Solicitation Attachment 0015 CHS Production Assessment Survey.docx

DOCX document 30 KB Posted

Attached to
Common Hardware System 5th Generation (CHS-5)
Solicitation number
W15P7T17R0008
Issued by

About this file

Solicitation Attachment 0015 CHS Production Assessment Survey

View the file

Other files

File Type Posted
CHS-5_Responses_to_Industry_Questions_dated_15_Sept_2017_(Industry_Responses_to_Post).docx DOCX document
CHS-5_Solicitation_W15P7T17R0008_-_Amendment_0001.pdf PDF
Solicitation_Attachment_0012_-_Small_Business_Participation —
Solicitation Attachment 0005 - Contract Security Classification Specification - DD Form 2~.pdf PDF
Solicitation Attachment 0006 - Pricing Spreadsheet_and_Instructions 12 Aug 17.xlsx XLSX spreadsheet
CDRL C005 - TDP Developmental_SIGNED.pdf PDF
CDRL B001 - FAT Report_SIGNED.pdf PDF
Solicitation Attachment 0005 - DD254 Appendix D FOUO.doc DOC document
Solicitation Attachment 0003 - CHS-5 PWS Appendix B -- Data Item Tables.xlsx XLSX spreadsheet
CDRL C002 - V1+, V2, V3 Product Specs - Continuation.docx DOCX document
CDRL B007 - Warranty Input Sheet_SIGNED Updated 31 May 17.pdf PDF
Solicitation Attachment 0004 - CHS-5 PWS Appendix C -- Safety Specification.docx DOCX document
CDRL C003 - User Guides_SIGNED as of 31 May 17.pdf PDF
CDRL C006 - TDP Production_SIGNED.pdf PDF
CDRL A005 - Phase-In Transition Plan_SIGNED.pdf PDF
Solicitation Attachment 0011 -_CHS-4_Historical_Production_Data.xlsx XLSX spreadsheet
CDRL A001 - Program Protection Implementation Plan_SIGNED.pdf PDF
Solicitation Attachment 0005 - Contract Security Classification Specification - DD Form 2~ .pdf PDF
CDRL B003 - Failure Analysis_SIGNED.pdf PDF
CHS-5_Solicitation_Attachment_0007_-_CHS-5_Warranty_Input_Sheet_with_CEA_Tab_Final_.xlsx XLSX spreadsheet
Solicitation Attachment 0002 - CHS-5 PWS Appendix A -- Survivability, Reliability, Verif.docx DOCX document
Solicitation Attachment 0014 Past Performance Questionaire.docx DOCX document
CDRL B005 - CHS-5 IDE_SIGNED Updated 31 May 17.pdf PDF
Solicitation Attachment 0001 - CHS-5_PWS_v2.docx DOCX document
CDRL B008 - Small Business Utilization Report v4 1430 170911.pdf PDF
CDRL B004 - TASS Cost Report_SIGNED.pdf PDF
CDRL A002 - Counterfeit Detection and Avoidance_SIGNED.pdf PDF
Solicitation Attachment 0008 - CHS-5 V-1 Equipment Production List.xlsx XLSX spreadsheet
CDRL B002 - EOL_SIGNED.pdf PDF
Solicitation Attachment 0009 - CHS-5 V-1+ Equipment Production List.xlsx XLSX spreadsheet
CDRL C002 - V1+ V2 V3 Product Specs_SIGNED as of 31 May 17.pdf PDF
CDRL C004 - PDR and CDR_SIGNED as of 31 May 17.pdf PDF
CDRL A006 - QAPP_SIGNED.pdf PDF
Solicitation Attachment 0013 - CHS-5 Contract Year 1 Activity Baseline.xlsx XLSX spreadsheet
CHS-5 Solicitation W15P7T-17-R-0008.pdf PDF
CDRL B006 - SAR_SIGNED.pdf PDF
CDRL C001 - V1 Product Specs_SIGNED.pdf PDF
CDRL A003 - FAT Plan_SIGNED.pdf PDF
Solicitation Attachment 0010 - CHS-5 V-2 and OTC Equipment Production List.xlsx XLSX spreadsheet
CDRL A004 - CM Plan_SIGNED.pdf PDF
Solicitation Attachment 0005 - DD254 Appendix A COMSEC.pdf PDF
CDRL_A005_-_Phase-In_Transition_Plan_SIGNED.pdf PDF
CDRL_C002_-_V1+,_V2,_V3_Product_Specs_-_Continuation.docx DOCX document
CDRL_A003_-_FAT_Plan_SIGNED.pdf PDF
CDRL_B001_-_FAT_Report_SIGNED.pdf PDF
CDRL_C005_-_TDP_Developmental_SIGNED.pdf PDF
CDRL_B003_-_Failure_Analysis_SIGNED.pdf PDF
CDRL_C001_-_V1_Product_Specs_SIGNED.pdf PDF
CDRL_A006_-_QAPP_SIGNED.pdf PDF
CDRL_C003_-_User_Guides_SIGNED.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHS PRODUCTION ASSESSMENT SURVEY

Company Name:

Facility City/State/Zip Code (or City/Province/Postal Code):

CAGE Code:

Company POC/Title:

Phone:

FAX:

E-mail:

Date of Completion:

Section I. Facility Description

1. Total (sq. ft.) of this facility available to support all production workload.

2. Proportion of Total (sq. ft.) to be dedicated to CHS production line.

3. Is there existing floor space available for expansion? If so, how much?

4. Summarize your plans for this facility (e.g., capital improvements (facilities), capital equipment/upgrades) by year and dollar value.

Year
Capital Improvements ($)

(Facilities) Capital Equipment/Upgrades

5. Sales Volume and Business Information. This information is applicable only to the facility to which this survey applies, not the entire corporate entity.

2014
2015
2016
2017 (est)
2018 (est)
2019 (est)
2020 (est)
2021 (est)

Total Sales ($M)

Army (%)

Air Force (%)

Navy (%)

DLA (%)

Other Gov't (%)

Commercial (%)

FMS (%)

Direct Foreign (%)

Net Income

Operating Profit

Profit Margin

Interest Expense

Depreciation

Total Assets

Fixed Assets

Current Assets

Current Liabilities

Long Term Debt

Equity

Working Capital

Total Inventory

Funded Backlog

Backlog

Direct/Indirect Ratio

Average Wage Rate/Hour

Fringe Benefits % of wage rate

6. Have you had any violations of environmental, safety (OSHA) or other related laws and regulations in the past year? (yes/no) If yes, describe the issue and any actions taken to remedy the violation.

Section II. Business Related Questions

1. Is your company publicly or privately held?

1. Is your company classified as small or large business? (see Definitions)

1. Is this company non-US owned? (yes/no) If yes, list name and location of parent company.

1. What is your minimum sustaining rate (in US $) to maintain overall CHS production capability at this facility?

1. What level of revenue is needed to keep each production line viable?

1. What are the most significant barriers to your company’s participation in military system procurement?

1. Do you have any foreign trade export control problems? (yes/no) If yes, describe.

1. What is your company's view of the state of competition among DoD-unique CHS manufacturers?

Section III. Workforce Management

A. Management Provide the following information for this facility.

2014
2015
2016
2017 (est)
2018

(est) (est) (est) (est.)

Total Employment

Direct Labor (#)

Indirect Labor (#)

1. What is your turnover rate for both production and engineering personnel?

1. Identify key management changes occurring within the last three years.

1. Describe your current operating shift(s) at this site (i.e. 1-8-5, 2-8-5 or 3-8-5).

1. Skills:

1. List the required skills at this site dedicated to the production workload. Distinguish among workload skills (i.e. assembly worker, press operator, calibration tech, etc).

Critical Labor Skill
Quantity
Average Years Experience
Time Required to train replacement

1. Are you experiencing any problems hiring and/or retaining skilled workers? (yes/no) If yes, identify type(s) of skill and quantity.

1. What is your company's strategy for retaining the proper mix of skilled personnel?

1. Describe your employee training program and the amount of time spent training employees.

1. List the applicable design/production engineers & other specialty skills at this facility.

Engineering/Scientific Discipline
Quantity
Years Experience

Degree Required

1. Do you anticipate any shortage in skilled engineering professionals now or in the future? (yes/no) If yes, explain.

C. Union Representation

1. Does a union represent the workforce at this site? (yes/no) If yes, complete this table.

Union Name
Number of Employees
Contract Expiration Date
Last Strike Date

Duration

1. What are your company’s labor issues or concerns?

Section IV. Production Capability

A. Workload.

1. Describe your major product types.

1. Provide in chart below your planned production capabilities for CHS.

CHS Production Capacity

(est) (est) (est) (est) 2020 (est)

Total Plant Capacity Utilization (Max. units)

Capacity on 1-8-5

Actual

1. What is your plant’s current capacity utilization (%)?

1. What are planned production rates for CHS? Unit Items per Month each version (V1, V1+, V2, V3, OTC).

2016 thru 2021

Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul

1. What is the minimum sustaining rate (breakeven point) for CHS Units per Month

1. What is your surge capacity for CHS by month? Unit Items per Month each version (V1, V1+, V2, V3, OTC).

1. What are the limiting factors?

Start at Month 1

1st
2nd
3rd
4th
5th
6th
7th
8th
9th

1. Time to reach the maximum production rate for this product at this facility? Months. What are the limiting factors?

1. Will the CHS production line be shared?

1. What is the lead-time for this product, from a cold start (Months) and from a warm start Months). What are the limiting factors?

1. What is the average availability (100% minus % downtime) of production equipment, including test equipment, in this manufacturing facility for the past quarter?

1. Identify the top five bottlenecks to production throughput.

1. What investments are required to increase production by 50% and 100%, e.g., technology, materials, equipment, capital?

1. What recent funding has been expended to increase production? Identify both internal and external sources. Briefly describe dollar amounts received, major equipment purchased, etc.

1. For which DoD weapon systems programs are you the sole source provider?

1. What are the DoD acquisition practices that affect cost and production efficiency?

1. Identify from your respective vendor suppliers those components that are in short supply or limited availability and “will” impact your production delivery schedule?

18. If components have been identified and linked to a respective vendor supplier from #17 above, please identify what specific DX/DO programs those vendors support and if any of the products are identified as Special Priority Assistance (SPA) by that vendor?

B. Testing

1. Briefly describe your testing and evaluation capabilities, and identify any tests or inspections that are outsourced. Include both in-process and final testing.

1. What is your planned throughput rate for Test & Evaluation for CHS? hr/day/wk

1. Will Test & Evaluation become a production rate limiting constraint (pinch point)? (yes/no) If yes, what can be done to improve throughput?

1. What is the % of rejects of current products?

1. What are your top 5 reasons for rejections in general?

1. What rework is allowed on these units, if any, and how long does it take?

1. What are your top three yield problems?

C. Suppliers

1. Identify critical suppliers for CHS. Include vertically integrated operations.

Supplier
Location
Product/Service
Why are they Critical?
Alternate Source(s)
Cost & Time to qualify alternate?

1. Describe your supply chain risk management process for protecting hardware components?

1. Are any of the suppliers at risk or are there any problems or issues concerning your suppliers? (yes/no) If yes, identify supplier, risk, investment requirement, cost and schedule to mitigate the risk.

2. Provide company POC & phone #

1. Are any of your critical/primary suppliers non-US owned or based? (yes/no) If yes, list name(s) and location of parent company(s)

1. Quality/Operations Information

1. Does your firm track customer-reported defects and field performance feedback? (yes/no) if yes, how?

1. Do you utilize a quality management program? (yes/no) If so, what system do you use; what certification level have you achieved?

1. How do you use statistical process control to monitor critical processes, materials and procedures?

1. Do you use a configuration control system? (yes/no) If yes, describe what is included.

1. Are all manufacturing and testing processes under configuration control? (yes/no)

1. Does your facility have an automated process control/documentation system? (yes/no) Describe:

1. What type of ERP (enterprise resource planning), MRP (manufacturing resource planning) or MIS (management information systems) do you use?

Briefly describe:

Section V. Technology

1. Manufacturing R&D

1. Describe the current technologies/processes/materials in your facility that are or will soon become obsolete, and why?

2. Are your manufacturing engineers involved in the design of your products?

File details come from the government source that posted it. Updated .