S02 DRAWINGS - ELECTRICAL.pdf
PDF 7 MB Posted
- Solicitation number
- 36C24221B0061_1
About this file
This solicitation is for a project to install a new 1000 kW diesel generator, Tier 4 certified, at a VA medical center campus. Key requirements include providing an all-season housing/enclosure for the generator and associated automatic transfer switch and diesel sub-base fuel tank. The fuel tank must be sized to allow generator operation for 96 hours at full load rating. Remote monitoring/alarm panels will be installed and wired to the facility BMS system. Temporary power from the local utility is also required to facilitate construction and the power transfer without downtime. The work must be completed by a Service-Disabled Veteran-Owned Small Business. A site visit is scheduled for August 12, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24221B0061 0002.docx | DOCX document | |
| 36C24221B0061 0001.docx | DOCX document | |
| COVID-19 FORM.pdf | ||
| COVID-19 DIRECTIVE.pdf | ||
| RFI ANSWERS.xlsx | XLSX spreadsheet | |
| COVID-19 POLICY.pdf | ||
| S02 DRAWINGS - CIVIL.pdf | ||
| S02 VA ID PACKAGE 06-18-2019.pdf | ||
| S02 DRAWINGS - ARCHITECTUAL.pdf | ||
| S02 DRAWINGS - GENERAL.pdf | ||
| 36C24221B0061_1.docx | DOCX document | |
| S02 SPECS - FINAL.pdf | ||
| S02 Safety or Environmental Violations and Experience Modification Rate.pdf | ||
| S02 Participation Goals for Minorities and Females.pdf | ||
| S02 ALL POSTERS.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
N
O
T
F
R
C
O
N
S
T
R
U
C
T
I
O
N
N
R
C
O
N
S
T
R
U
C
T
I
O
N
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
JULY 20, 2021 CARHT
INSTALL GENERATOR FOR
BUILDINGS 85, 86 AND 87 (SA)
630A4-18-415
VA NEW YORK HARBOR HEALTHCARE
SYSTEM, ST. ALBANS CAMPUS
179-00 LINDEN BLVD,
JAMAICA, NY 1134-1468
19-227
BID DOCUMENTS
FULLY SPRINKLERED
20-1-SA
E-001
ELECTRICAL GENERAL NOTES, SYMBOL
LEGENDS, AND ABBREVIATIONS
85, 86, 87
L
L
ELECTRICAL ABBREVIATIONS LIST
SR SURFACE RACEWAY
SS STAINLESS STEEL
SSW SELECTOR SWITCH
STD STANDARD
SURF SURFACE MOUNTED
SW SWITCH
SWBD SWITCHBOARD
SYM SYMMETRICAL
SYS SYSTEM
TC TIMECLOCK
TEL TELEPHONE
TEL/DATA TELEPHONE/DATA
TERM TERMINAL
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TR TAMPER RESISTANT
T-STAT THERMOSTAT
TTB TELEPHONE TERMINAL BOARD
TTC TELEPHONE TERMINAL
CABINET
TV TELEVISION
TYP TYPICAL
UC UNDER COUNTER
UE UNDERGROUND ELECTRICAL
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
UT UNDERGROUND TELEPHONE
UTP UNSHIELDED TWISTED PAIR
UTIL UTILITY
UV UNIT VENTILATOR OR
ULTRAVIOLET
V VOLT
VA VOLT-AMPERES
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W WATT
W/ WITH
WH WATER HEATER
W/O WITHOUT
WP WEATHERPROOF
XFMR TRANSFORMER
XFR TRANSFER
ANGLE
@ AT
DELTA
' FEET
" INCHES
# NUMBER
Φ PHASE
C CENTER LINE
P PLATE
MTR MOTOR, MOTORIZED
MTS MANUAL TRANSFER SWITCH
NA NOT APPLICABLE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURER'S ASSOCIATION
NFDS NON-FUSED SAFETY DISCONNECT
SWITCH
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OL OVERLOAD
PA PUBLIC ADDRESS
PB PULL BOX OR PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT
UNIT
PCB POLYCHLORINATED BYPHENYL
PC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PIV POST INDICATING VALVE
PNL PANEL
POE POWER-OVER-ETHERNET
PR PAIR
PRI PRIMARY
PROJ PROJECTION
PRV POWER ROOF VENTILATOR
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (CONDUIT)
PWR POWER
QTY QUANTITY
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
REQD REQUIRED
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
RTU ROOF TOP UNIT
SC SURFACE CONDUIT
SEC SECONDARY
SF SQUARE FEET/FOOT
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SIM SIMILAR
S/N SOLID NEUTRAL
SPEC SPECIFICATION
SPKR SPEAKER
SP SPARE
1P 1 POLE (2P, 3P, 4P, ETC.)
1PH 1 PHASE
2/C TWO-CONDUCTOR (3/C, 4/C, ETC.)
W2 TWO-WIRE (3W, 4W, ETC.)
3PH 3 PHASE
A AMPERE
AAP ALARM ANNUNCIATOR PANEL
AC ABOVE COUNTER
AIR CONDITIONER
ALTERNATING CURRENT
ACC ACCESSIBLE
ACLG ABOVE CEILING
ADO AUTOMATIC DOOR OPENER
A/E ARCHITECT/ENGINEER
AF AMP FRAME
AFC AVAILABLE FAULT CURRENT (KILOAMPS)
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFI ARC FAULT CIRCUIT INTERRUPTER
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AIC AMPERE INTERRUPTING CAPACITY
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
APPROX APPROXIMATELY
ARCH ARCHITECT, ARCHITECTURAL
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
BATT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISHED FLOOR
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
BYP BYPASS
C CONDUIT
CAB CABINET
CALC CALCULATED
CAP CAPACITY
CAT CATALOG, CATEGORY
CATV COMMUNITY ANTENNA TELEVISION
CB CIRCUIT BREAKER
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR-FURNISHED
CKT CIRCUIT
CLG CEILING
CO CONTRACTING OFFICER
COAX COAXIAL CABLE
COMM COMMUNICATION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUATION OR CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CTR CENTER
CU COPPER
CU FT CUBIC FEET
dB DECIBEL
DB DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLISH/DEMOLITION
DEPT DEPARTMENT
DIA DIAMETER
DISC DISCONNECT
DIST DISTRIBUTION
DN DOWN
DS SAFETY DISCONNECT SWITCH
DT DOUBLE THROW
DWG DRAWING
EC ELECTRICAL CONTRACTOR
EG EQUIPMENT GROUND
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMS ENERGY MANAGEMENT SYSTEM
EMT ELECTRICAL METALLIC TUBING
EPO EMERGENCY POWER OFF
EQUIP EQUIPMENT
ESMT EASEMENT
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WALL HEATER
ELECTRIC WATER HEATER
EX EXISTING
EXP EXPLOSION PROOF
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FCU FAN COIL UNIT
FIXT FIXTURE
FLR FLOOR
FLUOR FLUORESCENT
FU FUSE
FUDS FUSED SAFETY DISCONNECT SWITCH
FVR FULL VOLTAGE REVERSING
FVNR FULL VOLTAGE NON-REVERSING
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
GND GROUND
GRS GALVANIZED RIGID STEEL (CONDUIT)
GYP BDGYPSUM BOARD
HID HIGH-INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HTR HEATER
HV HIGH VOLTAGE
HVAC HEATING, VENTILATING AND AIR
CONDITIONING
IES ILLUMINATION ENGINEERING SOCIETY
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
I/W INTERLOCK WITH
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT-AMPERE
KVAR KILOVOLT-AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
LED LIGHT-EMITTING DIODE
LF LINEAR FEET/FOOT
LM LUMEN
LRA LOCKED ROTOR AMPS
LT LIGHT
LTG LIGHTING
LTNG LIGHTNING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
METAL-CLAD (CONDUIT)
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MFR MANUFACTURER
MFS MAIN FUSED DISCONNECT SWITCH
MH MANHOLE
MIC MICROPHONE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MOA MULTIOUTLET ASSEMBLY
MSBD MAIN SWITCHBOARD
MT MOUNT
A1 b
E1 c d
T1
'LPN'
ELECTRICAL SYMBOL NOTES
THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER
CASE LETTER AND NUMBER.
THE SWITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.
EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.
EXIT SIGNS: STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING
MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES
DIRECTIONAL ARROW ON ILLUMINATED FACE(S).
DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.
THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.
TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER
FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR
THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND
REQUIREMENTS.
PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING
SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR
DESIGNATION CODES.
SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE
NUMBER INDICATED IN THE HEXAGON.
HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT
DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.
CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL
SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.
SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE
A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.
'LPN'-1,3,5
EXAMPLE 1: WALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE
AND DIRECTIONAL ARROW.
EMERGENCY LIGHT, BATTERY BACKUP, 120V POWER.
EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS
CONTROLLED BY SWITCH 'c'.
EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING
FIXTURES INDICATED BY 'd'.
EXAMPLE: TRANSFORMER TYPE 'T1'.
EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.
DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE
NOTE NUMBER INDICATED IN THE SQUARE.
GENERAL ELECTRICAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH
THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL
AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL
ELECTRICAL CODE AND VA STANDARDS.
PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE BUILDING
CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL PENETRATIONS
THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF
THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE APPLICABLE BUILDING CODES.
VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED MOUNTING
HARDWARE TO SUIT THE PARTICULAR INSTALLATION.
PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.
BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.
COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICT
DURING CONSTRUCTION.
ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM
NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR SPACE.
MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A
QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.
PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS MUST
COMPLY WITH "BUY AMERICAN ACT".
ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR EQUIPMENT
MANUFACTURER'S SPECIFICATIONS.
CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE DEVICE'S
SCREW TERMINALS.
MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS NOTED
OTHERWISE.
ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.
ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.
ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING
EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE
CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED
(MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.
ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED
THIRD PARTY TESTING AGENCY.
FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE SWITCHED/CONTROLLED
STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC PROTECTIVE MEASURES DISABLE
THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE MANUFACTURER, OR OTHER ACCEPTABLE
PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT BROWNOUT PROTECTION, WILL RETURN TO THE
SWITCHED/CONTROLLED STATE AUTOMATICALLY. PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.
IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER
QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS DETERMINED BY THE
GOVERNMENT, SHALL BE PROVIDED.
COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.
MINIMUM CONDUIT SIZE TO BE USED IS 3/4".
CONTRACTOR SHALL PERFORM THE SHORT CIRCUIT CURRENT CALCULATIONS &
BREAKER COORDINATION ON THE ELECTRICAL SYSTEM USING THE NEW FEEDERS
AND BREAKERS. MODEL WILL BE PROVIDED. SUBMIT THE STUDY TO VA/APOGEE
FOR REVIEW AND APPROVAL. PROVIDE RECOMMENDED SETTINGS FOR NEW AND
EXISTING BREAKERS. PERFORM ARC FLASH STUDY AND PROVIDE THE LABELS FOR
ALL PANELS IN BUILDINGS 85, 86, 87, VAULT-164, AND GENERATOR ENCLOSURE.
BREAKER SETTINGS AND
ARC FLASH LABELS
METHOD OF VOLTAGE DROP
CALCULATIONS
ELECTRICAL SYMBOL LEGEND
120V DUPLEX RECEPTACLE
RECEPTACLE MODIFIERS:
AC: 3" ABOVE COUNTERTOP/BACKSPLASH
GFI: GROUND FAULT CURRENT INTERRUPTER
WP: WEATHERPROOF ENCLOSURE
DED: DEDICATED CIRCUIT
120V DUPLEX RECEPTACLE EMERGENCY OUTLET
AND COVER PLATE SHALL BE RED IN COLOR
120V QUADRUPLEX RECEPTACLE
120V QUADRUPLEX RECEPTACLE EMERGENCY
OUTLET AND COVER PLATE SHALL BE RED IN COLOR
JUNCTION BOX, WALL MOUNTED, PURPOSE AS NOTED
DISCONNECT SWITCH NON-FUSED
DISCONNECT SWITCH FUSED
SINGLE POLE WALL SWITCH: 48" AFF STANDARD UNO
SYMBOL HEIGHT DESCRIPTION
18"
18"
18"
18"
AS
NOTED
72" TOP
72" TOP
SWITCH MODIFIERS:
M: MOTOR-RATED
48"
ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.
TOP: HEIGHT TO TOP OF DEVICE
ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE LISTED HERE.
SPECIAL RECEPTACLE
EQUIPMENT CONNECTION
AS
NOTED
E
208V DUPLEX RECEPTACLE18"
18"
120V DUPLEX RECEPTACLE FLOOR BOX
120V DUPLEX RECEPTACLE EMERGENCY FLOOR BOX
OUTLET AND COVER PLATE SHALL BE RED IN COLOR
120V QUADUPLEX RECEPTACLE FLOOR BOX
120V QUADUPLEX RECEPTACLE EMERGENCY
FLOOR BOX OUTLET AND COVER PLATE SHALL BE
RED IN COLOR
CLNG
J
J
J
JUNCTION BOX, CEILING MOUNTED, PURPOSE AS
NOTED
JUNCTION BOX, FLOOR MOUNTED, PURPOSE AS
NOTED
PHASE 1- PROVIDE TEMPORARY POWER
A. INSTALL TEMPORARY POWER SOURCE FOR B85, B86 AND B87 (DWGS ES101, E-602)
a. DETAILED WORK:
1. PROVIDE A TEMPORARY POWER SOURCE: CON EDISON POWER INCLUDING POWER LINES AND 500KVA TRANSFORMER.
2. PROVIDE A RENTAL SWITCHGEAR WITH CIRCUIT BREAKERS TO FEED B85, B86 AND B87
3. PROVIDE TEMPORARY CIRCUIT FEEDERS FROM THE SWITCHGEAR TO THE BUILDINGS
4. ENERGIZE THE SWITCHGEAR WITH ALL CIRCUIT BREAKERS ARE ON “OPEN” POSITION.
b. AFFECTED BUILDINGS: NONE
c. BUILDING SHUTDOWN: N/A
d. LENGTH OF SHUTDOWN: N/A
B. SWITCH THE BUILDING POWER ONTO THE TEMPORARY SOURCE (DWG E-602)
a. DETAILED WORK:
1. OPEN THE CIRCUIT BREAKER AT THE EXISTING SWITCHGEAR TO EACH BUILDING.
2. AT THE BUILDING MAIN PANELBOARD, REMOVE THE NORMAL POWER FEEDER AND CONNECT THE TEMPORARY FEEDER.
3. ENERGIZE THE TEMPORARY SWITCHGEAR.
4. ENERGIZE EACH BUILDING MAIN PANELBOARD BY CLOSING THE CIRCUIT BREAKER.
b. AFFECTED BUILDINGS: B85, B86 AND B87
c. ESTIMATED SHUTDOWN:
4-6 HOURS AT EACH BUILDING. TIME TO SWITCH THE POWER SOURCE TO THE TEMPORARY POWER.
PHASE 2- DE-ENERGIZE SWITCHGEAR MDP-167
C. DE-ENERGIZE POWER LOOP 1 TO DISCONNECT EXISTING 500KVA TRANSFORMER (DWG E-601)
a. DETAILED WORK:
1. PLACE THE POWER SWITCHES FOR THE BUILDING ONTO POWER LOOP 3.
2. DE-ENERGIZE POWER LOOPS 1, 2, 3, 4
3. CUT POWER LOOP 1 INSIDE MH #34 TO DISCONNECT THE EXISTING 500KVA TRANSFORMER IN VAULT 164 (ELECTRICAL ROOM).
4. PROVIDE A DEAD-BOLD CONNECTOR AND SECURE POWER LOOP 1.
b. AFFECTED BUILDINGS: B64, B85, B86, B87, B88, B89 AND 91.
c. ESTIMATED SHUTDOWN:
1. 15 - 30 MINUTES AT EACH BUILDING X-RAY EQUIPMENT. TIME TO PLACE THE POWER SWITCH ONTO LOOP 3, AS NECESSARY.
2. 12 HOURS AT B88 FOR THE X-RAY EQUIPMENT.
D. SWITCH THE BUILDING POWER ONTO THE TEMPORARY SOURCE (DWG E-602)
a. DETAILED WORK:
1. PLACE THE POWER SWITCHES FOR THE BUILDING ONTO POWER LOOP 1.
2. DE-ENERGIZE POWER LOOP 1, 2, 3, AND 4.
3. CUT POWER LOOP INSIDE MH #33 TO DISCONNECT THE EXISTING 500KVA TRANSFORMER IN VAULT 164 (ELECTRICAL ROOM).
4. PROVIDE A DEAD-BOLD CONNECTOR AND SECURE POWER LOOP 3.
b. AFFECTED BUILDINGS: B64, B85, B86, B87, B88, B89 AND B91.
c. ESTIMATED SHUTDOWN:
1. FOR B64, 15 - 30 MINUTES. (TIME TO PLACE THE POWER SWITCH ONTO LOOP 3 AS NECESSARY).
2. FOR B66 LAUNDRY, 12 HOURS. (TIME TO CUT AND PROVIDE DEAD-BOLD CONNECTOR INSIDE MH#33).
PHASE 3- DEMOLITION AND INSTALLATION
E. DEMOLISH EXISTING 500KVA TRANSFORMER AND SWITCHGEAR MDP-167 (DWG ED101, E-602)
a. DETAILED WORK:
1. DEMOLISH 500KVA TRANSFORMER.
2. DEMOLISH SWITCHGEAR MDP-167.
3. LABEL AND SECURE EXISTING FEEDER.
b. BUILDING SHUTDOWN: NONE
c. LENGTH OF SHUTDOWN: N/A
F. INSTALL NEW 1MW TIER 4 CERTIFIED GENERATOR, 1MVA TRANSFORMER AND 480V SWITCHGEAR (DWG E-603)
a. DETAILED WORK:
1. INSTALL THE NEW OUTDOOR 1MVA GENERATOR SET.
2. INSTALL THE INDOOR 1MVA TRANSFORMER AND 3000A SWITCHGEAR
3. RECONNECT THE FEEDERS TO B85, B86 AND B87
b. BUILDING SHUTDOWN: NONE
c. LENGTH OF SHUTDOWN: N/A
PHASE 4- ENERGIZE NEW EQUIPMENT
G. ENERGIZE NEW 1MW TIER 4 CERTIFIED GENERATOR, 1MVA TRANSFORMER & 3000A SWITCHGEAR (DWGS ES101, E-601, E-602, E603)
a. DETAILED WORK:
1. REVERSE PLAN D
2. REVERSE PLAN B
3. REVERSE PLAN C
4. REVERSE PLAN A
CONSTRUCTION PHASING PLAN AND SHUTDOWN
IMAGE VIEW
ELECTRICAL POWER POLE
ELECTRICAL CABLE/CONDUIT
ELECTRICAL N/G CABLE/CONDUIT
WORK HOURS
CONTRACTOR SHALL NOT PERFORM WORK DURING NORMAL VA BUSINESS
HOURS, UNLESS APPROVED BY COR OTHERWISE.
SCHEDULED POWER OUTAGE
CONTRACTOR TO SUBMIT SCHEDULED POWER OUTAGE PLAN TO VA FOR REVIEW
AND APPROVAL. CONTRACTOR TO DO ALL WORK BETWEEN 6PM AND 5AM ON
WEEKDAYS AND/OR ON WEEKENDS. CONTRACTOR TO COORDINATE THE POWER
OUTAGE WITH COR 2-3 WEEKS PRIOR TO THE WORK.
USING OHM'S LAW AND THE KNOWN RESISTIVITY CONSTANT OF CONDUCTOR
METAL (CIRCULAR MIL-OHM PER FOOT) FOR COPPER CONDUCTORS, CALCULATE
THE REQUIRED WIRE SIZE NECESSARY SO AS NOT TO EXCEED THE
RECOMMENDED VOLTAGE DROP OF 3% FOR BRANCH CIRCUIT CONDUCTORS.
EMERGENCY GENERATOR OFF PUSH BUTTON IN WEATHER-PROOF PLASTIC COVER
FEC
FIRE EXTINGUISHER CABINET
BOLLARDS
EM
DocuSign Envelope ID: E26C3B4A-3E59-4539-B825-8DACFEE00F57
7/21/2021
BUILDING SCHEDULE
NO: DESCRIPTION:
60 GUARD HOUSE
64 BOILER PLANT
65 GARAGE
85 INTERMEDIATE CARE WARD "C"
86 INTERMEDIATE CARE WARD "D"
87 NURSING CARE WARD "B"
88 DIETETICS BUILDING / DOMICILIARY "S"
89 ADMINISTRATION BUILDING/NURSING CARE "A"
91 NURSING CARE - WARD "E"
92 NURSING CARE WARD "F"
93 NURSING CARE WARD "F"
95 FUEL OIL STORAGE TANK NO. 1
138 FLAGPOLE
154 FUEL OIL STORAGE TANK NO. 2
157 FLAGPOLE
165 QUARTERS BUILDING - Leased to J-Cap
166 QUARTERS BUILDING - Leased to J-Cap
167 GENERATOR BUILDING
168 GENERATOR BUILDING
169 PRIMARY SUB-STATION
170 PADMOUNTED TRANSFORMER
171 PADMOUNTED TRANSFORMER
172 PADMOUNTED TRANSFORMER
173 CONSOLIDATED LAUNDRY
174 LAUNDRY GENERATOR BUILDING
175 WATER DISTRIBUTION RESERVOIR
176 WATER DISTRIBUTION PUMP HOUSE NO. 1
177 WATER DISTRIBUTION PUMP HOUSE NO. 2
XX
TEMPORARY 500KVA
TRANSFORMER AND
SWITCHBOARD
ELECTRICAL BUILDING
VAULT 164
MDP-870
MDP-850
MDP-164E
NEW 1MW TIER 4 CERTIFIED
GENERATOR
M.H. #34
M.H. #33
CONTRACTOR TO PROVIDE POWER POLE,
30FT CLASS 6 (TYPICAL, QTY-12)
4160V SECONDARY OVERHEAD POWER LINE
(MIN. 20'-0" ABOVE GROUND)
FACILITY
BMS
BOILER
ROOM
SECURITY
ROOM
EXISTING
CON EDISON
POWER POLE
3 #2/0 AWG, #4 EG
INSULATED CABLE
MDP-164
MDP-167
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
N
R
C
O
N
S
T
R
U
C
T
I
O
N
N
R
C
O
N
S
T
R
U
C
T
I
O
N
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
KEY PLAN:
JULY 20, 2021 CARHT
INSTALL GENERATOR FOR
BUILDINGS 85, 86 AND 87 (SA)
630A4-18-415
VA NEW YORK HARBOR HEALTHCARE
SYSTEM, ST. ALBANS CAMPUS
179-00 LINDEN BLVD,
JAMAICA, NY 1134-1468
19-227
BID DOCUMENTS
N
O
R
T
H
FULLY SPRINKLERED
20-1-SA
ES101
85, 86, 87
SITE PLAN/FEEDER ROUTES
1 SITE PLAN
SCALE: 1" = 50'
N
O
R
T
H
2.5 5 100
AREA OF WORK
1 2
A. REFER TO SITE DRAWING SET FOR EXACT
LOCATIONS OF OUTDOOR ELECTRICAL
EQUIPMENT.
B. REFER TO ONE LINE DIAGRAMS FOR
TEMPORARY, DEMOLITION AND NEW POWER
WIRING.
C. COORDINATE THE TEMPORARY POWER TIE-IN
SERVICE WITH POWER COMPANY. CONTRACTOR
RESPONSIBLE FOR PAYING ALL FEES
ASSOCIATED WITH TEMPORARY POWER
CONNECTION INCLUDING FEES CHARGED BY
CONEDISON.
1. POINT OF ENTRY OF TEMPORARY POWER
SERVICE WITH FUSE CUT-OUT. CONTRACTOR TO
COORDINATE TIE-IN WITH CON EDISON
COMPANY.
2. CONTRACTOR TO PROVIDE OVERHEAD
TEMPORARY 4160V POWER LINE FROM SERVICE
POINT ENTRY TO 500KVA OUTDOOR
TRANSFORMER.
3. CONTRACTOR TO PROVIDE TEMPORARY 500KVA
TRANSFORMER AND 2000A SWITCHBOARD.
REFER TO ES102 AND EP101 FOR DETAILS.
4. LOCATION WHERE POWER METER ON NEW
MDP-164 TO BE CONNECTED TO FACILITY BMS,
ROOM A-123A.
5. LOCATION WHERE GENERATOR, DEF FLUID AND
FUEL TANK MONITORING/ALARM REMOTE
PANELS ARE PROVIDED, SECURITY ROOM A-101.
6. CONTRACTOR TO REPROGRAM THE FACILITY
OPERATOR GRAPHICS IN BOILER BUILDING
CONTROL ROOM TO INCLUDE THE NEW REMOTE
GENERATOR AND FUEL TANK
MONITORING/ALARMS ON THE OPERATOR
SCREEN.
7. REFER TO DWG EP101 FOR THE NEW
INSTALLATION.
8. CONTRACTOR TO REMOVE THE OVERHEAD
TEMPORARY 4160V POWER LINE. REPAIR THE
GROUND TO MATCH WITH THE SURROUNDING
SURFACE IN THE AREA.
9. LOCATION WHERE CONTRACTOR TO
DISCONNECT THE POWER TO VAULT 164 AND
REPLACE THE FEEDER.
10. CONTRACTOR TO REMOVE THE TEMPORARY
500KVA TRANSFORMER AND 2000A
SWITCHBOARD. REPAIR THE GROUND AND
PROVIDE GRASS SOD TO MATCH EXISTING.
25 50 100
UG
/E
UG/E
UG/E
UG/E
C
O
N
C
W
A
L
K
C
O
N
L
K
C
O
N
L
K
UG/E
T
BLDG 87
CORRIDOR
BETWEEN BLDG
85 & 86
BLDG 85 & 86
CONTINUE ON DWG
EP102, DETAIL 1
(TO MDP-850)
CONTINUE ON DWG
EP102, DETAIL 1
(TO MDP-164)
EQUIPMENT LOCATION
AREA
CONTINUE ON DWG
EP102, DETAIL 2
(TO MDP-87)
10 2
NEW 1000 KW TIER 4
CERTIFIED GENERATOR
CONCRETE PAD FOR
GENERATOR. TOP OF PAD
TO BE MINIMUM OF 6"
ABOVE EXISTING GRADE
8'-0"WOOD COVERING
WITH CAUTION LABEL
GROUND COVER
GROUND
4 #500KCMIL + EG POWER CABLE
(TYPICAL)
GALVANIZED
METAL
SPIKE
NOTES:
1. COVER IS A TREATED WOOD 8'-0" LONG,
18" WIDE, 6" HIGH PAINTED BRIGHT
ORANGE COLOR WITH A WARNING LABEL
"CAUTION - 208V POWER CABLE".
2. PROVIDE GROUND COVER TO PREVENT
VEGETATION GROWTH.
3. PROVIDE 6" BETWEEN COVERS.
4. SECURE THE COVER TO THE GROUND AT
BOTH ENDS AND EVERY 4'-0" USING
GALVANIZED SPIKES.
MIN. 18"
IN GROUND
(TYPICAL)
MIN. 18"
IN GROUND
(TYPICAL)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
N
R
C
O
N
S
T
R
U
C
T
I
O
N
N
R
C
O
N
S
T
R
U
C
T
I
O
N
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
KEY PLAN:
JULY 20, 2021 CARHT
INSTALL GENERATOR FOR
BUILDINGS 85, 86 AND 87 (SA)
630A4-18-415
VA NEW YORK HARBOR HEALTHCARE
SYSTEM, ST. ALBANS CAMPUS
179-00 LINDEN BLVD,
JAMAICA, NY 1134-1468
19-227
BID DOCUMENTS
N
O
R
T
H
FULLY SPRINKLERED
20-1-SA
ES102
85, 86, 87
SITE PLAN/FEEDER ROUTES
1 SITE PLAN TEMPORARY FEEDER ROUTING
SCALE: 1" = 10'
NORTH
2.5 5 100
1. PROVIDE TEMPORARY 500KVA TRANSFORMER
AND OUTDOOR 2000A SWITCHBOARD. PREPARE
THE GROUND AREA WHERE THE EQUIPMENT
INSTALLED TO BE LEVELED AND SECURED. SEE
CONSTRUCTION PHASING PLAN AND SHUTDOWN
(ON DWG E-001) FOR ADDITIONAL INFORMATION.
SUPPORT PANEL ON TEMPORARY FRAME FOR
DURATION OF TIME IT IS CONNECTED.
2. ROUTE TEMPORARY ROUGH DUTY WATERPROOF,
SUNLIGHT RESISTANT CABLES ABOVE GROUND
FROM TEMPORARY SWITCHBOARD, AND DOWN
INTO WINDOW WELLS, TO SERVE PANELS
TEMPORARILY WHILE EXISTING SWITCHBOARD IN
BEING REPLACED. PROTECT CABLES AS
REQUIRED, AND PROVIDE SAFETY MARKINGS AT
PROTECTION, SO AS NOT TO BE A TRIP HAZARD.
SEE DETAIL "2" FOR SIZES OF CABLES.
3. SEE PHOTO 3/ES102. FOR REFERENCE.
4. REMOVE THE EXISTING (BROKEN/UNUSED)
EXHAUST FAN. USE THE WALL OPENING AS THE
FEEDER POINT OF ENTRY TO THE BUILDING.
5. SEE PHOTO 4/ES102. FOR REFERENCE.
6. USE THE WINDOW (TOP LEFT SIDE) AS THE
FEEDER POINT OF ENTRY TO THE BUILDING.
7. SEE PHOTO 5/ES102. FOR REFERENCE.
8. REFER TO CIVIL DRAWING CS101 FOR GATE AND
FENCE INSTALLATION DETAILS.
9. SEE PHOTO 6/ES102. FOR REFERENCE.
10. SEE SECTION DETAIL 2/ES102.
AREA OF WORK
3 SITE PLAN TEMPORARY FEEDER ROUTING FOR MDP-850
SCALE: 1" = 10'
4 SITE PLAN TEMPORARY FEEDER ROUTING FOR MDP-164
SCALE: 1" = 10'
5 SITE PLAN TEMPORARY FEEDER ROUTING FOR MDP-87
SCALE: 1" = 10'
6 SCALE: 1" = 10'
SITE PLAN TEMPORARY FOR TEMPORARY
SWITCHBOARD AND 500KVA TRANSFORMER
6 4
2 TEMPORARY POWER CONDUCTOR COVER
SCALE: N.T.S.
A. REFER TO CIVIL DRAWING SET FOR EXACT
LOCATIONS OF OUTDOOR ELECTRICAL
EQUIPMENT.
B. REFER TO ES101 FOR THE TEMPORARY POWER
LINE FROM UTILITY COMPANY.
C. CONTRACTOR TO CLOSE ALL OPENINGS AT AND
AROUND THE ENTRY POINT OF TEMPORARY
FEEDERS. SEAL WITH WATER TIGHT GRADE
MATERIALS.
5 10 20
HV
SWITCH
XFMR
MDP-167
SOLAR POWER
DISCONNECT
EXISTING PULL BOX
EXISTING PANEL '164E'
EXISTING SPLICE BOX
EXISTING FUEL
DAYTANK
EXHAUST
FAN
EXISTING
EXHAUST
FAN
BATTERY AND
CHARGER
INTAKE LOUVER
POWER METERING
ENCLOSURE
EXISTING
HEATER
EXISTING
HEATER
FUEL TANK
CONTROL PANEL
EXISTING
EMERGENCY
GENERATOR
14 15
2 3
EPO
ELECTRICAL ROOM
MECHANICAL
ROOM 102
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
N
R
C
O
N
S
T
R
U
C
T
I
O
N
N
R
C
O
N
S
T
R
U
C
T
I
O
N
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
KEY PLAN:
JULY 20, 2021 CARHT
INSTALL GENERATOR FOR
BUILDINGS 85, 86 AND 87 (SA)
630A4-18-415
VA NEW YORK HARBOR HEALTHCARE
SYSTEM, ST. ALBANS CAMPUS
179-00 LINDEN BLVD,
JAMAICA, NY 1134-1468
19-227
BID DOCUMENTS
N
O
R
T
H
FULLY SPRINKLERED
20-1-SA
ED101
POWER PLAN (DEMOLITION)
1 EXISTING ELECTRICAL BUILDING (VAULT 164) - DEMOLITION
SCALE: 1/4" = 1' 0"
1. CURB TO BE REMOVED.
2. DE-ENERGIZE THE TRANSFORMER AND MDP-167
BY OPENING THE HV SWITCH.
3. CUT AND SECURE THE 5KV POWER FEEDER LOOP
1 AND 3 FEEDING THE TRANSFORMER INSIDE
MH#34. SEE E-601 FOR DETAILS.
4. DISCONNECT SOLAR PANELS FROM MDP-167.
5. DISCONNECT, LABEL AND SECURE ALL EXISTING
POWER FEEDERS AND REMOTE METER WIRING
FROM MDP-164.
6. DEMOLISH THE TRANSFORMER AND MDP-164.
7. KEEP AND SECURE THE EXISTING HOUSEKEEPING
PAD.
8. DEMOLISH EXISTING EXHAUST FAN.
9. EXISTING INTAKE LOUVER AND MOTORIZED
DAMPER TO REMAIN.
10. SECURE THE EXISTING SOLAR PANEL WIRING TO
MDP-167 DURING CONSTRUCTION.
11. DEMOLISH ALL CIRCUITS AS SHOWN ON PANEL
SCHEDULE.
12. DEMOLISH GEN-SET, FUEL DAYTANK, EXHAUST
SYSTEM, BATTERY AND CHARGER AND ALL
POWER/CONTROL WIRING. EXTEND THE
GENERATOR "START" WIRING FROM AUTOMATIC
TRANSFER SWITCHES (ATS-ELS, ATS-ECR, AND
ATS-EME) TO THE NEW GENERATOR.
13. DEMOLISH EXISTING ROOM SPACE HEATER AND
EXHAUST FAN.
14. SEE PHOTO 2/ED101. FOR REFERENCE.
15. SEE PHOTO 3/ED101. FOR REFERENCE.
16. SEE PHOTO 4/ED101. FOR REFERENCE.
17. SEE PHOTO 5/ED101. FOR REFERENCE.
18. SEE PHOTO 6/ED101. FOR REFERENCE.
A. CONTRACTOR IS TO REPLACE EXISTING HV
SWITCH, 500 KVA TRANSFORMER AND 2000A
SWITCHGEAR WITH NEW EQUIPMENT. ALL
POWER/CONTROL WIRING INCLUDING CONDUITS
SHALL REMAIN SECURED DURING
CONSTRUCTION AND BE READY FOR
TERMINATION TO NEW EQUIPMENT.
B. CONTRACTOR IS ALSO TO DECOMMISSION
EXISTING 150 KVA DIESEL GENERATOR AND
RELOCATE TO THE BUILDING 65 GARAGE FOR
STORAGE.
C. REFER TO THE PROJECT WORK PHASING PLAN
AND SHUTDOWN ON E-001 PRIOR TO
CONSTRUCTION.
D. REFER TO E-602 SINGLE LINE DIAGRAM FOR
ELECTRICAL POWER DETAILS.
E. VERIFY, LABEL, AND RECORD (PHOTOGRAPH)
ALL POWER/CONTROL CABLES AND CONDUITS
PRIOR TO DEMOLITION.
0 2 4 8
NORTH
PLAN
85, 86, 87
AREA OF WORK
2 FRONT VIEW - HV SWITCH
SCALE: NTS4 FRONT VIEW - MDP-167
SCALE: NTS
3 FRONT VIEW - TRANSFORMER
SCALE: NTS5 AREA VIEW - BEHIND TRANSFORMER
SCALE: NTS
6 VIEW - PANEL 168-E & EAST DOOR
SCALE: NTS
X
SHEET KEY NOTES:
SHEET NOTES:
101A
101B
101C
MECHANICAL
ROOM
FEC
FEC
DS DS
ELECTRICAL
ROOM
HV
SWITCH
11 12 14
SOLAR POWER
DISCONNECT
EXISTING PULL BOX
EXISTING PANEL '164-E'
EXISTING SPLICE BOX
EXHAUST
FAN
XFMR
POWER METERING
ENCLOSURE
EXISTING INTAKE
LOUVER AND
MOTORIZED DAMPER
EXISTING EXHAUST FAN
BUS
BAR
BUS
BAR
16 17
L1
L1
L1L1
L1 L1
EX
EM
EM
EM
EX
EX
NEW
MDP-167
GENERATOR "START"
SIGNAL SPLICE BOX
C O
N C
W
A L K
CONC. WALK
CONC. WALK
T
TEMPORARY 2000A
SWITCHBOARD
BLDG 85
CORRIDOR
TEMPORARY
500kVA
TRANSFORMER
CONDUIT SUPPORT
5 6
GROUND LOOP
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G G G G G G
GGGGGGG
G G
G G
G G
G G
G G
G G
G G
G G
G G
3 4
1000KW GEN-SET AND
3000A ATS ENCLOSURE
8 9 10
SECTION 9 ON
DWG E-501
PNL BOARD
NEW ATS
L11
L11
L11
EPO
GFCI
L12
L12
L11
L11
L11
EPO
GFCI
L12
L12
FUEL TANK
LEAK DETECTION,
LEVEL MONITOR
CONTROL PANEL
FUEL TANK
ALARM ANNUNCIATOR
L11 L11
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
N
R
C
O
N
S
T
R
U
C
T
I
O
N
N
R
C
O
N
S
T
R
U
C
T
I
O
N
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
KEY PLAN:
JULY 20, 2021 CARHT
INSTALL GENERATOR FOR
BUILDINGS 85, 86 AND 87 (SA)
630A4-18-415
VA NEW YORK HARBOR HEALTHCARE
SYSTEM, ST. ALBANS CAMPUS
179-00 LINDEN BLVD,
JAMAICA, NY 1134-1468
19-227
BID DOCUMENTS
N
O
R
T
H
FULLY SPRINKLERED
20-1-SA
EP101
POWER PLAN (NEW WORK)
85, 86, 87
1 ELECTRICAL BUILDING (VAULT 164) - FLOOR PLAN
SCALE: 1/4" = 1' 0"
0 2 4 8
NORTH
4 ELECTRICAL BUILDING AND GENERATOR ENCLOSURE - ROOF PLAN
SCALE: 3/16" = 1' 0"
AREA OF WORK
A. REFER TO THE PROJECT WORK PHASING PLAN AND
SHUTDOWN ON E-001 PRIOR TO CONSTRUCTION.
B. REFER TO E-603 AND E-604 SINGLE LINE DIAGRAMS
FOR TEMPORARY AND NEW POWER DETAILS.
C. NEW 1000 KVA PAD MOUNTED TRANSFORMER SHALL
BE A COMPACT SIZED DEAD FRONT SUBSTATION WITH
4160V DUAL VACUUM INTERUPTER, ENVIROTEMP FR3
FLUID FILLED, AND 3000A 208V/120Y OUTPUT BREAKER.
THIS NEW TRANSFORMER SHALL FIT ON THE EXISTING
FOOTPRINT OF 500KVA TRANSFORMER UTILIZING THE
PRIMARY FEEDER CONDUIT FLOOR STUB-UPS. DESIGN
BASIS EQUIPMENT IS EATON AR-VFI SERIES.
D. THE DESIGN BASIS FOR NEW DIESEL GENERATOR IS
KOHLER KD1250-A, NAMEPLATED AT 1000KVA. WHERE
CONTRACTOR DEVIATES FROM THE BASIS OF DESIGN,
THE CONTRACTOR IS RESPONSIBLE FOR ANY
INCREASES IN PAD SIZE, CABLE LENGTHS AND SIAR
CONFIGURATIONS RESULTING FROM CHANGE.
E. NEW 3000A SWITCHGEAR SHALL FIT ON EXISTING
MDP-167, UTILIZING THE EXISTING CIRCUIT FEEDERS
AND CONDUIT FLOOR STUBUPS. DESIGN BASIS
EQUIPMENT IS EATON SWITCHGEAR WITH MAGNUM
BREAKERS.
SHEET NOTES:
3 GENERATOR ENCLOSURE - FLOOR PLAN
SCALE: 1/4" = 1' 0"
2 SAFETY SIGNAGE
SCALE: NTS
0 2 4 8
NORTH
SHEET KEY NOTES:
8"X12" COLOR ALUMINUM
METAL SIGN PRE-DRILLED
HOLE ON EACH CORNER
1. PROVIDE 1000KVA OUTDOOR GEN-SET TO INCLUDE:
-TIER 4 CERTIFIED DIESEL ENGINE-GENERATOR,
NAMEPLATED AT 1000KVA.
-3000A AUTOMATIC TRANSFER SWITCH (ATS)
-96-HR DOUBLE WALL BASE TANK AT FULL LOAD.
-WALK-IN ENCLOSURE WITH ACCESS PLATFORMS FOR
ENTRY AND MAINTENANCE OF EQUIPMENT.
-SUFFICIENT SPACE TO HOUSE NECESSARY EXHAUST
SYSTEMS WITHIN THE ENCLOSURE FOR 96-HR RUN
RUN TIME AT FULL LOAD.
-GROUND LUG AT EACH SIDE END OF STRUCTURE
FRAME.
2. PROVIDE 200A, 208/120V POWER FROM PANEL 164-E
TO THE GENERATOR PANEL BOARD.
3. PROVIDE LOCK AND KEY HARDWARE FOR ALL DOORS.
4. PROVIDE POWER AND CONTROL WIRING BETWEEN
THE 3000A ATS AND NEW SWITCHBOARD MDP-167.
5. PROVIDE OVERHEAD CONDUIT SUPPORT BETWEEN
THE GEN-SET ENCLOSURE AND ELECTRICAL BUILDING
AS REQUIRED.
6. PROVIDE POWER & CONTROL WIRING IN CONDUITS.
7. ALL LIGHTING, CONTROLLERS, PUSHBUTTONS,
HEATERS, BATTERY CHARGER, EXHAUST SYSTEMS,
AND DEVICES ARE PREWIRED AND FURNISHED WITH
ENCLOSURE.
8. PROVIDE E-STOP PUSH BUTTONS IN WEATHER PROOF
PLASTIC ENCLOSURE WITH TAMPER SEAL.
9. PROVIDE NEW SAFETY SIGNAGE ON THE EXTERIOR
OF ALL GENERATOR DOORS.
10.PROVIDE AND WIRE THE REMOTE GENERATOR
CONTROL/ANNUNCIATOR, DEF FLUID AND FUEL
MONITORING PANELS TO THE SECURITY ROOM A-101 IN
BUILDING 89.
11.PROVIDE NEW TRANSFORMER AND SWITCHGEAR
MDP-164. CONNECT THE POWER METER ON
SWITCHGEAR TO CONNECT TO FACILITY BMS IN BLDG
89.
12.RECONNECT ALL EXISTING LOADS AND WIRING TO
THE SOLAR POWER. REFER TO E-605 FOR DETAILS.
13.PROVIDE NEW EXHAUST FAN. WALL MOUNTED, 3/4 HP,
DIRECT DRIVE PROPELLER STYLE, SIZE TO FIT IN
EXISTING OPEN. 1000 CFM AT .2 IN EXTERNAL STATIC
PRESSURE (ELEV = 33 FT). PROVIDE WITH GRAVITY
BACKDRAFT DAMPER, BIRDSCREEN, FACTORY
MOUNTED DISCONNECT, AND FACTORY MOUNTED
SOLID STATE SPEED CONTROL. RE-INTEGRATE WITH
EXISTING THERMOSTAT AND INTAKE DAMPER
CONTROLS. SET THERMOSTAT TO 80 DEGREES F.
14.CONNECT THE NEW 1000KVA TRANSFORMER TO THE
PLANT POWER LOOP 1 AND 3.
15. PROVIDE WIRING FOR THE MDP POWER METER.
16.PROVIDE WIRING FROM THE POWER METER TO THE
FACILITY BMS IN ENGINEERING SERVICE, BLDG 89.
17.PROVIDE GROUNDING FROM NEW EQUIPMENT TO
BUILDING GROUND BUS BAR.
18.REPLACE EXISTING INTERIOR LIGHTING FIXTURES
INCLUDING WALL SWITCHES, EMERGENCY AND EXIT
SIGNS.
19.THOROUGHLY CLEAN AND PAINT EXISTING LOUVER
AND DAMPER. PROVIDE PRIMER AND HEAVY DUTY
URETHANE TOPCOAT.
20.PROVIDE GROUND LOOP AROUND THE ENCLOSURE.
TIE-IN THE GROUND LOOP TO THE GEN-SET
ENCLOSURE.
21.PROVIDE GROUNDING TO THE TEMPORARY
SWITCHBOARD AND FENCES.
22.REFER TO ES102 FOR INSTALLATION AND REMOVAL
OF TEMPORARY SWITCHBOARD AND TRANSFORMER.
23.PROVIDE A 30"x42" PLEXIGLASS FRAME FOR AS-BUILT
SINGLE-LINE DIAGRAM.
NORTH
0 42 8
SHEET KEY NOTES:
EXISTING
MDP-164
EXSTING
MDP-164E
85-ATS-ECR
DP-ECR-164
85-ATS-ELS
DP-ELS-164
85-ATS-EME
DP-EME-164
EXISTING
MDP-850E
5 6
CONTINUE ON DWG
ES101, DETAIL 2
5 6
CONTINUE ON DWG
ES101, DETAIL 2
85-MTS-ELS
EXISTING
EXHAUST FAN
BROKEN/UNUSED
EXHAUST FAN
ROOM
85-5A
MDP-87
5 6
CONTINUE ON
DWG ES101,
DETAIL 2
MECHANICAL ROOM
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
N
R
C
O
N
S
T
R
U
C
T
I
O
N
N
R
C
O
N
S
T
R
U
C
T
I
O
N
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
KEY PLAN:
JULY 20, 2021 CARHT
INSTALL GENERATOR FOR
BUILDINGS 85, 86 AND 87 (SA)
630A4-18-415
VA NEW YORK HARBOR HEALTHCARE
SYSTEM, ST. ALBANS CAMPUS
179-00 LINDEN BLVD,
JAMAICA, NY 1134-1468
19-227
BID DOCUMENTS
N
O
R
T
H
FULLY SPRINKLERED
20-1-SA
EP102
POWER PLAN (NEW WORK)
1. PROVIDE POWER FEEDERS "TO" AND "FROM"
MAINTENANCE TRANSFER SWITCH. LINE DIAGRAM
E-605 FOR DETAILS.
2. ROUTE TEMPORARY ROUGH-DUTY
CONDUCTORS(2 - 4 #500 KCMIL WITH EG) IN 3"
RIGID CONDUIT DOWN WINDOWWELL AND
THROUGH WINDOW TO TEMPORARILY FEED PANEL
MDP-164(NORMAL), SEE ONE LINE DIAGRAM. E-603
FOR DETAILS.
3. ROUTE TEMPORARY ROUGH-DUTY CONDUCTORS
(2-4 #500KCMIL WITH EG) IN 3" RIGID CONDUIT
DOWN WINDOWWELL AND THROUGH BOARDED UP
WINDOW OPENING TO ROUTE DOWN CORRIDOR,
AS HIGH AS PRACTICEABLE. SUPPORT
CONDUCTORS FROM STRUCTURE.
4. SLEEVE THROUGH EXISTING WALL AND PATCH TO
ALLOW ROUGH-DUTY CONDUCTORS TO PASS
THROUGH WALL. PROVIDE SEAL AT AND AROUND
OPENING WITH 1-HR FIRE RATED MATERIALS AS
REQUIRED.
5. DURING CONSTRUCTION, REMOVE AND SECURE
THE NORMAL FEEDER FROM MDP-167. CONNECT
THE TEMPORARY FEEDER FROM TEMPORARY
2000A SWITCHBOARD.
6. AFTER CONSTRUCTION, REMOVE THE
TEMPORARY AND RECONNECT THE NORMAL
FEEDER.
7. PROVIDE MAINTENANCE TRANSFER SWITCH WITH
MOUNTING BRACKET.
8. ROUTE IN 3" RIGID CONDUIT, ESTIMATED 40 FT.
1 BUILDING 85/86 BASEMENT RM. 005-85-5A/CONNECTING CORRIDOR
SCALE: 1/4" = 1' 0"
2 BUILDING 87 MECHANICAL ROOM
SCALE: 1/4" = 1' 0"
85, 86, 87
AREA OF WORK
A. REFER TO THE PROJECT WORK PHASING PLAN ON
E-001 PRIOR TO CONSTRUCTION. .
B. CONTRACTOR TO CLOSE ALL OPENINGS AT AND
AROUND THE ENTRY POINT OF TEMPORARY FEEDER.
SEAL WITH WATER TIGHT GRADE MATERIALS.
0 2 4 8
N
O
R
T
H
0 2 4 8
N
O
R
T
H
TO
VAULT
E-167
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
N
R
C
O
N
S
T
R
U
C
T
I
O
N
N
R
C
O
N
S
T
R
U
C
T
I
O
N
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
KEY PLAN:
JULY 20, 2021 CARHT
INSTALL GENERATOR FOR
BUILDINGS 85, 86 AND 87 (SA)
630A4-18-415
VA NEW YORK HARBOR HEALTHCARE
SYSTEM, ST. ALBANS CAMPUS
179-00 LINDEN BLVD,
JAMAICA, NY 1134-1468
19-227
BID DOCUMENTS
N
O
R
T
H
FULLY SPRINKLERED
20-1-SA
EP103
POWER PLAN (NEW WORK)
1. CONTRACTOR TO PROVIDE CONTROL WIRING IN
1-1/2" CONDUIT ABOVE CEILING FROM VAULT E-167
ROOM.
2. CONTRACT TO PROVIDE 18"x18"x6" PULL BOX AT
EACH 90 DEGREE TURN AND EVERY 100'.
3. CONTRACTOR TO TURN THE CONDUIT UP TO 1ST
FLOOR ROOM A-101, SECURITY OFFICE.
4. CONTRACTOR TO TURN THE CONDUIT UP TO 1ST
FLOOR ROOM A-123A.
5. CONTRACTOR TO PROVIDE CONTROL WIRING IN
1-1/2" CONDUIT TO GENERATOR, DEF FLUID, AND
DIESEL FUEL MONITORING REMOTE PANELS.
COORDINATE EXACT LOCATION OF PANEL WITH
SECURITY PERSONNEL.
6. CONTRACTOR TO PROVIDE CONTROL WIRING TO
FACILITY BMS AND SCHNEIDER METERING
SYSTEM.
87, 89
AREA OF WORK
N
O
R
T
H
0 4 8 16
A. COORDINATE WITH VA SECURITY FOR ROUTING
AND INSTALLING ANNUNCIATOR AND MONITORING
PANELS IN ROOM A-101.
B. COORDINATE WITH VA FACILITY FOR ROUTING
AND TERMINATING CONTROL WIRING ON BMS
EQUIPMENT IN ROOM A-123A.
2 ENLARGED PARTIAL PLAN - BUILDING 89 FIRST FLOOR
SCALE: 1/8" = 1' 0"
N
O
R
T
H
0 4 8 161 BUILDING 89 AND CONNECTING CORRIDOR - BASEMENT
SCALE: 1/8" = 1' 0"
STANDBY POWER SYSTEMNORMAL POWER SYSTEM
FROM UTILITY TRANSFORMER
SERVICE #2 IS BREAKER
FROM UTILITY TRANSFORMER
NORMAL POWER SYSTEM
SERVICE #1 IS
LOCATED IN VAULT 167
FROM DIESEL GENERATOR
SERVICE #2 OF 2
STANDBY POWER SYSTEM
LOCATED ON OUTDOOR
DIESEL GENERATOR SET
SERVICE #1 OF 2
NOTE:
LABELS SHALL BE ENGRAVED PHENOLIC LABELS
WITH WHITE TEXT ON BLACK BACKGROUND
(NORMAL); WHITE TEXT ON RED BACKGROUND
(STANDBY)
CONCRETE BASE-MIN. 28 DAY STRENGTH
OF 3000 PSI-EXTEND 12" BEYOND
TRANSFORMER ON
ALL SIDES-MAINTAIN REBARS MINIMUM 3"
CLEAR FROM SURFACE OF CONRETE-
SURFACE SHALL BE LEVEL AND
TROWELED SMOOTH-CHAMFER EDGE 3/4"
6" BASE OF COMPACTED
CRUSHED STONE
SOIL BENEATH PAD SHALL
BE UNDISTURBED SOIL OR
COMPACTED FILL FREE
FROM ROOTS AND OTHER
ORGANIC MATERIAL
DETAIL NOTES:
1.
3"
FUEL TANK OR OTHER ELECTRICAL EQUIPMENT
PAD SHALL BE 6" THICK. PROVIDE #4 BARS 12"
ON CENTER EACH WAY VERTICALLY.
INSYLATING BUSHING-PROVIDE GROUNDING BUSHING AT
PAD MOUNT TRANSFORMER, AND WHEN TERMINATING IN
SERVICE ENTRANCE EQUIPMENT
BEND AND CONDUIT RISE TO
ABOVE GRADE/FLOOR SHALL BE
RIGID METAL CONDUIT-COAT WITH
ASPHALTUM AS SPECIFIED TO 6"
ABOVE GRADE OR FLUSH AT
FLOOR
RISE MIN. 6" ABOVE
GRADE/FLOOR UNO
FINISH GRADE/FLOOR
RIGID METAL CONDUIT AS
SPECIFIED-SEE SPECIFICATIONS
AND/OR DRAWINGS
FEEDER WITH EG
BOND
BUSHING-
TYPICAL
'ATS'
GROUND BAR
NEUTRAL BAR
GROUND BAR
GENERATOR
1000A
4 POLE
TRANSFER
SWITCH
FROM NORMAL
POWER SOURCE
TO DOWNSTREAM
DISTRIBUTION
EQUIPMENT
BOND TO
GROUND RING
MAIN BONDING
JUMPER-3/0 AWG
BONDING
JUMPER
B
A
C
EG
A
C
B
C
N
N
B
C
B
N
C
B
N
N
EG
C
C
B
A
A
A
EG
EG
EXISTING EQUIPMENT
OR COLUMN
SUPPORT PAD
G G
G G G
" MAXIMUM
#4/0 BARE COPPER
CONDUCTOR PIGTAIL
WITH EXCESS FOR
LATER CONNECTIONS.
1" PVC CONDUIT
EXOTHERMIC WELD#4/0 GROUND LOOP
3/4" X 10'-0" LONG COPPER
CLAD STEEL GROUND ROD.
DRIVEN AT LEAST 30" BELOW
FINISHED GRADE.
CADWELD TYPE
"TA"
CONNECTIONS
CADWELD TYPE
'GY'
CONNECTION
#4/0 BARE COPPER WIRE
CROSSING CONDUCTOR (PART
OF GROUND LOOP WHERE
SHOWN ON DRAWINGS)
TYPICAL BARE COPPER WIRE
CONNECTION (FROM SERVICE
ENTRANCE EQUIPMENT, STEEL COLUMN,
AND LIGHTNING PROTECTION SYSTEM
AS SHOWN ON DRAWINGS)
#4/0 BARE COPPER WIRE
(GROUND LOOP)
M
I N
I M
U M
T
P
R
O D
NOTES:
1. ALL MATERIALS SHALL BE BY A SINGLE MANUFACTURER.
2. ALL WORK SHALL BE PERFORMED STRICTLY ACCORDING TO THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. PROPER
GROUNDING CONNECTIONS ARE CRITICAL TO SAFETY AND FACILITY OPERATION.
3. CLEAN AND DRY CONDUCTORS AND OTHER CONNECTION PARTS AND MOLDS PRIOR TO USE.
4. CONDUCTORS SHALL NOT BE UNDER TENSION DURING WELDING. PROVIDE A CABLE CLAMP WHERE TENSION IS ON CABLES
PRIOR TO WELDING TO PREVENT DEFORMATION OF CONDUCTOR.
5. PROVIDE PACKING MATERIAL ON REBAR PRIOR TO WELDING TO PREVENT LEAKAGE OF WELDING MATERIAL.
CONDUCTOR TEE
CONNECTION TYPE
'TA'
CONDUCTOR TO REBAR
TEE CONNECTION TYPE
'RJ'
CONDUCTOR TO REBAR
THRU CONNECTION TYPE
'RC'
CONDUCTOR TO GROUND
ROD CONNECTION TYPE
'GT'
VERTICAL CONDUCTOR TO
VERTICAL STEEL CONNECTION TYPE
'VV'
HORIZONTAL CONDUCTOR TO
VERTICAL STEEL CONNECTION TYPE
'VG'
CONDUIT SCHEDULE
NUMBER
13-20
1-8
11-12
SIZE
FROM
4"
2 1/2"
2"
4"
4"
3000A BREAKER
TRANSF. OUTPUT
PANEL 164-E
REMOTE
ANNUNCIATOR
3000A MAIN BRKR
MDP-167
600A BREAKER
GEN. OUTPUT
TO
85-ATS-GEN
NORMAL SOURCE
GEN. PANEL
GEN. CONTROL
PANEL
85-ATS-GEN
OUTPUT
SPLICE BOX
NOTE:
X - CONDUIT NUMBERING
X - NUMBER
1 2 3 4 5
14 1513 1716
201918
36.0
7 8
POWER CONDUCTORS
POLE
GRADE
POLE
LINE OF SIGHT
20'-0"
MIN. HEIGHT
GROUND
TAMP SOIL/EARTH
POWER POLE
MIN 5'-0'
MIN 25'-0'
NOTE: GUY LINES SHALL
BE INSTALLED IF
NECESSARY-TO
ADD STABILITY.
POLE HOLE DEPTHS
POLE
LENGTH
CLAY SAND SOLID
ROCK
25'
30'
35'
40'
4'-0"
4'-6"
5'-0"
5'-0"
5'-0"
5'-6"
6'-0"
6'-0"
3'-6"
3'-6"
3'-6"
3'-6"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
JULY 20, 2021 CARHT
INSTALL GENERATOR FOR
BUILDINGS 85, 86 AND 87 (SA)
630A4-18-415
VA NEW YORK HARBOR HEALTHCARE
SYSTEM, ST. ALBANS CAMPUS
179-00 LINDEN BLVD,
JAMAICA, NY 1134-1468
19-227
BID DOCUMENTS
FULLY SPRINKLERED
20-1-SA
E-501
ELECTRICAL DETAILS
1 GENERATOR GROUNDING - 4 POLE ATS
SCALE: N.T.S.
2 MULTIPLE SERVICE LABELING
SCALE: N.T.S.
3 OUTDOOR EQUIPMENT PAD FOR TEMPORARY UTILITY TRANSFORMER
SCALE: N.T.S.
4 UNDERGROUND CONDUIT RISE TO ABOVE GRADE/FLOOR
SCALE: N.T.S.
7 GROUND EQUIPMENT "STUB-UP"
SCALE: N.T.S.
8 GROUND LOOP CONNECTIONS
SCALE: N.T.S.
6 EXOTHERMIC WELD CONNECTIONS
SCALE: N.T.S.
5 GROUNDING ROD
SCALE: N.T.S.
9 SECTIONS - CONDUIT RACK
SCALE: NTS
10 SECTION - POWER CONDUCTORS AND POLES
SCALE: N.T.S.
11 DETAIL - INSTALLATION OF POLES
SCALE: N.T.S.
1. FLOOR OR WALL ASSEMBLY - MIN 4-1/2 IN. (114 MM) THICK LIGHTWEIGHT OR NORMAL WEIGHT (100-150 PCF
OR 1600-2400 KG/M3) CONCRETE. WALL MAY ALSO BE CONSTRUCTED OF ANY UL CLASSIFIED CONCRETE
BLOCKS*. MAX DIAM OF CIRCULAR THROUGH OPENING IS 32-1/2 IN. (826 MM).
SEE CONCRETE BLOCKS (CAZT) CATEGORY IN THE FIRE RESISTANCE DIRECTORY FOR NAMES OF
MANUFACTURERS.
1A. STEEL SLEEVE (OPTIONAL, NOT SHOWN) - NOM 12 IN. (305 MM) DIAM (OR SMALLER) SCHEDULE 40 (OR
HEAVIER) STEEL PIPE SLEEVE CAST INTO CONCRETE FLOOR OR WALL. SLEEVE TO BE FLUSH WITH OR
PROJECT MAX 2 IN. (51MM) FROM TOP SURFACE OF FLOOR OR FROM BOTH SURFACES OF WALL.
2. THROUGH PENETRANT - ONE METALLIC PIPE, CONDUIT OR TUBING INSTALLED EITHER CONCENTRICALLY
OR ECCENTRICALLY WITHIN THE FIRESTOP SYSTEM. THE ANNULAR SPACE BETWEEN PIPE, CONDUIT OR
TUBING AND PERIPHERY OF OPENING SHALL BE MIN OF 0 IN. (0 MM)(POINT CONTACT) TO MAX 1-3/8 IN. (35 MM).
PIPE, CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY. THE FOLLOWING
TYPES AND SIZES OF METALLIC PIPES, CONDUITS OR TUBING MAY BE USED:
A. STEEL PIPE - NOM 30 IN. (762 MM) DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE.
A1. IRON PIPE - NOM 30 IN. (762 MM) DIAM (OR SMALLER) CAST OR DUCTILE IRON PIPE.
B. CONDUIT - NOM 6 IN. (152 MM) DIAM (OR SMALLER) RIGID STEEL CONDUIT.
C. CONDUIT - NOM 4 IN. (102 MM) DIAM (OR SMALLER) STEEL ELECTRICAL METALLIC TUBING.
3. PACKING MATERIAL - POLYETHYLENE BACKER ROD OR NOM 1 IN. (25 MM) THICKNESS OF TIGHTLY-PACKED
CERAMIC (ALUMINA SILICA) FIBER BLANKET, MINERAL WOOL BATT OR GLASS FIBER INSULATION MATERIAL
USED AS A PERMANENT FORM. PACKING MATERIAL TO BE RECESSED FROM TOP SURFACE OF FLOOR OR
FROM BOTH SURFACES OF SOLID CONCRETE OR CONCRETE BLOCK WALL AS REQUIRED TO ACCOMMODATE
THE REQUIRED THICKNESS OF CAULK FILL MATERIAL (ITEM 4). AS AN ALTERNATE WHEN MAX PIPE SIZE IS 10
IN. (254 MM) DIAM AND WHEN MAX ANNULAR SPACE IS 1 IN. (25 MM), A MIN 1 IN. (25 MM) THICKNESS OF
TIGHTLY-PACKED CERAMIC FIBER BLANKET OR MINERAL WOOL BATT PACKING MATERIAL MAY BE RECESSED
MIN 1/2 IN. (13 MM) FROM BOTTOM SURFACE OF FLOOR OR FROM EITHER SIDE OF SOLID CONCRETE WALL.
4. FILL,VOID OR CAVITY MATERIALS* - CAULK OR SEALANT - APPLIED TO FILL THE ANNULAR SPACE TO THE
MIN THICKNESS SHOWN IN THE FOLLOWING TABLE:
(A) BR = POLYETHYLENE BACKER ROD.
CF = CERAMIC FIBER BLANKET.
GF = GLASS FIBER INSULATION.
MW = MINERAL-WOOL BATT.
(B) CAULK INSTALLED FLUSH WITH TOP SURFACE OF FLOOR OR BOTH SURFACES OF WALL.
(C) CAULK INSTALLED FLUSH WITH BOTTOM SURFACE OF FLOOR OR ONE SURFACE OF SOLID (NON-
CONCRETE BLOCK) WALL.
3M COMPANY - CP 25WB+ CAULK OR FB-3000 WT SEALANT.
(NOTE: W RATING APPLIES ONLY WHEN FB-3000 WT SEALANT IS USED.)
*BEARING THE UL CLASSIFICATION MARKING
MAX PIPE DIAM
IN. (MM)
10 (254)
10 (254)
30 (762)
MAX ANNULAR
SPACE IN. (MM)
1 (25)
1 (25)
2-1/2 (64)
PACKING MATL
TYPE (a)
BR, CF, GF OR MW
CF OR MW
BR, CF, GF OR MW
MIN. CAULK THKNS
IN. (MM)
1/2 (13) (b)
1/2 (13) (c)
1 (25) (b)
System No. C-AJ-1001
June 15, 2005
F Rating - 3 Hr
T Rating - 0 Hr
W Rating - Class I (See Item 4)
SECTION A-A
4 1
A
A
1. FLOOR OR WALL ASSEMBLY - LIGHTWEIGHT OR NORMAL WEIGHT (100-150 PCF OR 1600-2400 KG/M3) CONCRETE.
EXCEPT AS NOTED IN TABLE UNDER ITEM 4, MIN THICKNESS OF SOLID CONCRETE FLOOR OR WALL ASSEMBLY IS 4-1/2
IN. (114 MM). FLOOR MAY ALSO BE CONSTRUCTED OF ANY MIN 6 IN. (152 MM) THICK UL CLASSIFIED HOLLOW CORE
PRECAST CONCRETE UNITS* . WHEN FLOOR IS CONSTRUCTED OF HOLLOW CORE PRECAST CONCRETE UNITS, PACKING
MATERIAL (ITEM 3) AND CAULK FILL MATERIAL (ITEM 4) TO BE INSTALLED SYMMETRICALLY ON BOTH SIDES OF FLOOR, FLUSH WITH FLOOR SURFACE. WALL ASSEMBLY MAY ALSO BE CONSTRUCTED OF ANY UL CLASSIFIED CONCRETE
BLOCKS*. MAX DIAM OF OPENING IS IN SOLID LIGHTWEIGHT OR NORMAL WEIGHT CONCRETE. FLOOR IS 32 IN. (813 MM).
MAX DIAM OF OPENING IN FLOOR CONSTRUCTED OF HOLLOW-CORE PRECAST CONCRETE UNITS IS 7 IN. (178 MM).
SEE CONCRETE BLOCKS (CAZT) AND PRECAST CONCRETE UNITS (CFTV) CATEGORIES IN THE FIRE RESISTANCE
DIRECTORY FOR NAMES OF MANUFACTURERS.
1A. STEEL SLEEVE (OPTIONAL, NOT SHOWN) - MAX 15 IN. (381 MM) ID (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL
SLEEVE CAST OR GROUTED INTO FLOOR OR WALL ASSEMBLY. SLEEVE MAY EXTEND A MAX OF 2 IN. (51 MM) ABOVE TOP
OF FLOOR OR BEYOND EITHER SURFACE OF WALL. MAX 16 IN. (406 MM) ID (OR SMALLER) MIN 0.028 (0.71 MM) WALL
THICKNESS (OR HEAVIER) GALVANIZED STEEL SLEEVE CAST OR GROUTED INTO FLOOR OR WALL ASSEMBLY. SLEEVE
MAY EXTEND A MAX OF 1/2 IN. (13 MM) BEYOND EITHER SURFACE OF FLOOR OR WALL.
2. THROUGH PENETRANTS - ONE METALLIC PIPE, CONDUIT OR TUBING TO BE INSTALLED EITHER CONCENTRICALLY OR
ECCENTRICALLY WITHIN THE FIRESTOP SYSTEM. MAX ANNULAR SPACE BETWEEN PIPE, CONDUIT OR TUBING AND
EDGE OF THROUGH OPENING OR SLEEVE IS DEPENDENT ON THE PARAMETERS SHOWN IN ITEM 4. MIN ANNULAR SPACE
BETWEEN PIPE OR CONDUIT AND EDGE OF THROUGH OPENING IS 0 IN. (0 MM) (POINT CONTACT). PIPE CONDUIT OR
TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY. THE FOLLOWING TYPES AND
SIZES OF METALLIC PIPES, CONDUITS OR TUBING MAY BE USED:
A. STEEL PIPE - NOM 30 IN. (762 MM) DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE.
B. IRON PIPE - NOM 30 IN. (762 MM) DIAM (OR SMALLER) CAST OR DUCTILE IRON PIPE.
C. CONDUIT - NOM 6 IN. (152 MM) DIAM (OR SMALLER) RIGID STEEL CONDUIT.
D. CONDUIT - NOM 4 IN. (102 MM) DIAM (OR SMALLER) STEEL ELECTRICAL METALLIC TUBING.
E. COPPER - TUBING NOM 6 IN. (152 MM) DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBE.
F. COPPER PIPE - NOM 6 IN. (152 MM) DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.
3. PACKING MATERIAL - POLYETHYLENE BACKER ROD OR NOM 1 IN. (25 MM) THICKNESS OF TIGHTLY-PACKED MINERAL
WOOL BATT OR GLASS FIBER INSULATION FIRMLY PACKED INTO OPENING AS A PERMANENT FORM. PACKING MATERIAL
TO BE RECESSED FROM TOP SURFACE OF FLOOR OR FROM BOTH SURFACES OF WALL AS REQUIRED TO
ACCOMMODATE THE REQUIRED THICKNESS OF CAULK FILL MATERIAL (ITEM 4).
4. FILL,VOID OR CAVITY MATERIAL* - CAULK OR SEALANT - APPLIED TO FILL THE ANNULAR SPACE FLUSH WITH TOP
SURFACE OF FLOOR. IN WALL ASSEMBLIES, REQUIRED CAULK THICKNESS TO BE INSTALLED SYMMETRICALLY ON BOTH
SIDES OF WALL, FLUSH WITH WALL SURFACE. AT POINT CONTACT LOCATION BETWEEN PENETRANT AND SLEEVE OR
BETWEEN PENETRANT AND CONCRETE, A MIN 1/4 IN. (6 MM) DIAM BEAD OF CAULK SHALL BE APPLIED AT TOP SURFACE
OF FLOOR AND AT BOTH SURFACES OF WALL. THE HOURLY F RATINGS AND THE MIN REQUIRED CAULK THICKNESSES
ARE DEPENDENT UPON A NUMBER OF PARAMETERS, AS SHOWN IN THE FOLLOWING TABLE:
(A)MIN 2 IN. (51 MM) THICKNESS OF MINERAL WOOL BATT INSULATION REQUIRED IN ANNULAR SPACE.
(B)MIN 1 IN. (25 MM) THICKNESS OF MINERAL WOOL BATT INSULATION REQUIRED IN ANNULAR SPACE ON BOTH SIDES
OF FLOOR OR WALL ASSEMBLY. MIN 1 IN. (25 MM) THICKNESS OF CAULK TO BE INSTALLED FLUSH WITH EACH SURFACE
OF FLOOR OR WALL ASSEMBLY.
3M COMPANY - CP 25WB+ CAULK OR FB-3000 WT SEALANT. (NOTE: W RATING APPLIES ONLY WHEN FB-3000 WT SEALANT
IS USED.)
*BEARING THE UL CLASSIFICATION MARKING
MIN FLOOR OR
WALL THKNS IN.
(MM)
2-1/2 (64)
2-1/2 (64)
4-1/2 (114)
NOM PIPE TUBE OR
CONDUIT DIAM IN.
(MM)
1/2-12 (13-305)
1/2-12 (13-305)
1/2-6 (13-152)
MAX
ANNULAR
SPACE IN.
(MM)
1-3/8 (35)
3-1/4 (83)
MIN. CAULK
THKNS IN.
(MM)
1/2 (13)
1 (25)
1/4 (6) (a)
System No. C-AJ-1044
June 15, 2005
F Ratings - 2, 3, and 4 Hr (See Items 2A and 4)
T Rating - 0 Hr
L Rating At Ambient - 2 CFM/sq ft
L Rating At 400 F - less than 1 CFM/sq ft
W Rating - Class I (See Item 4)
SECTION A-A
A
A
F
RATING
HR
1-3/8 (35)
1/2 (13)
1 (25)
1 (25)
1 (25)
2 (51)
1 (25) (b)1-3/8 (35)
3-1/4 (83)
2 (51)
2 (51)
2 (51)
1-1/4 (32)1/2-12 (13-305)
1/2-12 (13-305)
22-30 (558-762)
1/2-20 (13-508)
1/2-6 (13-152)
1/2-20 (13-508)
4-1/2 (114)
4-1/2 (114)
4-1/2 (114)
4-1/2 (114)
4-1/2 (114)
5-1/2 (140)
1. WALL ASSEMBLY - THE 1, 2, 3 OR 4 HR FIRE-RATED GYPSUM WALLBOARD/STUD WALL ASSEMBLY SHALL BE
CONSTRUCTED
OF THE MATERIALS AND IN THE MANNER DESCRIBED IN THE INDIVIDUAL U300 OR U400 SERIES WALL OR PARTITION
DESIGNS
IN THE UL FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING CONSTRUCTION FEATURES:
A. STUDS - WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS (MAX 2 HR FIRE RATED ASSEMBLIES) OR STEEL
CHANNEL STUDS. WOOD STUDS TO CONSIST OF NOM 2 BY 4 IN. (51 BY 102 MM) LUMBER SPACED 16 IN. (406 MM) OC
WITH
NOM 2 BY 4 IN. (51 BY 102 MM) LUMBER END PLATES AND CROSS BRACES. STEEL STUDS TO BE MIN 3-5/8 IN. (92 MM)
WIDE BY 1-3/8 IN. (35 MM) DEEP CHANNELS SPACED MAX 24 IN. (610 MM) OC.
B. GYPSUM BOARD* - NOM 1/2 OR 5/8 IN. (13 OR 16 MM) THICK, 4 FT. (122 CM) WIDE WITH SQUARE OR TAPERED EDGES.
THE
GYPSUM WALLBOARD TYPE, THICKNESS, NUMBER OF LAYERS, FASTENER TYPE AND SHEET ORIENTATION SHALL BE
AS
SPECIFIED IN THE INDIVIDUAL U300 OR U400 SERIES DESIGN IN THE UL FIRE RESISTANCE DIRECTORY. MAX DIAM OF
OPENING IS 26 IN. (660 MM).
2. THROUGH PENETRANT - ONE METALLIC PIPE, CONDUIT OR TUBING INSTALLED EITHER CONCENTRICALLY OR
ECCENTRICALLY WITHIN THE FIRESTOP SYSTEM. THE ANNULAR SPACE BETWEEN PIPE, CONDUIT OR TUBING AND
PERIPHERY
OF OPENING SHALL BE…
This is the start of the file's text. The full file is on GovTribe.