Attachment_8_-_Pricing_Tables__(A003).xlsx

XLSX spreadsheet 68 KB Posted

Attached to
ACOTA IDIQ Federal contract opportunity
Solicitation number
SAQMMA15R0318
Issued by
Department of State Office of Acquisition Management

About this file

Attachment 8 - Pricing Tables (A003)

View the file

Other files for this federal contract opportunity

Other files attached to ACOTA IDIQ, newest first.
File Type Posted
A007_SAQMMA15R0318.pdf PDF
A006_SAQMMA15R0318.pdf PDF
A006_-_Amendment_Changes.docx DOCX document
Attachment_10_-_Questions_and_Answers_(A006).xlsx XLSX spreadsheet
ACOTA_RFP_SECTIONS_B_-_M__(A006)_clean.docx DOCX document
ACOTA_RFP_SECTIONS_B_-_M__(A006).docx DOCX document
Notice_and_Order.pdf PDF
A005_SAQMMA15R0318.pdf PDF
Attachment_4_-_PP_Contract_Profile_(A004).docx DOCX document
ACOTA_RFP_SECTIONS_B_-_M__(A004)_clean.docx DOCX document
Attachment_3_-_Equipment_List_(A004).xlsx XLSX spreadsheet
Attachment_7_-_Labor_Categories_(A004).docx DOCX document
Attachment_2_-_ACOTA_Sample_Task_Order_SOW_(A004).docx DOCX document
A004_SAQMMA15R0318.pdf PDF
A004_-_Amendment_Changes.docx DOCX document
Attachment_6_-_Training_Courses_(A004).docx DOCX document
Attachment_6_-_Training_Courses_(A004_-_CLEAN).docx DOCX document
ACOTA_RFP_SECTIONS_B_-_M__(A004).docx DOCX document
Attachment_2_-_ACOTA_Sample_Task_Order_SOW_(A004_-_CLEAN).docx DOCX document
Attachment_8_-_Pricing_Tables__(A004).xlsx XLSX spreadsheet
Attachment_9_-_Revised_Bidders_DD_254_(A004).pdf PDF
Attachment_5_-_PP_Customer_Satisfaction_Survey_(A004).xlsx XLSX spreadsheet
Attachment_10_-_Questions_and_Answers_(A004).xlsx XLSX spreadsheet
Attachment_1_-_PKO_Procurement_Restrictions_(A004).pdf PDF
Attachment_9_-_Revised_Bidders_DD_254_(A003).pdf PDF
Attachment_5_-_PP_Customer_Satisfaction_Survey.xlsx XLSX spreadsheet
Attachment_6_-_Training_Courses_(A003).docx DOCX document
A003_SAQMMA15R0318.pdf PDF
Attachment_7_-_Labor_Categories_(A003).docx DOCX document
Attachment_2_-_ACOTA_Sample_Task_Order_SOW_(A003).docx DOCX document
Attachment_4_-_PP_Contract_Profile.docx DOCX document
Attachment_10_-_Questions_and_Answers_(A003).xlsx XLSX spreadsheet
ACOTA_RFP_SECTIONS_B_-_M__(A003).docx DOCX document
Attachment_1_-_PKO_Procurement_Restrictions.pdf PDF
A003_--_Amendment_Changes.docx DOCX document
ACOTA_RFP_SECTIONS_B_-_M__(clean).docx DOCX document
Attachment_3_-_Equipment_List_(A003).xlsx XLSX spreadsheet
A002_SAQMMA15R0318.pdf PDF
SAQMMA15R0318A001.pdf PDF
Attachment_1_-_PKO_Procurement_Restrictions.pdf PDF
Attachment_4_-_PP_Contract_Profile.docx DOCX document
SF33.pdf PDF
Attachment_8_-_Pricing_Tables.xlsx XLSX spreadsheet
Attachment_3_-_Equipment.xlsx XLSX spreadsheet
Attachment_2_-_ACOTA_Sample_Task_Order_SOW.docx DOCX document
Attachment_5_-_PP_Customer_Satisfaction_Survey.xlsx XLSX spreadsheet
Attachment_7_-_Labor_Categories.docx DOCX document
Attachment_6_-_Training_Courses.docx DOCX document
Attachment_9_-_Bidders_DD254.pdf PDF
ACOTA_RFP_SECTIONS_B_-_M__(FBO_FINAL).docx DOCX document
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Compliance Checklist IDIQ

Pricing Table 1
Price Volume Compliance Checklist
RFP
ReferenceRequirementComply
(Yes/No)Proposal Reference
L.19.3.2 (1)The electronic price proposal shall consist of the following, which are described further in this subsection:

a. Narrative (in Word or PDF)

b. Pricing Tables 1-8 (in one folder containing one Excel workbook)

c. Detail Pricing Tables (in a second folder containing one Excel workbook)

d. Supporting Information (in Word or PDF)

Offerors shall prepare on a CD-ROM one electronic file for each of the above sections. Therefore, offerors shall prepare four files on each CD-ROM.

L.19.3.2 (2) The hard-copy price proposal shall consist of the following, which are described further in this subsection:

a. Narrative

b. Pricing Tables 1-8

c. Detail Pricing Tables

d. Supporting Information

Offerors shall separate each of the above sections by a distinct tab divider.

L.19.3.2 (3)The content of the electronic price proposal and hard-copy price proposal shall match. If differences exist between the two proposals, the hard-copy proposal shall take precedence.
L.19.3.2 (4)Pricing Tables 1-8 are provided by the Government and shall be completed by the offerors. Detail Pricing Tables shall be provided and completed by the offerors.
L.19.3.2 (5)Offerors shall not add, delete, or otherwise alter the existing format or content in Pricing Tables 1-8. Offerors shall complete the required areas only.
L.19.3.2 (6)Offerors shall use for pricing purposes the following period of performance:

Base Period: January 1, 2016 through December 31, 2016 Option Period 1: January 1, 2017 through December 31, 2017 Option Period 2: January 1, 2018 through December 31, 2018 Option Period 3: January 1, 2019 through December 31, 2019 Option Period 4: January 1, 2020 through December 31, 2020 Six-Month Option to Extend: January 1, 2021 through June 30, 2021

L.19.3.2 (7)In Pricing Table 1, offerors shall complete the “Comply (Yes/No)” and “Proposal Reference” columns.
L.19.3.2 (8)In Pricing Table 2, offerors shall identify their most current indirect cost rates that would be used as the proposed provisional billing rates. If applicable, these indirect cost rates should be reflected in the most current indirect cost rate agreement that has been negotiated between the offeror and its cognizant Federal agency official.
L.19.3.2 (9)In Pricing Table 2, the proposed provisional billing indirect cost rates shall not exceed the ceiling indirect cost rates proposed in Pricing Table 3.
L.19.3.2 (10)In Pricing Tables 2 and 3, offerors shall propose only their own indirect cost rates. Indirect cost rates for subcontractors and/or other entities not proposed as the offeror shall not be included in part or in whole.
L.19.3.2 (11)In Pricing Tables 2 and 3, the proposed indirect cost rates shall reflect the impact of this potential contract.
L.19.3.2 (12)In Pricing Tables 2 and 3, offerors shall include all indirect cost rate descriptions that are anticipated to apply under this contract.
L.19.3.2 (13)In Pricing Tables 2 and 3, the proposed indirect cost rate descriptions and allocation bases shall match the respective indirect cost rate descriptions and allocation bases identified in any and all other official sources (e.g., DCAA files, cognizant Federal agency official files, CASB Disclosure Statement, joint venture operating agreement, and internal budget estimates).
L.19.3.2 (14)In Pricing Tables 2 and 3, offerors shall add or delete rows as necessary. The number (e.g., “1)”) in the “Indirect Cost Rate Description” column signifies a specific indirect cost rate description. For example, an offeror may elect to propose “Fringe Benefits” next to “1)”, “Overhead” next to “2)”, and “G&A” next to “3).”
L.19.3.2 (15)In Pricing Tables 2 and 3, each row will apply to a different Contractor Fiscal Year Period, which offerors shall identify with month, day, and year in the right-most column.
L.19.3.2 (16)In Pricing Tables 2 and 3, offerors shall propose a Offeror Fiscal Year Period for each of its fiscal years through the life of the contract. Offerors shall assume that the life of the contract, including any extension, is January 1, 2016 through June 30, 2021.
L.19.3.2 (17)In Pricing Tables 2 and 3, Facilities Capital Cost of Money (FCCOM) factors shall be separately identified if the offeror allocates FCCOM costs as part of its established cost accounting practices.
L.19.3.2 (18)In Pricing Table 4, offerors shall propose one fixed profit percentage and one fixed fee percentage per contract period.
L.19.3.2 (19)In Pricing Table 4, the proposed fixed profit percentages and fixed fee percentages shall not exceed two decimal places.
L.19.3.2 (20)In Pricing Table 4, each proposed fixed fee percentage shall not exceed 10%.
L.19.3.2 (21)In Pricing Table 5, offerors shall propose one not-to-exceed (NTE) fully-loaded hourly labor rate per labor category/CLIN per period, regardless of which entity (offeror, subcontractor offeror, or other) is anticipated to perform the labor category.

(Note 1: The IDIQ award shall be based, in part, on an aggregate basis for all labor categories listed in Pricing Table 5. These categories are also listed in Section J, Attachment 7 – Labor Categories. Offerors that do not propose an NTE fully-loaded hourly labor rate per contract period for each labor category in Pricing Table 5/Attachment 7 shall not be eligible for award. In the context of this RFP, a proposed NTE fully-loaded hourly labor rate is one that is not $0.00 or other nominal amount. It is one at which the contractor is expected to cover its costs and receive a reasonable profit.)

(Note 2: If an offeror normally allocates indirectly the costs associated with a labor category identified in Pricing Table 5, we remind such offeror that such allocation does not relieve the offeror from complying with each solicitation and any resulting contract term [e.g., Sections L.16, L.19.3.1(2), L.19.3.2(21), and B.4]. Section K’s FAR 52.230-7 (Proposal Disclosure – Cost Accounting Practice Changes) reiterates the requirement for offeror compliance, but as it relates to large business offerors, by requiring each large business offeror to prepare its price proposal in accordance with any change to its cost accounting practices resulting from any solicitation requirement.)

L.19.3.2 (22)In Pricing Table 5, each proposed NTE fully-loaded hourly labor rate shall be based on the corresponding labor category description provided in Section J, Attachment 7 – Labor Categories.
L.19.3.2 (23)In Pricing Table 5, the respective proposed NTE fully-loaded hourly labor rates shall be based on a normal workweek of 40 hours (8 hours per day x 5 days per week) for performance in the continental United States (CONUS), and 48 hours (8 hours per day x 6 days per week) for performance outside the continental United States (OCONUS). “CONUS” means the 48 contiguous states, Alaska, Hawaii, and the District of Columbia.
L.19.3.2 (24)In Pricing Table 5, each proposed NTE fully-loaded hourly labor rate shall consist of a proposed unloaded hourly rate, any labor-related direct costs (e.g., any direct fringe benefits, any direct bonuses), applicable indirect costs, and profit. It shall not consist of any other costs, including other compensation costs like post hardship differential pay and danger pay. See Section B.4.
L.19.3.2 (25)In Pricing Table 5, the proposed NTE fully-loaded hourly labor rates shall apply only to individuals who have legal status to work in the United States of America (e.g., United States citizens, United States resident aliens, and individuals with permits showing authorization to work in the United States).
L.19.3.2 (26)In Pricing Table 5, the proposed NTE fully-loaded hourly labor rates shall not exceed two decimal places.
L.19.3.2 (27)In Pricing Table 5, offerors shall not complete the cells shaded in gray. The Government has determined the labor category located on the same row as the gray cells is not expected to perform normally under the workweek schedule identified with such cells.
L.19.3.2 (28)In Pricing Table 6, offerors shall propose one not-to-exceed (NTE) unit price per CLIN per period, regardless of which entity (offeror, subcontractor offeror, or other) is anticipated to provide the equipment.

(Note: The IDIQ award shall be based, in part, on an aggregate basis for all supplies listed in Pricing Table 6. These supplies are also listed in Section J, Attachment 3 – Equipment List. Offerors that do not quote an NTE unit price per contract period for each item in Pricing Table 6/Attachment 3 shall not be eligible for award. In the context of this RFP, a proposed NTE unit price is one that is not $0.00 or other nominal amount. It is one at which the contractor is expected to cover its costs and receive a reasonable profit.)

L.19.3.2 (29)In Pricing Table 6, each proposed NTE unit price shall be based on a quantity of one per unit of measure (e.g., one each hat, one pair of boots), and otherwise as described in the Equipment Description column and in Attachment 3 – Equipment List in Section J.
L.19.3.2 (30)In Pricing Table 6, each proposed NTE unit price shall consist of the equipment’s direct costs, applicable indirect costs, and profit. It shall not consist of any other costs, including direct shipping/transportation costs.
L.19.3.2 (31)In Pricing Table 6, the proposed NTE unit prices shall not exceed two decimal places.
L.19.3.2 (32)In Pricing Table 7, the Government provided formulas to transfer automatically the proposed NTE fully-loaded hourly labor rates from Pricing Table 5 to the respective cells in the “NTE Rate” column. However, offerors shall verify the transfer.
L.19.3.2 (33)In Pricing Table 7, the Government provided formulas to calculate automatically each proposed Subtotal under the labor section. Each formula is “FTE” multiplied by “NTE Rate” multiplied by “Hours.” However, offerors shall verify the arithmetic accuracy.
L.19.3.2 (34)In Pricing Table 7, the Government provided formulas to transfer automatically the proposed NTE unit prices from Pricing Table 6 to the respective cells in the “NTE Unit Price” column. However, offerors shall verify the transfer.
L.19.3.2 (35)In Pricing Table 7, the Government provided formulas to calculate automatically each proposed Subtotal under the Equipment section. Each formula is “NTE Unit Price” multiplied by “Units.” However, offerors shall verify the arithmetic accuracy.
L.19.3.2 (36)In Pricing Table 7, the estimated indirect costs in the “Ind $” column shall reflect the product of the applicable proposed ceiling indirect cost rate(s) proposed in Pricing Table 3 and the RFP-specified estimated direct cost.
L.19.3.2 (37)In Pricing Table 7, the Government provided a formula to calculate automatically each proposed estimated fee in the “Fee $” column. Each formula is the applicable fee percentage proposed in Pricing Table 4 multiplied by the sum of “Dir $” and “Ind $.” However, offerors shall verify the arithmetic accuracy.
L.19.3.2 (38)In Pricing Table 7, the Government provided a formula to calculate automatically each proposed Subtotal under the “Other Direct Costs (ODCs)/Materials Costs” section. Each formula is “Dir $” plus “Ind $” plus “Fee $.” However, offerors shall verify the arithmetic accuracy.
L.19.3.2 (39)In Pricing Table 7, the Government provided formulas to calculate automatically the proposed Subtotal, Total, and Overall Proposed Price. However, offerors shall verify the arithmetic accuracy.
L.19.3.2 (40)In Pricing Table 7, the proposed Subtotal, Total, and Overall Proposed Price shall be in whole numbers (i.e., no decimals).
L.19.3.2 (41)In Pricing Table 8, offerors shall propose one NTE fully-loaded hourly labor rate per period for each RFP-specified labor category (as applicable) proposed to be performed only by employees not exempt under the Fair Labor Standards Act (FLSA). We note that FLSA does not apply in Africa.
L.19.3.2 (42)In Pricing Table 8, offerors shall propose one NTE fully-loaded hourly labor rate per applicable labor category per period, regardless of which entity (offeror, subcontractor offeror, or other) is anticipated to perform the labor category.
L.19.3.2 (43)In Pricing Table 8, the proposed NTE fully-loaded hourly labor rates shall be based on performance exceeding a normal workweek of 40 hours (8 hours per day x 5 days per week) for performance inside the continental United States (CONUS).
L.19.3.2 (44)In Pricing Table 8, each proposed NTE fully-loaded hourly labor rate shall consist of a proposed unloaded hourly rate, overtime premium, any labor-related direct costs (e.g., any direct fringe benefits, any direct bonuses), applicable indirect costs, and profit. It shall not consist of any other costs, including other compensation costs like post hardship differential pay and danger pay. See Section B.4.
L.19.3.2 (45)In Pricing Table 8, the proposed NTE fully-loaded hourly labor rates shall apply only to individuals who have legal status to work in the United States of America (e.g., United States citizens, United States resident aliens, and individuals with permits showing authorization to work in the United States).
L.19.3.2 (46)In Pricing Table 8, the proposed NTE fully-loaded hourly labor rates shall be listed in the “Rate” column.
L.19.3.2 (47)In Pricing Table 8, the overtime premium included in each proposed NTE fully-loaded hourly labor rate shall be listed in the “Premium” column.
L.19.3.2 (48)In Pricing Table 8, the overtime premium listed in the “Premium” column shall include any indirect costs and profit associated with such premium, and which were included in the proposed NTE fully-loaded hourly labor rate listed in the “Rate” column.
L.19.3.2 (49)In Pricing Table 8, the proposed NTE fully-loaded hourly labor rates and premium costs shall not exceed two decimal places.
L.19.3.2 (50)In the Detail Pricing Tables, offerors shall show for each contract period the breakdown of the information required under “Other Direct Costs (ODCs)/Materials Costs” in Pricing Table 7. The breakdown shall consist of the following:

a. RFP-specified estimated direct cost (represented by Travel)

b. Each applicable indirect cost rate description (e.g., G&A)

c. Each applicable ceiling indirect cost rate

d. Each ceiling indirect cost

e. Each fee percentage

f. Each fee dollar amount

g. Subtotal

L.19.3.2 (51)In the Detail Pricing Tables, offerors shall ensure that the proposed applicable ceiling indirect cost rate(s) (see "50" immediately above) are for the contractor fiscal year(s) that coincides with the contract performance period. When a given performance period traverses two contractor fiscal years, the offeror shall show and compute accordingly for the given performance period the proposed applicable ceiling indirect cost rate(s) for each of the two contractor fiscal years.
L.19.3.2 (52)In the Detail Pricing Tables, the proposed applicable ceiling indirect cost rates (see "50" above) shall match the respective ceiling indirect cost rates proposed in Pricing Table 3. For award of the IDIQ contract, ceiling indirect rates are required to be applied only to the RFP-specified estimated direct cost (represented by Travel) identified under “Other Direct Costs (ODCs)/Materials Costs” in Pricing Table 7.
L.19.3.2 (53)In the Detail Pricing Tables, the proposed ceiling indirect cost subtotals (see "50" above) shall match the respective proposed “Ind $” costs in Pricing Table 7.
L.19.3.2 (54)In the Detail Pricing Tables, the proposed fee percentages (see "50" above) shall match the respective fee percentages proposed in Pricing Table 4. For award of the IDIQ contract, fee percentages are required to be applied only to the sum of the RFP-specified estimated direct cost and proposed ceiling indirect costs identified under “Other Direct Costs (ODCs)/Materials Costs” in Pricing Table 7.
L.19.3.2 (55)In the Detail Pricing Tables, the proposed fee subtotals (see "50" above) shall match the respective “Fee $” amount proposed in Pricing Table 7.
L.19.3.2 (56)In the Detail Pricing Tables (in electronic submission only), offerors shall show with formulas the arithmetic process by which they calculated their proposed ceiling indirect costs, fee, and subtotal (see "50" above).
L.19.3.2 (57)In Pricing Tables 1-8 and the Detail Pricing Tables, offerors shall complete all applicable data cells.
L.19.3.2 (58)In Pricing Tables 1-8 and the Detail Pricing Tables (in electronic submission only), offerors shall not hide or lock any rows, columns, or cells that contain proposed data.
L.19.3.2 (59)In Pricing Tables 1-8 and the Detail Pricing Tables, offerors shall propose all rates, costs, and prices in United States currency.
L.19.3.2 (60)In the Narrative, offerors shall identify the number of hours in their normal workweek.
L.19.3.2 (61)In the Narrative, offerors shall identify, based on the Overall Proposed Price in Pricing Table 7, their:

a. Proposed subcontractors;

b. Total dollars estimated to be subcontracted to each proposed subcontractor;

c. Total dollars estimated to be performed by the offeror; and

d. Percentage of work (based on estimated total dollars) to be performed by the offeror and each proposed subcontractor.

L.19.3.2 (62)In the Narrative, offerors shall identify the name and full contact information, including e-mail address, of their cognizant Federal auditor (e.g., local Defense Contract Audit Agency branch).
L.19.3.2 (63)In the Narrative, offerors shall identify the name and full contact information, including e-mail address, of their cognizant Federal agency official (CFAO). The CFAO works in the offeror’s cognizant Federal agency, which is normally the agency with which the offeror has the largest dollars in negotiated contracts, including option periods. See FAR 42.003. If the Government has not appointed a CFAO, the offeror shall identify the name and full contact information of the contracting officer cognizant of the largest dollars in negotiated contracts, including option periods.
L.19.3.2 (64)In the Narrative, pursuant to FAR 52.246-6(f) (Inspection – Time-and-Material and Labor-Hour), offerors shall identify the percentage of the proposed not-to-exceed fully-loaded hourly labor rates attributable to profit. See Section B.4(s).
L.19.3.2 (65)In the Narrative, offerors shall explain how they considered the impact of this potential contract in their budgetary estimates for their provisional billing indirect cost rates and ceiling indirect cost rates proposed in Pricing Tables 2 and 3, respectively.
L.19.3.2 (66)In the Narrative, offerors shall explain any difference between the provisional billing indirect cost rates proposed in Pricing Table 2 and the respective indirect cost rates submitted in the Supporting Information [reference L.19.3.2(67)].
L.19.3.2 (67)In the Supporting Information, offerors shall submit evidence to support the provisional billing indirect cost rates proposed in Pricing Table 2. Offerors shall submit at least one of the following pieces of evidence, pursuant to the following descending order of Government preference:

a. Current forward pricing rate agreement with the offeror’s cognizant Federal agency official

b. Current other negotiated indirect cost rate agreement (that contains forward pricing indirect cost rates) with the offeror’s cognizant Federal agency official

c. Current forward pricing rate recommendation letter issued by the offeror’s cognizant Federal agency official

d. Current provisional billing rate agreement with the offeror’s cognizant Federal agency official

e. Current provisional billing rate recommendation letter issued by the offeror’s cognizant Federal agency official.

f. Most recent (within the last two years) audit report from the Defense Contract Audit Agency (DCAA) or other qualified external auditor

g. Most recent (within the last two years) audit report from a qualified internal auditor

h. Current indirect cost rate proposal submitted to the offeror’s cognizant Federal agency official and cognizant auditor

i. Identification of the indirect cost pools and respective allocation bases, and breakdown of the cost elements/costs comprising such pools and bases. The Government prefers that the offeror submit such evidence in a format similar to the applicable schedules in Enclosure 6 (Incurred Cost Proposals) of DCAA’s Information for Contractors, which may be found on DCAA’s Web site (www.dcaa.mil) under the “Audit Process Overview – Information for Contractors” link under the Guidance tab at the top of the homepage.

L.19.3.2 (68) In the Supporting Information, offerors, in accordance with FAR 15.404-3(b) (Subcontract Pricing Considerations), shall conduct appropriate cost or price analyses to establish the reasonableness of proposed subcontract prices, and shall include the results of these analyses.

a. Results shall be in the form of the offeror’s cost/price analysis report(s).

b. The report(s) shall include:

1. Cost/price analysis technique(s) used (e.g., comparison of proposed prices received in response to the solicitation);

2. Summary findings;

3. Detailed findings; and

4. Basis for the determination of fair and reasonable proposed subcontract prices.

c. For award of the IDIQ contract, “proposed subcontract prices” shall mean:

1. Fully-loaded hourly labor rates proposed by the subcontractor offeror to the (prime) offeror, or fully-loaded hourly labor rates negotiated between the subcontractor offeror and (prime) offeror; and

2. Equipment unit prices proposed by the subcontractor offeror to the (prime) offeror, or equipment unit prices negotiated between the subcontractor offeror and (prime) offeror.

2. Provisional Billing Rates Pricing Table 2

Proposed Provisional Billing Indirect Cost Rates

Indirect Cost Rate Description (e.g., Fringe Benefits, Overhead, G&A)Proposed Provisional Billing RateBasis of Estimate of Proposed Provisional Billing Rate
(e.g., Negotiated Indirect Cost Rate Agreement with Cognizant FAO)Allocation Base
(e.g., Direct Labor Dollars, Total Cost Input)Contractor Fiscal Year Period

(e.g., January 1, 2016 - December 31, 2016) 1)

2)

THE FOLLOWING IS FOR ILLUSTRATION PURPOSES ONLY:

Indirect Cost Rate DescriptionProposed Provisional Billing RateBasis of Estimate of Proposed Provisional Billing RateAllocation Base
Contractor Fiscal Year Period

1) G&A 6.25% August 1, 2015 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2016 - December 31, 2016 G&A 6.00% August 1, 2015 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2017 - December 31, 2017 G&A 5.95% August 1, 2015 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2018 - December 31, 2018 G&A 5.80% August 1, 2015 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2019 - December 31, 2019 G&A 5.80% August 1, 2015 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2020 - December 31, 2020 G&A 5.80% August 1, 2015 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2021 - December 31, 2021

3. Ceiling Indirect Cost Rates

Pricing Table 3
Proposed Ceiling Indirect Cost Rates
Indirect Cost Rate Description (e.g., Fringe Benefits, Overhead, G&A)Proposed Ceiling Indirect Cost RateBasis of Estimate of Proposed Ceiling Indirect Cost Rate
(e.g., Indirect Cost Budget Estimate)Allocation Base
(e.g., Direct Labor Dollars, Total Cost Input)Contractor Fiscal Year Period

(e.g., January 1, 2016 - December 31, 2016) 1)

2)

THE FOLLOWING IS FOR ILLUSTRATION PURPOSES ONLY:

Indirect Cost Rate Description Proposed Ceiling Indirect Cost Rate Basis of Estimate of Proposed Ceiling Indirect Cost Rate Allocation Base Contractor Fiscal Year Period

1) G&A 6.25% August 1, 2015 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2016 - December 31, 2016 G&A 6.00% August 1, 2015 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2017 - December 31, 2017 G&A 5.95% August 1, 2015 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2018 - December 31, 2018 G&A 5.80% August 1, 2015 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2019 - December 31, 2019 G&A 5.80% August 1, 2015 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2020 - December 31, 2020 G&A 5.80% August 1, 2015 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2021 - December 31, 2021

4. Profit and Fee Percentages

Pricing Table 4
Proposed Fixed Profit Percentages and Fixed Fee Percentages
Proposed Fixed Profit Percentages
Base YearOption Year 1Option Year 2Option Year 3Option Year 4Six-Month Option to Extend

(see FAR 52.217-8)

Proposed Fixed Fee Percentages
Base YearOption Year 1Option Year 2Option Year 3Option Year 4Six-Month Option to Extend

(see FAR 52.217-8)

5. NTE Labor Rates Pricing Table 5

Proposed Not-to-Exceed (NTE) Fully-Loaded Hourly Labor Rates

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4 Six-Month Option to Extend (see FAR 52.217-8)

CLIN RFP-specified Labor Category 40 48 40 48 40 48 40 48 40 48 40 48

X001Program Manager
X002Deputy Program Manager
X003Systems Administrator
X004Logistics Manager
X005Logistics Specialist
X006Supply Technician
X007Country Manager
X008Senior PSO Staff Trainer
X009PSO Staff Trainer
X010Senior PSO Soldier Skills Trainer
X011PSO Soldier Skills Trainer
X012PSO Specialty Trainer
X013PSO Senior Subject Matter Expert
X014Data Base Administrator
X015Translator
X016Construction Engineer
X017Human Rights Subject Matter Expert
Notes
40 = The number of hours in a normal workweek at which the NTE fully-loaded hourly labor rates in that column are being proposed.
48 = The number of hours in a normal workweek at which the NTE fully-loaded hourly labor rates in that column are being proposed.
No rates shall be proposed in the gray cells.

6. NTE Equip Prices

Pricing Table 6
Proposed Not-to-Exceed (NTE) Unit Prices for Selected Equipment

CLIN Equipment Description Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4 Six-Month Option to Extend (see FAR 52.217-8)

PPE
Helmet
X500.01Helmet, Small
X500.02Helmet, Medium
X500.03Helmet, Large
X500.04SAPI 8 x 10
X500.05SAPI 10 x 12
X500.06Ballistic Vest, Small
X500.07Ballistic Vest, Medium
X500.08Ballistic Vest, Large
X500.09Ballistic Vest, X-Large
LBE
X500.10LC-1 Suspenders
Belt
X500.11Tactical Duty Belt F5618-75
X500.12Belt, Olive Drab, Small
X500.13Belt, Olive Drab, Medium
X500.14Belt, Olive Drab, Large
X500.15Canteen, 1 QT, w/M1 Cap
X500.16Canteen Cover, 1 QT
X500.17Canteen, 2 QT
X500.18Canteen Cover, 2 QT
X500.19Cup, Canteen, wire handle
X500.20First Aid kit
X500.21Butt Pack
X500.22Utility Pouch
X500.23Mag Pouch AK-47 3 PAK
X500.24Mag Pouch M-16 3 PAK
X500.25Hydration Pouch
X500.26Entrenching Tool
X500.27Carrier, Entrenching Tool
X500.28ALICE Pack, Large
X500.29Frame, ALICE Pack
X500.30Weapon cleaning kit, M16
X500.31Weapon cleaning kit, AK-47
X500.32Compass, unmounted

7. IDIQ Prices Pricing Table 7 IDIQ Proposed Prices

Proposed Labor Prices

Six-Month Option to Extend
Base YearOption Year 1Option Year 2Option Year 3Option Year 4(see FAR 52.217-8)
CLINRFP-specified Labor CategoryFTENTE RateHoursSubtotalNTE RateHoursSubtotalNTE RateHoursSubtotalNTE RateHoursSubtotalNTE RateHoursSubtotalNTE RateHoursSubtotalTotal
X001Program Manager10.001,8800.000.001,8800.000.001,8800.000.001,8800.000.001,8800.000.009400.000
X002Deputy Program Manager10.001,8800.000.001,8800.000.001,8800.000.001,8800.000.001,8800.000.009400.000
X003Systems Administrator50.001,8800.000.001,8800.000.001,8800.000.001,8800.000.001,8800.000.009400.000
X004Logistics Manager10.001,8800.000.001,8800.000.001,8800.000.001,8800.000.001,8800.000.009400.000
X005Logistics Specialist10.001,8800.000.001,8800.000.001,8800.000.001,8800.000.001,8800.000.009400.000
X006Supply Technician10.001,8800.000.001,8800.000.001,8800.000.001,8800.000.001,8800.000.009400.000
X007Country Manager260.002,2560.000.002,2560.000.002,2560.000.002,2560.000.002,2560.000.001,1280.000
X008Senior PSO Staff Trainer260.002,2560.000.002,2560.000.002,2560.000.002,2560.000.002,2560.000.001,1280.000
X009PSO Staff Trainer780.002,2560.000.002,2560.000.002,2560.000.002,2560.000.002,2560.000.001,1280.000
X010Senior PSO Soldier Skills Trainer260.002,2560.000.002,2560.000.002,2560.000.002,2560.000.002,2560.000.001,1280.000
X011PSO Soldier Skills Trainer2600.002,2560.000.002,2560.000.002,2560.000.002,2560.000.002,2560.000.001,1280.000
X012PSO Specialty Trainer1040.002,2560.000.002,2560.000.002,2560.000.002,2560.000.002,2560.000.001,1280.000
X013PSO Senior Subject Matter Expert260.002,2560.000.002,2560.000.002,2560.000.002,2560.000.002,2560.000.001,1280.000
X014Data Base Administrator50.002,2560.000.002,2560.000.002,2560.000.002,2560.000.002,2560.000.001,1280.000
X015Translator2080.002,2560.000.002,2560.000.002,2560.000.002,2560.000.002,2560.000.001,1280.000
X016Construction Engineer260.002,2560.000.002,2560.000.002,2560.000.002,2560.000.002,2560.000.001,1280.000
X017Human Rights Subject Matter Expert260.002,2560.000.002,2560.000.002,2560.000.002,2560.000.002,2560.000.001,1280.000
SubtotalSubtotalSubtotalSubtotalSubtotalSubtotal
821000000

Proposed Equipment Prices

CLINEquipment DescriptionNTE Unit PriceUnitsSubtotalNTE Unit PriceUnitsSubtotalNTE Unit PriceUnitsSubtotalNTE Unit PriceUnitsSubtotalNTE Unit PriceUnitsSubtotalNTE Unit PriceUnitsSubtotal
PPE
Helmet
X500.01Helmet, Small0.002,5000.000.002,5000.000.002,5000.000.002,5000.000.002,5000.000.0000.000
X500.02Helmet, Medium0.003,5000.000.003,5000.000.003,5000.000.003,5000.000.003,5000.000.0000.000
X500.03Helmet, Large0.002,5000.000.002,5000.000.002,5000.000.002,5000.000.002,5000.000.0000.000
X500.04SAPI 8 x 100.008,5200.000.008,5200.000.008,5200.000.008,5200.000.008,5200.000.0000.000
X500.05SAPI 10 x 120.008,5200.000.008,5200.000.008,5200.000.008,5200.000.008,5200.000.0000.000
X500.06Ballistic Vest, Small0.001,7500.000.001,7500.000.001,7500.000.001,7500.000.001,7500.000.0000.000
X500.07Ballistic Vest, Medium0.002,5000.000.002,5000.000.002,5000.000.002,5000.000.002,5000.000.0000.000
X500.08Ballistic Vest, Large0.002,5000.000.002,5000.000.002,5000.000.002,5000.000.002,5000.000.0000.000
X500.09Ballistic Vest, X-Large0.001,7500.000.001,7500.000.001,7500.000.001,7500.000.001,7500.000.0000.000
LBE
X500.10LC-1 Suspenders0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
Belt
X500.11Tactical Duty Belt F5618-750.008500.000.008500.000.008500.000.008500.000.008500.000.0000.000
X500.12Belt, Olive Drab, Small0.002500.000.002500.000.002500.000.002500.000.002500.000.0000.000
X500.13Belt, Olive Drab, Medium0.003000.000.003000.000.003000.000.003000.000.003000.000.0000.000
X500.14Belt, Olive Drab, Large0.002500.000.002500.000.002500.000.002500.000.002500.000.0000.000
X500.15Canteen, 1 QT, w/M1 Cap0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.16Canteen Cover, 1 QT0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.17Canteen, 2 QT0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.18Canteen Cover, 2 QT0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.19Cup, Canteen, wire handle0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.20First Aid kit0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.21Butt Pack0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.22Utility Pouch0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.23Mag Pouch AK-47 3 PAK0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.24Mag Pouch M-16 3 PAK0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.25Hydration Pouch0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.26Entrenching Tool0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.27Carrier, Entrenching Tool0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.28ALICE Pack, Large0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.29Frame, ALICE Pack0.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.30Weapon cleaning kit, M160.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.31Weapon cleaning kit, AK-470.008,5000.000.008,5000.000.008,5000.000.008,5000.000.008,5000.000.0000.000
X500.32Compass, unmounted0.008000.000.008000.000.008000.000.008000.000.008000.000.0000.000
SubtotalSubtotalSubtotalSubtotalSubtotalSubtotal
000000

Other Direct Costs (ODCs)/Materials Costs

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4 Six-Month Option to Extend

RFP-specified DescriptionDir $Ind $Fee $Dir $Ind $Fee $Dir $Ind $Fee $Dir $Ind $Fee $Dir $Ind $Fee $Dir $Ind $Fee $
X400Travel12,200,000- 012,200,000- 012,200,000- 012,200,000- 012,200,000- 06,100,000- 0
SubtotalSubtotalSubtotalSubtotalSubtotalSubtotal
12,200,00012,200,00012,200,00012,200,00012,200,0006,100,00067,100,000

Sub-total Base Year 12,200,000 Sub-total Option Year 1 12,200,000 Sub-total Option Year 2 12,200,000 Sub-total Option Year 3 12,200,000 Sub-total Option Year 4 12,200,000 Six-Month Option to Extend (see FAR 52.217-8) 6,100,000

OVERALL PROPOSED PRICE 67,100,000

Notes
CONUS = Continental United States
OCONUS = Outside the Continental United States
FTE = RFP-specified estimated maximum number of full-time equivalent (FTE) employees that may be required
NTE Rate = Proposed not-to-exceed fully-loaded hourly labor rate
Hours = RFP-specified estimated number of productive hours
Subtotal (Labor) = FTE x NTE Rate x Hours
NTE Unit Price = Proposed not-to-exceed unit price
Units = RFP-specified estimated maximum number of units that may be required
Subtotal (Equipment) = NTE Unit Price x Units
Dir $ = RFP-specified estimated direct costs
Ind $ = Estimated ceiling indirect costs
Fee $ = Estimated fee dollars
Subtotal (ODCs/Materials) = Direct $ + Ind $ + Fee $
Total = Sum of Subtotals
Overall Proposed Price = Sum of Totals

8. NTE Overtime Labor Rates

Pricing Table 8
Proposed Not-To-Exceed (NTE) Fully-Loaded Hourly Labor Rates and Premiums for Overtime Performance
Base YearOption Year 1Option Year 2Option Year 3Option Year 4Six-Month Option to Extend
(see FAR 52.217-8)
CLINRFP-specified Labor CategoryRatePremiumRatePremiumRatePremiumRatePremiumRatePremiumRatePremium
Notes
Rate = Proposed not-to-exceed fully-loaded hourly labor rate for performance exceeding a normal workweek of 40 hours.
Premium = Portion of proposed not-to-exceed fully-loaded hourly overtime rate attributable to the overtime premium (includes associated indirect costs and profit).

File details come from the government source that posted it. Updated .