S02 - Calculation Worksheet for Self-Performed and Subcontracted Work.docx

DOCX document 19 KB Posted

Attached to
Z2DA--Replace AHU's Impacting Pharmacy, Lab, IR Suites and Ground Floor
Solicitation number
36C25922R0009
Issued by

About this file

This document contains a calculation worksheet for self-performed and subcontracted work on a federal construction contract. The contract requires at least 15% of total contract labor costs to be spent on employees of the prime contractor or other eligible service-disabled veteran-owned small businesses. The worksheet outlines a format for contractors to provide a breakdown of personnel and material costs by specification division. It includes lines to identify SDVOSB and non-SDVOSB subcontractors as well as calculations to determine the percentage of work that will be self-performed. Accompanying the worksheet is a solicitation for HVAC replacement work at the Oklahoma City VA Medical Center, to be awarded on a SDVOSB set-aside basis with responses due by the date specified in the solicitation.

View the file

Other files

File Type Posted
Updated Bid Schedule.pdf PDF
262416 Panelboards.pdf PDF
Complete RFI Answers.pdf PDF
Power for Temporary Air Handler.pdf PDF
36C25922R0009 0002.pdf PDF
Project 535-14-103 Sheet E207 Path.pdf PDF
36C25922R0009 0001.pdf PDF
RFIs.pdf PDF
Pre-Bid Site Visit Attendance.pdf PDF
Mechanical Calculations.pdf PDF
635-20-102 Drawings stamped_Part1.pdf PDF
635-20-102 Drawings stamped_Part2.pdf PDF
635-20-102 Specifications.pdf PDF
2015-06-05 Past Performance Questionnaire.docx DOCX document
36C25922R0009_1.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK

Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division and name
SDVOSB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs

Division 01

$
$

Division 02

$
$

Division 03

$
$

(Add additional lines as necessary for each Division applicable to this project)

$
$
$
$
Sub Total (Personnel Costs, Material/Equipment Costs)
$
Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $_________________

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________

3. Remainder is ‘Total amount of work to be self-performed under the

Contract’:$__________________
4. Self-performed work = Line 3/Line 1 x 100 =__________%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

___________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)