CDRL_A026_-_Wood_Packaging_Material.pdf

PDF 170 KB Posted

Attached to
Distribution and Warehouse Services
Solicitation number
SP3300-18-R-5004
Issued by

About this file

CDRL A026

View the file

Other files

File Type Posted
RFP_SP3300-18-R-5004_Sections_B_-_M_(2-14-18)_TRACKED.docx DOCX document
SP3300-18-R-5004-A002.docx DOCX document
Attachment_J.1_Section_C_(2-12-18)_TRACKED.docx DOCX document
SP3300-18-R-5004_-_Questions_and_Answers__1_(2-15-18).docx DOCX document
Attachment J.33, Proposed Productive Hours —
A014 - Monthly Cost Report for Travel and Training CLIN.pdf PDF
RFP_SP3300-18-R-5004_Sections_B_-_M_(1-22-18)_TRACKED.docx DOCX document
Attachment J.25, TE 5.2 Projected Workload —
SP3300-18-R-5004-A001.docx DOCX document
Attachment J.2, DDGM Site Specific DOC document
Attachment J.37, TE 5.12N Air TCSP Customer Listing.pdf PDF
Attachment J.9, Contractor Equipment List —
A015 - Monthly Cost Report for Special Projects and SS CLIN.pdf PDF
Attachment J.36, Draft DDGM Dist Ops Training Schedule —
Attachment J.19, TE 4.2 Gov Operated Equip for Contractor Maint —
Attachment J.24, TE 5.1 DDGM Historical Workload XLS spreadsheet
A034 - MPC and Local Delivery Refusal Log.pdf PDF
Attachment J.1, Section C —
Attachment J.6, TE 3.4 GE-MHE —
Attachment J.8, TE 3.6 GE-Office Equipment DOC document
A013 - Monthly Cost Report for Material Support CLIN.pdf PDF
Attachment J.1, Section C —
A031 - MHE Corrosion Control Program.pdf PDF
A010 - Cost Report for CLIN X001.pdf PDF
Attachment J.2, DDGM Site Specific DOC document
A012 - Monthly Cost Report for Non-Capital Equip Replacement CLIN.pdf PDF
A011 - Monthly Cost Report for Equip Maint Mat CLIN.pdf PDF
Attachment J.7, TE 3.5 GE-MISC —
Attachment J.38, TE 5.13N MTIS Offload Process Flow.docx DOCX document
Notice_Regarding_Restricted_Access.docx DOCX document
CDRL_A027_-_Contractor_Employee_CAC_Report.pdf PDF
CDRL_A008_-_Location_Survey_Schedule.pdf PDF
CDRL_A024_-_Physical_Security_Plan.pdf PDF
CDRL_A001_-_Transition_Plan_and_Weekly_Reports.pdf PDF
CDRL_A002_-_SOH_Plan_and_Reporting.pdf PDF
CDRL_A022_-_Radioactive_Protection_Officer_Quarterly_Audit.pdf PDF
Attachment_J.22,_TE_4.5_Other_Equipment_PM_Task_Codes.xlsx XLSX spreadsheet
Attachment_J.26,_TE_5.11_Transshipment_of_Hazardous_Assets.doc DOC document
CDRL_A006_-_Quality_Control_Plan.pdf PDF
CDRL_A033_-_ODS_Leak_Detection_Report.pdf PDF
CDRL_A013_-_Cost_Report_for_Material_Support_CLIN.pdf PDF
Attachment_J.32,_TE_5.8N_Leak_Monitoring_Detection_and_Transfer_Procdures.docx DOCX document
Attachment_J.14,_TE_2.1_Definitions_Acronyms_and_Abbreviations.docx DOCX document
CDRL_A019_-_Storage_Space_Management_Report.pdf PDF
Attachment_J.6,_GE_-_Material_Handling_Equipment.doc DOC document
CDRL_A012_-_Cost_Report_for_Non-Capital_Equip_Replacement_CLIN.pdf PDF
Attachment_J.3,_Wage_Determination.pdf PDF
CDRL_A020_-_Shipment_to_Restricted_Country_-_Approval_Necessary.pdf PDF
Attachment_J.34_Proposed_Training_Hours_(3-31-17).xlsx XLSX spreadsheet
Attachment_J.29,_TE_6.1_Government_Forms.docx DOCX document
Show 40 more

Latest 50 of 131 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: A026
2_TITLE_OF_DATA_ITEM: Wood Packaging Material
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: N/A
5_CONTRACT_REFERENCE: Attachment J.1, Paragraph C-5.6.4
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT: B
10_FREQUENCY: See Block 16
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: J-7 Contract Spec
draft1:
reg1:
repro1: 1
addressee2: COR
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS: Submit electronically tailored to contractor's format. Reference DoD 4140.65-M Issue, Use, and Disposal of Wood Packaging Material (WPM). Report due date no later than the 10th of each month (or the next workday if it falls on a non-workday).

The following data elements required for the WPM verification:

1) Lumber receipts

2) Lumber used

3) Lumber NSN

4) Date of fabrication

Block 7 - Inspection and acceptance requirements:

The COR will review and provide acceptance after review and comments.

Block 14 - Distribution - Contractor to submit original to COR and copy to the Contract Specialist.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO: X007
B_EXHIBIT: Attachment J.11
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 1
Reset:
2017-12-21T09:21:53-0500
CRUSEY.SHANE.M.1287981151
2017-12-21T10:10:29-0500
FLICK.CLIFFORD.C.1032268311

File details come from the government source that posted it.