-0001 0005.pdf PDF
W50S8R-22-B-0001 0004.pdf PDF
Request for Information (RFI) document_02.pdf PDF
W50S8R-22-B-0001 0003.pdf PDF
RFI 01_Red Horse Site Plan.pdf PDF
RFI 01_Geotechnical Report.pdf PDF
RFI 01_Environmental Report.pdf PDF
Request for Information (RFI) document_01.pdf PDF
W50S8R-22-B-0001 0002.pdf PDF
sign in sheet.pdf PDF
Pre-Bid Conference minutes_Complex.pdf PDF
Pre-Bid Conference-slides.pptx PPTX presentation
W50S8R-22-B-0001 0001.pdf PDF
Attachment 01-I_Drawings.pdf PDF
Attachment 01-H_Drawings.pdf PDF
Attachment 01-D_Drawings.pdf PDF
Attachment 01-B_Drawings.pdf PDF
Attachment 03_Specifications Vol 02.pdf PDF
Attachment 02_Specifications Vol 01.pdf PDF
Attachment 01-G_Drawings.pdf PDF
Attachment 01-F_Drawings.pdf PDF
Attachment 01-E_Drawings.pdf PDF
Attachment 01-C_Drawings.pdf PDF
Attachment 01-A_Drawings.pdf PDF
Exhibit B_Checklist for Bid Bonds.pdf PDF
W50S8R-22-B-0001.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The following list should be used by bidders to avoid irregularities which have occurred in past bids.

1. Have amendments to the invitation been acknowledged on the bid form in the spaces provided? If not, acknowledgment must be made by separate letter or telegram prior to opening of bids.

2. Have prices been inserted for all bid items of the Bidding Schedule?

3. Do prices inserted include subcontractors' and suppliers' quotations, indirect costs, and profit?

4. Does the total bid amount include the costs of obtaining performance and payment bonds?

5. Have all prices and computations been checked?

6. Is the bid submitted on the latest bid schedule?

7. Have changes been made to the Bidding Schedule if required by amendment?

8. Are decimal points in the bid prices in the proper places?

9. Have you checked for transposition of figures in prices inserted on the Bidding Schedule?

10. Is the bid form signed, and if so, is the bid form signed by a person legally authorized to bind the bidder?

Is the bidder's address included?

11. If the bid is signed by an agent, is legal evidence of agent's authority to sign included with the bid?

12. Is the Bid Bond on STANDARD FORM 24 (rev. 1-90) or authorized form as directed in the BID GUARANTEE clause of this solicitation? If not, YOUR BID WILL BE CONSIDERED NONRESPONSIVE.

13. Is the Bid Bond completely and properly executed, dated not later than the bid opening date, signed by Principal and Surety, corporate certificates executed, and seals affixed, all as contained in "Instructions" on STANDARD FORM 24 BACK (REV 1-90)? Power of Attorney is also required to accompany the bonds. Is the penal sum marked in? If an individual surety (or sureties) is (are) guaranteeing the bid bond, have the requirements of the PLEDGES OF ASSETS clause of this solicitation been satisfied and are the supporting documents included with the bond? Copy of Bid Bond Checklist is provided, for contractor to use for quality assurance, prior to submitting bid bond.

14. Has the Plant and Equipment Schedule been completed and included? (if applicable)

15. When applicable, has the form entitled, "Work to be Performed with Contractor's Own Organization" been completed? Does the work or percentage listed meet the requirements of the invitation?

16. Have the appropriate boxes been checked in all paragraphs of the REPRESENTATIONS AND

CERTIFICATIONS?

17. Have all representations and certifications been submitted with the bid?

18. If required by the invitation, is literature, date, catalogs, etc., specified by the invitation included with the bid?

19. Have requirements of the LATE SUBMISSIONS, MODIFICATIONS AND WITHDRAWALS OF BIDS provision of this solicitation been met?

File details come from the government source that posted it. Updated .