This is a Qualifying Project (QP) Form template used for evaluating contractor experience and performance on prior projects under the MAPS IDIQ contract. The form is divided into two parts: Part 1 captures project identification and evaluation criteria, while Part 2 contains the legacy version of the form for reference.
Part 1 requires offerors to submit one of three qualifying projects (numbered 001, 002, or 003) with supporting contract documentation and relevant statements of work, performance work statements, or task guidance letters. Offerors must designate the domain(s) against which the QP will be evaluated: Engineering, Logistic & Operational Domain; Management & Advisory Domain; RDT&E Domain; Emerging IT Domain; or Foundational IT Domain. For evaluation purposes, the form captures: the contracting party point of contact information, specific contract/agreement numbers with copies, period of performance (LOE-based QPs require at least one year of completed performance within three years prior to May 1, 2026; outcome-based QPs must be fully completed within that same timeframe), alignment with technical capabilities in Section 3.0 of the PWS, applicable NAICS codes, and CPARS or PPQ ratings. For LOE-based QPs, offerors must provide vacancy rate and time-to-fill rate calculations for the last full year of performance. For outcome-based QPs, offerors must demonstrate schedule adherence (100% on-time delivery), completeness against project requirements (100% requirements fulfilled), and document customer-recognized efficiencies such as cost savings, operational improvements, or quality enhancements. All QPs must include the subcontractor passthrough rate calculated as total incurred subcontractor labor dollars divided by total incurred labor dollars. The form requires certification by both the contracting party point of contact and the offeror, and the government reserves the right to contact references to verify submitted information.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QP Form Qualifying Project Form Attachment 0003 Amendment 01 Part 1
| Item # | Qualifying Project Number (001, 002 or 003): | [PLEASE SELECT ONE] |
| 1 | Contracting Party Point of Contact (Name, Title, Email, Phone) (Government Official or Private Official) : | [Insert Name and Title Here] |
| [Insert Email Here] | ||
| [Insert Phone Number Here] | ||
| 2 | Specific Contract/Agreement Number: |
Offeror shall provide a copy of the Contract/Agreement with this QP.
| If this an Order off of a Contract, please ensure to include that as well as the contract number. | [Insert Full Contract/Agreement/and Order (if applicable) Number Here] | ||||
| 3 | Proposed Domain(s), in which this QP shall be evaluated against: | ||||
| Select all that apply for this QP to be evaluated against | FALSE | ENGINEERING, LOGISTIC & OPERATIONAL DOMAIN | |||
| FALSE | MANAGEMENT & ADVISORY DOMAIN | ||||
| FALSE | RDT&E DOMAIN | ||||
| FALSE | EMERGING IT DOMAIN | ||||
| FALSE | FOUNDATIONAL IT DOMAIN | ||||
| 4 | Period of Performance: |
LOE Based QPs shall have at least one (1) year of completed performance that has occurred within the last three (3) years prior to 01 May 2026.
Outcome Based QPs period of performance shall be completed. The period of performance end date shall be within the last three (3) years prior to 01 May 2026.
| 5 | Please identify which of the Technical Capabilities identified in Section 3.0 of the PWS, aligns with the QP for the proposed Domain(s): |
| 6 | Please provide a brief description of work mapping to the PWS, SOW, or SOO to demonstrate the work performed is relevant to the Offerors proposed Domain |
on the second part of this form:
Offerors shall provide a copy of the PWS, SOW, or SOO that is being referenced with this QP. Associated TGLs may also be provided in addition to the PWS, SOW, or SOO.
| 7 | Does this QP have a NAICS Code on the contract, order, or agreement? |
| 8 | If yes, identify which permissible NAICS Code per RFP Section L.2.3.2: |
| 9 | If no, identify which permissible NAICS Code would it best align to per RFP Section L.2.3.2: |
| 9.a | Please provide a brief explination on how this NAICS Code relates to your QP: |
| 10 | Does this QP have a CPARS or PPQ per RFP Section L.2.3.2 |
| 11 | Dollar Value: |
| Items 12-17 can be completed by the Offeror or Contracting Party Point of Contact Listed Above. |
Item 18 shall be digitally or hard signed by the Contracting Party POC.
If this QP is identified as a LOE QP, Items 13 and 14 shall be completed, with Items 15 and 16 being N/A.
If this QP is identified as an Outcome Based QP, Items 15 and 16 shall be completed, with Items 13 and 14 being N/A.
| 12 | Is this QP a LOE-Based QP or an Outcome-Based QP? |
| 13 | Vacancy Rate |
(per RFP Section M.5.7.1)
The Government will evaluate the QPs to determine the vacancy rate for the last full year of performance on the QP.
The vacancy rate shall be determined by the following: the number of vacant positions on the QP, divided by the total number of proposed positions, multiplied by 100.
(# of vacant position at the end of the last full year of performance of the QP / # of positions proposed)*100
If the QP had a reduction of labor due to an official descope of the requirements by the requirements owner, and as a result the number of positions was reduced, the Offeror may update the total number of employees proposed to reflect this reduction in labor.
14 Time to Fill Rate (per RFP Section M.5.7.2)
The Government will evaluate the QPs to determine the average time to fill for any job vacancy on the QP for the last full year of performance on the QP.
The Time to Fill shall be calculated by the Date of Offer Acceptance − Date Vacancy Opened for each vacancy on the QP over the last full year of performance. If more than one vacancy was filled on the QP over the last full year of performance, the average time to fill shall be calculated by using the mean average of all filled positions.
Date Of Offer Acceptance – Date Vacancy Opened = Time to Fill
(Time to Fill Vacancy 1 + Time to Fill Vacancy 2 + Time to Fill Vacancy 3 (etc.) / Total Number of Vacancies Filled for the Last Year of Performance = Mean Average 15 Schedule (per RFP Section M.5.7.3)
The Government will evaluate each QP to determine the timeliness/delivery of the service outcome as identified in the contract/agreement.
In order for a QP to earn points for this criteria, the QP shall meet the Acceptable Quality Level (AQL) which is 100% of the Overall Project Schedule has been met.
Calculation: (Actual Delivery/Contractual Delivery) *100%
* Unit of measure (i.e. days, months, years) is dependent on terms of the QP.
16 Completeness (per RFP Section M.5.7.4)
The Government will evaluate each QP to determine its completeness against the project requirements as identified in the contract/agreement, as well as customer recognized efficiencies. A customer recognized efficiency must have been experienced during the performance of the QP and show measurable improvements tied to results, not just level of effort. These efficiencies may include, but are not limited to cost efficiencies, administrative efficiencies, performance and operations efficiencies, improved reliability/stability, reduced oversight burden, better quality outputs, and contractor-initiated improvements. Efficiencies related to schedule shall not be attributable to this section but are in paragraph M.5.7.3 above.
In order for a QP to earn points for this criteria, the QP shall meet the AQL which is 100% of the requirements fulfilled.
17 Passthrough Rate (per RFP Section M.5.6)
The passthrough rate will be calculated by the Total Incurred Subcontractor Labor Dollars divided by the Total Incurred Labor Dollars for each QP. Labor Dollars shall be fully burdened.
(Total Incurred Subcontractor Labor Dollars/Total Incurred Labor Dollars)*100 = Subcontracted Amount 18 Certification of Contracting Official (Government or Private Official):
I certify that all information contained in this Section is complete and accurate.
| 19 | If CAGE code differs from Offeror's CAGE code, the following rows shall be completed. | ||
| 20 | CAGE Code of affiliate or subsidary: | ||
| 21 | Confirm legal entity: | ||
| Offerors shall attest to the following statement. | FALSE | The QP was performed by the same legal entity as the Offeror. | |
| 22 | Please provide a brief description of the relationship between the Offeror and the entity providing this QP: |
| 23 | Printed Name of Offeror: |
| 24 | Certification of Offeror: |
I certify that all information contained in this QP form is complete and accurate.
**The Government reserves the right to contact the POC provided to verify any/all information provided on this form.
Qualifying Project Form Attachment 0003 Amendment 01 PWS, SOW, and/or TGL Part 2
OLD QP Form Qualifying Project Form Attachment 0004
| Qualifying Project Number (001, 002 or 003): |
| Specific Contract/Agreement Number: |
Offeror shall provide a copy of the Contract/Agreement with this QP.
| Proposed Domain(s), in which this QP shall be evaluated against: |
| Dollar Value: |
| NAICS Code: |
| If no NAICS Code is identified on agreement, which NAICS does it best align: |
| Please provide a brief explination on how this NAICS Code relates to your QP: |
| Period of Performance: |
| Government Official and/or Private Official Point of Contact (Name, Title, Email, Phone): |
| Please identify which of the Technical Capabilities identified in Section 3.0 of the PWS, your QP aligns with for the proposed Domain(s): |
| Vacancy Rate for last full year of POP (N/A for Commercial-Sector Vendors): |
The vacancy rate shall be calculated as follows:
(# of vacant position at the end of the last full year of performance of the QP / # of positions proposed * 100)
If the QP had a reduction of labor due to an official descope of the requirements by the requirements owner, and as a result the number of positions was reduced, the Offeror may update the total number of employees proposed to reflect this reduction in labor.
Average Time to Fill Rate (N/A for Commercial-Sector Vendors):
The Time to Fill shall be calculated as follows:
Time to fill = (Date Offer Acceptance - Date Vacancy Opened)
If more than one vacancy was filled on the QP over the last full year of performance, the average time to fill shall be calculated by using the mean average of time to fill for each vacancy: EX. (time to fill vacancy 1 + time to fill vacancy 2 + time to fill vacancy 3)/total number of vacancies filled for the last full year of performance.
| Brief description of work mapping to the PWS to demonstrate the work performed is relevant to the Offerors proposed Domain: | |
| If CAGE code differs from Offeror's CAGE code, the following rows shall be completed. | |
| CAGE Code of affiliate or subsidary | |
| Confirm legal entity | [ ] The QP was performed by the same legal entity as the Offeror. |
| Describe the relationship between the Offeror and the entity providing this QP |
| Printed Name of Offeror: |
| Certification of Offeror: |
I certify that all information contained in this form is complete and accurate.
**The Government reserves the right to contact the POC provided to verify information provided on this form.
image1.png