Amendment_0008.pdf
PDF 163 KB Posted
- Attached to
- White Sands Missile Range, New Mexico Federal contract opportunity
- Solicitation number
- SPE600-16-R-0510
- Issued by
- Defense Logistics Agency Energy
About this file
Amendment 0008
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE600 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60016R0510
X
2016 APR 05
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
8725 JOHN J KINGMAN RD STE 4950
FT BELVOIR VA 22060-6222
USA
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUED ON NEXT PAGE
* NOTE: Due to system constraints and the numbering of Amendments in Federal Business Opportunities (FBO) Amendment 0006 was submitted in error on July 27, 2016 therefore, this is the correct Amendment 0008 which supersedes the generated numbering of Amendment 0008 and 0009 in FBO.*
The purpose of Amendment 0008 is to:
1.) Incorporate the QUESTIONS and ANSWERS dated February 16, 2017 (Attachment I).
2.) Offers are due no later than Feburuary 23, 2017 to DLA Energy – FESAB at 1:00 PM Ft. Belvoir, Virginia time.
3.) Questions will no longer be accepted prior to the closing date. Any additional questions will be addressed with each offeror during negotiations.
4.) All terms and conditions remain the same.
PO Number: 4001782922
PAGE 2 OF 4 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SPE60016R0510-0008
CONTINUED ON NEXT PAGE
PAGE 3 OF 4 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
Attachments
List of Attachments
Description File Name ATTACH.Attachment I Q&A
Section A - Planning and Solicitation - T
PAGE 4 OF 4 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
ATTACHMENT A
QUESTIONS AND ANSWERS
Date: February 16, 2017
1. We have one more question/clarification. The table relating to ground fuel deliveries in PWS Appendix – E was removed. Yet, within the reattached previous Q&As are questions (e.g., 132 & 132) there are still questions and answers pertaining to contractor responsibility for ground fuel deliveries.
Can you please confirm that all fuel deliveries, pods, and fuel truck requirements – aviation and ground
– are removed from the scope of contractor responsibility and the contractor just operates bulk storage, fuel stations, etc.?
According to the revised PWS, all responsibility for PODS, Fuel to the ranges and radar sites, and alongside aircraft refueling are removed. Contractor only responsible for the operation of bulk storage and retail stations (Main Post, Stallion Range Complex, and Rhodes Canyon). The requirements are stated in the PWS and Appendix E.
2. We have an important question regarding the new PWS requirements released with Amendment 0007. Appendix – E: Terminal Specific Information used to state for Rhodes Canyon Retail that Overhead Canopy will not be required at this location. With the revised Amendment 0007 PWS Appendix-E, this statement about the Overhead Canopy was removed. Does this mean an Overhead Canopy is now required for the Rhodes Canyon Retail location?
DLA Energy confirmed that the Overhead Canopy requirement at Rhodes Canyon is now removed.
| Attachments |
| List of Attachments |
File details come from the government source that posted it. Updated .