Tillman_Site_9.2022.pdf
PDF 90 KB Posted
- Attached to
- COMPLETE ARCHITECTURAL AND ENGINEERING SERVICES – TILLMAN ELEMENTARY CAMPUS WIDE RENOVATION, SDMC 2025-09
- Solicitation number
- 2025-09
- Issued by
- Manatee County, Florida
About this file
This is a site plan document for Tillman Elementary School prepared by the Department of Construction Services at the Matzke Support Center in Bradenton, Florida. The site plan depicts the campus layout for Tillman Elementary School located at 1415 29th Street East in Palmetto, Florida, and is referenced in relation to the School District of Manatee County's comprehensive architectural and engineering services solicitation (RFQ 2025-09) for a campus-wide renovation project. The site plan illustration, scaled at 1 inch equals 100 feet, identifies key campus features including retention basins, retention pond, fire hydrants, a preschool play area, and the spatial arrangement of campus buildings and facilities. The document is dated August 1, 2020, and serves as the foundational site reference for the renovation project encompassing three classroom buildings totaling 96,928 square feet.
The site plan provides essential baseline documentation for the planned renovation scope, which includes mechanical, plumbing, and electrical system replacements; fire alarm system removal and replacement; kitchen appliance upgrades; administrative security and lobby enhancements; technology infrastructure installation; LED lighting upgrades; ceiling, flooring, and painting work; exterior door and window replacement; and necessary sitework. The main building, constructed in 1994, contains 29,332 square feet, while the media building, flammable storage, covered play area, and cafeteria comprise 11,403 square feet. Building 6, renovated in 2020, will require a new air handling unit and potential electrical upgrades. The campus serves 722 student stations and requires architectural and engineering teams with five professional disciplines licensed in Florida, with an estimated project budget of $31,000,000, design completion targeted for May 2026, and construction completion projected for July 2027.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF
CONSTRUCTION
SERVICES
MATZKE SUPPORT CENTER
1 MATZKE WAY
BRADENTON, FL 34208
(941) 708-8800
FISH #
DATE
SHEET
TILLMAN
ELEMENTARY
SCHOOL
1415 29TH STREET EAST
PALMETTO, FL 34221
FISH
SITE PLAN
08/01/20
0' 50' 100'25'
SCALE: 1" = 100'-0"
SITE PLAN
RETENTION BASIN
RETENTION POND
FIRE HYDRANT
FIRE HYDRANT
1 3
PRESCHOOL
PLAY
AREA
File details come from the government source that posted it. Updated .