This bid schedule outlines pricing requirements for a construction contract to replace air handling units at the Oklahoma City VA Medical Center. The contractor will furnish all labor, equipment, materials, and supervision to complete the work as described in the scope of work and attachments. A lump sum price is required for the base bid to perform all work excluding power to a temporary generator. Two alternates are also included - Add Alternate 1 requires pricing to purchase and install a 400-amp panel, while Deduct Alternate 2 removes pricing for a temporary generator from the base bid. The government will make a single award to the responsible offeror with the most advantageous proposal based on the base bid and alternates. The construction performance period is 300 calendar days from notice to proceed.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
The contractor shall furnish all labor, equipment, materials, and supervision for Replace AHU’s Impacting Pharmacy, Lab, IR Suites, and Ground Floor at the Oklahoma City VA Health Care System, 921 NE 13th St., Oklahoma City, OK 73104.
The contractor shall include prices for all items and include all costs associated for work in the SOW. Work will be accomplished at the Oklahoma City VA Health Care System, 921 NE 13th St., Oklahoma City, OK 73104.
CLIN Description Qty Unit of issue
Firm Fixed Price Lump Sum Total amount
0001 Base Pricing
(SEE SOW FOR DETAILS)
Provide all work as described by attached plans, specifications, and Wage Determinations for Veterans Administration project Replace AHU’s Impacting Pharmacy, Lab, IR Suites, and Ground Floor at the Oklahoma City VA Health Care System as described in the attached scope of work. Price includes all costs for construction. Cost shall include but not be limited to direct and indirect costs including profit, overhead, general and administration, insurance, labor, bonds, taxes, necessary for 100% completion of the project as indicated in the attached SOW. The construction performance period is 300 calendar days from receipt of notice to proceed.
1 Job $_________
Alternate 1 Add Pricing
Purchase and install 400-Amp Panel
All materials, labor, profit and overhead related to the purchase and installation of 400-amp panel for feed to temporary air handling unit.
1 Job $_____________
Alternate 2 Deduct Pricing
Temporary Generator
All work in the Base Bid minus any materials, labor, profit, and overhead related to the temporary Generator.
1 Job $_____________
A single award will be made on the Base Bid to the responsible offeror whose proposal is the most advantageous to the Government.
Offerors shall provide a lump sum price for the Base Bid and each of the alternates. Line Item 0001 (Base Bid) contains all the work for this project excluding power to the temporary generator. Each Line Item (Add Alternate and Deduct Alternate) is listed in descending order of importance and adds to or removes a portion of the work.
The intent is to award Line Item 0001 (Base Bid). However, if the decision is made to alternate add 1, Deduct alternate 2 will be applied.