System_Installation_Acceptance_Forms_Sample.pdf
PDF 134 KB Posted
- Attached to
- Elections Tabulation System
- Solicitation number
- 2026-RFP-184
- Issued by
- Pierce County, Washington
About this file
This is a System Installation Acceptance Forms Sample document related to Pierce County's Elections Tabulation System procurement in Washington State. The document provides a template and guidance for the acceptance process of the elections tabulation system upon installation and deployment. The form outlines the procedures and documentation requirements that the selected vendor must complete to demonstrate that the system has been properly installed and meets the County's specifications and requirements before final acceptance and payment authorization.
The acceptance forms serve as a quality assurance mechanism and include sections for documenting system functionality verification, hardware and software installation confirmation, testing results, and sign-off by both the vendor and County representatives. This documentation framework establishes clear expectations for system delivery and ensures that all installation requirements are satisfied prior to project completion, protecting the County's interests and providing a defined pathway for system handover and operational transition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Elections_Tabulation_System.pdf | ||
| Management_Questions.docx | DOCX document | |
| Attachment_D_-_Solution_Requirements.xlsx | XLSX spreadsheet | |
| Exhibit_1_Technical_Specifications_Form.pdf | ||
| Pierce_County_Service_Agreement_Sample_.pdf | ||
| Attachment_C_-_Technical_Questions.docx | DOCX document | |
| Exhibit_2_-Tabulation_and_Scan_Room_Design.pdf | ||
| Attachment_A_-_Pricing.xlsx | XLSX spreadsheet | |
| Attachment_E_-_Evaluation,_Scoring_and_Demonstration.docx | DOCX document | |
| Procurement_of_Goods_and_Services-Intake_Form_-_Georgia_Cookson.eml | EML file | |
| 2026_Elections_Tabulation_System_RFP_(Draft).docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Acceptance Form for System Installation
Purpose
The purpose of the System Installation Acceptance Form is to confirm that the system installation is complete and accepted by the county.
Deliverables
The Tabulation System is installed, operational, and accepted by the County.
Acceptance Criteria:
1. Both test and production environments have been implemented.
2. The County has inspected and approved the installation (system and database) per the specifications documented in the Architecture and Technical Specifications in both the production and test environments. (It is expected that the documentation will be updated at the end of the project, if any changes have been made prior to go-live).
3. The County has completed thorough testing.
The work is accepted under the conditions of the Statement of Work of this contract.
The work was completed on .
Accepted by:
(Pierce County): Date:
Title:
Software Configuration and Customization
The purpose of the Software Configuration Acceptance Form is to confirm that the software configuration is complete and accepted by the County.
Deliverables
The software configuration and customization is completed and accepted by the County.
Acceptance Criteria:
1. All software has been installed and customized for the County’s use.
2. Security has been configured for each role.
3. System options, displayed/hidden fields, and labels have been configured
The work is accepted under the conditions of the Statement of Work of this Contract.
This work was completed on .
System/Unit Testing
The purpose of the System Testing Acceptance Form is to confirm that the system testing is complete and Accepted by the County.
Deliverables
The Test Plan is complete and specifies all of the testing to be conducted, test scripts, test script templates, schedule, roles and responsibilities, and definitions of passed/failed test. The system testing has been completed, the system did not fail any tests, and the County accepts the results.
Acceptance Criteria
All of the tests were conducted, including quality assurance testing of the system configuration (templates, reports, security, business rules) and load testing.
The work is accepted under the conditions of the Statement of Work of this Contract.
The work was completed on .
User Acceptance Testing
The purpose of the User Acceptance Testing Form is to confirm that the User Acceptance Testing is complete and the County accepts the system as ready for user training and go-live.
Deliverables
The County has tested and accepts the system as ready for user training and go-live.
Acceptance Criteria:
All test cases have successfully passed and there are no outstanding issues. The County has signed off on all testing and has accepted the system as ready for user training and to go into production.
Training and Documentation
The purpose of the Training and Documentation Acceptance Form is to confirm that training is complete and documentation is received and both are acceptable to the County.
Deliverables
The Training Plan is complete and specifies the training schedule and curriculum, for the recipients of system administrator training and end-user training. All training has been completed and accepted by the County.
Acceptance Criteria:
1. System Administrators have been trained on all aspects of system configuration, individual and role-based security profiles, enterprise silo security settings and configurations, document template configuration, and report queries and changes.
2. System Administrators are able to complete new configuration items with minimal assistance from the Contractor.
3. End users have been trained on all aspects of the system and can complete tasks within the system.
4. Training materials and documentation are relative to our deployment, thorough and have been delivered.
Final Acceptance
The purpose of the Final Acceptance Form is to confirm that the system is operational and Accepted by the County.
Deliverables
The system is operational and Accepted by the County.
Acceptance Criteria:
1. All project tasks are complete and the system is in production by the County.
2. There are no unresolved issues that prevent the County from conducting their normal work as deemed by the County.
3. The system has been operational in production for not less than two (2) complete election cycles without material defect in accordance with the Contract in the County’s fully implemented production environment.
File details come from the government source that posted it. Updated .