Attachment_J.22 _TE_4.4_AMHS_PM_Task_Codes.xls

XLS spreadsheet 395 KB Posted

Attached to
Distribution Warehouse Services - DLA Distribution Hill, UT
Solicitation number
SP330016R5004
Issued by

About this file

Attachment J.22 TE 4.4

View the file

Other files

File Type Posted
Amendment_0003_A021_-_Training_Report.pdf PDF
Amendment_0003_RFP_SP3300-16-R-5004_Sections_B-M_TRACKED.docx DOCX document
SP3300-16-R-5004_0003_11-3-16.pdf PDF
Amendment_0003_A006_-_Quality_Control_Plan.pdf PDF
Amendment_0003_Attachment_J.16_TE_3.2_Government_Training.docx DOCX document
Amendment_0003_Attachment_J.1_Section_C_(11-3-16)_TRACKED.docx DOCX document
Amendment_0003_Attachment_J.29_TE_5.5__Type_Physical_Inventory_Code_(TPIC)_Matrix.docx DOCX document
Questions_stemming_from_Amendment_0002_11-2-16_(Responses).docx DOCX document
Amendment_0001_DDHU_RFP_Questions.docx DOCX document
SP3300-16-R-5004_0001_10-14-16.pdf PDF
Amendment_0001_Attachment_J.16_TE_3.2_Government_Training.docx DOCX document
Amendment_0001_Attachment_J.19_TE_4.1_Contractor_Training.docx DOCX document
Attachment_J.14 _TE_2.1_Definitions_Acronyms_and_Abbreviations.docx DOCX document
Attachment_J.11_A013_-_Monthly_Cost_Report_for_Material_Support_CLIN.pdf PDF
Attachment_J.11_A029_-_Contractor_Labor_Hour_Report_(including_Subcontractor).pdf PDF
Attachment_J.32 _Draft_Distribution_Ops_Training_Schedule.xlsx XLSX spreadsheet
Attachment_J.19 _TE_4.1_Contractor_Training_.docx DOCX document
Attachment_J.11_A024_-_Physical_Security_Plan.pdf PDF
9-29-16_RFP_SP3300-16-R-5004_Sections_B-M_for_FBO_Issuance.docx DOCX document
Attachment_J.30 _TE_5.9_DSS_Load_and_Maintain.docx DOCX document
Attachment_J.26 _TE_5.2_Projected_Workload_DDHU.docx DOCX document
Attachment_J.6 _Gov_Equipment_MHE.xlsx XLSX spreadsheet
Attachment_J.11_A002_-_SOH_Plan_and_Reporting.pdf PDF
Attachment_J.5 _CLIN_X006_Labor_Rate_Table_DDHU.xlsx XLSX spreadsheet
Attachment_J.18 _TE_3.4_Environmental_Storage_Control.docx DOCX document
Attachment_J.20 _TE_4.2_Gov_Operated_Equipment_for_Contractor_Maintenance.xlsx XLSX spreadsheet
Attachment_J.13 _TE_1.2_CAC_Procedures.docx DOCX document
Attachment_J.11_A021_-_Training_Report.pdf PDF
Attachment_J.11_A032_-_SBSS_Inventory_Schedule.pdf PDF
Attachment_J.11_A007_-_Customer_Service_Support_Procedures-On-Call_Response_Roster.pdf PDF
Attachment_J.29 _TE_5.5__Type_Physical_Inventory_Code_(TPIC)_Matrix.docx DOCX document
Attachment_J.31 _TE_6.1_Government_Forms.docx DOCX document
Attachment_J.17 _TE_3.3_Government_Data_Systems.doc DOC document
Attachment_J.11_A018_-_DOT_Exemption_Usage_Report.pdf PDF
Attachment_J.27 _TE_5.3_Kit_Quote.xlsx XLSX spreadsheet
Attachment_J.11_A001_-_Transition_Plan_and_Weekly_Reports.pdf PDF
Attachment_J.35_SB_Participation_Plan_Template.doc DOC document
SF33.pdf PDF
Attachment_J.11_A031_-_SBSS_Direct_Turnover_Report.pdf PDF
Attachment_J.11_A006_-_Quality_Control_Plan.pdf PDF
Attachment_J.3_Wage_Determination.pdf PDF
Attachment_J.11_A030_-_Phase-out_Plan.pdf PDF
Attachment_J.11_A004_-_SSDRP.pdf PDF
Attachment_J.11_A008_-_Location_Survey_Schedule.pdf PDF
Attachment_J.34_Proposed_Training_Hours_for_Management_Support_and_Distribution_Areas.xlsx XLSX spreadsheet
DRAFT_RFP_SP3300-16-R-5004_Sections_B-M.docx DOCX document
Draft_Attachment_J.1 _Section_C_(9-15-16)_clean.docx DOCX document
Draft_Attachment_J.2 _Section_C-AF_(8-26-16)_clean.docx DOCX document
DDHU_Preproposal_Conference_Instructions_(8-31-16).docx DOCX document
SF33.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Spiral Shrink Wrap Mach

Spiral Shrink Wrap Machine - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
spiral shrink wrap machine, electric (EJON: 0H7204, 0H7207, 0H7208, 0H7209, 0H7210)30-monthly3010complete operation check0.2
30-monthly1100lube0.1
30-monthly2128check for safety hazards0.1
30-monthly2127check and tighten carriage lift belt0.4
0.8
Annually9.6

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Roller Convyr Diverter

Roller Conveyor Diverter - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
roller conveyor diverter, electric (EJON: 0H4047, 0H4266, 0H4267)56-eight week2071check belt tracking/lacing0.5
56-eight week2028check, clean drive motor0.1
56-eight week2117check hardware/tighten as needed0.5
56-eight week2118inspect covers0.3
56-eight week1010lubricate rollers0.2
56-eight week1014clean, oil chain1
56-eight week1042check gear box oil/fill if needed0.2
56-eight week1104clean rollers on line1
56-eight week1105lube bearings in drive motor0.3
56-eight week2106clean belts1
5.1
Annually33.15

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Pneumatic Air Stop

Pneumatic Air Stop - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
pneumatic air stop, pneumatic/electric (EJON: 0H0051, 0H0052, 0H0053, 0H0054, 0H0055, 0H0060, 0H0061, 0H0062, 0H0063, 0H0064, 0H0065, 0H0066, 0H0067, 0H0068)180-semi-annual1100lube0.1
180-semi-annual2043check general operation0.1
180-semi-annual4100verify equipment is on site with location0.3
0.5
Annually1

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Dock Leveler

Dock Leveler - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
dock leveler, electric (EJON: 0H7091, 0H7092, 0H7093, 0H7094, 0H7095, 0H7096, 0H7097)90-quarterly2038check for proper operation0.3
90-quarterly3032clean machine0.1
0.4
Annually1.6
dock leveler, electric (EJON: 0H7303, 0H7304, 0H7305, 0H7306, 0H7307, 0H7308, 0H7309, 0H7310, 0H7311, 0H7313, 0H7314, 0H7315, 0H7316, 0H7317, 0H7318, 0H7319, 0H7320)90-quarterly1019lube complete0.5
90-quarterly2018check & replace damaged/missing part0.1
90-quarterly1053service as needed0.5
90-quarterly1035check hydraulic system oil level0.5
90-quarterly1097drain/refill hydraulic oil0.4
2
Annually8
dock leveler, unpowered (EJON: 0H9250)30-monthly1023verify structural soundness0.3
30-monthly1022check all welds for cracks0.5
30-monthly1133clean1
30-monthly2117check hardware/tighten as needed0.5
2.3
Annually27.6

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Convyr Spiral

Conveyor Spiral - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
conveyor spiral, electric (EJON: 0H4261, 0H4262)56-eight week2071check belt tracking/lacing0.5
56-eight week2028check, clean drive motor0.1
56-eight week2117check hardware/tighten as needed0.5
56-eight week2118inspect covers0.3
56-eight week1010lubricate rollers0.2
56-eight week1014clean, oil chain1
56-eight week1042check gear box oil/fill if needed0.2
56-eight week1104clean rollers on line1
56-eight week1105lube bearings in drive motor0.3
56-eight week2106clean belts1
5.1
Annually33.15

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Convyr Roll PKG Curve

Conveyor Roller Package Curve - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
conveyor roller package curve, electric (EJON: 0H7100, 0H7104, 0H7108, 0H7109, 0H7110, 0H7111, 0H7112, 0H7113, 0H7116, 0H7118, 0H7119, 0H7120, 0H7121, 0H7122, 0H7123, 0H7124, 0H7126)56-eight week2071check belt tracking/lacing0.5
56-eight week2028check, clean drive motor0.1
56-eight week2117check hardware/tighten as needed0.5
56-eight week2118inspect covers0.3
56-eight week1010lubricate rollers0.2
56-eight week1014clean, oil chain1
56-eight week1042check gear box oil/fill if needed0.2
56-eight week1104clean rollers on line1
56-eight week1105lube bearings in drive motor0.3
56-eight week2106clean belts1
5.1
Annually33.15

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Convyr Roll Accum Pkg

Conveyor Roller Accumlation Package - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
conveyor roller accumulation package, electric (EJON: 0H4018, 0H4020, 0H4055, 0H4056, 0H4057, 0H4058, 0H4059, 0H4060, 0H4097, 0H4120, 0H4121, 0h4122, 0H4123, 0H4124, 0H4125, 0H4126, 0H4127, 0H4128, 0H4129)56-eight week2071check belt tracking/lacing0.5
56-eight week2028check, clean drive motor0.1
56-eight week2117check hardware/tighten as needed0.5
56-eight week2118inspect covers0.3
56-eight week1010lubricate rollers0.2
56-eight week1014clean, oil chain1
56-eight week1042check gear box oil/fill if needed0.2
56-eight week1104clean rollers on line1
56-eight week1105lube bearings in drive motor0.3
56-eight week2106clean belts1
5.1
Annually33.15

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Convyr Chain Powered

Conveyor Chain Powered - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
conveyor chain powered, electric (EJON: 0H4318, 0H4321, 0H4325, 0H4328, 0H4331, 0H4334)56-eight week2071check belt tracking/lacing0.5
56-eight week2028check, clean drive motor0.1
56-eight week2117check hardware/tighten as needed0.5
56-eight week2118inspect covers0.3
56-eight week1010lubricate rollers0.2
56-eight week1014clean, oil chain1
56-eight week1042check gear box oil/fill if needed0.2
56-eight week1104clean rollers on line1
56-eight week1105lube bearings in drive motor0.3
56-eight week2106clean belts1
5.1
Annually33.15

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Convyr Roller Gravity

Conveyor Roller Gravity - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
conveyor roller gravity, unpowered (EJON: 0H4401, 0H4402, 0H4403, 0H4404, 0H4405, 0H4406, 0H4407, 0H4408, 0H4409)56-eight week2247check alignment of line/straighten as needed0.4
56-eight week1010lubricate rollers0.2
56-eight week1104clean rollers on line1
56-eight week2117check hardware/tighten as needed0.5
56-eight week2246check legs/check floor security0.3
2.4
Annually15.6

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Convyr Live Roll Pkg

Conveyor Live Roller Package - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
conveyor live roll package, electric (EJON: 0H4017, 0H4131, 0H4132, 0H4133, 0H4144, 0H4164,56-eight week2071check belt tracking/lacing0.5
0H4165, 0H4167, 0H4168, 0H4180, 0H4183, 0H4184, 0H4202, 0H4205, 0H4210, 0H4218, 0H4219, 0H4224, 0H4226, 0H4258, 0H4264, 0H4279, 0H4301,56-eight week2028check, clean drive motor0.1
0H4303, 0H4305, 0H4306, 0H4307, 0H4316, 0H4349, 0H4350, 0H4353, 0H4359, 0H4362, 0H4364, 0H4366, 0H4368, 0H4375, 0H4376)56-eight week2117check hardware/tighten as needed0.5
56-eight week2118inspect covers0.3
56-eight week1010lubricate rollers0.2
56-eight week1014clean, oil chain1
56-eight week1042check gear box oil/fill if needed0.2
56-eight week1104clean rollers on line1
56-eight week1105lube bearings in drive motor0.3
56-eight week2106clean belts1
5.1
Annually33.15

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Convyr Flat Belt

Conveyor Flat Belt Curve/Power - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
conveyor flat belt curve, electric (EJON: 0H4260)56-eight week2071check belt tracking/lacing0.5
56-eight week2028check, clean drive motor0.1
56-eight week2117check hardware/tighten as needed0.5
56-eight week2118inspect covers0.3
56-eight week1010lubricate rollers0.2
56-eight week1014clean, oil chain1
56-eight week1042check gear box oil/fill if needed0.2
56-eight week1104clean rollers on line1
56-eight week1105lube bearings in drive motor0.3
56-eight week2106clean belts1
5.1
Annually33.15
conveyor flat belt power, electric (EJON: 0H4046, 0H4049, 0H4050, 0H4051, 0H4088, 0H4092, 0H4093,56-eight week2071check belt tracking/lacing0.5
0H4094, 0H4116, 0H4134, 0H4136, 0H4138, 0H4139, 0H4140, 0H4220, 0H4221, 0H4231, 0H4263, 0H4265, 0H4269, 0H4270, 0H4271, 0H4273, 0H4274,56-eight week2028check, clean drive motor0.1
0H4276, 0H4277, 0H4278, 0H4299, 0H4300, 0H4302, 0H4304, 0H4308, 0H4309, 0H4310, 0H4311, 0H4312, 0H4313, 0H4314, 0H4315, 0H4317, 0H4319, 0H4322, 0H4323,56-eight week2117check hardware/tighten as needed0.5
0H4324, 0H4326, 0H4327, 0H4329, 0H4330, 0H4332, 0H4333, 0H4335, 0H4351, 0H4358, 0H4360, 0H4363, 0H4365, 0H4370, 0H4372, 0H4374, 0H7061)56-eight week2118inspect covers0.3
56-eight week1010lubricate rollers0.2
56-eight week1014clean, oil chain1
56-eight week1042check gear box oil/fill if needed0.2
56-eight week1104clean rollers on line1
56-eight week1105lube bearings in drive motor0.3
56-eight week2106clean belts1
5.1
Annually33.15

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Convyr Belt Non-MMHS

Conveyor Belt Non-MMHS - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
conveyor belt non-mmhs, unpowered (EJON: 0H9801)semi-annual2020clean equipment0.3
semi-annual1022check all welds for cracks0.5
semi-annual2031check, tighten set screws0.3
1.1
Annually2.2

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Elec Cntrl Sys

Electronic Control System (MMHS) - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
electronic control system (mechanized material handling system) (EJON: 0H4001, 0H4002, 0H4003, 0H4004, 0H4005, 0H4006, 0H4007, 0H4008, 0H4009, 0H4010, 0H4012, 0H7000, 0H7001, 0H7003, 0H7004, 0H7005, 0H7007, 0H7008)180-semi-annual3010complete operation check0.2
180-semi-annual2076check circuits/wiring1
180-semi-annual1000air clean0.2
1.4
Annually2.8
electronic control system (mechanized material handling system) (EJON: 0H4900)30-monthly1133clean1
30-monthly2016checkbelt align/tension0.3
30-monthly3033check/tighten bolts0.5
30-monthly1015lube all bearings1
30-monthly1040lube motor gearhead1
30-monthly1042check gear box oil/fill if needed0.2
4
Annually48

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Convyr chain Curve

Conveyor Chain Curve Powered - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
conveyor chain curve powered, electric (EJON: 0H4154, 0H4348)56-eight week2071check belt tracking/lacing0.5
56-eight week2028check, clean drive motor0.1
56-eight week2117check hardware/tighten as needed0.5
56-eight week2118inspect covers0.3
56-eight week1010lubricate rollers0.2
56-eight week1014clean, oil chain1
56-eight week1042check gear box oil/fill if needed0.2
56-eight week1104clean rollers on line1
56-eight week1105lube bearings in drive motor0.3
56-eight week2106clean belts1
5.1
Annually33.15

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Carousel

Carousel
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
carousel, electric (EJON: 0H4509, 0H4511, 0H4512, 0H4513, 0H4514, 0H4516, 0H4518, 0H4521, 0H4522, 0H4523, 0H4525)365-annual2004check contactor points0.1
365-annual2022check door switches0.3
365-annual4408visually inspect for discoloration of heaters0.5
365-annual3055check relay for tightness0.5
365-annual3038check electric control1
365-annual2020clean equipment0.3
365-annual3026check electric connections0.2
365-annual3023check indicator lights0.3
365-annual3017clean panels0.1
365-annual3003inspect points, motor starter0.1
365-annual2076check circuits/wiring1
365-annual3027check fuse, heater rating4
8.4
Annually8.4

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&R SP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Sortation Sys Pneu Push

Sortation System Pneumatic Push - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
sortation system pneumatic push, electric/pneumatic (EJON: 0H5101, 0H5102, 0H5103, 0H5104, 0H5105, 0H5106, 0H5107, 0H5108, 0H5109, 0H5110, 0H5111, 0H5112, 0H5113, 0H5114, 0H5115, 0H5116, 0H5117, 0H5118,30-monthly3010complete operation check0.2
0H5500, 0H5501, 0H5502, 0H5503, 0H5504, 0H5505, 0H5506, 0H5507, 0H5508, 0H5509, 0H5510, 0H5511, 0H5512, 0H5513, 0H5514)30-monthly1008check/fill oil levels0.1
30-monthly1053service as needed0.5
30-monthly1056check oil leaks0.1
30-monthly2037drain water separator0.1
30-monthly2038check for proper operation0.3
30-monthly3001check for air leaks0.1
1.4
Annually16.8

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Vehicle Comm Sys (MHS)

Vehicle Communication System (Material Handling System) - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
vehicle communication system (mechanized material handling system), electric (EJON: 0H5295, 0H5297, 0H5298, 0H5299)30-monthly1000air clean0.2
30-monthly2076check circuits/wiring1
30-monthly3058check wire guidance0.3
30-monthly4005adjust power suppy0.5
30-monthly4006adjust osc0.5
30-monthly4007adjust driver cards0.5
3
Annually36
vehicle communication system (mechanized material handling system) electric (EJON: 0H5302)90-quarterly1000air clean0.2
90-quarterly2076check circuits/wiring1
90-quarterly3058check wire guidance0.3
1.5
Annually6
vehicle communication system (mechanized material handling system), electric (EJON: 0H5305)365-annual1000air clean0.2
365-annual2076check circuits/wiring1
1.2
Annually1.2

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Compressor Air Stationary

Compressor Air Stationary - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
compressor air stationary, electric (EJON:0H7270, 0H7271)2-2 day1077check coolant heater0.2
2-2 day1000air clean0.2
2-2 day2036check and tighten all fittings0.3
2-2 day2035check filter indicator if red change0.1
0.8
Annually146
compressor air stationary, electric (EJON: 0H8201, 0H8202, 0H8205, 0H8208)30-Monthly2009operate safety valves0.1
30-Monthly1008check/fill oil levels0.1
30-Monthly1028change air compressor oil0.3
30-Monthly1052clean oil tank breather0.5
1
Annually12
compressor air stationary, electric (EJON: 0h5150, 0x8230)30-Monthly1008ck/fill oil levels0.1
30-Monthly2009operate safety valves0.1
30-Monthly1028chg air comp oil0.3
30-Monthly1052clean oil tank breather0.5
1
Annually12

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Misc Whse Equip

Miscelaneous Warehouse Equipment - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
hookbase -38/44, fork truck attachment, unpowered (EJON: 0H9442, 0H9443)30-monthly1022check all welds for cracks0.5
30-monthly1023verify structural soundness0.3
30-monthly1133clean1
30-monthly2117check hardware/tighten as needed0.5
2.3
Annually27.6

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

Electronic Data Input Device

Electronic Data Input Device - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionStandard Time of Completion
electronic data input device-shock watch (EJON: 0H0044, 0H0045, 0H0077, 0H0079, 0H0080, 0H0081, 0H0082, 0H0083, 0H0085, 0H0086, 0H0087, 0H0088, 0H0089)30-monthly3094check/clean shock watch0.4
30-monthly3203upload operator lists0.5
30-monthly2024check, tighten mounting bolt0.5
30-monthly3026check electric connections0.2
1.6
Annually19.2

&CTechnical Exhibit 4.3 DDHU MHS PM Task Codes&RSP3100-07-R-0002 &CTE 4.3 MHS PM Task Codes &P of &N

File details come from the government source that posted it. Updated .