Questions Amd 0010

View the file

Other files for this federal contract opportunity

Other files attached to COCO and alongside refueling services at Yuma proving Grounds, newest first.
File Type Posted
SF_30_0011_yPGa.pdf PDF
SF_30_0010_yPGa.pdf PDF
SF_30_0009_yPGa.pdf PDF
Amd_0009_Questions.docx DOCX document
YPG_PWS_UPDATES_8_July.doc DOC document
Amd_0008_Questions.docx DOCX document
TPR_99-1.pdf PDF
SF_30_0008_yPGa.pdf PDF
WD_YPG_June2013.pdf PDF
SF_30_0007-yPGa.pdf PDF
YPG_PWS_UPDATES_25_June_mod1.doc DOC document
SF_30_0006_yPGa.pdf PDF
SF_30_0005_yPGa.pdf PDF
SF_30_0004_yPGa.pdf PDF
SF_30_0003_yPG.apdf.pdf PDF
YPG_PWS_UPDATES_12_June_mod1.doc DOC document
Field_Deliveries_locations_and_miles_YPG.pdf PDF
COCO_Fuels_RoA_Section_C_112011.pdf PDF
SF_30_0001_yPGa.pdf PDF
ATT_I_YPG_PWS_.pdf PDF
13R0511_Yuma_Proving_Ground_Solicitation.pdf PDF
ATT_II_OSP_.pdf PDF
ATT_IV_Past_Performance_Survey.pdf PDF
ATT_VII_ConsentLetter.pdf PDF
ATT_V_Draft_Lease_YPG.pdf PDF
ATT_III_Wage_Determination.pdf PDF
ATT_VI__19.3_Subcontracting_Plan.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP0600-13-R-0511

Amendment 0010 Yuma Proving Grounds, AZ July, 18, 2013 Questions & Answers

158. The PWS states on page 17, paragraph C.8.1, last sentence, that Tanks shall be cleaned in accordance with INT E18. We cannot find any reference to what INT E18 is. Will the Government please issue a copy of this instruction or document, or direct us to where we can find it?

ANSWER: Please see amendment 0010, E18 is now incorporated in to the solicitation.

159. The answer to Question 22 issued with Amendment 0008 alludes to the fact that there will be design reviews. Will the Government please state at what stages of the design they occur, where to send them and how many hard copies, and what is the review period for each review, as our schedule might need to be adjusted to show this?

ANSWER: About 30-60 days after award, a solid 35% design review is requested to provide the DPW Engineering Section the ability to comment on and coordinate for end state utility hookups, understand tank capacities for amended environmental documents. It also ensures the design meets installation design guide requirements, is UFC/NFPA compliant, etc. It is also to allow further design revisions to accommodate/meet any recommend changes by the installation, DLA Energy, or the Army Petroleum Center (APC). The Government normally requires about 14 days to coordinate comments back to DLA Energy through the DLA Energy COR.

160. Reference question and answer # 93 (amendment 8), please clarify that the tracked vehicles actually have to exit the facility the same way they enter the facility (reverse direction) or can they pass straight through the facility once fueled exiting the other side of the property?

Answer: Both are sufficient answers but exit should be as close as possible to tank trail designated on map

161. Reference question and answer # 140 (amendment 8), which states M1-A1 may also be trailered in, for pavement design, can you please confirm the heaviest load will now exceed the 70 tons listed in Appendix E, PWS? Appendix E indicates total # of dispensers as (2) dual and (3) dual (KOFA). Do you want (2/3) dual dispensers (capable of fueling 4/6-vehicles simultaneously)? If so what will the maximum weight be?

Answer: 70 tons is the maximum

b. Yes, (2/3) dual dispensers capable of fueling 4/6-vehicles simultaneously

c. 5 ton for MUR and DS2 and JP8 is 70 ton

162. Reference Appendix E, YTC and KOFA sites, can you please confirm the approximate frequency tracked vehicles will be entering the site and fueling at the same time?

Answer: Only a few times daily