TE-E_Outstanding_Obligations_Report_Revision 1.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Base Operations Support Services, Dugway Proving Ground, Utah Federal contract opportunity
Solicitation number
W5168W23R0002
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services, Dugway Proving Ground, Utah, newest first.
File Type Posted
Amendment 0008 W5168W23C0002.pdf PDF
Attachment H - Dugway Pricing Matrix Revised 15 JUN 23.xlsx XLSX spreadsheet
Amendment 0007 RPF W5168W23R0002-0007.pdf PDF
W5168W23R0002 MOD 0006_Contracting Officer POC Update.pdf PDF
Amended_RFP_W5168W23R0002_0005_DPG_BASOPS_12JUN2023_Conformed Copy.pdf PDF
Amended_RFP_W5168W23R0002_0004_DPG_BASOPS_31MAY2023-Conformed Version.pdf PDF
Attachment H - Dugway Pricing Matrix CLIN Structure revised 30 May 2023.xlsx XLSX spreadsheet
Amended_RFP_W5168W23R0002_0001_DPG_BASOPS_23MAR2023.pdf PDF
Attachment 12 - Collective Bargaining Agreement (CBA).pdf PDF
Attachment 10 - DBA Wage Determination - Highway.pdf PDF
Attachment 9 - DBA Wage Determination - Heavy.pdf PDF
Attachment 14 - CLS 201 AFH Management Operation_12 Apr 22.docx DOCX document
TE-YYY_Number_Movements_and_Placements_Revision 1.xlsx XLSX spreadsheet
TE-V-3_Baker_Semi-Improved_Land_Area_Revision 1.pdf PDF
TE-UU_Exhaust_Fans_Revision 1.pdf PDF
TE-RRR_WasteWater_Treatment_Systems_Revision1.pdf PDF
TE-V-4_Carr_Semi-Improved_Land_Area_Revision 1.pdf PDF
TE-V_English_Village_Semi-Improved_Land_Area_Revision 1.pdf PDF
TE-VV_Air_Compressors_Revision 1.pdf PDF
TE-T_Hantavirus_Contamination_Prevention_Revision 1.pdf PDF
TE-XX_HVAC_Filters_Revision 1.pdf PDF
TE-N_Water_Contamination_Threat_Revision 1.pdf PDF
TE-SSS_Water Operating Logs_Sample_Revision 1.pdf PDF
TE-ZZ_Food_Service__Equipment_Revision 1.pdf PDF
TE-M_High_Priority_Facilities_Revision 1.pdf PDF
TE-B_Typical_Certifications_Revision 1.pdf PDF
TE-K_Government_Facilities_for_Use_by_Contract_Revision 1.pdf PDF
TE-PPP__Spill_Report_Form_Revision 1.docx DOCX document
TE-UU Exhaust Fans_Revision 1.xlsx XLSX spreadsheet
TE-DD_Paved_Roads_and_Parking_Sections_Revision 1.xlsx XLSX spreadsheet
TE-RR Furnances-UnitHeaters_Revision 1.xlsx XLSX spreadsheet
TE-TT_Chiller_Water_Chemistry_Revision 1.xlsx XLSX spreadsheet
TE-RRRR List of Lighted Traffic Control Devices.docx DOCX document
TE-NN_Boiler_Operating_Log_Revision 1.xlsx XLSX spreadsheet
TE-MMM_Gas_Leak_Survey_Requirements_Revision 1.docx DOCX document
TE-HHHH publications and forms.docx DOCX document
TE-JJJJ Grease traps.docx DOCX document
TE-KK_Emerg_Lighting_Label_Revision 1.docx DOCX document
TE-CC FY21 Approved Pesticide Use List.xlsx XLSX spreadsheet
TE-BBBB Crosswalk of repair terminology.docx DOCX document
TE-XXX_Estimated_Appliances_Replacment_Revision 1.xlsx XLSX spreadsheet
TE-Y_Irrigation_System_Components_Revision 1.docx DOCX document
TE-UUUU OVERHEAD DOORS 20210512.xlsx XLSX spreadsheet
TE-Q_Real_Property_Facilities_C.5.2.2_Revision 1.xlsx XLSX spreadsheet
TE-WWWW Work Capability Levels.docx DOCX document
Attachment 18 - CLS 411 Facility Maintenance_ Vertical_12 Apr 22.docx DOCX document
Attachment 22 - CLS 502 Water Services_12 Apr 22.docx DOCX document
Attachment 24 - CLS 510 Pest Management_12 Apr 22.docx DOCX document
Attachment 15 - CLS 404 Grounds Maintenance_12 Apr 22.docx DOCX document
TE-VVVV Master keys dupicate keys and locks.docx DOCX document
Show all 50

Base Operations Support Services, Dugway Proving Ground, Utah has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

MISSION & INSTALLATION CONTRACTING COMMAND
Dugway Proving Ground Contracting Office
Technical Exhibit: E
CONTRACTOR:
CONTRACT:

Revision 1

Contract Costs SummaryDated
Dates of costs incurred
LABOR COSTSSRM
ContractBOS
Period Hourly Labor SRM Dollars$
Period Hourly Labor BOS Dollars$
Period Hourly Labor Subtotal$
Period Exempt Labor SRM Dollars$
Period Exempt Labor BOS Dollars$
Period Exempt Labor Subtotal$
Period Labor Subtotal$
Fringe Cost on Subtotal (%)$
G&A Cost on Subtotal and Fringe (%)$
Total Loaded KIRA Labor$
Sub contract
Period Hourly Labor SRM Dollars$
Period Hourly Labor BOS Dollars$
Period Hourly Labor Subtotal$
Period Exempt Labor SRM Dollars$
Period Exempt Labor BOS Dollars$
Period Exempt Labor Subtotal$
Period Labor Subtotal$
Fringe Cost on Subtotal (%)$
G&A Cost on Subtotal and Fringe (%)$
Total Loaded CSC Labor$
Total Loaded Contract Labor:$
MATERIAL COSTS
Period Materials SRM Dollars$
Period Materials BOS Dollars$
Period Material Subtotal$
G&A Cost on Subtotal (%)$
Total Loaded Contract Materials:$
OTHER DIRECT COSTS
Period ODCs SRM Dollars
Period ODCs BOS Dollars
Period ODCs Subtotal$
G&A Cost on Subtotal (%)$
Total Loaded Contract ODCs:$
CONTRACTOR SERVICES COSTS
Period Contractor Services SRM Dollars
Period Contractor Services BOS Dollars
Period Contractor Services Subtotal0
G&A Cost on Subtotal ()0
Total Loaded Contract Contractor Services:0
Total Loaded Costs (Labor & Material) for period:$
TOTAL FUNDS OBLIGATED ON CONTRACT$
TOTAL SRM FUNDS OBLIGATED$
TOTAL BOS FUNDS OBLIGATED$
TOTAL FUNDING RECEIVED TO DATE$
PERCENTAGE SPENT TO DATE%

File details come from the government source that posted it. Updated .