Questions_stemming_from_Amendment_0002_11-2-16_(Responses).docx

DOCX document 15 KB Posted

Attached to
Distribution Warehouse Services - DLA Distribution Hill, UT
Solicitation number
SP330016R5004
Issued by

About this file

Answers to Questions Stemming from Amendment 0002

View the file

Other files

File Type Posted
Amendment_0003_A021_-_Training_Report.pdf PDF
Amendment_0003_RFP_SP3300-16-R-5004_Sections_B-M_TRACKED.docx DOCX document
SP3300-16-R-5004_0003_11-3-16.pdf PDF
Amendment_0003_A006_-_Quality_Control_Plan.pdf PDF
Amendment_0003_Attachment_J.26_TE_5.2_Projected_Workload_DDHU_(10-26-16).docx DOCX document
Amendment_0002_RFP_SP3300-16-R-5004_Sections_B-M_TRACKED.docx DOCX document
Amendment_0001_DDHU_RFP_Questions.docx DOCX document
SP3300-16-R-5004_0001_10-14-16.pdf PDF
Attachment_J.14 _TE_2.1_Definitions_Acronyms_and_Abbreviations.docx DOCX document
Attachment_J.11_A013_-_Monthly_Cost_Report_for_Material_Support_CLIN.pdf PDF
Attachment_J.11_A029_-_Contractor_Labor_Hour_Report_(including_Subcontractor).pdf PDF
Attachment_J.32 _Draft_Distribution_Ops_Training_Schedule.xlsx XLSX spreadsheet
Attachment_J.19 _TE_4.1_Contractor_Training_.docx DOCX document
Attachment_J.11_A024_-_Physical_Security_Plan.pdf PDF
9-29-16_RFP_SP3300-16-R-5004_Sections_B-M_for_FBO_Issuance.docx DOCX document
Attachment_J.30 _TE_5.9_DSS_Load_and_Maintain.docx DOCX document
Attachment_J.26 _TE_5.2_Projected_Workload_DDHU.docx DOCX document
Attachment_J.6 _Gov_Equipment_MHE.xlsx XLSX spreadsheet
Attachment_J.11_A002_-_SOH_Plan_and_Reporting.pdf PDF
Attachment_J.5 _CLIN_X006_Labor_Rate_Table_DDHU.xlsx XLSX spreadsheet
Attachment_J.18 _TE_3.4_Environmental_Storage_Control.docx DOCX document
Attachment_J.20 _TE_4.2_Gov_Operated_Equipment_for_Contractor_Maintenance.xlsx XLSX spreadsheet
Attachment_J.13 _TE_1.2_CAC_Procedures.docx DOCX document
Attachment_J.11_A021_-_Training_Report.pdf PDF
Attachment_J.11_A032_-_SBSS_Inventory_Schedule.pdf PDF
Attachment_J.11_A007_-_Customer_Service_Support_Procedures-On-Call_Response_Roster.pdf PDF
Attachment_J.29 _TE_5.5__Type_Physical_Inventory_Code_(TPIC)_Matrix.docx DOCX document
Attachment_J.31 _TE_6.1_Government_Forms.docx DOCX document
Attachment_J.10_Past_Performance_Questionnaire.docx DOCX document
Attachment_J.11_A012_-_Monthly_Cost_Report_for_Non-Capital_Equip_Replacement_CLIN.pdf PDF
Attachment_J.11_A009_-_Contractor_Provided_Equipment_Report.pdf PDF
Attachment_J.11_A005_-_ION_Reporting.pdf PDF
Attachment_J.7 _Gov_Equipment_AMHS.xlsx XLSX spreadsheet
Attachment_J.33 _Proposed_Productive_Labor_Hours.xlsx XLSX spreadsheet
Attachment_J.24 _TE_5.0_APLs.doc DOC document
Attachment_J.11_A003_-_ESD_Control_Program.pdf PDF
Attachment_J.9 _Contractor_Equipment_List.pdf PDF
Attachment_J.22 _TE_4.4_AMHS_PM_Task_Codes.xls XLS spreadsheet
Attachment_J.34_Proposed_Training_Hours_for_Management_Support_and_Distribution_Areas.xlsx XLSX spreadsheet
Attachment_J.8 _Gov_Equipment_Misc.xlsx XLSX spreadsheet
Attachment_J.2 _Site_Specific_Requirements_(8-26-16)_clean.docx DOCX document
Attachment_J.25 _TE_5.1_Historical_Workload.docx DOCX document
Attachment_J.11_A016_-_Open_Unconfirmed_MRO.pdf PDF
Attachment_J.11_A017_-_GOCARE_Program.pdf PDF
Attachment_J.34_Proposed_Training_Hours_for_Management_Support_and_Distribution_Areas.xlsx XLSX spreadsheet
Attachment_J.33 _Proposed_Productive_Labor_Hours.xlsx XLSX spreadsheet
DRAFT_RFP_SP3300-16-R-5004_Sections_B-M.docx DOCX document
Draft_Attachment_J.25 _TE_5.1_Historical_Workload.docx DOCX document
Draft_Attachment_J.26 _TE_5.2_Projected_Workload_DDHU.docx DOCX document
SF33.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question RFP Page OR Pre-Proposal Conference OR Site Visit/GFP/GFE Review/Inspection

RFP Para Reference (if question relates to the RFP)
Response:
Where will the Depack of all F condition assets done by the Government be performed and what will be required of the SP in support of this operation?
Attachment J.2, page 6
5.2.5.15AF, paragraph A
The Government Depack area will be located in building 849 near the non-accountable cage. The SP will be required to deliver F condition material requiring depack to this area in building 849. Once the material is depacked by the Government, it will be staged for the SP to pick up the material and deliver it to the maintenance centers.
Will the SP be responsible for movement of the bare item from the Government’s Depack area to the Maintenance Facility? If so, how will this action be tracked in DSS?
Attachment J.2, page 6
5.2.5.15AF, paragraph A
Yes. The SP will be responsible for moving the bare items form the Government Depack area to the Maintenance Facility. This will be tracked the same way as any local delivery.
Will the SP be responsible for pick-up and movement of the reusable container to the Reclaim area and the removal/discarding of those that are “trashed”/cannot be reclaimed?
Attachment J.2, page 6
5.2.5.15AF, paragraph A
Yes. The SP will be responsible for pick-up and movement of all reusable containers to the reclaim area. Trash and non-reusable containers will be handled by the Government Depack employees.

File details come from the government source that posted it. Updated .