Final_Solicitation_2-_White_Sands_Missile_Range_July-28-16.pdf
PDF 1 MB Posted
- Attached to
- White Sands Missile Range, New Mexico Federal contract opportunity
- Solicitation number
- SPE600-16-R-0510
- Issued by
- Defense Logistics Agency Energy
About this file
Final Solicitation SPE600-16-R-0510
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPE600-16-R-0510
White Sands Missile Range, NM
A. A pre-proposal conference is scheduled for March 7-9, 2016 at 1870 White Sands Missile Range, New Mexico. (See clause L-0006 L198 for details and directions). Interested parties planning to attend should submit names, phone numbers, email address and company represented to Tabassam Salim via email at tabassam.salim@dla.mil before
March 1, 2016, 12:00 p.m. EST (See clause L-0006 L198 for details).
B. The NAICS code is 493190 and the threshold is $27.5 million in annual receipts. The point of contact for Small
Business Affairs is Mr. Gregory Thevenin, 703-767-9465.
C. DLA ENERGY-FESAB is the designated office for receipt of offers. All offerors shall clearly mark envelopes/packages sent in response to this solicitation with the words, “Offer Under Solicitation SPE600-16-R-
0510.” Mailed offers should be mailed to the following address:
US Post Office/US Post Office Express Mail offer only: Hand Carried/Courier Delivery Service only:
ATTN: DLA Energy-FESAB, Bid Custodian Room 2945 ATTN: DLA Energy-FESAB, Bid Custodian Room 2945
Defense Logistics Agency Energy Ms. Debbie Lloyd/Telephone: 703-767-9350
8725 John J. Kingman Road, Suite 2945 Defense Logistics Agency Energy
Fort Belvoir, Virginia 22060-6222 8725 John J. Kingman Road, Suite 2945
Fort Belvoir, Virginia 22060-6222
For Verification of Receipt: Contact tabassam.salim@dla.mil, (703) 767-6744.
D. Your offer must be received in DLA Energy-FESAB by 1:00 pm local Ft. Belvoir, VA time on April 4, 2016.
Facsimile proposals are not authorized. Do not return the entire solicitation package. Simply complete and return one original, one copy and one PDF electronic copy of the Offeror Submission Package data (including ORCA certification) and one original, one copy and one PDF electronic copy of the Technical Proposal submissions as described in 52.212-1 Instructions to Offers—Commercial Items with Addendum (Feb 2012). Your prices must be inserted in Clause B-0001 B34.01 in the Offeror Submission Package. Proposed prices that are unrealistically low may be considered an indication of a lack of understanding of the solicitation requirements.
E. FAXED PROPOSALS ARE NOT AUTHORIZED. Please e-mail your proposal to: bidcustodian@dla.mil and
CC: Tabassam.salim@dla.mil. All e-mail proposals MUST be followed-up with the hard copy (consisting of two volumes as outlined below) NO LATER THAN (5) business days after solicitation closing. Late proposals will be processed in accordance with FAR 15.208 – Submission, Modification, Revision, and Withdrawal of Proposals.
Offeror’s proposals shall be prepared in two separate volumes and provided in the quantities shown below:
Volume Title No. of Copies Required Page Limit
I Technical Proposal 1 original, 1 hard copies and PDF electronic copy 50
II Price Proposal 1 original, 1 hard copy and PDF electronic copy & MS
Excel electronic copy of Attachment II – OFFEROR
SUBMISSION PACKAGE
F. Unless you specifically state otherwise, your offer is assumed to accept all terms and conditions of this solicitation.
Any exceptions to any part of this solicitation must be specifically identified in a cover letter to your proposal.
G. The Government intends to evaluate proposals and award contract after written or oral discussions with all responsible offerors that submit proposals within the competitive range. This procurement will use Source Selection
Procedures. See FAR 52.212-2 Evaluation—Commercial Items (Oct 2014) for evaluation factors. The resulting type of contract will be Firm Fixed Price.
H. Any contract awarded to a contractor who, at the time of award, was suspended, debarred, or ineligible for receipt of a Government contract is voidable at the option of the Government.
I. Care should be taken to mail correspondence relating to this solicitation or resulting contract to the appropriate office as indicated in the applicable clauses.
mailto:tabassam.salim@dla.mil mailto:tabassam.salim@dla.mil mailto:bidcustodian@dla.mil
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS
B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENTOFWORK
C-0001 C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)
C-0002 C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)
C-0003 C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DLA ENERGY JAN 2012)
SECTION D PACKAGING AND MARKING
52.247-9012 REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL (WPM). (FEB 2007)
SECTION E INSPECTION AND ACCEPTANCE
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)
E-0001 E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT INSPECTION OF SERVICES (DLA ENERGY JAN 2012)……...13
E-0002 E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000)
E-0003 E18 INSPECTION AND CLEANING OF BULK PETROLEUM TANKS (DLA ENERGY NOV 2003)
E-0004 E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY JUL 2013)
E-0005 E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA ENERGY DEC 2011)
E-0006 E34 TEST FOR SULFIDES IN WATER (DLA ENERGY MAY 1987)
E-0007 E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)
E-0008 E36 INSPECTION (STORAGE) (DLA ENERGY FEB 1976)
ECTION F DELIVERIES OR PERFORMANCE
52.242-15 STOP-WORK ORDER (AUG. 1989)
52.211-9072 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY)(NOV 2011)
F-0001 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)
F-0002 F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY (APR 2014)
F-0003 F1.14 DETERMINATION OF QUANTITY (STORAGE) (DLA ENERGY NOV 1997)
F-0004 F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) (DLA ENERGY DEC 1991)
SECTION G CONTRACT ADMINISTRATION DATA
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)
252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
G-0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)
G-0002 G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY DEC 1999)
G-0003 G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009)
G-0004 G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997)
SECTION H SPECIAL CONTRACT REQUIREMENTS
H-0001 H9.01 TECHNICAL DIRECTION (DLA ENERGY FEB 1992)
H-0002 H9.02 AUTHORITY TO TAKE DIRECTION (DLA ENERGY FEB 1992)
H-0003 H11 GUARD SERVICE (DLA ENERGY MAR 1982)
H-0004 H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA ENERGY JAN 2012)
H-0005 H51.03 INSURANCE REQUIREMENTS FOR CONTRACTORS AND SUBCONTRACTORS (DLA ENERGY JAN 2012)
SECTION I CONTRACT CLAUSES
52.202-1 DEFINITIONS. (NOV 2013)
52.203-3 GRATUITIES. (APR 1984)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
52.230-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) .. 36
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(SEPT 2007)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)
52.204-4 PRINTED OR COPIED DOUBLE SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)
52.204-9 PERSONAL IDENTIFY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
52.204-9000 CONTRACTOR PERSONNEL SECURITY (MAY 2009)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (JUL 2013)
52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (AUG 2013)
52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (SEP 2013)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS –
COMMERCIAL ITEMS (APR 2015)
52.215-8 ORDER OF PRECEDENCE – UNIFORM CONTRACT (OCT 1997)
52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA – MODIFICATIONS (AUG 2011)
52.215-13 SUBCONTRACTOR COST OR PRICING DATA—MODIFICATIONS (OCT 2010)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014) (ALT 1)
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2014)
52.219-16 LIQUIDATED DAMAGES SUBCONTRACTING PLAN (JAN 1999)
52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES. (FEB 1997)
52.222-26 EQUAL OPPORTUNITY (APR 2015)
52.222-26 EQUAL OPPORTUNITY (APR 2015)
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
52.222-99 ESTABLISHING A MINIMUM WAGE FOR CONTRACTORS (DEVIATION 2014-O0017) (JUNE 2014)
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
52.223-10 WASTE REDUCTION PROGRAM (MAY 2011)
52.223-19 COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS. (MAY 2011)
52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
52.228-5 INSURANCE -- WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
52.229-3 FEDERAL, STATE, AND LOCAL TAXES. (FEB 2013)
52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
52.232-9 LIMITATION OF WITHHOLDING OF PAYMENTS (APR 1984)
52.232-11 EXTRAS
52.232-17 INTEREST (OCT 2010)
52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
52.232-25 PROMPT PAYMENT (JUL 2013)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT (JUL 2013)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
52.233-1 DISPUTES (MAY 2014)
52.233-3 PROTEST AFTER AWARD (AUG 1996)
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984)
52.237-3 CONTINUITY OF SERVICES (JAN 1991)
52.242-13 BANKRUPTCY (JUL 1995)
52. 245-1 GOVERNMENT PROPERTY (APR 2012)
52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES (APR 2012)
52.245-9 USE AND CHARGES (APR 2012)
52.246-25 LIMITATION OF LIABILITY—SERVICES (FEB 1997)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT- RELATED FELONIES
(DEC 2008)
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013)
252.204-7000 DISCLOSURE OF INFORMATION (AUG 2013)
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)
252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS (DEC 2015)
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (DEC 2015)
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A
COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (DEC 2014)
252.209-7998 REPRESENTATION REGARDING CONVICTION OF A FELONY CRIMINAL VIOLATION UNDER ANY FEDERAL OR
STATE LAW (DEVIATION MAR 2012-O0007)
252.209-7999 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILITY OR A FELONY
CONVICTION UNDER ANY FEDERAL LAW DEVIATION 2012-00004) {JAN 2012)
252.211-7008 USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS (SEPT 2010)
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
52.215-9016 NOTICE TO CONTRACTORS AND DEFENSE FINANCE ACCOUNTING SERVICES (DFAS) (NOV 2011)
52.232-9010 ACCELERATED PAYMENTS TO SMALL BUSINESS (APR 2014)
52.233-9001 DISPUTES – AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (NOV 2011)
I-0001 I1.01-4 DEFINITIONS (CONT’D) (STORAGE) (DLA ENERGY JUNE 2009)
I-0002 I102.02 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT ACT -- PAYROLL TAX ADJUSTMENT
(DLA ENERGY JAN 2012)
I-0003 I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA ENERGY JAN 2012)
I-0004 I116.01 LIABILITY FOR FUEL SPILLS (DLA ENERGY JAN 2012)
I-0005 I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY JAN 2012)
I-0006 I121 CUSTODY OF PERTROLEUM PRODUCT (DLA ENERGY APR 1968)
I-0007 I122 USE OF FACILITIES (DLA ENERGY APR 2009)
I-0008 I147 DEMURRAGE (DLA ENERGY NOV 1989)
I-0009 I291 CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI) (DLA ENERGY APR 2009)
I-0010 I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY JAN 2012)
I-00011 I605-01 DISCLOSURE OF INFORMATION (DLA ENERGY JAN 2012)
SECTION J – ATTACHMENTS
SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)
52.230-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (SEP 2007)
52.204-5 WOMEN-OWNED BUSINESS (OTHER THAN SMALL BUSINESS) (OCT 2014)
52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010)
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS -- COMMERCIAL ITEMS ALTERNATE I (OCT 2014)
52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014) ALT 1 (MAY 2014)
52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR TRANSACTIONS
RELATING TO IRAN-REPRESENTATION AND CERTIFICATION (DEC 2012)
K-0001 K15 RELEASE OF PRICES (DLA ENERGY MAR 2009)
K-0002 K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007)
K-0003 K150 WIDE AREA WORKFLOW (DLA ENERGY AUG 2012)
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (APR 2014)
52.216-1 TYPE OF CONTRACT (APR 1984)
52.232-38 SUBMISSION OF ELECTRONIC FUNDS TRANSFER INFORMATION WITH OFFER (JUL 2013)
52.233-2 SERVICE OF PROTEST. (SEP 2006)
52.237-7 SITE VISIT (APR 1984)
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
52.212-9002 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUES OR EXECUTIVE ORDERS
APPLICABLE TO DEFENSE ACQUISITIONS OF COMMECIAL ITEMS (NOV 2014)
52.215-9003 USE OF PAST PERFORMANCE INFORMATION RETRIEVAL SYSTEM – STATISTICAL REPORTING (PPIRS-SR)
INFORMATION IN PAST PERFORMANCE EVALUATION (APR 2014)
52.215-9007 PREPROPOSAL CONFERENCE (FEB 2005)
52.233-9000 AGENCY PROTESTS (NOV 2011)
L-0001 L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991)
L-0002 L2.11-4 EMAIL PROPOSALS (DLA ENERGY OCT 2010)
L-0003 L7 SOCIOECONOMIC/SUBCONTRACTING PROPOSAL (DLA ENERGY MAR 2007)
L-0004 L82 WAGE DETERMINATION (DLA ENERGY FEB 2009)
L-0005 L116.01 DATA REQUIREMENTS (STORAGE) (DLA ENERGY JAN 2013)
L-0006 L198 PREPROPOSAL CONFERENCE (SERVICES) (DLA ENERGY FEB 2009)
L-0007 L201.02 INSTRUCTIONS TO OFFERORS (COCO) (DLA ENERGY JAN 2012)
SECTION M – EVALUATION FACTORS FOR AWARD
52.212-2 EVALUATION -- COMMERCIAL ITEMS (OCT 2014)
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
M-0001 M7 SOCIOECONOMIC/SUBCONTRACTING PROPOSAL EVALUATION (DLA ENERGY FEB 2005)
M-0002 M43.01 EVALUATION OF OPTIONS (DLA ENERGY MAR 2009)
M-0003 M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997)
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS
B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)
The services to be furnished during the period specified herein and the unit prices are as follows: The contract shall be for a period of four (4) years with three 5-years renewal options and six 1-month extensions. The Offeror is required to provide a monthly price for each facility as well as the total monthly price.
Due to Enterprise Business System (EBS) constraints, the CLIN structure will reflect a yearly MUCC. However, the offered MUCC for each year under the base will be the same. Furthermore, the offered MUCC for each year under each option period will also be the same.
BASE PERIOD
(September 1, 2016 through August 21, 2020)
Years 1-4:
LINE ITEM 0001- NON PERSONAL SERVICES (FIRM-FIXED PRICE): The prices for the services and Contractor-owned, Contractor operated (COCO) facilities to be provided during the performance of the initial 4-years period. Offeror is required to provide a monthly price for each facility (MUCC) at White Sands Missile Range. Level unit pricing for each period of performance is required.
MUCC COCO Services Years 1-4
Bulk/Retail Location (Main Post): ______________________ per Month
Bulk/Retail Location (Stallion RC): ______________________ per Month
Retail Location (Rhodes Canyon): ______________________ per Month
TOTAL MONTHLY PRICE: ______________________
FIRST OPTION
(September 1, 2020 through August 31, 2025)
Years 5-9:
LINE ITEM 0002- NON PERSONAL SERVICES (FIRM-FIXED PRICE): The prices for the services and Contractor-owned, Contractor-operated (COCO) facilities to be provided during the performance period. Offeror is required to provide a monthly price for each facility at White Sands Missile Range. Level unit pricing for each period of performance is required.
MUCC COCO Services Years 5-9
This space is intentionally left blank.
SECOND OPTION
(September 1, 2025 through August 31, 2030)
Years 10-14:
LINE ITEM 0003- NON PERSONAL SERVICES (FIRM-FIXED PRICE): The prices for the services and Contractor-owned, Contractor-operated (COCO) facilities to be provided during the performance period. Offeror is required to provide a monthly price for each facility at White Sands Missile Range. Level unit pricing for each period of performance is required.
MUCC COCO Services Years 10-14
THIRD OPTION
(September 1, 2030 through August 31, 2035)
Years 15-19:
LINE ITEM 0004- NON PERSONAL SERVICES (FIRM-FIXED PRICE): The prices for the services and Contractor-owned, Contractor-operated (COCO) facilities to be provided during the performance period. Offeror is required to provide a monthly price for each facility at White Sands Missile Range. Level unit pricing for each period of performance is required.
MUCC COCO Services Years 15-19
This space is intentionally left blank.
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENTOFWORK
C-0001 C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)
(a) The entire facility shall be enclosed by a fence suitable to deter unauthorized access. The fence shall be fitted with gates that may be padlocked when not in use.
(b) A method of visitor and entrance control will be in effect. A visitor register shall be maintained.
(c) An internal, self-powered communication system linking all critical points of the facility, capable of serving both as an alarm system and for conduct of terminal operation, will be in use.
(d) A water supply and fire fighting equipment conforming to National Fire Protection Association and American Petroleum Institute standards will be maintained. At locations outside the United States, other standards may be used with prior approval of the Contracting Officer.
(e) In the event of an emergency at a CONUS COCO terminal, the Contractor shall seek the assistance of the following as appropriate:
local ambulance service; local fire department; local, county, and State police; regional office of the Federal Bureau of Investigation; Secret
Service; U.S. Marshal's Service; and the Federal Emergency Management Agency.
C-0002 C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)
Storage tanks for DLA Energy use shall be equipped with positive water sumps for removal of all water bottoms. All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present. (Weekly water drainage is necessary because the datum plate may not necessarily be the low point in the storage tank. Water could possibly accumulate below the datum plate and not show up in the gauging process.) Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt. Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product. (Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.)
C-0003 C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DLA ENERGY JAN 2012)
(a) SAMPLING. The samples identified in the solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE
SAMPLING AND TESTING are a required part of the services to be provided. The Contractor must provide these samples using qualified personnel, facilities, and equipment on-site and shall include all associated costs in the monthly service charge. These on-site resources may be provided by Contractor personnel or by a commercial source acting on behalf of the Contractor. The Quality Representative will not be responsible for taking any samples for the Contractor. All samples must be taken in accordance with ASTM D 4057, Standard
Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter
8.1).
(b) TESTING. The tests identified in this solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE
SAMPLING AND TESTING are a required part of the services to be provided. Those tests identified in the attachment which are part of a higher order analysis (defined as follows: Composite Samples, Storage Tanks After Receipt, Interface Mixture, Dormant Stocks, and
Individual Tests, including particulate contamination) shall be provided by the Contractor using one of the following options (the
Contractor shall check the appropriate box below):
[ ] The Contractor will perform the tests using its own qualified personnel, facilities, and equipment. (All costs for this service are to be included in the monthly service charge.)
[ ] The Contractor will not perform the tests using its own personnel, but will provide on a seven days per week, 24 hours a day basis, its own facilities and equipment for testing of product by Government personnel. (All costs for this service are to be included in the monthly service charge.)
[ ] The Contractor will not provide its own personnel, facilities, or equipment. Instead, the Contractor will, within 24 hours after sampling, transport any sample(s) to a commercial laboratory approved by the Government and arrange for that commercial laboratory to perform all the required tests. The Government, at its own option, may direct that samples be tested at a Government laboratory under contract to the Government. In this case, transport of such samples is still the responsibility of the Contractor. (The
Government will reimburse the Contractor for the actual costs of the tests performed by their commercial laboratory. All other associated costs must be included in the monthly service charge.)
All other tests found in the above referenced attachment, which are not part of a higher order analysis, shall be provided in accordance with the CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) contract provision.
(c) All facilities and equipment to be provided, whether that of a Contractor or a commercial laboratory, must conform to the standards for such facilities and equipment established by the Occupational Safety and Health Act and the National Fire Protection
Association or local regulations, whichever is more stringent.
SECTION D PACKAGING AND MARKING
52.247-9012 REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL (WPM) (FEB 2007)
(a) This clause only applies when wood packaging material (WPM) will be used to make shipments under this contract and/or when WPM is being acquired under this contract.
(b) Definition.
Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
(c) All wood packaging material (WPM) used to make shipments under Department of Defense (DOD) contracts and/or acquired by DOD must meet requirements of international standards for phytosanitary measures (ISPM) 15, “Guidelines for Regulating Wood Packaging
Materials in International Trade.” DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, Incorporated (ALSC) wood packaging material program and WPM enforcement regulations (see http://www.alsc.org/).
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved dunnage stamp.
(d) Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government."
SECTION E INSPECTION AND ACCEPTANCE
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)
(a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.
(b) Contractor submission of the material inspection and receiving information required by Appendix F of the Defense FAR Supplement by using the Wide Area WorkFlow (WAWF) electronic form (see paragraph (b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the
WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR
Supplement.
http://www.alsc.org/
E-0001 – E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT INSPECTION OF SERVICES (DLA ENERGY JAN
2012)
If any inspection or test is made by the Government on the premises of the Contractor or subcontractor, the Contractor without additional charge shall provide all reasonable facilities and assistance for the safety and convenience of the Government inspectors in the performance of their duties.
E-0002 -E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000)
(a) Upon award, the Contractor shall prepare, in triplicate and in English, a Quality Control Plan (QCP). Prior to the first receipt of Government-owned product into the facility, two copies of the QCP shall be forwarded to the Contracting Officer and one copy to the assigned Quality Assurance Representative for approval.
(b) The QCP shall include the following quality control procedures employed by the Contractor.
(1) Receiving (both product and additives);
(2) Blending;
(3) Sampling;
(4) Testing;
(5) Storage and handling;
(6) Loading and shipping;
(7) Calibration program for testing and measuring equipment in accordance with ISO 10012-1, "Quality Assurance
Requirements for Measuring Equipment, Part I." Equivalent local regulation, as appropriate, may be used as well. Whichever program used must include a section addressing meter proving (used to determine quantity) and must comply with the American Petroleum Institute
Manual of Petroleum Measurement Standards, Chapters 4, 5, and 6, or equivalent foreign standard. For any item that requires calibration but is not covered by ASTM, API, or IP publications, the applicable manufacturer's recommended calibration method(s) outlined in the applicable industry publication shall be used if acceptable to the Government;
(8) Quantity measurement;
(9) Records and reports; and
(10) Corrective action procedures (to include, but not be limited to, procedures for notification of Quality
Representative, actions to be taken on discovery of off-spec product during receipts/shipments, upgrading procedures for Contractor-caused contamination, leaks, etc.). The QCP shall also include an organizational chart of key personnel and their responsibilities and a schematic diagram of the facility with key inspection/activity points marked for each product handled.
(c) The QCP shall require that each Contractor employee be familiar with its content and shall state that it must be reviewed semiannually and revised as needed. Revision should occur when any change is made to the inspection system, when any corrective action needs to be incorporated due to quality problems, and as otherwise necessary. The Contractor shall sign and date each revision of the QCP.
E-0003 -E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY JUNE 2015)
(a) The Contractor shall maintain and make available upon request the following historical data relative to each storage tank provided:
(1) Date and type of construction;
(2) Name of installing contractor;
(3) Product service (past and present) and dates;
(4) Date of last cleaning/physical entry inspection and contractor's name;
(5) Structural condition based on cycle inspection at the time of cleaning or repair;
(6) Record or tank repairs;
(7) Tank dimensions and capacity;
(8) Inspection and tank cleaning frequency (date of next mandatory inspection, when tank out of service, required);
(9) Tank coating history;
(10) Tank strapping charts;
(11) As built drawings (if available); and
(12) Records of product tests and trends.
(b) At the Contractor's expense, the Contractor shall empty, inspect, and clean each bulk petroleum storage tank and dispose of all tank bottom waste for each tank furnished under this contract at the following intervals. When tank cleaning does take place, the
Contractor, at his own expense, shall be responsible for providing alternate tankage and transferring the remaining product to that tankage.
Such tankage shall be suitable for storing the transferred product and shall be of equal or greater capacity than the tankage being cleaned.
Any proposed reduction in the storage capacity cited in the contract must be approved by the Contracting Officer in advance.
(1) AVIATION FUEL STORAGE TANKS.
(i) Every 4 years for uncoated storage tanks without an inlet-filter separator;
(ii) Every 6 years for either a coated tank without an inlet filter separator, or for an uncoated tank with an inlet-filter separator; and
(iii) Every 8 years for coated tanks with an inlet-filter separator.
(iv) For storage tanks with direct receipt of fuel from barge or tanker, the frequency for physical entry inspection and cleaning will be 3, 5, and 8 years for (i), (ii), and (iii) above, respectively.
(v) Tanks will be emptied, cleaned, and inspected more frequently than the periods stated in (i) through (iv) above when sample analysis indicates a build up of sediment in the tanks.
With advanced approval, a delay in tank cleaning may be authorized if the cause for such delay is justified and approved by the Contracting
Officer.
(2) GROUND AND MARINE FUEL STORAGE TANKS. Tanks will be emptied, cleaned, and inspected when sample analysis indicates a build up of sediment in the storage tanks.
(c) The time for cleaning will be measured from the date of the last cleaning regardless of whether the tank was under contract with DLA Energy at the time of the last cleaning.
(d) Samples will be taken and tested at Government expense. If tank cleaning is required earlier than the criteria listed in (b)(1) above and the Government is shown to be at fault, then the Government will be responsible for cleaning, sampling, and testing costs. In all other cases, tanks requiring cleaning will be removed from revenue and cleaned at the Contractor's expense.
(e) At the time of offer submission, the offeror shall provide the Contracting Officer with a listing of all tank inspections and cleanings, and other activities that would take a tank out of service, which are anticipated to occur during the contract period (see chart below). This listing shall include the tank number, location, reason for being out of service, dates the tank will be out of service and provisions that have been made to replace the tankage while it is out of service. Updates to the listing shall be sent to the Contracting
Officer as soon as a change is known.
Tank
Number Location Reason Dates Replacement Tankage
E-0004 - E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY JUL 2013)
The following lists shall be used to identify the Government inspection office assigned inspection responsibility for DLA Energy contracts in a particular geographic area. These contracts include, but are not limited to, those for bulk petroleum products and additives, into-plane refueling, petroleum storage and laboratory services, coal, aerospace energy (including compressed gases), and posts, camps, and stations. The area of inspection responsibility and corresponding office code are assigned in paragraphs (a) and (b). The address and phone number of each inspection office by office code is provided in paragraph (c). Unless a particular inspection office is identified in another part of the contract, the assignments in this contract provision shall apply.
(a) AREAS OF RESPONSIBILITY AND OFFICE CODES WITHIN THE CONTINENTAL UNITED STATES (CONUS):
Alabama 110 Maine 110 Oklahoma 110
Arizona 120 Maryland 110 Oregon 120
Arkansas 110 Massachusetts 110 Pennsylvania 110
California 120 Michigan 110 Rhode Island 110
Colorado 120 Minnesota 110 South Carolina 110
Connecticut 110 Mississippi 110 South Dakota 110
Delaware 110 Missouri 110 Tennessee 110
District of Columbia 110 Montana 120 Texas 110
Florida 110 Nebraska 110 Utah 120
Georgia 110 Nevada 120 Vermont 110
Idaho 120 New Hampshire 110 Virginia 110
Illinois 110 New Jersey 110 Washington 120
Indiana 110 New Mexico 120 West Virginia 110
Iowa 110 New York 110 Wisconsin 110
Kansas 110 North Carolina 110 Wyoming120
Kentucky 110 North Dakota 110
Louisiana 110 Ohio 110
EXCEPTIONS:
(1) The El Paso, Texas, area is assigned to Code 120 (DLA Energy Americas – West).
(2) The Newcastle, Wyoming, area is assigned to Code 110 (DLA Energy Americas – East).
(b) AREAS OF RESPONSIBILITY AND OFFICE CODES OUTSIDE THE CONTINENTAL UNITED STATES (OCONUS)
(INCLUDING ALASKA AND HAWAII):
Afghanistan 400 Cyprus 200 Malaysia 300 Singapore 300
Africa 200 1 Egypt 4001 Maldives 300 South America 110
Alaska 300 Europe (Continental) 200 Malta 200 South Korea 300
Antarctica 300 Georgia 200 Mauritius 200 Sri Lanka 300
Armenia 200 Greenland 200 Mexico 110 Syria 400
Ascension Island 110 Hawaiian Islands 300 Midway Island 300 Taiwan 300
Australia 300 Hong Kong 300 Mongolia 300 Tajikistan400
Azerbaijan 200 Iceland 200 Myanmar 300 Thailand 300
Azores 200 India 300 Nepal 300 Turkey 200
Bahrain 400 Indonesia 300 New Zealand 300 Turkmenistan 400
Bangladesh 300 Ireland 200 North Korea 300 United Arab
Bermuda 110 Iran 400 Oman 400 Emirates 400
Bhutan 300 Iraq 400 Pacific Islands United Kingdom 200
Brunei 300 Israel 200 (Central & South) 300 Uzbekistan 400
Cambodia 300 Japan 300 Pakistan 400 Vietnam 300
Canada 110/120 2 Jordan 400 Papua New Guinea 300 Wake Island 300
Canary Island 200 Kazakhstan 400 Philippines 300 Yemen 400
Caribbean Islands 110 Kuwait 400 Qatar 400
Central America 110 Kyrgyzstan 400 Russia 200
Chagos Archipelago 300 Laos 300 Ryukus Islands, Japan 300
China 300 Lebanon 400 Saudi Arabia 400
Comoros 200 Madagascar 200 Seychelles Is. 420
1 Except for Egypt, which is assigned to DLA Energy Middle East (Code 400), all other countries in Africa fall under DLA
Energy Europe (Code 200).
2 The provinces of Manitoba, Ontario, Quebec, Newfoundland and Labrador, New Brunswick, Nova Scotia, and Prince Edward
Island are assigned to DLA Energy Americas East (Code 110). The rest of Canada falls under DLA Energy Americas West (Code 120).
(c) INSPECTION OFFICES AND CODES.
110. DLA Energy Americas East
ATTN: Quality Manager 3
Federal Building, Room 1005
2320 LaBranch Street
Houston, TX 77004-1091
Phone: (713) 718-3883, ext. 162/161/160
FAX: (713) 718-3891
120. DLA Energy Americas West
3171 N Gaffey Street
San Pedro, CA 90731-1099
Phone: (310) 241-2806/2807
FAX: (310) 241-2836
200. DLA Energy Europe and Africa
Military Mailing Address:
DLA Energy Petroleum Lab
ATTN: Quality Manager 3
CMR 422
APO AE 09067-0422
Phone: 49-631-3406-2285/2286 4
FAX: 49-631-3406-2289 4
Commercial Shipping Address:
DLA Energy Petroleum Lab
ATTN: Quality Manager
Bldg. 320, Rhine Ordinance Barracks
Am Opelkreisel
67663 Kaiserslautern, Germany
300. DLA Energy Pacific
1025 Quincy Avenue, Building 479, Suite 2000
Pearl Harbor, HI 96860-4512
Phone: (808) 473-4307/4287
FAX: (808) 473-4232
400. DLA Energy Middle East
PSC 851, Box 180
FPO AP 09834-2800
Phone: 973-17-85-6493 4
FAX: 973-17-85-4650 4
[Location: Bahrain]
3 Designated location of the DLA Energy Regional Quality Manager/Pre-Award Survey Monitor.
4 Dial 011 before these numbers when calling from the U.S. When calling these numbers from outside the U.S., use the appropriate international long distance prefix for the country where the call originates.
E-0005 - E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA ENERGY DEC 2011)
(a) Inspection and tests by the Government of services, facilities, and equipment specified within this contract does not relieve the Contractor from responsibility to meet all requirements of the contract.
(b) The Contractor shall furnish personnel, facilities, and equipment on-site to accomplish the following routine tests and procedures. These on-site resources may be provided by Contractor personnel or by a commercial source action on behalf of the
Contractor. The Quality Representative will not be responsible for performing any of these services for the Contractor.
(1) Sampling of storage tanks, shipments and receipts in accordance with ASTM D 4057, Standard Practice for Manual
Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1);
(2) Retaining of product composite samples from shipments and receipts as follows:
MINIMUM
METHOD OF SHIPMENT MINIMUM QUANTITY RETENTION PERIOD
Pipeline 20 liters 60 days
Tanker/Barge
Parcel Composite 20 liters 90 days
Each compartment 0.5 liters 90 days
Navy Fleet Oilers/Vessels 10 liters 60 days
Tank Truck/Car 1 liter 15 days
NOTE: After the minimum retention period, samples shall be tested for Appearance, Color (Visual), API Gravity/Density and
Flash Point and, if found to be on-specification, shall be returned to like Government stock on-site. Sample containers may be reused if properly cleaned.
(3) Determining the presence of water in storage tanks, shipments and receipts. Ensure that accurate water cuts are obtained by means of a water indicating paste conforming to MIL-W-83779B. Two suggested sources are Stewart Hall Chemical
Testmaster Water Indicating Paste or Sartomer Sar Gel Water Indicating Paste (see Note 2 below);
(4) Determining Density at 15 degrees Celsius or API gravity of products by ASTM D 1298 or ASTM D 4052 (see
Note 2 below);
(5) Determining the temperature of products by the API MPMS, Chapter 7 (see Note 2 below);
(6) Determining the Appearance of applicable products using ASTM D 4176, Procedure 1 (see Note 2 below);
(7) Determining the visual color of products.
(8) Determining the Flash Point of applicable products using test methods cited in the appropriate product specification
(see Note 2 below);
(9) Conversion of gross to net gallonage (liters);
(10) Determining the percentage (volume) of fuel system icing inhibitor (FSII) by means of a portable refractometer in accordance with ASTM D 5006. One suggested source is H.B. Industries, Inc., Glenview, IL 60025 (B/2 Anti-Icing Additive test kit) (see
Note 2 below); and
(11) Determining the range of fuel electrical conductivity using ASTM D 2624. One suggested source for a conductivity meter is Emcee Electronics, Inc., Sarasota, FL 33581 (Model 1152) (see Note 2 below).
Note 1: All costs for providing the above tests and procedures shall be included in the monthly service charge. The only exception to the Contractor’s obligation to provide these services as part of the monthly service charge is when the tests described above are part of the higher order analysis (defined as the following categories: Composite Samples, Storage Tanks After Receipt, Interface
Mixtures, Dormant Stocks and Individual Tests (including particulate contamination) found in the attachment to the solicitations entitled
MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING. Provisions for providing higher order analyses are covered in the SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) contract provision.
Note 2: Upon request, the Contractor shall permit the Quality Representative unrestricted use of the equipment and ancillary supplies needed to perform this test/procedure on behalf of the Government.
(c) During the contract, the Contractor shall furnish representative samples of the product in each storage tank, shipment or receipt at the request of, and in the manner and to the place designated by, the Quality Representative. Sample size will be 2 gallons for gasoline-type fuels and one gallon or 10 gallons for jet diesel-type fuels. The number of samples to be furnished during any 12-month period shall not exceed eight times the number of tanks specified in the contract. Such samples shall be packed, marked, and shipped by the Contractor, shipping expense prepaid, in containers and shipping boxes furnished by the Contractor. Sample containers shall be epoxy coated on the interior. This requirement is in addition to sampling required elsewhere in this contract provision and the contract. All reasonable direct shipping costs associated with samples required by this paragraph shall be reimbursed upon request from the Contractor and such costs shall not be included in the monthly service charge. However, all other costs related to this requirement shall be included as part of the monthly service charge.
E-0006 - E34 TEST FOR SULFIDES IN WATER (DLA ENERGY MAY 1987)
(a) SCOPE. This method describes a procedure for determining the presence of hydrogen sulfide, which is sometimes formed as a result of bacterial action on the sulfates contained in water bottoms in fuel storage tanks.
(b) APPARATUS. 250 ml conical flask.
(c) MATERIALS.
(1) Dilute (10%) chemically pure sulfuric or hydrochloric acid.
(2) Lead acetate paper.
(d) SAMPLES. Representative water samples from storage tank bottoms must be taken in a glass bottle. In some cases it will be necessary to take the water sample in a Bacon bomb sampler. Samples so taken will always be transferred to a glass bottle. To preclude oxidation by air, the filled bottle must be capped immediately. The sample should be tested as soon as possible after sampling to minimize possible changes in the composition of materials in the water.
(e) PROCEDURE.
(1) The sample must be shaken thoroughly just prior to performing the test to make certain that any sediment present is included in the portion of the sample to be tested.
(2) Transfer 100 ml of the shaken sample into a conical flask. Add 20 ml of dilute (10%) chemically pure sulfuric or hydrochloric acid to the flask. Immediately place a piece of lead acetate paper folded in a "V" shape in the neck of the flask. Bring the water to a boil and continue to gently boil for three or four minutes.
(f) REPORT. The presence of sulfides in the sample will be reported if the lead acetate paper shows a black or brown discoloration
E-0007 – E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)
(a) DEFINITION: As used in this contract provision:
Deviation is defined as a written authorization granted after contract award and prior to manufacture of an item, to depart from a particular performance or design requirement of a contract, specification, or referenced document, for a specific number of units or specific period of time, normally the duration of the contract.
Extraordinary situation means the matter cannot await resolution until the next DLA Energy business day (0800 to
1630 hours EST, Monday through Friday, Federal Holidays excluded).
Waiver is defined as a written authorization granted after contract award to accept a configuration item or other designated item which, during production or after having been submitted for inspection, is found to depart from specified requirements, but nevertheless is considered suitable for use “as is” or after repair by an approved method. Approval is on a case-by-case basis and is normally for a set period of time.
(b) The Government may, at its discretion, accept nonconforming supplies or services. In such cases, the Contractor must obtain a deviation or waiver from the Contracting Officer prior to acceptance.
(c) The following procedures shall be used to request a deviation or waiver.
(1) Requests for deviations and waivers shall be submitted by the Contractor to the Contracting Officer with a copy to the appropriate Inspection Office referenced in the LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS or QUALITY
REPRESENTATIVE contract provision of this contract. Each request shall provide the following information: Contractor name; name and contact information of the contractor’s authorized negotiator; contract number; contract line item number and product nomenclature, clause or contract provision number, paragraph and subparagraph, as appropriate; the nature of the request; the reason for the request; the corrective action being taken by the Contractor to correct and prevent recurrence of the condition(s) causing the nonconformance; and an agreement to pay an equitable price reduction, estimated and proposed by DLA Energy, over and above the administrative fee, contingent on the impact of the specific circumstances on DLA Energy relative to approval of the deviation or waiver.
(2) In extraordinary situations, the Contractor may initially submit a verbal request for a waiver, but not a deviation, to the Contracting Officer. Written requests shall be submitted to the Contracting Officer by the next DLA Energy business day (0800 to
1630 hours EST, Monday through Friday, Federal Holidays excluded). If the Contracting Officer cannot be reached, the Duty Officer shall be contacted to provide the necessary information to the proper individuals as soon as possible. The Duty Officer's telephone number is
(800) 286-7633 or (703) 767-8420.
(3) If a deviation or waiver is granted, the contract will be modified to accept the nonconforming supplies or services and to require the Contractor to provide an equitable price reduction or other adequate consideration commensurate with the deviation or waiver being granted. If the situation warrants, a deviation or waiver may be granted without prior agreement on price reduction or other consideration, subject to agreement by the Contractor, or its representative, to subsequent negotiation. Such an agreement, in addition to a brief description of the terms of the deviation or waiver, shall be documented on the shipping document or other appropriate correspondence. After negotiations, failure to agree on adequate consideration shall be a dispute concerning a question of fact within the meaning of the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS contract provision of this contract.
(4) If a deviation or waiver is granted and the nonconforming supplies are accepted, then in no event will consideration be less than $500, which covers administrative costs, plus any additional cost of Government reinspection or retest, if necessary.
(5) If a deviation or waiver is granted modifying this contract, but the supplies accepted are subsequently determined to be in conformity with contract specifications, the Contractor shall still be obligated to pay the consideration originally agreed upon in support of the deviation or waiver. If, however, this consideration exceeds $1000, a second contract modification shall be issued reducing the Contractor's obligation to $1000 (the administrative cost of issuing the two required modifications), plus, if appropriate, any cost of
Government reinspection or retest performed as a result of the deviation or waiver being granted.
(d) When notification of nonconforming supplies is received after the supplies have been accepted, and the Government determines not to exercise its right to reject or to require correction under the INSPECTION OF SUPPLIES – FIXED-PRICE, INSPECTION OF SERVICES – FIXED PRICE, or CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS contract provision, then in no event will consideration be less than $500 to cover administrative costs. This $500 fee is in addition to—
(1) Consideration commensurate with the extent of nonconforming supplies; and
(2) Cost of Government reinspection or retest, if necessary.
The administrative fee will apply to each claim letter issued for off-specification product delivered to an activity.
(e) Contractors shall be held responsible for payment of any fines or penalties imposed on a receiving activity by an environmental enforcement agency, resulting from the delivery of nonconforming supplies under a DLA Energy contract.
(f) Repeated tender of nonconforming supplies or services, including those with only minor defects, will be discouraged by appropriate actions, including, but not limited to, rejecting the supplies or services whenever feasible and documenting the Contractor's performance records.
E-0008 -E36 INSPECTION (STORAGE) (DLA ENERGY FEB 1970)
The facilities to be provided hereunder shall be ready for inspection and acceptance by __________________________. The
Contractor shall notify the Contracting Officer of the date such tanks and facilities are available for inspection and acceptance, and the
Contracting Officer, or his designated representative, shall…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .