NB194000-16-04839_Elec_Specs_Binder.pdf
PDF 2 MB Posted
- Solicitation number
- SB1341-16-RQ-0982
About this file
B1W3 Electrical Specs Binder
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NIST WING 3 RE-CUSTOMIZATION 03/30/16
CONSTRUCTION DOCUMENTS
SECTION 260500 – COMMON WORK RESULTS FOR ELECTRICAL
PART 1 - GENERAL:
1.1 RELATED DOCUMENTS:
A. All drawings associated with the entire project, including general provisions of the Contract, including The General Conditions of the Contract for Construction, General and Supplementary Conditions and Division-1 Conditions specification sections shall apply to the Division 26 specifications and drawings. The Contractor shall be responsible for reviewing and becoming familiar with the aforementioned and all other Contract Documents associated with the project.
B. Related Sections: Refer to all sections in Division 23. Refer to Division 26 and 28 specification sections and Division 26 and 28 drawings.
C. Where contradictions occur between this section and Division 1, the more stringent requirement shall apply.
D. Contractor shall be defined as any and all entities involved with the construction of the project.
1.2 SUMMARY:
A. This Section specifies the basic requirements for electrical installations and includes requirements common to more than one section of Division 26 and Division 28. It expands and supplements the requirements specified in sections of Division 1 through 23.
1.3 ELECTRICAL INSTALLATIONS:
A. All equipment and materials used on this project shall comply with the “American Reconstruction and Reinvestment Act (ARRA)/letter/statement indication compliance. Refer to Division 1 for additional requirements.
B. Drawings are diagrammatic in character and do not necessarily indicate every required conduit, box, fitting, etc.
C. Drawings and specifications are complementary. Whatever is called for in either is binding as though called for in both. Report any discrepancies to the Engineer and obtain written instructions before proceeding. Where any contradictions occur between the specifications and the drawings the more stringent requirement shall apply. The contractor shall include pricing for the more stringent and expensive requirements.
D. Drawings shall not be scaled for rough-in measurements or used as shop drawings. Where drawings are required for these purposes or have to be made from field measurement, take the necessary measurements and prepare the drawings.
E. The exact location for some items in this specification may not be shown on the drawings. The location of such items may be established by the Engineer during the progress of the work.
F. The contractor shall make the installation in such a manner as to conform to the structure, avoid obstructions, preserve headroom and keep openings and passageways clear, without further instructions or costs to the Owner. All equipment shall be installed so access is maintained for serviceability.
COMMON WORK RESULTS FOR ELECTRICAL 260500-1
G. Before any work is begun, determine that equipment will properly fit the space and that conduit can be run as contemplated without interferences between systems, with structural elements or with the work of other trades.
H. Verify all dimensions by field measurements.
I. Arrange for chases, slots, and openings in other building components to accommodate electrical installations.
J. Sequence, coordinate, and integrate installations of electrical materials and equipment for efficient flow of the work. Give particular attention to large equipment requiring an access path for positioning prior to closing-in the building or space.
K. Where mounting heights are not detailed or dimensioned, install electrical conduits, boxes, and overhead equipment to provide the maximum headroom possible. In general, keep installations tight to structure.
L. Install electrical equipment to facilitate maintenance and repair or replacement of equipment components. As much as practical, connect equipment for ease of disconnecting and removal with minimum of interference with other installations.
M. Make allowance for expansion and contraction for all building electrical components and conduit systems that are subject to such.
N. The ceiling space shall not be “layered”. It is the contractor’s responsibility to offset and coordinate any systems as required to allow installation within the identified ceiling cavity. The contractor shall include labor and material in the base bid to accommodate such offsets.
O. In general, all conduit systems shall be routed as high as possible. Keep all equipment in accessible areas such as corridors and coordinate with systems and equipment from other sections.
P. Coordinate the installation of required supporting devices and sleeves to be set in poured-in-place concrete and other structural components, as they are constructed.
Q. Coordinate the installation of electrical materials and equipment above and below ceilings with suspension system, luminaires and other building components. Ductwork and piping shall not be installed above electrical panelboards, switchboards, motor control centers, and transformers.
1.4 COORDINATION:
A. Work out all installation conditions in advance of installation. The Contractor shall be responsible for preparing coordination drawings, showing all work, in all areas. The Contractor shall be responsible for providing all labor and material, including but not limited to all fittings, hangers, control devices, lighting, low voltage equipment, cable tray, conduit, transformers, disconnects, etc., necessary to overcome congested conditions at no increase in contact sum.
The Contractors base bid shall include any and all time and manpower necessary to develop such coordination efforts and drawings. Increases to contract sum or schedule shall not be considered for such effort.
B. Provide proper documentation of equipment, product data and shop drawings to all entities involved in the project. Coordination shall include, but not be limited to the following:
Fire Alarm Contractor shall provide shop drawings to other Contractors as required. 1.
COMMON WORK RESULTS FOR ELECTRICAL 260500-2
Automatic Temperature Controls, Building Management and Testing, Adjusting and 2.
Balancing Contractors shall be provided with equipment product data and shop drawings from other Division 23 and Division 26 Contractors and shall furnish the same information involving control devices to the appropriate Contractor.
Automatic Doors and controls, Elevators and other building access equipment shall have 3.
cut sheets reviewed and shall furnish the same information to the appropriate Contractor.
C. Coordination Drawings:
Coordination drawings shall be prepared by the Contractor for his utilization and are his 1.
responsibility to assure systems will be installed in a manner to allow all systems to function properly.
Prepare and submit a set of coordination drawings showing major elements, 2.
components, and systems of electrical equipment and materials in relationship with other building components. Prepare 11”x17” drawings to an accurate scale of 1/4"=1'-0" or larger. Indicate the locations of all equipment and materials, including clearances for servicing and maintaining equipment. Indicate movement and positioning of large equipment into the building during construction.
Coordination drawings are informational submittals. Submit coordination drawings to 3.
Engineer for information only to document proper coordination of all portions of work and that coordination issues have been identified and resolved prior to submitting to the Engineer and prior to commencing construction in each affected area. The review of the coordination drawings by the Engineer does not constitute a relief of responsibility of the Contractor or a change to the contract documents. The Contractor shall have sole responsibility in developing a fully coordinated and integrated ceiling cavity.
Clearly indicate solutions to space problems. Identification of space problems without 4.
solutions is not acceptable. Only areas clearly identified will be reviewed.
All coordination drawings shall be 3D, with provision for collision check. The contractor 5.
is responsible for obtaining the architectural and structural files in 3D, if not available, the contractor shall develop them from the 2D architectural and structural drawings. All 3D drawing development, collision check, coordination.
Prepare coordination drawings and other Shop Drawings at a suitable scale, showing the 6.
required dimension. In addition to the mentioned areas and systems above, also submit specific equipment installations, including, but not limited to the following:
a. Pad mounted dry type transformers
b. Panelboards
c. Equipment connections
CADD Drawings: Electronic AutoCAD drawings are available for purchase by the 7.
Contractor from the Engineer. Contact Engineer for further information in acquiring CADD drawings. The Engineers Construction documents cannot be used directly for coordination drawings. They are for information and initial coordination only.
Wiring Diagrams: Provide wiring diagrams indicating field installed electrical power, 8.
control wiring, cabling layouts, overcurrent protective devices, equipment, and equipment connections.
D. Existing Conditions:
Carefully survey existing conditions prior to bidding work. In addition, Contractor shall 1.
complete a thorough ceiling cavity survey prior to developing 3D drawing.
Contractor shall be responsible for showing all existing conditions on the 3D coordination 2.
drawings.
Provide proper coordination of electrical work with existing conditions. 3.
Report any issues or conflicts immediately to Engineer before commencing with work 4.
and prior to purchasing equipment and materials.
COMMON WORK RESULTS FOR ELECTRICAL 260500-3
1.5 COORDINATION WITH OTHER DIVISIONS:
A. General:
Coordinate all work to conform with the progress of the work of other trades. 1.
Complete the entire installation as soon as the condition of the building will permit. No 2.
extras will be allowed for corrections of ill-timed work, when such corrections are required for proper installation of other work.
B. Coordinate ceiling cavity space carefully with all trades. In the event of conflict, install mechanical and electrical systems within the cavity space allocation in the following order of priority:
Equipment and required clearances 1.
Plumbing waste, cooling coil drain piping and roof drain mains and leaders. 2.
Ductwork mains. 3.
Plumbing vent piping. 4.
Low pressure ductwork and air devices. 5.
Electrical and communication conduits, raceways and cable tray. 6.
Domestic hot and cold water. 7.
Hydronic piping. 8.
Fire sprinkler mains, branch piping and drops (locate as tight to structure as possible). 9.
DDC control wiring and other low voltage systems. 10.
Fire alarm systems. 11.
C. Chases, Inserts and Openings:
Provide measurements, drawings and layouts so that openings, inserts and chases in 1.
new construction can be built in as construction progresses.
Check sizes and locations of openings provided. Including the access panels for 2.
equipment in hard lid ceilings and wall cavities.
Any cutting and patching made necessary by failure to provide measurements, drawings 3.
and layouts at the proper time shall be done at no additional cost in contract sum.
D. Support Dimensions: Provide dimensions and drawings so that concrete basis and other equipment supports to be provided under other sections of the specifications can be built at the proper time.
E. Coordinate the installation of required supporting devices and sleeves to be set in poured in place concrete and other structural components, as they are constructed.
F. Coordinate the cutting and patching of building components to accommodate the installation of electrical equipment and materials.
G. Modifications required as result of failure to resolve interferences, provide correct coordination drawings or call attentions to changes required in other work as result of modifications shall be paid for by responsible Contractor/Subcontractor.
1.6 DESIGN WORK REQUIRED BY CONTRACTOR:
A. The construction of this project requires the Contractor to include the detailing and design of several systems and/or subsystems. All such design work associated with the development of the coordination drawings shall be the complete responsibility of the Contractor.
COMMON WORK RESULTS FOR ELECTRICAL 260500-4
B. The Contractor shall take the full responsibility to develop and complete routing strategies which will allow fully coordinated system to be installed in a fully functional manner. The Engineers contract drawings shall be for system design intent and general configurations.
C. Systems or subsystems which require design responsibility by the contractor include but are not limited to:
Final coordinated distribution systems within the ceiling cavity. 1.
Any system not fully detailed. 2.
Equipment supports, hangers, anchors and seismic systems not fully detailed nor 3.
specified in these documents, or catalogued by the manufacturer.
Seismic restraint systems. 4.
1.7 PROJECT CONDITIONS:
A. The contractor shall be required to attend a pre-bid walk-thru if required and shall make themselves familiar with the existing conditions. No additional costs to the Owner shall be accepted for additional work for existing conditions.
B. Field verify all conditions prior to submitting bids.
C. Report any damaged equipment or systems to the Owner prior to any work.
D. Protect all work against theft, injury or damage from all causes until it has been tested and accepted.
E. Be responsible for all damage to the property of the Owner or to the work of other contractors during the construction and guarantee period. Repair or replace any part of the work which may show defect during one year from the final acceptance of all work, provided such defect is, in the opinion of the Architect, due to imperfect material or workmanship and not due to the Owner's carelessness or improper use.
F. The Contractor shall coordinate and co-operate with Owner at all times for all new to existing connections.
G. Provide temporary electrical connections where required to maintain existing areas operable.
H. Coordinate all services shut-down with the Owner; provide temporary services. Coordinate any required disruptions with Owner, at a minimum one week in advance.
I. Minimize disruptions to operation of electrical systems in occupied areas.
1.8 SAFETY:
A. Refer to Division 1.
1.9 EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS:
A. Refer to Division 1 and conform with the Owners requirements.
1.10 REQUIREMENTS OF REGULATORY AGENCIES:
A. Refer to Division 1.
COMMON WORK RESULTS FOR ELECTRICAL 260500-5
B. Execute and inspect all work in accordance with Underwriters Laboratories (UL), and all local and state codes, rules and regulations applicable to the trade affected as a minimum, but if the plans and/or specifications call for requirements that exceed these rules and regulations, the more stringent requirement shall be followed. Follow application sections and requirements and testing procedures of NFPA, IEEE, NEMA, CBM, ANSI, NECA, ICEA and IETA.
C. Comply with standards in effect at the date of these Contract Documents, except where a standard or specific date or edition is indicated.
D. The handling, removal and disposal of regulated liquids or other materials shall be in accordance with U.S. EPA, state and local regulations.
E. The handling, removal and disposal of lead based paint and other lead containing materials shall comply with EPA, OSHA, and any other Federal, State, or local regulations.
F. After entering into contract, Contractor will be held to complete all work necessary to meet these requirements without additional expense to the Owner.
G. All material used on this project shall be UL listed and labeled and be acceptable to the authority having jurisdiction as suitable for the use intended.
1.11 PERMITS AND FEES:
A. Refer to Division 1.
B. Contractor shall pay all fees required for connection to municipal and public utility facilities.
C. Contractor shall arrange for and pay for all inspections, licenses and certificates required in connection with the work.
1.12 PROJECT SEISMIC REQUIREMENTS:
A. Installation shall comply with the local seismic requirements for the area of installation. Provide restraints, bracing, anchors, vibration isolation, seismic snubbers, and all other components required for the installation.
B. All electrical and fire alarm systems shall be installed to meet NFPA and IBC Seismic requirements.
Where any conflicts arise the more stringent requirements shall be applicable. 1.
The design of the seismic requirements shall be the responsibility of the contractor. 2.
1.13 ELECTRICAL SUBMITTALS:
A. General
Refer to the Conditions of the Contract (General and Supplementary), Division 1. 1.
The submittals shall be submitted as a fully complete package identified by the 2.
specification section. Submittals that are not complete with the required information will be sent back to be corrected.
The Contractor shall identify any "long lead time" items which may impact the overall 3.
project schedule. If these submittal requirements affect the schedule, the Contractor shall identify the impacts and confer with the Engineer within two weeks of entering into the contract.
COMMON WORK RESULTS FOR ELECTRICAL 260500-6
The cover shall be identified with the job name, Owner's project number, date, Prime 4.
Contractor's name, etc. Each submittal shall be tabbed by thespecification section it is specified in.
Submittals shall be provided electronically. All electronic submittals need to be complete 5.
with all design information and stamped for conformity by the contractor. Any submittal not stamped or complete will be sent back. Submittals will be reviewed, marked appropriately and returned by the same means received.
An index shall be provided which includes: 6.
a. Product
b. Plan Code (if applicable)
c. Specification Section
d. Manufacturer and Model Number
Submittals shall be provided for review within four (4) working weeks from award of 7.
contract to successful bidder.
B. The manufacturer's material or equipment listed first in the specifications or on the drawings are the types to be provided for the establishment of size, capacity, grade and quality. If alternates are used in lieu of the first names, the cost of any changes in construction required by their use shall be borne by this Contractor.
C. All equipment shall conform to the State and/or local Energy Conservation Standards.
D. Submittal of shop drawings, product data, and samples will be accepted only when submitted by the Contractor. Each submittal shall be reviewed for general conformance with contract requirements and stamped by the respective contractor prior to submittal to the Architect/Engineer. Data submitted from subcontractors and material suppliers directly to the Architect/Engineer will not be processed unless written prior approval is obtained by the Contractor.
E. Before starting work, prepare and submit to the Architect/Engineer shop drawings and descriptive product data. Continue to submit in the stated format after each Architect/Engineer's action until a "No Exception Taken" or "Make Correction Noted" action is received. When a "Make Corrections Noted" is received, make the required corrections for inclusion in the operation and maintenance manual. Submittals marked "Make Corrections Noted" shall not be resubmitted during the submittal process.//In the City and County of Denver, fire alarm submittals must be submitted until a "NO EXCEPTION TAKEN" action is received.
Unless each item is identified with specification section and sufficient data to identify its compliance with the specifications and drawings, the item will be returned "Revise and Resubmit". Where an entire submittal package is returned for action by the Contractor, the Engineer will summarize comments in letter format and return the entire set. Submittals shall include the following specified materials and, in addition, any materials not listed below but which are specified in the individual sections of Division 26:
Raceways including surface raceways and wireways. 1.
Cabinets, boxes, fittings, etc. 2.
Electrical equipment signs and labels. 3.
Transformers 4.
Panelboards 5.
Disconnect Switches 6.
Circuit breakers and fused switches for installation in existing panelboards or distribution 7.
centers.
COMMON WORK RESULTS FOR ELECTRICAL 260500-7
F. The Design Professional’s review and appropriate action on all submittals and shop drawings is only for the limited purpose of checking for conformance with the design concept and the information expressed in the contract documents. This review shall not include:
Accuracy or completeness of details, such as quantities, dimensions, weights or gauges, 1.
fabrication processes
Construction means or methods 2.
Coordination of the work with other trades 3.
Construction safety precautions 4.
G. The Design Professional’s review shall be conducted with reasonable promptness while allowing sufficient time in the Design Professional’s judgment to permit adequate review.
Review of a specific item shall not indicate that the Design Professional has reviewed the entire assembly of which the item is a component.
H. The Design Professional shall not be responsible for any deviations from the contract documents not brought specifically to the attention of the Design Professional in writing by the Contractor. This shall clearly identify the design and the specific element which vary from the Design. The Contractor shall be responsible for all remedy for lack of strict conformance associated with this criteria.
I. The Design Professional shall not be required to review partial submissions or those for which submissions of correlated items have not been received.
1.14 SPECIFIC CATEGORY SUBMITTAL REQUIREMENTS:
A. Product Data:
Where pre-printed data covers more than one distinct product, size, type, material, trim, 1.
accessory group or other variation, mark submitted copy with black pen to indicate which of the variations is to be provided.
Delete or mark-out portions of pre-printed data which are not applicable. 2.
Where operating ranges are shown, mark data to show portion of range required for 3.
project application.
For each product, include the following: 4.
a. Sizes.
b. Weights.
c. Speeds.
d. Capacities.
e. Conduit and electrical connection sizes and locations.
f. Statements of compliance with the required standards and regulations.
g. Performance data.
h. Manufacturer's specifications.
B. Shop Drawings:
Shop Drawings are defined as electrical system layout drawings prepared specifically for 1.
this project, or fabrication and assembly type drawings of system components to show more detail than typical pre-printed materials.
Prepare Electrical Shop Drawings, except diagrams, to accurate scale, min 1/8”-1'-0", 2.
unless otherwise noted.
a. Show clearance dimensions at critical locations.
b. Show dimensions of spaces required for operation and maintenance.
COMMON WORK RESULTS FOR ELECTRICAL 260500-8
c. Show interfaces with other work, including structural support.
C. Test Reports:
Submit test reports which have been signed and dated by the accredited firm or testing 1.
agency performing the test.
Prepare test reports in the manner specified in the standard or regulation governing the 2.
test procedure (if any) as indicated.
Submit test reports as required for O & M manuals. 3.
D. Product Listing:
Prepare listing of major electrical equipment and materials for the project, within (2) two 1.
weeks of signing the Contract Documents and transmit to the Architect. A sample schedule is included at the end of this section to complete this requirement.
a. Provide all information requested.
b. Submit this listing as a part of the submittal requirement specified in Division 1.
Unless otherwise specified, all materials and equipment shall be of domestic (USA) 2.
manufacture and shall be of the best quality used for the purpose in commercial practice.
When two or more items of same material or equipment are required (plumbing fixtures, 3.
pumps, valves, air conditioning units, etc.) they shall be of the same manufacturer.
Product manufacturer uniformity does not apply to raw materials, bulk materials, pipe, tube, fittings (except flanged and grooved types), sheet metal, wire, steel bar stock, welding rods, solder, fasteners, motors for dissimilar equipment units and similar items used in work, except as otherwise indicated.
a. Provide products which are compatible within systems and other connected items.
For conduit, wire and fittings, the Contractor shall select a prime and alternate 4.
manufacturer from the list of acceptable manufacturers provided in the appropriate sections of this Division. The prime and alternate manufacturers shall be identified in the product listing. The contractor shall make every effort to use the prime manufacturer for the entire project. If products from this manufacturer are unavailable, the Contractor shall use the listed alternate with the following provisions.
a. Wire: All wire placed in a single conduit or installed in multiple conduits making up parallel feeders shall be of the same manufacturer.
b. Conduit and Fittings: All conduits and fittings installed exposed within the same room or immediate area shall be of the same manufacturer.
E. Schedule of Values
Provide Preliminary Schedule of Values to Engineer with product data submittal within 1.
four (3) weeks from award of contract to successful bidder. Provide according to the following descriptions:
a. General Construction (total)
b. Service/Distribution
c. Basic Materials/Devices/Equipment Connections (Mechanical)
Provide a final Schedule of Values at close-out of project including updated values based 2.
on actual installation.
COMMON WORK RESULTS FOR ELECTRICAL 260500-9
F. Coordination Drawings: See section 1.4 of this specification section.
G. Required Submittals: Provide submittals for each item of equipment specified or scheduled in the contract documents. See table at the end of this section.
H. If more than two submittals (either for product data, shop drawings, record drawings, or test reports are made by the Contractor, the Owner reserves the right to charge the Contractor for subsequent reviews by their consultants. Such extra fees shall be deducted from payments by the Owner to the Contractor.
I. The contractor shall cloud all changes made on submittals that are marked “Revise and Resubmit.”
J. Submit letters certifying compliance with ANSI standards for medium or high voltage gear.
These letters shall be signed by a corporate officer and shall list applicable standards. Letters signed by local representatives will not be acceptable.
K. Submit proposed changes to electrical room or other equipment room layouts when revised from contract documents prior to installation.
L. Mark submittals with designations as shown on the drawings and identify as required by Specification Sections. Identification shall contain the information as required in details and each label shall be submitted in list form with disconnects, MCC's, panelboards, switchboards, overcurrent protection devices and utilization equipment.
1.15 DELIVERY, STORAGE AND HANDLING:
A. Refer to the Division 1, Sections on Transportation and Handling and Storage and Protection.
B. Deliver products to project properly identified with names, model numbers, types, grades, compliance labels, and similar information needed for distinct identifications; adequately packaged and protected to prevent damage during shipment, storage, and handling.
C. Check delivered equipment against contract documents and submittals.
D. Store equipment and materials at the site, unless off-site storage is authorized in writing.
Protect stored equipment and materials from damage and weather.
E. Coordinate deliveries of electrical materials and equipment to minimize construction site congestion. Limit each shipment of materials and equipment to the items and quantities needed for the smooth and efficient flow of installations.
1.16 CUTTING AND PATCHING:
A. This Article specifies the cutting and patching of electrical equipment, components, and materials to include removal and legal disposal of selected materials, components, and equipment. Coordinate the cutting and patching of building components to accommodate the installation of electrical equipment and materials.
B. Refer to the Division 1 Section covering cutting and patching for general requirements.
C. Do not endanger or damage installed Work through procedures and processes of cutting and patching.
COMMON WORK RESULTS FOR ELECTRICAL 260500-10
D. Arrange for repairs required to restore other work, because of damage caused as a result of electrical installations.
E. No additional compensation will be authorized for cutting and patching Work that is necessitated by ill-timed, defective, or non-conforming installations.
F. Perform cutting, fitting, and patching of electrical equipment and materials required to:
Uncover Work to provide for installation of ill-timed Work; 1.
Remove and replace defective Work; 2.
Remove and replace Work not conforming to requirements of the Contract Documents; 3.
Remove samples of installed Work as specified for testing; 4.
Install equipment and materials in existing structures; 5.
Upon written instructions from the Architect/Engineer, uncover and restore Work to 6.
provide for Architect/Engineer observation of concealed Work.
G. Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including, but not limited to removal of conductors, conduit, luminaires, boxes, devices and other electrical items made obsolete by the new Work.
H. Protect the structure, furnishings, finishes, and adjacent materials not indicated or scheduled to be removed.
I. Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas.
J. Locate, identify, and protect electrical services passing through remodel or demolition area and serving other areas required to be maintained operational.
1.17 ROUGH-IN:
A. Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected.
B. . Refer to equipment shop drawings and manufacturer's requirements for actual provided equipment for rough in requirements.
C. Work through all coordination before rough-in begins.
1.18 ACCESSIBILITY:
A. Install equipment and materials to provide required code clearances and access for servicing and maintenance. Coordinate the final location with piping, ducts, and equipment of other trades to insure proper access for all trades. Coordinate locations of concealed equipment, disconnects, and boxes with access panels and doors. Allow ample space for removal of parts, fuses, lamps, etc. that require replacement or servicing.
B. Extend all conduits so that junction and pull boxes are in accessible locations.
C. Provide access panel or doors where equipment or boxes are concealed behind finished surfaces.
D. Furnish hinged steel access doors with concealed latch, whether shown on drawings or not, in all walls and ceilings for access to all concealed valves, shock absorbers, air vents, motors, COMMON WORK RESULTS FOR ELECTRICAL 260500-11 fans, balancing cocks, and other operating devices requiring adjustment or servicing. Refer to Division 1 for access door specification and requirements.
E. The minimum size of any access door shall not be less than the size of the equipment to be removed or 12 inches x 12 inches if used for service only.
F. Furnish doors to trades performing work in which they are to be built, in ample time for building in as the work progresses. Whenever possible, group valves, cocks, etc., to permit use of minimum number of access doors within a given room or space.
G. Factory manufactured doors shall be of a type compatible with the finish in which they are to be installed. In lieu of these doors, approved shop fabricated access doors with DuroDyne hinges may be used.
H. Access doors in fire rated walls and ceilings shall have equivalent U.L. label and fire rating.
1.19 TESTING:
A. Submit test reports as outlined in Division 1 Sections on Quality Control Services and each Division 26 Section.
B. Testing as required by these specifications shall pertain to all equipment, wiring, devices, etc.
installed under this contract and being reused.
C. General Scope:
Perform all tests and operational checks to assure that all electrical equipment, both 1.
Contractor and Owner-supplied, is operational within industry and manufacturer's tolerances and is installed in accordance with design specifications.
The tests and operational checks shall determine the suitability for energization. 2.
Schedule tests and give a minimum of two weeks advance notice to the Architect. 3.
Reschedule testing for Owner convenience if required.
D. Test Report: Submit three copies of the completed report to the Architect no later than fifteen
(15) days after completion of test unless directed otherwise. The test report shall be bound and its contents certified.
E. The test report shall include the following:
Project information including: Building, name, address, date, and other pertinent 1.
information.
List of equipment tested. 2.
Description of test. 3.
List of test equipment used and calibration date. 4.
Baseline, acceptable, or published target value for test with code or standard reference 5.
indicating where value was derived.
Test results that summarize all measured values with baseline values. 6.
Conclusions and recommendations. 7.
Appendix, including appropriate test forms that show all measured values. 8.
F. Failure to Meet Test:
Any system material or workmanship which is found defective on the basis of 1.
performance tests shall be reported directly to the Architect.
COMMON WORK RESULTS FOR ELECTRICAL 260500-12
All failed tests shall be sent immediately by email to Engineer with proposed corrective 2.
action and proposed re-test date and time.
Contractor shall replace the defective material or equipment as necessary, and have test 3.
repeated until test proves satisfactory without additional cost to the Owner.
The Contractor or testing agency shall have a calibration program which maintains all 4.
applicable test instrumentation within rated accuracy. The accuracy shall be traceable to the National Institute of Standards and Technology (NIST) in an unbroken chain.
Instruments shall be calibrated in accordance with the following frequency schedule:
a. Field Instruments: 6 months
b. Laboratory Instruments: 12 months
c. Leased specialty equipment: 12 months. (Where accuracy is guaranteed by lessor
Dated calibration labels shall be visible on all test equipment. 5.
1.20 NAMEPLATE DATA:
A. Provide equipment with permanent operational data nameplate on each item of power operated equipment, indicating manufacturer, product name, model number, serial number, capacity, operating and power characteristics, labels of tested compliances, and similar essential data.
Install equipment so that nameplate is readily visible.
B. Phase Rotation
Existing Building: Match existing phase rotation. Verify existing phase rotation. 1.
1.21 METHODS OF PROCEDURE (MOP):
A. Definition: Method of Procedure (MOP) is a written plan which describes the activities and procedures to safeguard the building's occupants and contents and to interface with the building's management, operations and security. Building occupants shall be defined as employees, patients, and visitors.
B. Requirements:
A MOP is required when a construction activity affects the safety of the occupants, 1.
equipment or valuable contents, or any supporting system; or essentially affects the building's management, operations or security.
A MOP is required for any shutdown or interruption of any system which affects the 2.
building occupants, including, but not limited to, infrastructure, life safety, electrical, and building management systems.
A MOP is required when requested or deemed necessary by the Owner or Engineer. 3.
C. Development:
The Prime Contractor shall develop, submit, track and process the MOP. Any assistance 1.
required by the Subcontractors shall be provided. All MOPs shall be reviewed by the Prime Contractor prior to submitting the MOP to the Engineer.
All MOPs Shall Be Typed. 2.
Contractor shall develop the MOP in a timely fashion prior to review and approval by all 3.
required parties.
Contractor shall develop the MOP with input from the subcontractor, where necessary. 4.
COMMON WORK RESULTS FOR ELECTRICAL 260500-13
D. Form: Each MOP shall be a written document in narrative, descriptive or outline form supplemented with drawings, diagrams and schedules as necessary. The detailed format included in the appendix shall be utilized.
E. Review and Approval: Contractor shall submit each MOP to the Engineer for review and approval. All MOPs require Owner's approval.
F. Implementation: Contractor shall implement the MOP when approved by the Engineer and Owner in writing. No construction activity which requires a MOP shall proceed until the MOP is approved.
G. Compliance: Contractor shall comply with the approved MOP. The Owner and Engineer reserve the right to stop the work for non-compliance with the MOP. Any cost or time delay resulting from the work stoppage shall be borne by the Contractor.
H. Posting: Work shall not proceed on any facet of the work involving any MOP if an approved and signed MOP is not posted in the work area.
1.22 CLEANING:
A. Refer to the Division 1 Section on project closeout or final cleaning for general requirements for final cleaning.
B. Clean all luminaires, lamps and lenses per manufacturer’s recommendations prior to final acceptance. Replace all inoperative lamps.
1.23 RECORD DOCUMENTS:
A. Refer to the Division 1 Section on Project Closeout or Project Record Documents for requirements. The following paragraphs supplement the requirements of Division 1.
B. Keep a complete set of record document prints in custody during entire period of construction at the construction site. Documents shall be updated on a weekly basis.
C. Mark Drawings to indicate revisions to conduit size and location both exterior and interior; actual equipment locations, dimensioned from column lines; concealed equipment, dimensioned to column lines; distribution and branch electrical circuitry; fuse and circuit breaker size and arrangements; support and hanger details; Change Orders; concealed control system devices, and any other relevant deviations from the Contract Documents.
D. Mark shop drawings to indicate approved substitutions; Change Orders; actual equipment and materials used.
E. Schedules:
Mark luminaire schedule on drawings to indicate manufacturer and complete catalog 1.
numbers of installed equipment.
Mark schedules including panelboard, switchboard, motor control center, mechanical, 2.
kitchen and similar equipment schedules on drawings to indicate installed equipment and materials used, and any deviations or revisions to electrical load data and calculations.
F. Revisions to the Contract Documents shall be legible and shall be prepared using the following color scheme.
Red shall indicate new items, deviations and routing. 1.
COMMON WORK RESULTS FOR ELECTRICAL 260500-14
Green shall indicate items removed or deleted. 2.
Blue shall be used for relevant notes and descriptions. 3.
G. At the completion of the project, obtain from the Architect a complete set of the Contract Documents in a read-only electronic format (.pdf unless otherwise noted). This set will include all revisions officially documented through the Architect/Engineer. Using the above color scheme, transfer any undocumented revisions from the construction site record drawings to this complete set. Submit completed documents to the Architect/Engineer. This contract will not be considered completed until these record documents have been received and reviewed by the Architect/Engineer.
H. Contractor may propose methods of maintaining record documents on electronic media. Obtain approval of Engineer and Owner prior to proceeding. Marked-up .pdf format readable by Bluebeam is preferred.
1.24 OPERATION AND MAINTENANCE DATA:
A. Refer to the Division 1 Section on project closeout or operation and maintenance data for procedures and requirements for preparation and submittal of maintenance manuals.
B. No later than four (4) weeks prior to the completion of the projectprovide complete set of operating and maintenance manuals, or as specified in Sections of Division 1 (whichever is more stringent).
C. A testing and equipment settings report (circuit breaker, relay, transformer tap, and other equipment settings) shall be submitted and received by the Engineer at least fifteen calendar days prior to the contractor's request for final observation time frame requirements. Include in the O & M Manual after review with "No Exceptions Taken" has been accomplished.
D. In addition to the information required by Division 1 for Maintenance Data, include the following information:
The job name and address and contractor's name and address shall be identified at the 1.
front of the electronic submittal.
Description of function, normal operating characteristics and limitations, fuse curves, 2.
engineering data and tests, and complete nomenclature and commercial numbers of all replaceable parts.
Manufacturer's printed operating procedures to include start-up, break-in, routine and 3.
normal operating instructions; regulation, control, stopping, shut-down, and emergency instructions; and summer and winter operating instructions.
Maintenance procedures for routine preventative maintenance and troubleshooting; 4.
disassembly, repair, and reassembly; aligning and adjusting instructions.
Servicing instructions and lubrication charts and schedules. 5.
Manufacturer's service manuals for all electrical equipment provided under this contract. 6.
Complete equipment and protection wiring diagrams. 7.
Name, Address and Telephone numbers of the Sub-contractors and local company and 8.
party to be contacted for 24-hour service and mantenance for each item of equipment.
Starting, stopping, adjusting, equipment identification numbers and adjustment clearly 9.
indicated for each piece of equipment.
Complete recommended spare parts list. 10.
Electrical System and Equipment Warranties. 11.
Copies of all test reports and settings reports shall be included in the manuals. 12.
Provide manuals with dividers for major sections and special equipment. Mark the 13.
individual equipment when more than one model or make is listed on a page. Provide detailed table of contents.
COMMON WORK RESULTS FOR ELECTRICAL 260500-15
Final Schedule of Values with all Electrical (and Information Technology) change order 14.
costs included and identified.
E. This contract will not be considered completed nor will final payment be made until all specified material, including test reports, settings reports, and final Schedule of Values with all Electrical and Information Technology change order costs included and identified is provided and the manual is reviewed by the Architect/Engineer.
1.25 PROJECT CLOSEOUT LIST:
A. In addition to the requirements specified in Division 1, complete the requirements listed below.
B. The contractor shall be responsible for providing the items listed on the Electrical Submittal Checklist prior to applying for certification of substantial completion. Refer to individual specification sections for additional requirements (Checklist is located at the end of this section.)
1.26 WARRANTIES:
A. Refer to the Division 1 Section on Warranties and Bonds for procedures and submittal requirements for warranties. Refer to individual equipment specifications for warranty requirements. In no case shall the warranty for the total electrical system be less than one year from date of acceptance by the Owner.
B. Compile and assemble the warranties specified in Division 26, into a separated set of vinyl covered, three ring binders, tabulated and indexed for easy reference.
C. Provide complete warranty information for each item. Information to include product or equipment description, date of beginning of warranty or bond; duration of warranty or bond; and names, addresses, and telephone numbers and procedures for filing a claim and obtaining warranty services.
1.27 CONSTRUCTION REQUIREMENTS:
A. The contractor shall maintain and have available at the jobsite current information on the following at all times:
Up to date record drawings. 1.
Submittals 2.
Site observation reports with current status of all action items. 3.
Test results; including recorded values, procedures, and other findings. 4.
Outage information. 5.
1.28 EQUIPMENT HOUSEKEEPING PADS:
A. Provide 4" concrete housekeeping pad for all floor mounted equipment including, but not limited to: floor mounted dry type transformers. Fabricate pads as follows:
Coordinate size of equipment bases with actual unit sizes provided. Fabricate base 4" 1.
larger in both directions than the overall dimensions of the supported unit.
Form concrete pads with framing lumber with form release compounds. Chamfer top 2.
edge and corners of pad.
Place concrete and allow to cure before installation of units. Use Portland cement that 3.
conforms to ASTM C 150, 54000-psi compressive strength, and normal weight aggregate.
COMMON WORK RESULTS FOR ELECTRICAL 260500-16
Anchor housekeeping pads to slab using #3 rebar bent in “L” or “Z” shape 12 inch on 4.
center on each side of slab.
1.29 ELECTRICAL SUBMITTAL CHECKLIST
Division 26
SPEC Section TITLE
Requirements Report Data
Test Facto ry Test
Report
Factory Rep
Supervisi on at Site
Training Req’d at
Site
Extra Material O&M Shop
Drawings
Listing Product
Data
26 05 00 Common Work Results For Electrical
Preliminary Schedule Of Values X
Final Schedule Of Values X X
Electrical Coordination Drawings X
Contractor/Equipment Warranties X
O&M Manuals X X X X
26 05 19 Low Voltage Electrical Power Conductors And Cables X X X X
26 05 29 Hangers And Supports For Electrical Systems X X X
26 05 33 Raceway And Boxes For Electrical Systems X
Electrical Metallic Tubing X
Flexible Metal Conduit X
Intermediate Metal Conduit X
Liquid-Tight Flexible Conduit X
Non-Metallic Conduit PVC X
Rigid Metal Conduit X
Surface Metal Raceway X X X
Wireways X X X
Rigid Aluminum Conduit X
26 05 34 Cabinets, Boxes & Fittings X X X
26 05 53 Identification For Electrical Systems X X
26 05 83 Wiring Connections X X
26 22 00 Transformers X X X X X
26 24 16 Panelboards X X X X X X
26 28 00 Overcurrent Protective Devices X X X X X X X
26 33 33 Rectifiers & Inverters X X X X X X X X
26 43 13 Surge Protection Device X X X X X X
COMMON WORK RESULTS FOR ELECTRICAL 260500-17
END OF SECTION 260500
COMMON WORK RESULTS FOR ELECTRICAL 260500-18
SECTION 260519 – LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
PART 1 - GENERAL
1.1 SUMMARY:
A. This section includes wires, cables, and connectors for power, lighting, signal, control, and related systems rated 600 volts and less.
1.2 QUALITY ASSURANCE:
A. Manufacturers: Firms regularly engaged in manufacture of electrical wire and cable products of types, sizes, and ratings required, whose products have been in satisfactory use in similar service for not less than 5 years.
B. Installer's Qualifications: Firm with at least 3 years of successful installation experience with projects utilizing electrical wiring and cabling work similar to that required for this project.
C. Conform to applicable code regulations regarding toxicity of combustion products of insulating materials.
1.3 SUBMITTALS:
A. Product Data: Submit manufacturer's data on electrical wires, cables and connectors.
1.4 DELIVERY, STORAGE, AND HANDLING:
A. Deliver wire and cable properly packaged in factory- fabricated type containers, or wound on NEMA-specified type wire and cable reels.
B. Store wire and cable in clean dry space in original containers. Protect products from weather, damaging fumes, construction debris and traffic.
C. Handle wire and cable carefully to avoid abrading, puncturing and tearing wire and cable insulation and sheathing. Ensure that dielectric resistance integrity of wires/cables is maintained.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS:
A. Manufacturers: Subject to compliance with requirements, provide products by the following (for each type of wire, cable, and connector):
Wire and Cable: 1.
a. American Insulated Wire
b. Belden
c. Cerrowire
d. Encore Wire
e. General Cable Corporation.
f. Southwire Company
g. Okonite
h. Superior Essex:
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519- 1
1) Triangle
2) Excel
3) Royal
Connectors: 2.
a. O-Z/Gedney Co.
b. AMP, Inc.
c. Burndy Corporation.
d. Ideal Industries, Inc.
e. 3M Company
f. Thomas and Betts Corp.
2.2 WIRES AND CABLES:
A. General: Provide wire and cable suitable for the temperature, conditions, and location where installed.
B. Conductors: Provide solid conductors and approved connectors for power, control, and branch circuits 10 AWG and smaller. Provide stranded conductors for 8 AWG and larger.
C. Conductor Material: Provide copper for all wires and cables.
Cables: Provide the following types of cables in NEC approved locations and 1.
applications where permitted by the contract documents. Cables shall be U.L. listed and approved by the local building authority. All cables shall contain a green insulated equipment ground conductor of the same size as the neutral conductor.
2.3 CONNECTORS:
A. Description: Provide UL-type factory-fabricated, solderless metal connectors of sizes, ampacity ratings, materials, types and classes for applications and for services indicated. Use connectors with temperatures equal to or greater than those of the wires upon which used.
B. Provide 2-hole compression lugs for all power feeder, neutral, and grounding connections when installed on bus bars. (Including phase, neutral and grounding conductors).
C. Provide connectors that are designed to accept stranded conductors where stranded conductors are used.
PART 3 - EXECUTION
3.1 WIRE AND CABLE INSTALLATION SCHEDULE:
A. Building Wire: Install all building wire in raceway regardless of location.
3.2 INSTALLATION OF WIRES AND CABLES:
A. General: Install electrical cables, wires and connectors in compliance with applicable requirements of NEC, NEMA,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .