TE-JJJJ Grease traps.docx

DOCX document 22 KB Posted

Attached to
Base Operations Support Services, Dugway Proving Ground, Utah Federal contract opportunity
Solicitation number
W5168W23R0002
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services, Dugway Proving Ground, Utah, newest first.
File Type Posted
Amendment 0008 W5168W23C0002.pdf PDF
Attachment H - Dugway Pricing Matrix Revised 15 JUN 23.xlsx XLSX spreadsheet
Amendment 0007 RPF W5168W23R0002-0007.pdf PDF
W5168W23R0002 MOD 0006_Contracting Officer POC Update.pdf PDF
Amended_RFP_W5168W23R0002_0005_DPG_BASOPS_12JUN2023_Conformed Copy.pdf PDF
Amended_RFP_W5168W23R0002_0004_DPG_BASOPS_31MAY2023-Conformed Version.pdf PDF
Attachment H - Dugway Pricing Matrix CLIN Structure revised 30 May 2023.xlsx XLSX spreadsheet
Amended_RFP_W5168W23R0002_0001_DPG_BASOPS_23MAR2023.pdf PDF
Attachment 12 - Collective Bargaining Agreement (CBA).pdf PDF
Attachment 10 - DBA Wage Determination - Highway.pdf PDF
Attachment 9 - DBA Wage Determination - Heavy.pdf PDF
Attachment 14 - CLS 201 AFH Management Operation_12 Apr 22.docx DOCX document
TE-YYY_Number_Movements_and_Placements_Revision 1.xlsx XLSX spreadsheet
TE-V-3_Baker_Semi-Improved_Land_Area_Revision 1.pdf PDF
TE-UU_Exhaust_Fans_Revision 1.pdf PDF
TE-RRR_WasteWater_Treatment_Systems_Revision1.pdf PDF
TE-V-4_Carr_Semi-Improved_Land_Area_Revision 1.pdf PDF
TE-V_English_Village_Semi-Improved_Land_Area_Revision 1.pdf PDF
TE-VV_Air_Compressors_Revision 1.pdf PDF
TE-T_Hantavirus_Contamination_Prevention_Revision 1.pdf PDF
TE-XX_HVAC_Filters_Revision 1.pdf PDF
TE-N_Water_Contamination_Threat_Revision 1.pdf PDF
TE-SSS_Water Operating Logs_Sample_Revision 1.pdf PDF
TE-ZZ_Food_Service__Equipment_Revision 1.pdf PDF
TE-M_High_Priority_Facilities_Revision 1.pdf PDF
TE-B_Typical_Certifications_Revision 1.pdf PDF
TE-K_Government_Facilities_for_Use_by_Contract_Revision 1.pdf PDF
TE-PPP__Spill_Report_Form_Revision 1.docx DOCX document
TE-UU Exhaust Fans_Revision 1.xlsx XLSX spreadsheet
TE-DD_Paved_Roads_and_Parking_Sections_Revision 1.xlsx XLSX spreadsheet
TE-RR Furnances-UnitHeaters_Revision 1.xlsx XLSX spreadsheet
TE-TT_Chiller_Water_Chemistry_Revision 1.xlsx XLSX spreadsheet
TE-RRRR List of Lighted Traffic Control Devices.docx DOCX document
TE-NN_Boiler_Operating_Log_Revision 1.xlsx XLSX spreadsheet
TE-MMM_Gas_Leak_Survey_Requirements_Revision 1.docx DOCX document
TE-HHHH publications and forms.docx DOCX document
TE-KK_Emerg_Lighting_Label_Revision 1.docx DOCX document
TE-CC FY21 Approved Pesticide Use List.xlsx XLSX spreadsheet
TE-BBBB Crosswalk of repair terminology.docx DOCX document
TE-XXX_Estimated_Appliances_Replacment_Revision 1.xlsx XLSX spreadsheet
TE-Y_Irrigation_System_Components_Revision 1.docx DOCX document
TE-UUUU OVERHEAD DOORS 20210512.xlsx XLSX spreadsheet
TE-Q_Real_Property_Facilities_C.5.2.2_Revision 1.xlsx XLSX spreadsheet
TE-WWWW Work Capability Levels.docx DOCX document
W5168W23R0002 -Solicitation BaseOps Dugway Proving Ground.pdf PDF
Attachment 2 - Annex B to OPORD 18-011 Facilities Maint Inst.docx DOCX document
Attachment 1 - Annex A Overarching PWS_12 Apr 22.docx DOCX document
Attachment 11 - DBA Wage Determination - Residential.pdf PDF
Attachment 8 - Davis Bacon - Building.pdf PDF
Attachment 5 - Past Performance Questionnaire.docx DOCX document
Show all 50

Base Operations Support Services, Dugway Proving Ground, Utah has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit IIII

Grease Traps/Interceptors.

Inspect, pump, clean and maintain grease traps/interceptors in buildings 5124 and 5230. Inspect all grease traps at least monthly.

Maintain Grease Traps.

Remove any grease that is floating on the liquid surface of grease traps monthly as a maintenance task and disposed of at the Sewage Lagoon or other approved location.

Pump & Clean.

Pump and clean all grease interceptors according to the following criteria (at least annually):

· When the floatable grease (FOG) layer exceeds six inches in depth as measured by a sludge core sampling device;

· When the settled solid layer exceeds eight inches in depth as measured by a sludge core sampling device;

· When the total volume of captured grease and solid material displaces more than twenty-five percent of the capacity of the interceptor as calculated using a sludge core sampling device; and When the interceptor is not retaining/capturing oils and greases.

Built-Up Solids.

Ensure built-up solids are scraped from walls, floors, baffles, and all pipe work interior of the interceptor when it is determined that a grease interceptor requires a complete pumping or cleaning.

Records.

Maintain records for each grease interceptor which include the date and time of each inspection, FOG depth, sludge depth, details of any repairs, dates cleaned, dates pumped, amount of liquids and solids removed on each occasion and the service order number for repairs made and any other records pertaining to the interceptor. Make records available for review upon request by the DPW.

Obtain Approval.

Obtain approval through the KO via the COR from DPW Environmental Division for any chemicals, enzymes, live bacteria or other grease cutters prior to use.

File details come from the government source that posted it. Updated .