S02 DRAWINGS - CIVIL.pdf
PDF 5 MB Posted
- Solicitation number
- 36C24221B0061_1
About this file
This document package includes civil engineering drawings and details for site work related to a federal contract opportunity to install a generator for three buildings at the VA New York Harbor Healthcare System campus in Jamaica, New York. The scope of work involves demolishing existing site features; installing a concrete pad, sidewalks, and stairs; erecting a generator, fuel tank, and enclosure; running conduits and feeders; and providing temporary power. The civil drawings depict the existing site conditions and proposed demolition, site plan, grading and erosion control plan, and standard details. The related federal contract opportunity is a solicitation to provide a 1,000 kW diesel generator with a 96-hour fuel tank, automatic transfer switch, and remote monitoring panels. The work requires EPA Tier 4 engine certification and fuel tank monitoring compliance. Improvements to an adjacent switchgear building are also included. Temporary power from the utility is detailed to facilitate construction and switchover without downtime. The 100% SDVOSB set-aside requirement and a pre-bid site visit date are noted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24221B0061 0002.docx | DOCX document | |
| 36C24221B0061 0001.docx | DOCX document | |
| COVID-19 FORM.pdf | ||
| COVID-19 DIRECTIVE.pdf | ||
| RFI ANSWERS.xlsx | XLSX spreadsheet | |
| COVID-19 POLICY.pdf | ||
| S02 VA ID PACKAGE 06-18-2019.pdf | ||
| S02 DRAWINGS - ARCHITECTUAL.pdf | ||
| S02 DRAWINGS - GENERAL.pdf | ||
| 36C24221B0061_1.docx | DOCX document | |
| S02 SPECS - FINAL.pdf | ||
| S02 Safety or Environmental Violations and Experience Modification Rate.pdf | ||
| S02 Participation Goals for Minorities and Females.pdf | ||
| S02 ALL POSTERS.pdf | ||
| S02 DRAWINGS - ELECTRICAL.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date
JULY 20, 2021
UG
/E
UG/E
UG/E
UG/E
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
T10"
T2"
T6"
T6"
T8"
T8"
CONC. W
ALK
CONC. W
ALK
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
CONC. W
ALK
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
UG/E
12'
16'
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POWPOW
POW
POW
POW
POW POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW POW
POW T
3.5'
11.47'
59.33'
8.37'
8'
6'
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
7 6 C501
C501
C501
1' TYP.
UG
/E
UG/E
UG/E
UG/E
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
T10"
T2"
T36"
T48"
T6"
T6"
T8"
T8"
CONC. W
ALK
CONC. W
ALK
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
CONC. W
ALK
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
UG/E
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS: VA PROJECT NUMBER
Building Number
Drawing Number
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
© COPYRIGHT Apogee Consulting Group, P.A.
VA NEW YORK HARBOR HEALTHCARE SYSTEM,
ST. ALBANS CAMPUS
179-00 LINDEN BLVD,
JAMAICA, NY 1134-1468 JULY 20, 2021
85, 86, 87
630A4-18-41519-227
BID DOCUMENTS
INSTALL GENERATOR FOR
BUILDINGS 85, 86 AND 87 (SA)
FULLY SPRINKLERED
20-1-SA
CIVIL ENGINEER:
Brett Basquin, PE 2128 Moores Mill Road
Suite C Auburn, AL 36830
(O) 334.887.6064 ext. 302
(F) 334.887.6024
BRETT BASQUIN, SOLE PROPRIETOR
SCALE IN FEET
2010510 1" = 10'
SITE PLAN
1"=10'
7/
/2
4:
:3
P
M
CS101
JMRNRS
CIVIL DEMOLITION & SITE PLAN
1 3
XXXX
KEY PLANDEMOLITION PLAN
1"=10'
SITE
LEGEND
CONCRETE PAD
EXISTING CONTOURS
EXISTING UNDERGROUND POWER LINE
EXISTING UNDERGROUND FIBER OPTIC LINE
PROPOSED TEMPORARY POWER CONDUIT
PROPOSED OVERHEAD POWER CONDUIT
8' HIGH TEMPORARY CONSTRUCTION FENCING
TREE PROTECTION FENCING
EXISTING TREE TO BE REMOVED
UG/E UG/E
FOC FOC
POW POW POW
OHP OHP OHP
DEMOLITION KEY NOTES:
1. PROVIDE 8' HIGH TEMPORARY CONSTRUCTION FENCING AND
GATE. CONTRACTOR TO COORDINATE EXACT LOCATION OF
FENCE AND GATE WITH COR PRIOR TO INSTALLATION (TYP.)
2. PROVIDE TREE PROTECTION FENCING. FENCING TO REMAIN IN
PLACE FOR DURATION OF CONSTRUCTION (SEE DETAIL ON
SHEET C-501, TYP.)
3. PROVIDE CONSTRUCTION FENCING TO BE TIGHT TO BUILDING
WITHOUT GAPS OR OPENINGS (TYP.)
4. EXISTING EXIT FROM BUILDING. DOOR SHALL REMAIN SECURE
DURING THE COURSE OF CONSTRUCTION AND CONTRACTOR
SHALL PROVIDE SIGNAGE PER VA REQUIREMENTS
5. EXISTING CONCRETE SIDEWALK (TO REMAIN, TYP.)
6. EXISTING UNDERGROUND FIBER OPTIC LINES (TO REMAIN)
7. EXISTING TREES (TO REMAIN, TYP.)
8. EXISTING TREES (TO BE REMOVED)
9. EXISTING LIGHT POLE (TO REMAIN, TYP.)
SITE KEY NOTES:
1. PROVIDE LEVEL CONCRETE PAD FOR GENERATOR. TOP OF PAD
TO BE MINIMUM OF 6" ABOVE EXISTING GRADE. (SEE DETAILS
ON SHEET C-501)
2. PROVIDE CONCRETE SIDEWALK (SEE DETAIL ON SHEET C-501)
3. CONCRETE SIDEWALK TO TIE INTO EXISTING
4. PROVIDE TEMPORARY EQUIPMENT LOCATION AREA
(SEE ELECTRICAL PLANS FOR DETAILS)
5. 500KVA TEMPORARY TRANSFORMER TO BE PROVIDED BY CON
EDISON (CONTRACTOR'S RESPONSIBILITY TO HIRE CON
EDISON. SEE ELECTRICAL PLANS FOR DETAILS)
6. PROVIDE SWITCHBOARD
(SEE ELECTRICAL PLANS FOR DETAILS)
7. PROVIDE CONCRETE LANDING AT BOTTOM OF STAIRS (TYP.)
8. PROVIDE PLATFORMS AND STAIRS FOR GENERATOR
(SEE ARCHITECTURAL AND ELECTRICAL PLANS FOR DETAILS)
9. PROVIDE 1000 KW GENERATOR
(SEE ELECTRICAL PLANS FOR DETAILS)
10. TEMPORARY POWER CONDUITS TO BE RUN ABOVE GROUND
(SEE ELECTRICAL PLANS, TYP.)
11. PROVIDE CONCRETE POST BARRICADE (PER VA STANDARD,
SEE DETAIL ON SHEET C-501, TYP.)
12. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION AND
DEPTH OF EXISTING FIBER OPTIC DUCT BANK PRIOR TO ANY
DEMOLITION OR NEW CONSTRUCTION AND NOTIFY THE COR OF
ANY CONFLICTS WITH THE PROPOSED DESIGN.
DEMOLITION PLAN NOTES:
1. ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY WITH APPLICABLE STATE,
FEDERAL, AND LOCAL BUILDING AND UTILITY INSTALLATION CODES. SEE SHEET G-001
FOR CODES AND REQUIREMENTS USED AS A BASIS OF DESIGN FOR THIS PROJECT.
2. ALL WORK ON-SITE SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH, AND
CONFORM TO, THE PROJECT SPECIFICATIONS.
3. A SUBSURFACE UTILITY LOCATION LEVEL B INVESTIGATION WAS PERFORMED FOR THE
SITE, UTILIZING GROUND PENETRATING RADAR AND AN ELECTROMAGNETIC PIPE
LOCATOR (SEE SHEET V-101). EXISTING INFORMATION AND CONDITIONS NOT
GUARANTEED; VERIFY AND TEST PIT EXISTING UTILITIES: THE CORRECTNESS AND
COMPLETENESS OF THE INFORMATION SHOWING EXISTING CONDITIONS IS NOT
GUARANTEED. BEFORE BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL
PERFORM THE FOLLOWING TASKS:
3.A. RETAIN AND NOTIFY A PRIVATE ON-SITE UTILITY LOCATION COMPANY, AND MAKE SURE
THEY COMPLETE THE MARKING OF UTILITIES WITHIN THE LIMITS OF CONSTRUCTION
AT LEAST 48 HOURS PRIOR TO INSTALLING SEDIMENT CONTROL MEASURES. MAINTAIN
ALL MARKINGS THROUGHOUT CONSTRUCTION. THE CONTRACTOR SHALL ALSO
INCLUDE IN HIS BID PRICE MARKING OF ON-SITE UTILITIES BY SUBCONTRACTING WITH
PRIVATE ON-SITE UTILITY LOCATION COMPANY.
3.B. VERIFY THE GENERAL ACCURACY OF THE EXISTING CONDITIONS SHOWN ON THE SITE
DRAWINGS BY VISUAL INSPECTION OF THE SURFACE OF THE SITE AND ALL EXISTING
STRUCTURES, PAVING AND UTILITY APPURTENANCES OBSERVED AS REQUIRED:
3.C. WITH REGARD TO THE STRUCTURES & APPURTENANCES OBSERVED AS REQUIRED
PER ITEM (B) ABOVE, DETERMINE THE TYPE, SIZE, LOCATION AND ELEVATION OF ALL
THOSE EXISTING UTILITIES (INCLUDING BUT NOT LIMITED TO ALL STORM DRAINS,
SANITARY LINES, WATER LINES, GAS LINES, STEAM LINES, ELECTRIC LINES,
TELEPHONE LINES, AND COMMUNICATION DUCTS, AND ALL MANHOLES, INLETS,
CLEAN-OUTS, VALVES, HANDHOLES, ETC. RELATED THERETO) WITHIN THE LIMITS OF
CONSTRUCTION IN ORDER TO; (1) AVOID DAMAGING OR DISRUPTING SERVICE, AND (2)
TO COORDINATE AND FACILITATE CONSTRUCTION OF PROPOSED UTILITIES AND
OTHER IMPROVEMENTS. IN ADDITION TO THE CONTRACTOR'S VISUAL OBSERVATION
AND THE UTILITY MARKINGS (AS REQUIRED ABOVE), THE CONTRACTOR SHALL
SCHEDULE AND COMPLETE TEST PITTING OF ALL EXISTING UTILITES (FOR THE
PURPOSES SET FORTH ABOVE) AND SHALL DO SO IN A TIMELY MANNER IN ORDER TO
ALLOW TIME FOR ANALYSIS AND REDESIGN BY FORESITE GROUP AND/OR OTHER
CONSULTANTS, WITHOUT DELAYING THE PROJECT SCHEDULE.
3.D. IMMEDIATELY REPORT TO THE COR AND THE ENGINEER THE RESULTS OF STEPS (A),
(B) AND (C) WHICH MIGHT INDICATE ANY DISCREPANCY BETWEEN ACTUAL CONDITIONS
AND THOSE SHOWN ON THE PLAN, AND ANY POTENTIAL CONFLICTS BETWEEN
PROPOSED IMPROVEMENTS AND EXISTING CONDITIONS.
TESTING PITTING DEFINED: FOR THE PURPOSES OF THIS CONTRACT, EXCAVATION OF
UTILITY TRENCHES DOES NOT CONSTITUTE TEST PITTING. TEST PITTING IS A SEPARATE
OPERATION COMPLETED AT LEAST SEVEN DAYS BEFORE UTILITY INSTALLATION IS
SCHEDULED TO BEGIN. TEST PITTING MEANS EXCAVATION TO EXPOSE EXISTING
UTILITIES IN TWO SITUATIONS: (1) WHERE PROPOSED IMPROVEMENTS CROSS EXISTING
UTILITIES (PIPES, LINES, STRUCTURES, APPURTENANCES) AND; (2) WHERE PROPOSED
UTILITES ARE DESIGNED TO CONNECT TO EXISTING UTILITIES. TEST PITTING INCLUDES
RECORDING THE TYPE, SIZE, LOCATION AND ELEVATION OF THE EXPOSED UTILITIES,
AND FAXING AND MAILING THE RECORD TO THE COR AND THE ENGINEER. THE RECORD
MAY BE LEGIBLE HAND-WRITTEN FIELD SKETCH.
4. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY OCCUR TO ANY
ADJACENT STRUCTURES OR PROPERTY, OR ANY EXISTING STRUCTURES WITHIN
LIMITS OF CONSTRUCTION THAT ARE DESIGNATED ON THE PLANS TO REMAIN, AND
SHALL REPAIR OR REPLACE SUCH DAMAGED PROPERTY TO THE COR'S SATISFACTION
AT NO COST TO THE VA.
5. THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS AND SPECIFICATIONS
WITHOUT THE PRIOR WRITTEN CONSENT OF THE ENGINEER.
6. CONTRACTOR IS RESPONSIBLE FOR CONTACTING VETERANS AFFAIRS AND ALL
EXISTING UTILITY PROVIDERS BEFORE REMOVING ANY/ALL UTILITIES FROM THEIR
EXISTING LOCATION ON THE SITE. THE CONTRACTOR SHALL PERFORM ALL UTILITY
DEMOLITION OR RELOCATION ACTIVITIES IN ACCORDANCE WITH THE EXISTING
UTILITIES SPECIFICATIONS, MATERIALS, AND REQUIREMENTS.
7. THE CONTRACTOR SHALL SEQUENCE THE WORK AND PROVIDE TEMPORARY
MEASURES AS NECESSARY TO MAINTAIN ACCESS TO THE SITE THROUGH ALL
ENTRANCES AT ALL TIMES DURING CONSTRUCTION.
8. CONTRACTOR EQUIPMENT SHALL NOT BE PARKED IN COUNTY, CITY OR STATE
RIGHT-OF-WAY, AND MUST BE STORED WITHIN SITE. THE VA ASSUMES NO
RESPONSIBILITY FOR EQUIPMENT STORED OR PARKED ON SITE. CONTRACTOR SHALL
DELIVER EQUIPMENT WHEN PREPARING THE SITE AND READYING FOR THE
INSTALLATION.
9. NO HAZARDOUS MATERIALS ARE ANTICIPATED ON SITE, HOWEVER SHOULD
HAZARDOUS MATERIALS BE ENCOUNTERD, THE CONTRACTOR SHALL DISPOSE OF
SUCH MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND
FEDERAL LAWS.
10. ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY DISPOSED OF, OFF SITE.
SITE PLAN NOTES:
1. ALL PROPOSED DIMENSIONS USED TO SHOW THE GEOMETRIC LAYOUT OF THE
PROPOSED STRUCTURE LOCATION ARE GIVEN AT THE OUTSIDE FACE OF THE
STRUCTURE CORNERS.
2. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES BETWEEN THE EXISTING
CONDITIONS IN THE FIELD AND THE SURVEY SHOWN ON THE PLANS BEFORE
PROCEEDING WITH ANY NEW CONSTRUCTION.
3. CONTRACTOR IS RESPONSIBLE FOR CORRECT HORIZONTAL AND VERTICAL ALIGNMENT
OF ALL TIES BETWEEN PROPOSED AND EXISTING PAVEMENTS, CURB AND GUTTER,
SIDEWALKS, WALLS, AND UTILITIES.
4. IN ALL AREAS OF FILL OR OTHERWISE DISTURBANCE OF EXISTING CONDITIONS, UNLESS
OTHERWISE NOTED, THE CONTRACTOR SHALL FULLY AND COMPLETELY REMOVE AND
LEGALLY DISPOSE OFF-SITE, ALL PLANT MATERIALS INCLUDING BUT NOT LIMITED TO
ROOT SYSTEMS, CONCRETE, REINFORCED CONCRETE, ASPHALT DEBRIS, UNDERBRUSH,
TOPSOIL, AND OTHER DELETERIOUS MATERIAL. THE SUBGRADE TO REMAIN SHALL BE
COMPACTED TO 98% STANDARD PROCTOR MAXIMUM DRY DENSITY FOLLOWING FULL
REMOVAL OF THESE MATERIALS.
5. COORDINATE AS REQUIRED WITH VA INSPECTIONS DURING CONSTRUCTION FOR
REQUIRED INSPECTIONS.
6. ALL CONDUIT, PIPE, AND CHASE PIPE SHALL BE WRAPPED WITH THE APPROPRIATE
LOCATION WIRE AND TAPE.
7. NOTIFY THE COR OF ANY SCHEDULED OUTAGES 7 DAYS PRIOR TO THE OUTAGE.
8. CONTRACTOR TO HAND DIG IF WITHIN 5 FEET OR ANY UNDERGROUND UTILITIES.
UG
/E
UG/E
UG/E
UG/E
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
T10"
T2"
T6"
T6"
T8"
T8"
CONC. W
ALK
CONC. W
ALK
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
CONC. W
ALK
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
UG/E
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POWPOW
POW
POW
POW
POW POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW
POW POW
POW T
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
GENERATOR PAD
FFE = 36.15
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
34.80
BP
TP 36.15
35.65
BP
TP36.15
35.27
TP36.15
BP
TP 36.15
34.92
TP36.15
TP36.15
34.53
33.61
33.67
33.97
TP
BP
36.15 35.00
BP34.09
BP33.76
BP34.27
34.62
33.89
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS: VA PROJECT NUMBER
Building Number
Drawing Number
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
© COPYRIGHT Apogee Consulting Group, P.A.
VA NEW YORK HARBOR HEALTHCARE SYSTEM,
ST. ALBANS CAMPUS
179-00 LINDEN BLVD,
JAMAICA, NY 1134-1468 JULY 20, 2021
85, 86, 87
630A4-18-41519-227
BID DOCUMENTS
INSTALL GENERATOR FOR
BUILDINGS 85, 86 AND 87 (SA)
FULLY SPRINKLERED
20-1-SA
CIVIL ENGINEER:
Brett Basquin, PE 2128 Moores Mill Road
Suite C Auburn, AL 36830
(O) 334.887.6064 ext. 302
(F) 334.887.6024
BRETT BASQUIN, SOLE PROPRIETOR
SCALE IN FEET
2010510 1" = 10'
GRADING & EROSION CONTROL PLAN
1"=10'
7/
/2
4:
:4
P
M
CG101
JMRNRS
CIVIL GRADING AND EROSION
CONTROL PLAN
2 3
KEY PLAN
SITE
XXXX
LEGEND
EXISTING CONTOURS
PROPOSED CONTOURS
EXISTING UNDERGROUND POWER LINE
EXISTING SPOT ELEVATION
PROPOSED SPOT ELEVATION
PROPOSED TOP OF PAD/BOTTOM OF PAD SPOT
ELEVATION
PROPOSED SILT FENCESF SF SF
XXXX
TP
BP
XXXX.XX
XXXX.XX
XXXX.XX
XXXX.XX
KEY NOTES:
1. PROPOSED SILT FENCE. SILT FENCE TO REMAIN IN PLACE UNTIL
SITE IS COMPLETELY STABILIZED (SEE DETAIL ON SHEET C-501,
TYP.)
2. ALL DISTURBED AREAS TO BE SEEDED AND MULCHED WHEN
WORK IS NOT ACTIVELY IN PROGRESS (TYP.)
3. CONTRACTOR SHALL RESTORE GRADES BACK TO EXISTING
ELEVATIONS AFTER REMOVAL OF TEMPORARY TRANSFORMER
GRADING & EROSION CONTROL NOTES:
1. ALL SPOT ELEVATIONS SHOWN ARE AT THE EDGE OF PAVEMENT UNLESS OTHERWISE
NOTED.
2. ALL PROPOSED SIDEWALKS SHALL BE BUILT WITH A 1.5% CROSS-SLOPE AWAY FROM THE
BUILDING.
3. THE CONTRACTOR SHALL CLEAN OUT ACCUMULATED SILT IN STORM WATER
CONVEYANCE CHANNELS AND PIPES AT END OF CONSTRUCTION WHEN DISTURBED
AREAS HAVE BEEN STABILIZED.
4. COORDINATE WITH VA INSPECTIONS DURING CONSTRUCTION.
5. CONSTRUCT EROSION CONTROL BARRIERS PER VA STANDARDS INSPECTOR AND
MAINTAIN UNTIL PERMANENT VEGETATION IS ESTABLISHED.
6. THE CONTRACTOR SHALL RE-ESTABLISH ALL AREA WHICH IS DAMAGED OR DISTURBED
TO ORIGINAL CONDITIONS OR BETTER DURING AUTHORIZED WORK.
7. MAXIMUM CUT OR FILL SLOPES IS 4H:1V
8. IN ALL AREAS OF FILL OR OTHERWISE DISTURBANCE OF EXISTING CONDITIONS, UNLESS
OTHERWISE NOTED, THE CONTRACTOR SHALL FULLY AND COMPLETELY REMOVE AND
LEGALLY DISPOSE OFF-SITE, ALL PLANT MATERIALS INCLUDING BUT NOT LIMITED TO
ROOT SYSTEMS, CONCRETE, REINFORCED CONCRETE, ASPHALT DEBRIS, UNDERBRUSH,
TOPSOIL, AND OTHER DELETERIOUS MATERIAL. THE SUBGRADE TO REMAIN SHALL BE
COMPACTED TO 98% STANDARD PROCTOR MAXIMUM DRY DENSITY FOLLOWING FULL
REMOVAL OF THESE MATERIALS.
9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN QUALIFIED PROFESSIONAL
ADVICE WHEN QUESTIONS ARISE CONCERNING DESIGN AND EFFECTIVENESS OF
EROSION CONTROL DEVICES. 24 HR. CONTACT: NATHAN SPENCE, P.E. (205) 397-0370
10. NO PORTION OF THIS PROPERTY LIES WITHIN A SPECIAL FLOOD HAZARD AREA PER
PANEL 3604970234F DATED 09/05/2007
11. EROSION CONTROL MEASURES ARE TO BE ACCOMPLISHED PRIOR TO ANY OTHER
CONSTRUCTION ON THE SITE AND MAINTAINED UNTIL PERMANENT GROUND COVER IS
ESTABLISHED.
12. THE INSTALLATION OF EROSION CONTROL MEASURES AND PRACTICES SHALL TAKE
PLACE PRIOR TO OR CONCURRENT WITH ALL LAND DISTURBING ACTIVITIES
THROUGHOUT THE ENTIRE PROJECT.
13. ANY AREA THAT HAS BEEN DISTURBED AND WILL REMAIN SO FOR MORE THAN 7 DAYS
SHALL BE SEEDED AND MULCHED WITHIN 5 DAYS OF BEING DISTURBED.
14. EROSION AND SEDIMENT CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF
FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE
EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL
BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
15. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION
OF EROSION CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH,
ALL LAND DISTURBING ACTIVITIES THROUGHOUT THE ENTIRE PROJECT.
16. SEDIMENT STORAGE INDICATORS MUST BE INSTALLED IN SEDIMENT STORAGE
STRUCTURES, INDICATING THE 1/3 FULL VOLUME.
17. WHEN SILT FENCES BECOME 1/3 FULL OF SEDIMENT, THE SEDIMENT MUST BE REMOVED.
18. MAINTENANCE OF ALL SOIL EROSION AND SEDIMENTATION CONTROL MEASURES AND
PRACTICES, WHETHER TEMPORARY OR PERMANENT, SHALL BE AT ALL TIMES THE
RESPONSIBILITY OF THE CONTRACTOR.
19. THE PROFESSIONAL WHO SEALS THIS PLAN CERTIFIES UNDER PENALTY OF LAW THAT
THIS PLAN WAS PREPARED AFTER A SITE VISIT TO THE LOCATIONS DESCRIBED HEREIN
BY THE PROFESSIONAL OR THE PROFESSIONAL'S AUTHORIZED AGENT, UNDER THE
PROFESSIONAL'S DIRECT SUPERVISION.
20. ALL TEMPORARY AND PERMANENT SEEDING MUST BE PERFORMED AT THE APPROPRIATE
SEASON. ADDITIONAL PLANTINGS WILL BE NECESSARY IF A SUFFICIENT STAND OF GRASS
FAILS TO GROW.
21. TOPSOIL SHALL BE STOCKPILED AND USED TO DRESS FINAL GRADES.
22. MULCH OR TEMPORARY GRASSING SHALL BE APPLIED TO ALL EXPOSED AREAS WITHIN
SEVEN DAYS OF DISTURBANCE.
23. GRASSING REQUIRED AT A MINIMUM OF EVERY (SEVEN) DAYS OR AS DIRECTED BY
QUALIFIED PERSONNEL.
24. ADDITIONAL BMPS MAY BE REQUIRED BY THE ENGINEER AND/OR THE VA OVER THE
COURSE OF THE PROJECT TO MINIMIZE SEDIMENT RELEASE FROM THE SITE.
25. ALL BMPS SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE NEW YORK
STATE STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL.
1'-0"
FIN GR
#5 @ 12" O.C.
GENERATOR PAD SECTION
3/4" = 1'-0"
T/SLAB EL
1' -0
TYPICAL THICKENED GRADE
SUPPORTED SLAB AT STEEL STAIR
3/4" = 1'-0"
1'-0" 1'-0"
8"
NOTE:
EXTEND THICKENED SLAB 1'-0" BEYOND
EITHER SIDE OF STAIR
STAIR STRINGER
L4x4x5/16 W/ 5/8" DIA EXP ANCHOR
W/ 6" MIN EMBED
WWF
2#5 CONT BOT
4@12"
2' -0
M
A X
4'
-0
M
IN
2'-0"
SLAB AT GENERATOR PAD
3/4" = 1'-0"
#5 @ 12" O.C.
1'-0"
#5 @ 12" O.C.
T/SLAB EL
1' -0
2' -0
M
A X
4'
-0
M
IN
2'-0" #5 @ 12" O.C.
T/SIDEWALK EL
CONCRETE SIDEWALK
2 EXPANSION JOINT
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS: VA PROJECT NUMBER
Building Number
Drawing Number
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
© COPYRIGHT Apogee Consulting Group, P.A.
VA NEW YORK HARBOR HEALTHCARE SYSTEM,
ST. ALBANS CAMPUS
179-00 LINDEN BLVD,
JAMAICA, NY 1134-1468 JULY 20, 2021
85, 86, 87
630A4-18-41519-227
BID DOCUMENTS
INSTALL GENERATOR FOR
BUILDINGS 85, 86 AND 87 (SA)
FULLY SPRINKLERED
20-1-SA
CIVIL ENGINEER:
Brett Basquin, PE 2128 Moores Mill Road
Suite C Auburn, AL 36830
(O) 334.887.6064 ext. 302
(F) 334.887.6024
BRETT BASQUIN, SOLE PROPRIETOR
7/
/2
4:
:5
P
M
C-501
JMRNRS
CIVIL STANDARD DETAILS
3 3
C-501
SILT FENCE DETAIL
NOT TO SCALE
C-501
CONCRETE SIDEWALK
NOT TO SCALE
C-501
CONCRETE POST BARRICADES
NOT TO SCALE
C-501
C-501
C-501
C-501
TREE PROTECTION FENCE DETAIL
NOT TO SCALE
C-501
| Sheets and Views |
| CS101 CIVIL DEMOLITION & SITE PLAN |
| CG101 CIVIL GRADING AND EROSION CONTROL PLAN |
| C-501 CIVIL STANDARD DETAILS |
File details come from the government source that posted it. Updated .