NB194000-16-04839_Mech_Specs_Binder.pdf

PDF 3 MB Posted

Attached to
NB194000-16-04839 Building 1 Wing 3 Customization
Solicitation number
SB1341-16-RQ-0982
Issued by

About this file

B1W3 Mechanical Specs Binder

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NIST WING 3 RE-CUSTOMIZATION 03/30/16

CONSTRUCTION DOCUMENTS

TABLE OF CONTENTS

DIVISION 22 – PLUMBING

22 05 00 Common Work Results for Plumbing

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING

23 05 00 Common Work Results for Mechanical 23 05 07 Motors, Drives, Motor Controllers and Electrical Requirements for Mechanical Equipment 23 05 09 Mechanical Fire Stopping 23 05 10 Basic Piping Materials and Methods 23 05 18 Piping Specialties 23 05 19 Meters and Gauges for Mechanical Piping 23 05 23 General Duty Valves for Mechanical Piping 23 05 29 Hangers and Supports for Mechanical Piping & Equipment 23 05 48 Vibration and Seismic Controls for Mechanical Systems 23 05 53 Identification for Mechanical Systems 23 05 93 Testing, Adjusting and Balancing for Mechanical Systems 23 07 00 Insulation for Mechanical Systems 23 09 00 Instrumentation and Control for Mechanical Systems 23 09 93 Sequences of Operation for Mechanical Systems 23 21 23 Hydronic Pumps 23 25 00 Water Treatment for Mechanical Systems 23 57 00 Heat Exchangers for HVAC

DIVISION 26 – ELECTRICAL

26 05 00 Common Work Results for Electrical 26 05 19 Low Voltage Electrical Power Conductors and Cables 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 05 34 Cabinets, Boxes and Fittings 26 05 53 Identification for Electrical Systems 26 05 83 Wiring Connections 26 22 00 Low Voltage Transformers 26 24 16 Panelboards 26 28 00 Low Voltage Circuit Protective Devices 26 43 13 Surge Protective Device (SPD)

TABLE OF CONTENTS 1

SECTION 22 05 00 – COMMON WORK RESULTS FOR PLUMBING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS:

A. Refer to Section 23 05 00. All work of Division 22 shall be in accordance with the corresponding section of Division 23, unless otherwise addressed in this Division.

B. This contract is subject to the Buy American Act and as required by that Act, Work performed under this contract shall use only domestically produced construction materials except when impossible due to documentable reasons.

1. Provide Government required reporting documents verifying compliance with the Buy American/ARRA requirements.

END OF SECTION 22 05 00

COMMON WORK RESULTS FOR PLUMBING 22 05 00 - 1

SECTION 23 05 00 - COMMON WORK RESULTS FOR MECHANICAL

PART 1 - GENERAL

1.1 RELATED DOCUMENTS:

A. All drawings associated with the entire project, including general provisions of the Contract, including The General Conditions of the Contract for Construction, General and Supplementary Conditions and Division-1 Conditions specification sections shall apply to the Division 21, 22, and 23 specifications and drawings. The Contractor shall be responsible for reviewing and becoming familiar with the aforementioned and all other Contract Documents associated with the project.

B. Related Sections: Refer to all sections in Division 21, 22, and 23. Refer to Division 26 specification sections and Division 26 drawings.

C. Where contradictions occur between this section and Division 1, the more stringent requirement shall apply.

D. Contractor shall be defined as any and all entities involved with the construction of the project.

1.2 SUMMARY:

A. This Section specifies the basic requirements for mechanical installations and includes requirements common to more than one section of Divisions 21, 22, and 23. It expands and supplements the requirements specified in Division 1.

B. This contract is subject to the Buy American Act and as required by that Act, Work performed under this contract shall use only domestically produced construction materials except when impossible due to documentable reasons.

1. Provide Government required reporting documents verifying compliance with the Buy American/ARRA requirements.

1.3 MECHANICAL INSTALLATIONS:

A. The Contract Documents are diagrammatic, showing certain physical relationships which must be established within the mechanical work and its interface with all other work. Such establishment is the exclusive responsibility of the Contractor. Drawings shall not be scaled for the purpose of establishing material quantities.

B. Drawings and specifications are complementary. Whatever is called for in either is binding as though called for in both. Report any discrepancies to the Engineer and obtain written instructions before proceeding. Where any contradictions occur between the specifications and the drawings the more stringent requirement shall apply. The contractor shall include pricing for the more stringent and expensive requirements.

C. Drawings shall not be scaled for rough-in measurements or used as shop drawings. Where drawings are required for these purposes or have to be made from field measurement, Contractor shall take the necessary measurements and prepare the drawings.

D. The exact location for some items in this specification may not be shown on the drawings. The location of such items may be established by the Engineer during the progress of the work.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 1

E. The contract documents indicate required size and points of terminations of pipes, and suggest proper routes to conform to structure, avoid obstructions and preserve clearances. It is not intended that drawings indicate necessary offsets. The contractor shall make the installation in such a manner as to conform to the structure, avoid obstructions, preserve headroom and keep openings and passageways clear, without further instructions or costs to the Owner. All equipment shall be installed so access is maintained for serviceability.

F. Before any work is installed, determine that equipment will properly fit the space; that required piping grades can be maintained and that ductwork can be run as intended without interferences between systems, structural elements or work of other trades.

G. Verify all dimensions by field measurements.

H. Coordinate installation in chases, slots and openings with all other building components to allow for proper mechanical installations.

I. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the work. Give particular attention to large equipment requiring positioning prior to closing-in the building.

J. Where mounting heights are not detailed or dimensioned, install mechanical services and overhead equipment to provide the maximum headroom possible.

K. Install mechanical equipment to facilitate maintenance and repair or replacement of equipment components. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations.

L. Make allowance for expansion and contraction for all building components and piping systems that are subject to such.

M. The ceiling space shall not be “layered”. It is the contractor’s responsibility to offset and system as required to allow installation within the identified ceiling cavity. The contractor shall include labor and material in the base bid to accommodate such offsets.

N. In general, all “static” piping systems shall be routed as high as possible, i.e. fire protection systems. Keep all equipment in accessible areas such as corridors and coordinate with systems and equipment from other sections.

O. The Contractor shall provide all labor and material necessary but not limited to the starting/stopping of all mechanical equipment, opening/closing of all valves, draining/refilling all mechanical systems and operating/verifying the operation of all mechanical systems controls as required to accomplish all work necessary to meet construction document requirements.

Contractor shall submit records of such activities to engineer and include in the O & M manuals.

1.4 COORDINATION:

A. Work out all installation conditions in advance of installation. The Contractor shall be responsible for preparing coordination drawings, showing all work, in all areas. The Contractor shall be responsible for providing all labor and material, including but not limited to all fittings, isolation valves, offsets, hangers, control devices, etc., necessary to overcome congested conditions at no increase in contact sum. The Contractors base bid shall include any and all time and manpower necessary to develop such coordination efforts and drawings. Increases to contract sum or schedule shall not be considered for such effort.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 2

B. Provide proper documentation of equipment, product data and shop drawings to all entities involved in the project. Coordination shall include, but not be limited to the following:

1. Fire Protection and Fire Alarm Contractor shall provide shop drawings to all other Division 21 and 23 Contractors.

2. Automatic Temperature Controls, Building Management and Testing, Adjusting and Balancing Contractors shall be provided with equipment product data and shop drawings from other Division 21, 22, 23 and 26 Contractors and shall furnish the same information involving control devices to the appropriate Division 21, 22, and 23 Contractor.

3. Furnish building equipment (elevator, food service, medical, technology, etc) in formation to Div 21, 22, and 23 contractors.

C. Coordination Drawings:

1. Coordination drawings shall be prepared by the Contractor for his utilization and are his responsibility to assure systems will be installed in a manner to allow all systems to function properly.

2. Submit drawings for all areas, pay special attention to those places where clearances are limited, where space problems exist, for places where several elements of work (or combinations of mechanical and other work) must be located with precision in order to fit into available space, where sequencing is of importance to the efficient flow of work and as specified, and required.

3. Coordination drawings are informational submittals. Submit coordination drawings to Engineer for information only to document proper coordination of all portions of work and that coordination issues have been identified and resolved prior to submitting to the Engineer and prior to commencing construction in each affected area. The review of the coordination drawings by the Engineer does not constitute a relief of responsibility of the Contractor or a change to the contract documents. The Contractor shall have sole responsibility in developing a fully coordinated and integrated ceiling cavity.

4. The Contractor shall take the lead in coordinating and drawing Division 26 and other Division 21, 22, and 23 components such as fire protection, plumbing, piping, sheet metal, etc. Where appropriate, the Contractor shall include medical gas, conduit, cable trays, pneumatic tube and any other system which may occupy the ceiling cavity.

5. Clearly indicate solutions to space problems. Identification of space problems without solutions is not acceptable. Only areas clearly identified will be reviewed.

6. Prepare Coordination Drawings and other Shop Drawings at a suitable scale, showing the required dimensions. In addition to the mentioned areas and systems above, also submit the following:

a. All mechanical equipment rooms such as fan rooms, boiler rooms, fire protection system rooms, etc. (1/4”=1’-0” scale).

b. All building floor plans (1/8”=1’-0” scale). Include all shafts with clearances.

c. Air handling unit, etc. main duct connections and transitions in ceiling space and to shafts or horizontal ducts. (1/4”=1’-0”).

d. Required access for all equipment requiring code or maintenance access.

e. All sections and elevations necessary for clarification.

f. Indicate all seismic restraint and support systems to be used for all mechanical equipment throughout the project.

g. Indicate duct and pipe elevations. Indicate clearances for installing and maintaining insulation.

h. Servicing and maintaining equipment, valve stem movement, and similar requirements.

i. Indicate movement and positioning of large equipment into the building during construction. Indicate pipe and duct size. Indicate equipment tags.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 3

7. CADD Drawings: Electronic mechanical AutoCAD drawings are available for purchase by the Contractor from the Engineer. Contact Engineer for further information in acquiring CADD drawings. The Engineers Construction documents cannot be used directly for coordination drawings. They are for information and initial coordination only.

D. Existing Conditions:

1. Carefully survey existing conditions prior to bidding work. In addition, Contractor shall complete a thorough ceiling cavity survey prior to developing 3D drawing.

2. Contractor shall be responsible for showing all existing conditions on the 3D coordination drawings.

3. Provide proper coordination of mechanical work with existing conditions.

4. Report any issues or conflicts immediately to Engineer before commencing with work and prior to purchasing equipment and materials.

1.5 COORDINATION WITH OTHER DIVISIONS:

A. General:

1. Coordinate all work to conform to the progress of the work of other trades.

2. Complete the entire installation as soon as the condition of the building will permit. No extras will be allowed for corrections of ill-timed work, when such corrections are required for proper installation of other work.

B. Coordinate ceiling cavity space carefully with all trades. In the event of conflict, install mechanical and electrical systems within the cavity space allocation in the following order of priority:

1. Equipment and required clearances

2. Plumbing waste, cooling coil drain piping and roof drain mains and leaders.

3. Ductwork mains

4. Plumbing vent piping

5. Medgas/lab gas systems

6. Low pressure ductwork and air devices.

7. Electrical and communication conduits, raceways and cabletray.

8. Domestic hot and cold water

9. Hydronic piping

10. Fire sprinkler mains, branch piping and drops (locate as tight to structure as possible).

11. DDC control wiring and other low voltage systems.

12. Fire alarm systems.

C. Chases, Inserts and Openings:

1. Provide measurements, drawings and layouts so that openings, inserts and chases in new construction can be built in as construction progresses.

2. Check sizes and locations of openings provided. Including the access panels for equipment in hard lid ceilings and wall cavities.

3. Any cutting and patching made necessary by failure to provide measurements, drawings and layouts at the proper time shall be done at no additional cost in contract sum.

D. Support Dimensions: Provide dimensions and drawings so that concrete basis and other equipment supports to be provided under other sections of the specifications can be built at the proper time.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 4

E. Coordinate the installation of required supporting devices and sleeves to be set in poured in place concrete and other structural components, as they are constructed.

F. Coordinate the cutting and patching of building components to accommodate the installation of mechanical equipment and materials. Refer to Division 1 and Division 23.

G. Modifications required as result of failure to resolve interferences, provide correct coordination drawings or call attentions to changes required in other work as result of modifications shall be paid for by responsible Contractor/Subcontractor.

H. Coordination with Electrical Work: Refer to Division 1 and 26.

1.6 DESIGN WORK REQUIRED BY CONTRACTOR:

A. The construction of this project requires the Contractor to include the detailing and design of several systems and/or subsystems. All such design work associated with the development of the coordination drawings shall be the complete responsibility of the Contractor.

B. The Contractor shall take the full responsibility to develop and complete routing strategies which will allow fully coordinated system to be installed in a fully functional manner. The Engineers contract drawings shall be for system design intent and general configurations.

C. Systems or subsystems which require design responsibility by the contractor include but are not limited to:

1. Final coordinated distribution of duct, hydronic, plumbing and other systems within the ceiling cavity.

2. Any system not fully detailed

3. Fire protection systems

4. Equipment supports, hangers, anchors and seismic systems not fully detailed nor specified in these documents, or catalogued by the manufacturer.

5. Temperature controls systems

6. Seismic restraint systems

D. Design Limitations:

1. The Contractor shall not modify the Engineers design intent in any way.

2. The Contractor shall not change any pipe size or equipment size without prior written approval from the Engineer.

3. The Contractor shall conform to the SMACNA Duct Construction Standards when modifying the ductwork layout to avoid collisions.

4. Back to back 90° fittings on duct system shall not be installed under any circumstance.

5. Bull nosed tees on piping systems shall not be installed under any circumstance.

1.7 PROJECT CONDITIONS:

A. The Contractor shall be required to attend a mandatory pre-bid walk-thru and shall make themselves familiar with the existing conditions. No additional costs to the Owner shall be accepted for additional work for existing conditions.

B. Field verify all conditions prior to submitting bids.

C. Report any damaged equipment or systems to the Owner prior to any work.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 5

D. Protect all mechanical and electrical work against theft, injury or damage from all causes until it has been tested and accepted.

E. Be responsible for all damage to the property of the Owner or to the work of other contractors during the construction and guarantee period. Repair or replace any part of the work which may show defect during one year from the final acceptance of all work, provided such defect is, in the opinion of the Architect, due to imperfect material or workmanship and not due to the Owner's carelessness or improper use.

F. The Contractor shall coordinate and co-operate with Owner at all times for all new to existing connections, system shutdowns and start-ups, flushing and filling both new and existing systems.

G. Provide temporary ductwork and piping services, where required, to maintain existing areas operable.

H. Coordinate all services shut-down with the Owner; provide temporary services. Coordinate any required disruptions with Owner, one week in advance.

I. Minimize disruptions to operation of mechanical systems in occupied areas.

1.8 SAFETY:

A. Refer to Division 1.

1.9 EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS:

A. Refer to Division 1 and conform with the Owners requirements.

1.10 REQUIREMENTS OF REGULATORY AGENCIES:

A. Refer to Division 1.

B. Execute and inspect all work in accordance with all Underwriters, local and state codes, rules and regulations applicable to the trade affected as a minimum, but if the plans and/or specifications call for requirements that exceed these rules and regulations, the greater requirement shall be followed. Follow recommendations of NFPA, SMACNA, EPA, OSHA and

ASHRAE.

C. Comply with standards in effect at the date of these Contract Documents, except where a standard or specific date or edition is indicated.

D. The handling, removal and disposal of regulated refrigerants and other materials shall be in accordance with U.S. EPA, state and local regulations.

E. The handling, removal and disposal of lead based paint and other lead containing materials shall comply with EPA, OSHA, and any other Federal, State, or local regulations.

F. After entering into contract, Contractor will be held to complete all work necessary to meet these requirements without additional expense to the Owner.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 6

1.11 REQUIREMENTS OF LOCAL UTILITY COMPANIES:

A. Comply with rules and regulations of local utility companies. Include in bid the cost of all valves, valve boxes, meter boxes, meters and such accessory equipment which will be required but not provided by Local Utility Company for the project.

B. Utility Connections:

1. Coordinate connection of mechanical systems with exterior underground and overhead utilities and services. Comply with requirements of governing regulations, franchised service companies and controlling agencies. Provide required connection for each service.

2. The contract documents indicate the available information on existing utilities and services and on new services (if any) to be provided to the project by utility companies and agencies. Notify Engineer immediately if discrepancies are found.

3. Coordinate mechanical utility interruptions one week in advance with the Owner and the Utility Company. Plan work so that duration of the interruption is kept to a minimum.

1.12 PERMITS AND FEES:

A. Refer to Division 1.

B. The Contractor shall pay all tap, development, meter, etc., fees required for connection to municipal and public utility facilities, unless directed otherwise by the General Contractor/Owner

– IN WRITING.

C. Contractor shall arrange for and pay for all inspections, licenses and certificates required in connection with the work.

1.13 PROJECT SEISMIC REQUIREMENTS:

A. Installation shall comply with the local seismic requirements for the area of installation. Provide restraints, bracing, anchors, vibration isolation, seismic snubbers, and all other components required for the installation.

B. All systems shall be installed to meet NFPA and IBC Seismic requirements.

1. Where any conflicts arise the more stringent requirements shall be applicable.

2. The design of the seismic requirements shall be the full responsibility of the Contractor.

1.14 TEMPORARY FACILITIES:

A. Light, Heat, Power, Etc.: Responsibility for providing temporary electricity, heat and other facilities shall be as specified in Division 1.

B. Use of Permanent Building Equipment for Temporary Heating or Cooling: Permanent building equipment shall not be used without written permission from the Owner. If this equipment is used for temporary heating or cooling, it shall be adequately maintained per manufacturer's instructions and protected with filters, strainers, controls, reliefs, etc. Steam and hydronic systems shall be flushed and chemically treated. Ductwork and air moving equipment shall be cleaned to an “AS New” condition. All filters required for the construction period shall be equivalent to the filters required for the final installation. All filters shall be replaced at the time of substantial completion. The guarantee period of all equipment used shall not start until the equipment is turned over to the Owner for his use. A written record of maintenance, operation and servicing shall be turned over to the owner prior to final acceptance.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 7

1.15 PRODUCT OPTIONS AND SUBSTITUTIONS:

A. Refer to the Instructions to Bidders and Division 1.

B. The burden of proof that proposed equipment is equal in size, capacity, performance, and other pertinent criteria for this specific installation, or superior to that specified is up to the Contractor.

Substituted equipment will only be allowed where specifically listed in a written addendum. If substitutions are not granted, the specified materials and equipment must be installed. Where substituted equipment is allowed, it shall be the Contractor's responsibility to notify all related trades of the accepted substitution and to assume full responsibility for all costs caused as a result of the substitution.

C. Materials and equipment of equivalent quality may be submitted for substituted prior to bidding.

This may be done by submitting to the Architect/Engineer at least ten (10) working days prior to the bid date requesting prior review. This submittal shall include all data necessary for complete evaluation of the product.

1. Substitutions shall be allowed only upon the written approval of the Architect/Engineer

NO EXCEPTIONS.

2. The Contractor shall be responsible for removal, replacement and remedy of any system or equipment which has been installed which does not meet the specifications or which does not have prior approval.

1.16 MECHANICAL SUBMITTALS:

A. General

1. Refer to the Conditions of the Contract (General and Supplementary), Division 1.

2. The submittals shall be submitted as a fully complete package identified by the specification section. Submittals that are not complete with the required information will be sent back to be corrected.

3. The Contractor shall identify any "long lead time" items which may impact the overall project schedule. If these submittal requirements affect the schedule, the Contractor shall identify the impacts and confer with the Engineer within two weeks of entering into the contract.

4. The cover shall be identified with the job name, Owner's project number, date, Prime Contractor's name, etc. Each submittal shall be tabbed by the specification section it is specified in.

5. Submittals shall be provided electronically. All electronic submittals need to be complete with all design information and stamped for conformity by the contractor. Any submittal not stamped or complete will be sent back. Submittals will be reviewed, marked appropriately and returned by the same means received.

6. An index shall be provided which includes:

a. Product

b. Plan Code (if applicable)

c. Specification Section

d. Manufacturer and Model Number

7. Fire protection and coordination drawings do not apply to the above. These drawings may be submitted in a separate submittal.

8. Submittals shall be provided for review within four (4) working weeks from award of contract to successful bidder.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 8

B. The manufacturer's material or equipment listed first in the schedule, specifications or identified by name on the drawings are the types to be provided for the establishment of size, capacity, grade and quality. If alternates are used in lieu of the scheduled names, the cost of any changes in construction required by their use shall be borne by Contractor.

C. All equipment shall conform to the State and/or local Energy Conservation Standards.

D. Submittal of shop drawings, product data and samples will be accepted only when submitted by and stamped by the General Contractor. Data submitted from Subcontractors and material suppliers directly to the Engineer will not be processed unless prior written approval is obtained by the General Contractor.

E. Before starting work, prepare and submit to the Architect/Engineer shop drawings and descriptive equipment data required for the project. . Continue to submit in the stated format after each Architect/Engineer's action until a "No Exception Taken" or "Make Correction Noted" action is received. When a "Make Corrections Noted" is received, make the required corrections for inclusion in the operation and maintenance manual. Submittals marked "Make Corrections Noted" shall not be resubmitted during the submittal process.Unless each item is identified with specification section and sufficient data to identify its compliance with the specifications and drawings, the item will be returned "Revise and Resubmit". Where an entire submittal package is returned for action by the Contractor, the Engineer will summarize comments in letter format and return the entire set.

F. The Design Professional’s review and appropriate action on all submittals and shop drawings is only for the limited purpose of checking for conformance with the design concept and the information expressed in the contract documents. This review shall not include:

1. Accuracy or completeness of details, such as quantities, dimensions, weights or gauges, fabrication processes

2. Construction means or methods

3. Coordination of the work with other trades

4. Construction safety precautions

G. The Design Professional’s review shall be conducted with reasonable promptness while allowing sufficient time in the Design Professional’s judgment to permit adequate review.

Review of a specific item shall not indicate that the Design Professional has reviewed the entire assembly of which the item is a component.

H. The Design Professional shall not be responsible for any deviations from the contract documents not brought specifically to the attention of the Design Professional in writing by the Contractor. This shall clearly identify the design and the specific element which vary from the Design. The Contractor shall be responsible for all remedy for lack of strict conformance associated with this criteria.

I. The Design Professional shall not be required to review partial submissions or those for which submissions of correlated items have not been received.

1.17 SPECIFIC CATEGORY SUBMITTAL REQUIREMENTS:

A. Product Data:

1. Where pre-printed data covers more than one distinct product, size, type, material, trim, accessory group or other variation, mark submitted copy with black pen to indicate which of the variations is to be provided.

2. Delete or mark-out portions of pre-printed data which are not applicable.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 9

3. Where operating ranges are shown, mark data to show portion of range required for project application.

4. For each product, include the following:

a. Sizes.

b. Weights.

c. Speeds.

d. Capacities.

e. Piping and electrical connection sizes and locations.

f. Statements of compliance with the required standards and regulations.

g. Performance data.

h. Manufacturer's specifications.

B. Shop Drawings:

1. Shop Drawings are defined as mechanical system layout drawings prepared specifically for this project, or fabrication and assembly type drawings of system components to show more detail than typical pre-printed materials.

2. Prepare Mechanical Shop Drawings, except diagrams, to accurate scale, min 1/8”-1'-0", unless otherwise noted.

a. Show clearance dimensions at critical locations.

b. Show dimensions of spaces required for operation and maintenance.

c. Show interfaces with other work, including structural support.

C. Test Reports:

1. Submit test reports which have been signed and dated by the accredited firm or testing agency performing the test.

2. Prepare test reports in the manner specified in the standard or regulation governing the test procedure (if any) as indicated.

3. Submit test reports as required for O & M manuals.

D. Product Listing:

1. Prepare listing of major mechanical equipment and materials for the project, within (2) two weeks of signing the Contract Documents and transmit to the Architect. A sample schedule is included at the end of this section to complete this requirement.

a. Provide all information requested.

b. Submit this listing as a part of the submittal requirement specified in Division 1, "PRODUCTS AND SUBSTITUTION."

2. Unless otherwise specified, all materials and equipment shall be of domestic (USA) manufacture and shall be of the best quality used for the purpose in commercial practice.

3. When two or more items of same material or equipment are required (plumbing fixtures, pumps, valves, air conditioning units, etc.) they shall be of the same manufacturer.

Product manufacturer uniformity does not apply to raw materials, bulk materials, pipe, tube, fittings (except flanged and grooved types), sheet metal, wire, steel bar stock, welding rods, solder, fasteners, motors for dissimilar equipment units and similar items used in work, except as otherwise indicated.

a. Provide products which are compatible within systems and other connected items.

E. Schedule of Values

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 10

1. Provide preliminary schedule of values with product data submittal, within three (3) weeks from award of contract to successful bidder. Provide according to the following descriptions:

a. Site Utilities

b. Plumbing

c. Fire Protection

d. HVAC

1) Equipment

2) Sheet Metal

3) Piping

4) Insulation

5) Test and Balancing

6) Specialty Systems

7) Temperature Controls

e. Demolition

f. Miscellaneous

2. Provide a final Schedule of Values at close-out of project including updated values based on actual installation.

F. Coordination Drawings: See section 1.4 of this specification section.

G. Required Submittals: Provide submittals for each item of equipment specified or scheduled in the contract documents. See table at the end of this section.

H. If more than two submittals (either for product data, shop drawings, record drawings, or test and balance reports) are made by the Contractor, the Owner reserves the right to charge the Contractor for subsequent reviews by their consultants. Such extra fees shall be deducted from payments by the Owner to the Contractor.

I. The contractor shall cloud all changes made on submittals that are marked “Revise and Resubmit.”

1.18 DELIVERY, STORAGE, AND HANDLING:

A. Refer to Division 1 Sections on Transportation and Handling and Storage and Protection.

B. Deliver products to project properly identified with names, model numbers, types, grades, compliance labels and similar information needed for distinct identifications; adequately packaged and protected to prevent damage or contamination during shipment, storage, and handling.

C. Check delivered equipment against contract documents and submittals.

D. Store equipment and materials at the site, unless off-site storage is authorized in writing.

Protect stored equipment and materials from damage, dirt, dust, freezing, heat and moisture.

E. Coordinate deliveries of mechanical materials and equipment to minimize construction site congestion. Limit each shipment of materials and equipment to the items and quantities needed for the smooth and efficient flow of installations.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 11

F. Provide factory-applied plastic end-caps on each length of pipe and tube, except for concrete, corrugated metal, hub-and-spigot, clay pipe. Maintain end-caps through shipping, storage and handling to prevent pipe-end damage and prevent entrance of dirt, debris and moisture.

G. Protect stored ductwork, pipes and tubes. Elevate above grade and enclose with durable, waterproof wrapping. When stored inside, do not exceed structural capacity of the floor.

H. Protect flanges, fittings and specialties from moisture and dirt by inside storage and enclosure, or be packaging with durable, waterproof wrapping.

I. Protect sheet metal ductwork and fittings. Elevate and store above grade and cover ends with waterproof wrapping.

1.19 CUTTING AND PATCHING:

A. This Article specifies the cutting and patching of mechanical equipment, components and materials to include removal and legal disposal of selected materials, components and equipment. Coordinate the cutting and patching of building components to accommodate the installation of mechanical equipment and materials.

B. Refer to Division 1.

C. Do not endanger or damage installed work through procedures and processes of cutting and patching.

D. Arrange for repairs required to restore other work, because of damage caused as a result of mechanical installations.

E. No additional compensation will be authorized for cutting and patching work that is necessitated by ill-timed, defective or non-conforming installations.

F. Perform cutting, fitting and patching of mechanical equipment and materials required to:

1. Uncover work to provide for installation of ill-timed work;

2. Remove and replace defective work;

3. Remove and replace work not conforming to requirements of the Contract Documents;

4. Remove samples of installed work as specified for testing;

5. Install equipment and materials in existing structures;

6. Upon written instructions from the Architect/Engineer, uncover and restore work to provide for Architect /Engineer observation of concealed work.

G. Cut, remove and legally dispose of selected mechanical equipment, components, and materials as indicated, including, but not limited to removal of mechanical piping, heating units, plumbing fixtures and trim and other mechanical items made obsolete by the new work.

H. Protect the structure, furnishings, finishes and adjacent materials not indicated or scheduled to be removed.

I. Provide and maintain an approved type of temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas. Temporary partitions must not impede access to building egress.

1. ICRA procedures must be maintained during construction.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 12

J. Locate identify, and protect mechanical and electrical services passing through remodeling or demolition area and serving other areas required to be maintained operational. When services must be interrupted, provide temporary services for the affected areas and notify the Owner prior to changeover. Cover openings in ductwork to remain. Protect equipment and systems to remain.

1.20 ROUGH-IN:

A. Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected.

B. Refer to equipment shop drawings and manufacturer's requirements for actual provided equipment for rough-in requirements.

C. Work through all coordination before rough-in begins.

1.21 ACCESSIBILITY:

A. Install equipment and materials to provide required access for servicing and maintenance.

Coordinate the final location of concealed equipment and devices requiring access with final location of required access panels and doors. Allow ample space for removal of all parts that require replacement or servicing.

B. Extend all grease fittings to an accessible location.

C. Furnish hinged steel access doors with concealed latch, whether shown on drawings or not, in all walls and ceilings for access to all concealed valves, shock absorbers, air vents, motors, fans, balancing cocks, and other operating devices requiring adjustment or servicing. Refer to Division 1 for access door specification and Division 23 for duct access door requirements.

D. The minimum size of any access door shall not be less than the size of the equipment to be removed or 12 inches x 12 inches if used for service only.

E. Furnish doors to trades performing work in which they are to be built, in ample time for building-in as the work progresses. Whenever possible, group valves, cocks, etc., to permit use of minimum number of access doors within a given room or space.

F. Factory manufactured doors shall be of a type compatible with the finish in which they are to be installed. In lieu of these doors, approved shop fabricated access doors with DuroDyne hinges may be used.

G. Access doors in fire-rated walls and ceilings shall have equivalent U.L. label and fire rating.

1.22 BELTS, SHEAVES, IMPELLERS:

A. The Mechanical Contractor shall coordinate with the Test and Balance Contractor and supply correctly-sized drive belts, sheaves, and trimmed impellers.

1.23 NAMEPLATE DATA:

A. Provide permanent operational data nameplate, refer to the section on Mechanical Identification, on each item of mechanical equipment, indicating manufacturer, product name, model number, serial number, capacity, operating and power characteristics, labels of tested compliances, and similar essential data. Locate nameplates in an accessible location.

Coordinate with Owner for specific requirements.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 13

1.24 LUBRICATION OF EQUIPMENT:

A. Refer to Division 1. The following paragraphs supplement the requirements of Division 1.

B. Contractor shall properly lubricate all mechanical pieces of equipment which he provided before turning the building over to the Owner. He shall attach a linen tag or heavy duty shipping tag on the piece of equipment showing the date of lubrication and the type and brand of lubricant used.

C. Furnish the Engineer with a typewritten list included in the O and M manuals of each item lubricated and type of lubricant used, no later than two (2) weeks before completion of the project, or at time of acceptance by the Owner of a portion of the building and the mechanical systems involved.

1.25 CLEANING:

A. Refer to Division 1.

B. Refer to Division 23, "TESTING, ADJUSTING AND BALANCING" for requirements for cleaning filters, strainers, and mechanical systems prior to final acceptance.

1.26 RECORD DOCUMENTS:

A. Refer to Division 1. The following paragraphs supplement the requirements of Division 1.

B. Keep a complete set of record document prints in custody during entire period of construction at the construction site. Documents shall be updated on a weekly basis.

C. Mark Drawing Prints to indicate revisions to piping and ductwork, size and location both exterior and interior; including locations of coils, dampers and other control devices, filters, boxes, and similar units requiring periodic maintenance or repair; actual equipment locations, dimensioned from column lines; actual inverts and locations of underground piping; concealed equipment, dimensioned to column lines; mains and branches of piping systems, with valves and control devices located and numbered, concealed unions located, and with items requiring maintenance located (i.e., traps, strainers, expansion compensators, tanks, etc.); Change Orders; concealed control system devices. Changes to be noted on the drawings shall include final location of any piping or ductwork relocated more than 1foot-0inches from where shown on the drawings.

D. Mark shop drawings to indicate approved substitutions; Change Orders; actual equipment and materials used.

E. Mark equipment and fixture schedules on drawings to indicate manufacturer and model numbers of installed equipment and fixtures.

F. Revisions to the Contract Documents shall be legible and shall be prepared using the following color scheme:

1. Red shall indicate new items, deviations and routing.

2. Green shall indicate items removed or deleted.

3. Blue shall be used for relevant notes and descriptions.

G. At the completion of the project, obtain from the Architect a complete set of the Mechanical Contract Documents in a read-only electronic format (.pdf unless otherwise noted). This set will include all revisions officially documented through the Architect/Engineer. Using the above color scheme, transfer any undocumented revisions from the construction site record drawings

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 14

to this complete set. Submit completed documents to the Architect/Engineer. This contract will not be considered completed until these record documents have been received and reviewed by the Architect/Engineer.

H. Contractor may propose methods of maintaining record documents on electronic media. Obtain approval of Engineer and Owner prior to proceeding. Marked-up .pdf format readable by Bluebeam is preferred.

1.27 OPERATION AND MAINTENANCE DATA:

A. Refer to Division 1.

B. No later than four (4) weeks prior to the completion of the project provided complete set of operating and maintenance manuals, or as specified in Sections of Division 1 (whichever is more stringent).

C. The testing and balancing report shall be submitted and received by the Engineer at least fifteen calendar days prior to the contractor's request for final observation time frame requirements.

Include in the O & M Manual after review with "No Exceptions Taken" has been accomplished.

D. In addition to the information required by Division 1 for Maintenance Data, include the following information:

1. The job name and address and contractor's name and address shall be identified at the front of the electronic submittal.

2. Description of mechanical equipment, function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of all replaceable parts.

3. Manufacturer's printed operating procedures to include start-up, break-in, routine and normal operating instructions; regulation, control, stopping, shut-down, and emergency instructions; and summer and winter operating instructions. Provide any test reports and start-up documents.

4. Maintenance procedures for routine preventative maintenance and troubleshooting;

disassembly, repair, and reassembly; aligning and adjusting instructions.

5. Servicing instructions, lubrication charts and schedules, including Contractor lubrication reports.

6. Manufacturer's service manuals for all mechanical equipment provided under this contract.

7. Include the valve tag list.

8. Name, Address and Telephone numbers of the Sub-contractors and local company and party to be contacted for 24-hour service and maintenance for each item of equipment.

9. Starting, stopping, lubrication, equipment identification numbers and adjustment clearly indicated for each piece of equipment.

10. Complete recommended spare parts list.

11. Mechanical System and Equipment Warranties.

12. Copies of all test reports shall be included in the manuals.

13. Provide manuals with dividers for major sections and special equipment. Mark the individual equipment when more than one model or make is listed on a page. Provide detailed table of contents.

14. Final schedule of values with all mechanical change order costs included and identified.

15. Contractor may propose methods of maintaining record documents on electronic media.

Obtain approval of Engineer and Owner prior to proceeding. Marked-up .pdf format readable by Bluebeam is preferred.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 15

E. This contract will not be considered completed nor will final payment be made until all specified material, including test reports, and final Schedule of Values with all Electrical and Information Technology change order costs included and identified is provided and the manual is reviewed by the Architect/Engineer.

1.28 PROJECT CLOSEOUT LIST:

A. In addition to the requirements specified in Division 1, complete the requirements listed below.

B. The Contractor shall be responsible for the following Mechanical Submittal Checklist either by performing and/or coordinating such items prior to applying for certification of substantial completion. Refer to individual specification sections for additional requirements. (Checklist is located at the end of this section.)

1.29 WARRANTIES:

A. Refer to the Division 1 for procedures and submittal requirements for warranties. Refer to individual equipment specifications for warranty requirements. In any case the entire mechanical system shall be warranted no less than one year from the time of acceptance by the Owner.

B. Compile and assemble the warranties specified in Division 21, 22, and 23, include the operating and maintenance manuals.

C. Provide complete warranty information for each item to include product or equipment to include date or beginning of warranty or bond; duration of warranty or bond; and names, addresses, and telephone numbers and procedures for filing a claim and obtaining warranty services.

1.30 CONSTRUCTION REQUIREMENTS:

A. The contractor shall maintain and have available at the jobsite current information on the following at all times:

1. Up to date record drawings.

2. Submittals

3. Site observation reports with current status of all action items.

4. Test results; including recorded values, procedures, and other findings.

5. Outage information.

1.31 EQUIPMENT HOUSEKEEPING PADS:

A. Provide 4" concrete housekeeping pad for all floor mounted equipment including, but not limited to: switchgear, switchboards, motor control centers, floor mounted distribution panelboards, floor mounted branch panelboards, and floor mounted dry type transformers. Fabricate pads as follows:

1. Coordinate size of equipment bases with actual unit sizes provided. Fabricate base 4" larger in both directions than the overall dimensions of the supported unit.

2. Form concrete pads with framing lumber with form release compounds. Chamfer top edge and corners of pad.

3. Place concrete and allow to cure before installation of units. Use Portland cement that conforms to ASTM C 150, 54000-psi compressive strength, and normal weight aggregate.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 16

4. Anchor housekeeping pads to slab using #3 rebar bent in “L” or “Z” shape 12 inch on center on each side of slab.

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 17

Spec Section Item

Requirements Submittals Supplemental Factory Rep Super-

Vision At Site Training

Req’d At Site Extra

Material Shop

Drawings Product

Data Include In

O & M Test Report

220500 Common Work Results For Plumbing

230500 Preliminary Schedule Of Values X

Final Schedule Of Values X X Equipment Warranties X O&M Manuals Coordination Drawings X Record Drawings X X X

230507

Motors, Drives, Motor Controllers And Electrical Requirements For Mechanical Equipment

X X X X4 X X X

230509 Mechanical Fire Stopping X X X X

230510 Basic Piping Materials And Methods X X X X

230518 Piping Specialties X X 230519 Meters And Gauges X X X2 X 230523 Valves X X 230529 Supports And Anchors X X X 230548 Vibration Control X X X X X 230553 Mechanical Identification X X X

230593 Testing ,Adjusting And Balancing X X

230700 Mechanical Insulation X X

230923 Direct Digital Control Systems X X X X X X

230933 Electric Control Systems X X X X X X 230993 Sequence Of Operation X 232123 Hvac Pumps X X 235700 Heat Exchangers X X X

1 For Soft Starters and Variable Frequency Drives

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 18

2 Requires Review & Approval from T & B Contractor 3Warranty Report/Warranty 4 Kitchen Exhaust Hood 5 See Specific Specification Section for Test & Certification Requirements

END OF SECTION 23 05 00

COMMON WORK RESULTS FOR MECHANICAL 23 05 00 - 19

SECTION 23 05 07 – MOTOR, DRIVES, MOTOR CONTROLLERS AND ELECTRICAL

REQUIREMENTS FOR MECHANICAL EQUIPMENT

PART 1 - GENERAL

1.1 DESCRIPTION OF WORK:

A. This section specifies the basic requirements for electrical components which are either separate components or are an integral part of all mechanical equipment. These components include, but are not limited to starters, variable frequency drives and disconnect switches.

B. Wiring of field-mounted switches and similar mechanical-electrical devices provided for mechanical systems, to equipment control panels.

C. Refer to electrical drawings and specifications for specific electrical requirements pertaining to mechanical equipment are scheduled on the Electrical Drawings. In case of conflict, Electrical Drawings shall take precedence.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .