635-20-102 Drawings stamped_Part2.pdf

PDF 10 MB Posted

Attached to
Z2DA--Replace AHU's Impacting Pharmacy, Lab, IR Suites and Ground Floor
Solicitation number
36C25922R0009
Issued by

About this file

This document provides details for a federal construction contract opportunity with the Department of Veterans Affairs. The solicitation seeks a contractor to replace air handling units impacting the pharmacy, lab, imaging suites, and ground floor at the Oklahoma City VA Medical Center. The contractor will provide all labor, materials, equipment, and supervision to complete the replacement work according to provided plans, drawings, and specifications. All work must be done at the Oklahoma City VAMC campus located at 921 NE 13th St in Oklahoma City, Oklahoma. The solicitation number for this opportunity is 36C25922R0009 and is titled "Z2DA--Replace AHU's Impacting Pharmacy, Lab, IR Suites and Ground Floor."

View the file

Other files

File Type Posted
Updated Bid Schedule.pdf PDF
262416 Panelboards.pdf PDF
Complete RFI Answers.pdf PDF
Power for Temporary Air Handler.pdf PDF
36C25922R0009 0002.pdf PDF
Project 535-14-103 Sheet E207 Path.pdf PDF
36C25922R0009 0001.pdf PDF
RFIs.pdf PDF
Pre-Bid Site Visit Attendance.pdf PDF
Mechanical Calculations.pdf PDF
635-20-102 Drawings stamped_Part1.pdf PDF
635-20-102 Specifications.pdf PDF
2015-06-05 Past Performance Questionnaire.docx DOCX document
S02 - Calculation Worksheet for Self-Performed and Subcontracted Work.docx DOCX document
36C25922R0009_1.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STAIR 6

CH

AS

E

CH

AS

E

CHASE

CH

AS

E

CHASE

ELEVATOR

P-8

C1

A

D

C

B

2 3 65 7 8

E

F

G

H

B1

A1

656 SF

9 S

F

0 S

F 100 SF

6 S

F

2F142

2F107b

PATIENT

HOLDING

TOILET

PATIENT PHLEBOTOMYDRESSING

ROOM

SPS

STORAGE

BONE

DENSITOMETRY

EMS

STORAGE

MRI #1

MRI

EQUIP

CONTROL

MRI

#2

ELECTRICAL

EQUIPMENT

PATIENT

HOLDING

EQUIPMENT

EQUIPMENT

CONTROL

WORK AREA

SCRUB

ROOM

H.A.C.

IR STORAGE FILES

SPS

STORAGE

TOILET

OFFICE

PHYSICIAN

OFFICEOFFICEOFFICE

OFFICE

PHYSICIAN

STAFFRADIOLOGY P.A.C.U.

TOILET

PATIENT

WAITING

HOLDING

ROOM

TOILET

TOILET

80 SLICE CT WORKROOM

64 SLICE CT

TOILETTOILET

TOILET TOILET

FLUOROSCOPY

CONTROL

X-RAY X-RAY

READING ROOM

EXPEDITE

DESKELECTRIC

PROCESSING ALCOVEH.A.C.

OFFICE

X-RAY

FERROUS

QUARRANTINE

FLUOROSCOPY

2F135

CONTROL

X-RAYX-RAY

READING ROOM

2F126

2F125

2F125c

2F153b

PATIENT CHECK-IN

ULTRASOUND

2F124b

TOILET

2F124b1

TOILET

2F124a1

ULTRASOUND

2F124a

ULTRASOUND

TOILET

MALE

2F125b

TOILET

FEMALE

2F125a

ST

OR

AG

E

2F

4c

2F138

80 SLICE CT

2F113a

2F112

2F133

2F134

2F108a

2F108

2F109

2F110

2F110a

2F111

2F116

2F1117b 2F117c

2F117

2F117a

2F117e

2F117d

2F118

2F119

2F121d

2F121f 2F121g 2F121h 2F121i 2F121j

2F121k

2F121l C7 2F

2F121c

2F121b 2F121a

2F121

2F132

2F139

2F102g 2F102f2F106

2F105

2F102

2F102a2F102b

2F101

2F1412F1402F144

2F1452F144a

2F1462F147a

2F147

2F150

2F151

2F154

2F152 2F153

2F153a

2F127

2F128 2F1292F129a2F130

CONTROL

EQUIPMENT

2F111a

MRI

EQUIPMENT

INTERVENTIONAL

RADIOLOGY

INTERVENTIONAL

RADIOLOGY

SOILED

UTILITY

PATIENT

HOLDING

RECEPTION/CHECK IN

TOILET TOILET

DRESSING

ROOM

DRESSING

ROOM

DRESSING

ROOM

DRESSING

ROOM

2F102e 2F102d 2F102c

OFFICE

RN

2F105a

COMPUTER

ROOM2F107c

TOILET

MALE

TOILET

FEMALE

LOCKER

ROOM

2F151a

OFFICE

C2F 1

C2 F

C2F 5

C2 F

C2F 7

C2 F

C2F 10

C2F 15

C2 F

1108 SF

9 S

F

IV ROOM

2F125d

1200CFM

1624CD"B" 10"x10"

T

12"Ø

10"Ø

12"Ø

8"Ø

6" Ø

8" Ø

8"Ø

8"Ø

8"Ø

10"Ø

8"Ø

12"Ø 14"Ø

"Ø

10"Ø

8"Ø

12" x12

" 10" Ø

10" Ø10"Ø

10"Ø

10"Ø

8"Ø

"Ø

8" Ø

8" Ø

22"Ø SA

UP

18x10

12x10 x1

12"Ø

6" Ø

7" Ø

25" x 12"

8"Ø

8"Ø

6"Ø

14"Ø

28"Ø

(AG-13)

FD

S x1

0 44x20

(AC-13)

S

24x10

(AC-2)

VAV 6

25" x 12"

VAV VAV

VAV

VAV

VAV

4VAV

VAV

VAV

EX.

FCU

24"x12"

455 CFM

"x

8"

20"x10"

16"x14" 20"x16"

10"x12" 18"x10"

14x8

"x

8"

"x

8"

FD

365 CFM

6"Ø

12"Ø

2F120

532 7641

H

G

H1

03/26/2021 DD MR

MD123

SECOND FLOOR HVAC DEMO PLAN

3 (AHU 7)

VEG 20.13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

635-20-102

921 NE 13TH ST OKLAHOMA CITY, OK 73104

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: REPLACE AIR HANDLERS 4, 7, 14,

AND FCU

KEY PLAN

NO SCALE

B

D

8 G

HW

C

5 18

Tr ue

N or th

E

A

F

100% CONSTRUCTION

DOCUMENTS

SCALE:

2' 4' 8' 16' 32'

1/8" = 1'-0"

SECOND FLOOR HVAC DEMO PLAN 3 (AHU 7)

Pl an

N or th Tr ue N or th

1. CONDUCT PRE-CONSTRUCTION TAB INSPECTION TO VERIFY EXISTING

AIR FLOWS. PROVIDE REPORT TO VHA COR.

KEY NOTES: -

A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND

REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING

WITH WORK.

B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND

ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.

C. REFER TO M-001 AND M-002 FOR ADDITIONAL GENERAL NOTES AND

SYMBOLS.

GENERAL MECHANICAL NOTES:

TYP. ALL AIR DEVICES

IN BORDERED AREA.

STAMP:

06/09/2021

70 SF

25,059 SF

SOILED

LINEN

ELECTRICAL

CLOSET

MECHANICAL

EQUIPMENT

ROOM

3F102 3F103

3F100

3F101

3F101A

ELECTRICAL

CLOSET

CLEAN

LINEN

TELE/DATA

3F101B

S G

H S

G H

S G

H R

RISER UP

2"

AHU-17

AFM-11

18x16 R/A28x24 R/A 12"x12" E/A

30x14 R/A

10x10

HR

N o.

x

E

XH

. U P x2

0 E

XH

x1

10x10 x

E

XH

x1

8 E /A

"x

" E

/A x1

38x24RISE28x2448x20

12"x18"

12x12 10x10

29x15 22x7 17x17 EXH x2

E/

A

22x7 E/A

"x

" 60x20 E

"x

" O

/A x2

0 O /A x3

30x24 R/A

DAMPER

AF

M-

60x26 R.A.44x26 R.A.

x2

6 R .A x2 0 R

.A

22" Ø

24" Ø

10"Ø

24"x20" S/A

28"Ø DN

16"Ø

28"Ø

UP

"Ø

10"Ø

O. A. PLENUM

AFM-17

28"Ø

22"Ø

96x20 O.A.

AFM-16

28"Ø39x14"

22"Ø DOWN 18"Ø

"Ø

"Ø

"Ø

AFM-

22" Ø

"Ø

"Ø

AFM-14AFM-18

AFM-18

34" Ø

66" x16

RETURN AIR DAMPER

26x14 S.A.

26x14 SA

DOWN TO

CATH LAB

6"Ø

M RF-7A 26x14 R.A.

26x14 R.A.

26x14 R.A.

6"Ø EA UP

FROM 1ST FLOOR

EXHAUST

FAN

EF-42

FD

MAXIMUM

OUTSIDE AIR

DAMPER

MINIMUM

OUTSIDE AIR

DAMPER M

FD

FD

AF

M-

72 x 108

MOTOR

OPERATED

DAMPERS 96x20 O.A.

FROM

HOOD

HD-36

M

32x12 x1 x1

10x10

26x28"

FD

FDFD

FD

FD

FM

B

(P

RE

FI

LT

ER

PR

EH

EA

T

CO

IL

BL

EN

DI

NG

B

OX

CO

IL

CH

ILL

ED

W

AT

ER

PL

EN

UM

FA

N

PL

EN

UM

AF

TE

R

FI

LT

ER

HU

MI

DI

FI

ER

AHU-7

O/A DAMPER

HEAT

RECOVERY

COILPF-14

PH-14

SF-14

DIFFUSER

FBD-12

CC-14

AHU-14

LINED

SUPPLY

PLENUM

"x

" O

/A x2

0 O /A

22" Ø

O. A. PLENUM

28"Ø

96x20 O.A.

AFM-14AFM-18

AFM-18

34" Ø x1

EF-7

14"Ø G

H R

G H

S G

H S

GHR GHR

GHS GHS GHS

GHR GHRGHS GHS GHS GHS

G H

S G

H S

G H

S G

H R

G H

R

G H

R G

H R

G H

S G

H S

G H

S

RISER UP

RISER DOWN

2" 2-1/2" 2-1/2"

C1

A

D

C

B

E

F

G

H

B1

A1

4 11a2 3 65 7 81

D

F

E

03/26/2021 DD MR

MD131

THIRD FLOOR HVAC DEMOLITION

PLAN (AHU 7 AND 14)

VEG 20.13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

635-20-102

921 NE 13TH ST OKLAHOMA CITY, OK 73104

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: REPLACE AIR HANDLERS 4, 7, 14,

AND FCU

KEY PLAN

NO SCALE

B

D

8 G

HW

C

5 18

Tr ue

N or th

E

A

F

100% CONSTRUCTION

DOCUMENTS

SCALE:

2' 4' 8' 16' 32'

1/8" = 1'-0"

THIRD FLOOR HVAC DEMOLITION PLAN (AHU 7 AND 14)

Pl an

N or th Tr ue N or th

1. DISCONNECT AND REMOVE AHUs AND ASSOCIATED MECHANICAL

ROOM DUCTWORK AS INDICATED. REMOVE HYDRONIC AND STEAM

PIPING BACK TO AND INCLUDING EXISTING ISOLATION VALVES AND

PREPARE FOR EXTENSION TO NEW EQUIPMENT. REMOVE AND

PROTECT LOUVER FOR REUSE AS REQUIRED. REFER TO NEW WORK

PLANS AND DETAILS. REFER TO M-001 FOR AHU AND GENERAL WORK

PHASING INSTRUCTIONS.

2. DEMO DUCTWORK AS REQUIRED TO REPLACE AHU-7. REFER TO

PHASING PLAN FOR ADDITIONAL INFORMATION.

3. ENERGY RECOVERY COILS SHALL REMAIN. DEMO PIPING UP TO NEW

COILS AND PROTECT FOR REUSE.

KEY NOTES: -

A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND

REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING

WITH WORK.

B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND

ROOF STRUCTURE.

C. REFER TO M-001 AND M-002 FOR ADDITIONAL GENERAL NOTES AND

SYMBOLS.

GENERAL MECHANICAL NOTES:

ELIGIBLITY LOW VISION

EXAM

EXAM

EXAM

EXAM EXAM EXAM

STORAGE H.A.C.

TOILET

FEMALE

EXAM

H.A.C.

EXAM NURSING

OFFICE

CLEAN

UTILITY

ADMINISTRATIVE

OFFICE

C MODULE

OFFICE

WAITING ROOM

C MODULE

NURSING

OFFICE

STORAGE

FORMS

ELECTRICAL

CLOSET

NURSING

OFFICE

NURSING

OFFICE

NURSING

OFFICE

WAITING ROOM

D MODULE

TOILET

MALE

EXAM

EXAM EXAM STORAGE

BREAK ROOM

ELECTRIC

CLOSET

ADMINISTRATIVE

OFFICE

B MODULE

OFFICEWAITING

TELERETINALEXAM

EXAM OFFICE OFFICE

TO

ILE

T

WAITING ROOM

B MODULE

PHARMACY

DISPENSARY

W

AL

KW

AY

T O

CH

ILD

RE

N'

S

UN

IV

ER

SI

TY

H

OS

PI

TA

L

TELE/DATA

TRASH

EXAM

EXAM

EXAM

EXAM TOILET

MALE

EXAM EXAM EXAM

EXAM

EXAM

EXAM EXAM

EXAMEXAMEXAMEXAM

EXAM

EXAM

EXAM

EXAM

EXAM EXAM EXAM EXAM EXAM EXAM EXAM

NURSING

OFFICE EXAM

EXAM EXAMEXAM

D MODULE

ADMINISTRATIVE

OFFICE

TOILET

FEMALE

TOILET

OFFICE

FLAMMABLE

STORAGE

CONTROLLED

SUBSTANCE

STORAGE

VAULT

RX CONSULT AREA

PHARMACY WAITING

STORAGE

ELECTRICAL

H.A.C. OFFICE

ELEC.

OFFICE

ASST. CHIEF

SECRETARY/

WAITING

GA145

OFFICE

CHIEF

GA144

OFFICEOFFICE

VESTIBULE

NARC. CONTROL

DISPENSING

I.V.

SOLUTION

STORAGE

CAGE

OFFICE

PRIMARY

CARE

CANTEEN

STORAGE

INPATIENT PHARMACY

NURSING

OFFICE

CHAPLAIN GROUP

ROOM

INFORMATION

BOOTH

VESTIBULE

TELE/DATA

VESTIBULE

VESTIBULE

CHAPELCHAPLAIN

SECRETARY

OFFICE

DAV

DRIVER'S ???

OPTICAL

SHOP

TOILET

FEMALE

TOILET

MALE

EYE CLINIC

SUPERVISOR

ELEC

TE

LE

DA

TA

ELECTRICAL

CHAPLAIN

OFFICE CHAPLAIN

STORAGE

CHAPLAIN

OFFICE

CANTEEN RETAIL

STORE

PATIENT

LIBRARY

OFFICE

PRIMARY

CARE

OFFICE

PRIMARY

CARE

OFFICE

PRIMARY

CARE

OFFICE

PRIMARY

CARE

PHARMACY

SUPPLY CHECK

IN

OFFICE

PRIMARY

CARE

CONFERENCE

ROOM BREAK ROOM

OFFICE

MOBILE FILE

ROOM

NEGATIVE CHEMO

CLEAN ROOM

POSITIVE IV

CLEAN ROOM

ANTE-ROOM

POSITIVE

ANTE-ROOM

PHARMACY

STORAGE

GA143B GA141B

GA129

GA104

GA105

GA

GA

GA

WAITING AREA GA106 GA107

GA109

GA108

GF118

GA112 GA113 GA114 GA115

GA117GA118GA119GA120

GA122

GA124A

GA125

GA126

GA126A

GE100AGE100

GA128A

GA130

GA130A

GA131

GA132

GA133

GA134GA135GA136

GA137GA138

GA139

CH

AP

LA

IN

ST

OR

AG

E

GF100

GA140 GA

0A

GA141GA141A

CHAPLAIN

OFFICE

GA141F

GA141C

CH

AP

LA

IN

ST

OR

AG

E

CHAPLAIN

OFFICE

GA141E

GA141D

GA142

GA142AGA142B

GA142A1GA142B1

GA143D

GA143C

GA143C1

GA143A

GA146

GA147

GA148GA148AGA148B

GA148CGA148DGA148E

GA149

GA150

GA151

TELE/DATA

GA152

GA153 GA154

GB

GB

GB

CA

NT

EE

N

ST

OR

AG

E

CA

NT

EE

N

ST

OR

AG

E

CA

NT

EE

N

ST

OR

AG

E

CANTEEN

CANTEEN KITCHEN

H.A.C.

FREEZER

FOOD

STORAGE

GB103

FOOD

STORAGE

DELI

OFFICE

CANTEEN SERVICE

EL

EC

H.A.C.

STORAGE

TRAY WASH

TE

LE

/D

AT

A

CL

OS

ET

ELEC

ELEC

CANTEEN

DINING ROOM

MECHANICAL ROOM

STORAGE

MEDICAL

LIBRARY

MECHANICAL ROOM

GB104E

GB104C

GB104D

GB104

GB104F

GB104F1

GB

5GB106GB106B

GB106C

GB104H

GB

4l

GB104J

GB104I

GB104G

GB104K

GB104K1

GB

GB108

GB

9B

GB117

GB118

GB118A

GB119

GB120A

GE101

GE101A

GE101B

GE101C1

GE102

GE103

GE104

OFFICE

GE101C

GE105

GE101D

GE101E

GE

1f

GE101G

GE101H

GE101I

TRASH

CANTEEN

PIZZA PLACE

GF101

CANTEEN

KITCHEN

CANTEEN

STORAGE

GF101A GF101B

GF101C

GF102

GF103

GF124

GF103AGF103BGF103CGF104GF105GF106GF107GF108GF109GF110GF111

MAS

SUPPLY

MY

HEALTHY

VET

SOCIAL

WORKERPSYCHOLOGISTCLEAN

SUPPLY

MED

ROOM

GF112

EXAM

EXAM

GF113

GF114

EXAM

EXAM

GF115

VA

EXPRESS

GF116

VA

EXPRESS

GF117

GF120

TELEHEALTH

GF119 GF121 GF122 GF123

RESEARCH FOOD/

NUTRITI0N

GA103

FEC

GA

9a

EL

EC

TE

LE

DA

TA

FEC

OFFICE

FEC

FE

C

GB104B

GB106A

LOST &

FOUND

GF135 GF136

GF126

GF127

GF128

GF143

GF144

GF145

GF146

GF159

GF160

GF161

GF162

GF173

GF172

GF181

GF180

GF181AGF165

GF164

GF163

GF182

GF166 GF167 GF168 GF169 GF170 GF171

GF156GF157GF158GF147

GF148

GF149

GF150 GF152 GF153 GF154

GF151 GF155

GF142 GF141 GF140 GF139 GF138

GF129 GF130 GF131 GF132 GF133 GF134

GF125

GF137

ELIGIBILITY

MAS

SUPPLY

STRETCHER

STORAGE

STORAGE

EXAM

GF124F

GF124D

GF124E

GF124G

GF124C GF124B

GF124H

GF

4A

GF172B

STORAGE

GF172A

GF173A

GF174

SOILED UTILITY

EXAM

EXAM

H.A.C.

ST

OR

AG

ESTORAGE

GF175GF176

GF177GF178GF179

GF183 GF184 GF185 GF186 GF187 GF188 GF189 GF190 GF191 GF192 GF193 GF194 GF195A GF195

GF198

GF197

GF196

GF199GF200

GF225

GF231

GF230

MEDICATION

PREP

STRETCHER STORAGE

GA143

GA143F

TOILET

TOILET

FEMALETOILET

MALE

GA121

GF172C

AB

AN

DO

NE

D

DU

MB

W

AI

TE

R

SH

AF

T

OFFICE

STORAGE OFFICE

OFFICE

CANTEEN

COFFEE SHOP

ST

OR

STORAGE

GF

3A O₂

STOR

GB120

GB120A

OFFICE

OFFICEOFFICEOFFICEOFFICE

GF172d GF172e GF172f GF172g

CLEAN

LINEN FOOD/

NUTRITI0N

MAS

OX

STORAGE

SOILED

LINEN

OFFICE

GF224

GF209

GENETIC

CONSULTING

TELEHEALTH

COORDINATOR

GF245

TRIAGE

SHARED

NURSE

OFFICE

SHARED

TOILET

IT CLOSET

SHARED WAITING ROOM

MY

HEALTHY

VET

OFFICE

AGENT CASHIER

SUPERVISOR

OFFICE

BENEFICIARY

TRAVEL

CHECK-IN

EXAM ROOM 8

SHARED NURSE

OFFICE

EXAM ROOM 6

LEAD

OFFICE

EXAM ROOM 5

OFFICE

CLASSROOM

OFFICE/EXAM

STORAGE

OFFICE PATIENT

CONSULT

CO-LOCATED CARE

COORDINATORS

TOILET

OFFICE OFFICE

EXAM ROOM 2

FLEX OFFICE

STORAGE

MED ROOM

TRIAGE

WAITING

ROOM

RECEPTION INTAKE

AND ELIGIBILITY

SHARED

TOILET

EXAM ROOM 7

EXAM ROOM 1

EXAM ROOM 4

EXAM ROOM 3

TRIAGE

WAITING

TOILET

CLEAN

HOLDING

STAFF

TOILET

CONSULT

OFFICE

PATIENT

EDUCATION

SOCIAL

WORKER

GF229 GF228

GF227

GF226

GF226a

GF220

GF221

GF222

GF219 GF218 GF217

GF201

GF215GF216

GF214

GF212GF213

GF223

GF232

GF233

GF234

GF235

GF236

GF239

GF238

GF237 GF241

GF240

GF210

GF211

GF207

GF208

GF242GF243GF244GF246 GF206GF247

GF205

GF202

GF204

GF203

STAFF TOILET

BREAK ROOM

PHYSICIAN

OFFICE

ELIGIBLITY ELIGIBLITY ELIGIBLITY

GF103D

GA109A

GA110 GA111

GA111A

GA116

GA123

GA124

GA127

GA127A

GA128

GA131A

RECEPTION

CHECK-IN/OUT

OPTICAL

SHOP

STORAGE

SOILED

UTILITY

WAITING

AREA

EYE

CLINIC

CALL

CENTER EXAM ROOM

PRE-TESTING

#1

EXAM ROOM

VISUAL FIELD

TESTING

EXAM ROOM

PRE-TESTING

#2

EXAM ROOM

PRE-TESTING

#3

EXAM ROOM

PRE-TESTING

#4

EXAM ROOM

PRE-TESTING

#5

EXAM ROOM

PRE-TESTING

#6

STORAGE

OMNICELL EXAM ROOM

ANCILLARY

TESTING

STAFF

BREAKROOM

STORAGE

HAC

EXAM ROOM

LASER

EXAM ROOM

IOL MASTER/

A-SCAN

EXAM ROOM CONFERENCE ROOM

OPHTHALMOLOGIST

ENSA PILLOW, MD

EXAM ROOM

RESIDENT

OPHTHALMOLOGIST EXAM ROOM

RESIDENT

OPHTHALMOLOGIST

EXAM ROOM

RESIDENT

OPHTHALMOLOGIST

SURGERY

SCHEDULER

EXAM ROOM

RESIDENT

OPHTHALMOLOGIST

EXAM ROOM

EXAM ROOM

PRE-TESTING

#7

OPTOMETRY

EXAM ROOM

OPTOMETRY

EXAM ROOM

OPTOMETRY

EXAM ROOM

OPTOMETRY

EXAM ROOM

ELEVATOR

P-12

ELEVATOR

P-11

ELEVATOR

P-1

ELEVATOR

P-2

ELEVATOR

P-3

ELEVATOR

P-4

ELEVATOR

P-5

ELEVATOR

P-6

STAIR 5

STAIR 8

ELEVATOR

P-9

ELEVATOR

P-10

ELEVATOR

P-8

ELEVATOR

P-7

ST

AI

R

STAIR 6

EMER GEN

ROOF

STAIR 7

STAIR 2

ST

AI

R

ST

AI

R

STAIR 12

STAIR 1

STAIR 11

ST

AI

R

STAIR

#15

DO

W

N

ST

AI

R

#1

RO

OF

OUTPATIENT

PHARMACY

SE

CT

E

SE

CT

F

SE

CT

F

SECT B

SECT A SECT A

SECT B

SECT E

SECT A SECT A

SECT ESECT E

SECT A

SECT B

SECT A SECT A

SECT B

SE

CT

E

SE

CT

F

SE

CT

A

SE

CT

F

SE

CT

E

SE

CT

A

SE

CT

F

SE

CT

F

SECT B

SECT A SECT A

SECT B

SECT E

SECT A

SECT E

SECT A SECT A

SECT ESECT E

SECT A

SECT B

SECT A SECT A

SECT B

SE

CT

E

SE

CT

F

SE

CT

A

SE

CT

F

139 SF

882 SF

71 SF

39 SF

49 SF

251 SF

94 SF

136 SF

160 SF

21 SF

133 SF

419 SF

S

F 112 SF

147 SF

79 SF

170 SF

306 SF

40SF

1042 SF

154 SF

131 SF

113 SF

106 SF

113 SF

154 SF124 SF

184 SF

119 SF

132 SF

69 SF

115 SF

27SF

121 SF

1815 SF

378 SF

1395 SF

3176 SF

233 SF

628 SF

554 SF

159 SF

76 SF

190 SF

170SF

41SF 49SF

98SF 98SF 91SF 98SF 90SF 95SF 96SF

117 SF115 SF120 SF112 SF

146 SF142 SF

42 SF

111 SF

129 SF

119 SF

105 SF

129 SF

49 SF

297 SF

ZONE 1 SERVED FROM AHU-4,

LOCATED IN 8E102

ZONE 2 SERVED FROM AHU-4,

LOCATED IN 8E102

ZONE 3 SERVED FROM AHU-4,

LOCATED IN 8E102

17 18 22 22a 23 2413 14 15 15a 16 16a12 19 20 21

A

D

C

B

E

F

G

H

B1

A1

C1

J

K

I

2 3 65 7 841

764 5321

SU T R Q P O N

8a

8 9a9 11 11a

9 10 11 11a M L I H F E

H

G

H1

D BC

03/26/2021 DD MR

M-100

GROUND FLOOR AHU 4 ZONES

VEG 20.13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

635-20-102

921 NE 13TH ST OKLAHOMA CITY, OK 73104

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: REPLACE AIR HANDLERS 4, 7, 14,

AND FCU

KEY PLAN

NO SCALE

E

B

D

8 G

HW

C

5 18

Tr ue

N or th

E

A

F

100% CONSTRUCTION

DOCUMENTS

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

GROUND FLOOR AHU 4 ZONES

N or th

TEMP AHU-4 LOCATION. PROVIDE AND ROUTE 28"Ø

DUCTWORK UP TO 8TH FLOOR ROOF, THROUGH

TEMPORARILY REMOVED ROOF VENT AND

CONNECT TO EXISTING SUPPLY DUCTWORK.

TEMP AHU-7 AND AHU-14 LOCATION. SAME TEMPORARY UNIT SHALL

SERVE BOTH UNITS. ROUTE 28"Ø DUCTWORK UP TO 3RD FLOOR

THROUGH TEMPORARILY REMOVED LOUVER AND CONNECT TO

EXISTING SUPPLY DUCTWORK.

STAMP:

NOT IN SCOPE

17 18 22 22a 23 24

S

G

F

E

U T

14 15 15a 16 16a

R Q P

L K I

K

H

D B

A

T S R Q P O N M

H H

F E

A

D

C

B

8a

2 3 65 7 8

9 10

H

G F D C B A

H G F E

O N

E

F

G

H

B1

A1

H

G

H1

D

M

C

C1

8 9a9 11 11a

4 11a

E

J

K

I 19 20 21

SE

CT

E

SE

CT

F

SE

CT

F

SECT B

SECT A SECT A

SECT B

SECT E

SECT A

SECT E

SECT A SECT A

SECT ESECT E

SECT A

SECT B

SECT A SECT A

SECT B

SE

CT

E

SE

CT

F

SE

CT

A

SE

CT

F

SE

CT

E

SE

CT

A

SE

CT

F

SE

CT

F

SECT B

SECT A SECT A

SECT B

SECT E

SECT A

SECT E

SECT A SECT A

SECT ESECT E

SECT A

SECT B

SECT A SECT A

SECT B

SE

CT

E

SE

CT

F

SE

CT

A

SE

CT

F

210 SF

3 S

F

638 SF

70 SF

206 SF

250 SF

71 SF

560 SF

111 SF

123 SF

143 SF

S

F

133 SF143 SF145 SF165 SF164 SF148 SF145 SF167 SF145 SF

298 SF93 SF 119 SF

41SF

95SF

55 SF

310 SF

62 SF

45 SF

2E110

TOILET

MALE

2B

2K

POT WASHING

KITCHEN

OFFICE

AO

PATIENT

HOLDING

TOILET

PATIENT

PHLEBOTOMY

2F106A

2F107

2F107

DRESSING

ROOM

2F106

RADIOLOGY WAITING

2F102F2F102G

SPS

STORAGE

2F103

BONE

DENSITOMETRY

2F105

2F102 2F101

EMS

STORAGE

2F100

TELE/DATA

MRI #1

2F109

MRI

EQUIP

2F110A

CONTROL

2F110

2F111

2F112

MRI

#2

ELECTRICAL EQUIPMENT

2F1132F113A

2F116

PATIENT

HOLDING

2F

7B

EQ

UI

PM

EN

T

2F117A

EQUIPMENT

CONTROL

2F117

WORK AREA

2F117E

SCRUB

ROOM

2F117D

2F118 2F119

2F121C H.A.C. 2F121B

IR STORAGE

2F121A

FILES

SPS

STORAGE

2F121

2F121L

TOILET

2F121K

OFFICE

PHYSICIANOFFICE

2F121J2F121I

OFFICEOFFICE

2F121H2F121G

OFFICE PHYSICIAN

2F121F

STAFF

RADIOLOGY P.A.C.U.

TOILET

2F123

TRASH LINEN

2F122

PATIENT

WAITING

2F125

2F121D

2F132

HOLDING ROOM

2F130

TOILET

2F129A 2F129

TOILET

2F133

2F150

80 SLICE CT

2F134

WORKROOM

2F151

64 SLICE CT

2F135

2F147

2F147A

TOILETTOILET

TOILET TOILET

2F146

2F1452F144A

FLUOROSCOPY

2F144

2F139

CONTROL

2F138 2F140

X-RAY

2F141

X-RAY 2F142

2F154

READING ROOM

2F125C

2F153B

EXPEDITE

DESK2F153A

ELECTRIC

PROCESSING ALCOVE

2F153 H.A.C.

2F128

OFFICE

X-RAY

2F127

2F152

ADVANCED

SURVEILLANCE

TEAM 2A1502A149

2A145

2A151

PVA

SERVICE

OFFICER

2A148

2A147

PVA SECRETARY RESEARCH

LAB

(DRIVING RM.)

2A146

NEUROLOGY

SUPPLY

CLOSET

EXAM

ROOM

2A144

STROKE

RESEARCH

LAB

2A152

2A153

EXAM EXAM

2A154

2A142

EXAM

ROOM

2A155

EXAM

2A156

2A157A

2A157 2A158 2A159 2A160

2A141

2A140 2A139

POWER MOBILITY

SUITE

2A137D 2A137C H.A.C 2A138

2A135

NEURO

NURSING

OFFICE

2A134

NEUROLOGY WAITING

NEUROLOGY CHECK IN

2A133

2A132

2 EAST

NURSE

MANAGER

MULTI PURPOSE

2A131

MEDICATION

2A130B

2A102

NURSE STATION

2A130

2A119

ELEC

SOILED

UTILITY

2A120

PATIENT RM

1 BED

2A118

2A118A

2A117

2A116

2A104A 2A106A2A103A

PATIENT RM

1 BED

2A106

2A105

KITCHEN

2A104

PATIENT RM

1 BED

2A103

PATIENT RM

1 BED

ELECTRICAL

STORAGE

2A107 2A108

PATIENT RM

1 BED

LINEN

2A109

ELEC

PATIENT RM

1 BED

2A110

2A111

2A112PATIENT RM

1 BED

2A115

2A115A

STORAGE

2A110A 2A113A

PATIENT RM

1 BED

2A113

PATIENT RM

1 BED

2A114

PATIENT RM

1 BED

2A116A 2A122A

2A122

ISOLATION

1 BED

TOILET

STRETCHER

SHOWER

2A129

2A128

CLEAN UTILITY

PATIENT RM

1 BED

2A127

PATIENT RM

1 BED

2A123

2A123A

2A124A

O₂ S

TO

RA

GE

2A

6BST

OR

AG

E

2A127A

2A125A

TOILET

2A126

H.A.C.

2A124

PATIENT RM

1 BED

2A125

2E100

0FFICE

SOCIALWORK

2E101

2E102

LEARNING

RESOURCES

2E

TE

LE

/D

AT

A

EL

EC

TR

IC

AL

2E104

OFFICEOFFICE

PHYSICIAN

2E105

OFFICE

PHYSICIAN

2E106

OFFICE

PHYSICIAN

2E107

CHIEF NEUROLOGY

2E1082E109

OFFICEWHEELCHAIR

OFFICE

OFFICE

PHYSICIAN

2E111

OFFICE

PHYSICIAN

2E112

OFFICE

2E113

TOILET

FEMALE

2E1142E115

2E1172E116

ELECT. H.A.C. EXAM

ROOM

2E118

STORAGE

2A136A

2A136B

EEG LAB

2A136C EEG/EMG

LAB

2A136

2A136D

EEG

READING

ROOM

2A136E

2A136G

EEG/EMG

LAB TOILET

2A136F

2A137A

SCI

W/C PHYSICIAN

2A137B

SCI

PA COORDINATOR

2A137

TE

LE

DA

TA

2A

EL

EC

2A

ELEVATOR LOBBY

2A

2B129

MECHANICAL ROOM

OFFICE

2B128

2B127

OCCUPATIONAL THERAPY

KITCHEN

2B126

2B126C

PHYSICAL

THERAPY

UTIL

TOILET

MALE

2B126A

2B126B

TOILET

FEMALE

2B125

WAITING

TEAM ROOM

2B124

WOUND CARE

2B119

2B117A

2B

TE

LE

DA

TA

STORAGE

2B117

ELEC

2B116

OFFICE

SUPERVISORS

2B116A

OFFICE

SUPERVISOR

CONFERENCE

2B115

OFFICE

2B114

2B103

OFFICE

2B1132B112

OFFICE

2B111

CHIEF

DIETETIC

SERVICE

SECRETARY

2B1102B108

OFFICE

BREAK ROOM

2B107

STORAGE

2B106

2B105

PATIENT

DINING ROOM

2B104

KITCHEN

SERVING LINE

2B102 TOILET

MALE

2B102A

2B102B

TOILET

FEMALE

2B102C2B102D

WALK-IN COOLER

#4

2B102S

2B102T

SALADS

2B102R

MECHANICALMECHANICAL

WALK-IN COOLER

#3 2B102E

WALK-IN COOLER

#2

2B102F

WALK-IN COOLER

#1

2B102G

2B102P 2B102Q

2B

STORAGE STORAGE

CART STAGING

2B102n

2B102o

KITCHEN

2B

2I 2B

2K

EL

EC

TR

IC

AL

C

LO

SE

T

DISHWASHING

2B102m

EXAM

ROOM

2A143

TOILET

CL

OS

ET

2B

2B

2H

EXAM

EXAM EXAM EXAM

RESIDENTS'

OFFICE

2F120

FERROUS

QUARRANTINE

FLUOROSCOPY

2A114A

STORAGE

2A108A

TOILET/

SHOWER

CONTROL

X-RAYX-RAY

READING ROOM

2F126

PATIENT CHECK-IN

ULTRASOUND

2F124B

TOILET

2F124B1

TOILET

2F124A1

ULTRASOUND

2F124A

ULTRASOUND

2F124D

TOILET

2F124D1

TOILET

MALE

2F125B

TOILET

FEMALE

2F125A

ST

OR

AG

E

2F

4C

80 SLICE CT

OFFICE

ELEC

SOILED

UTILITY

EEG/EMG

LAB

OFFICE

2A149A

2G100

TOILET/

SHOWER

TOILET/

SHOWER

TOILET/

SHOWER

2F108

2F102A2F102B

2A130A

CONTROL

2A107A

TOILET/

SHOWER

TOILET/

SHOWER

TOILET/

SHOWER

TOILET/

SHOWER

STORAGE

TOILET/

SHOWER

TOILET/

SHOWERTOILET/

SHOWER

2A121

ANTE

TOILET/

SHOWER

TOILET/

SHOWER

2A

6A

TOILET/

SHOWER

OFFICE

CL

OS

ET

ELEC

STORAGE

2B117B

ELEC

STORAGE

2B

8A

2B126D

EQUIPMENT

2F111A

MRI

EQUIPMENT

INTERVENTIONAL

RADIOLOGY

INTERVENTIONAL

RADIOLOGY

2F117C

2G100A

MECHANICAL

ROOM

SOILED

UTILITY

PATIENT

HOLDING

RECEPTION/CHECK IN

TOILET TOILET

2F103A

RADIOLOGY CONFERENCE

2F104

2F105B

DRESSING

ROOM

DRESSING

ROOM

DRESSING

ROOM

DRESSING

ROOM

2F102E 2F102D 2F102C

OFFICE

RN

2F105A

2F105C

OFFICE

TECHNICIAN

2F104A2F104B2F104C

2F104D

2F104E

OFFICE

AO

OFFICE

CHIEFADPACS

OFFICE

COMPUTER

STORAGE

TECHNICIAN

OFFICE

2F106C

2F106B

TELE/DATA

ELECT.

COMPUTER

ROOM

2F107A

2F107C 2F107B

TOILET

MALE

TOILET

FEMALE

LOCKER

ROOM

BREAK

ROOM

2F151A

OFFICE

CLO

ELECTRICAL

2A103B

CRASH

CART

POWER MOBILITY

EXAM

POWER MOBILITY

WAITING

EXAMRESIDENTS

IV ROOM

2F125D

AREA SERVED BY AHU-7,

LOCATED IN 3F101

ZONE 6 SERVED FROM

AHU-4, LOCATED IN 8E102

03/26/2021 DD MR

M-120

SECOND FLOOR AHU 4 AND 7

ZONES

VEG 20.13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

635-20-102

921 NE 13TH ST OKLAHOMA CITY, OK 73104

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: REPLACE AIR HANDLERS 4, 7, 14,

AND FCU

KEY PLAN

NO SCALE

B

D

8 G

HW

C

5 18

Tr ue

N or th

E

A

F

100% CONSTRUCTION

DOCUMENTS

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

SECOND FLOOR AHU 4 AND 7 ZONES

Pl an

N or th Tr ue N or th

STAMP:

NOT IN SCOPE

17 18 22 22a 23 24

S

G

F

E

U T

14 15 15a 16 16a

R Q P

L K I

K

H

D

T S R Q P O N M

H H

F E

A

D

C

B

8a

2 3 65 7 8

9 10

H

G F D

H G F E

O N

E

F

G

H

B1

A1

H

G

H1

D

M

C1

8 9a9 11 11a

4 11a

E

J

K

I 19 20 21

SE

CT

E

SE

CT

F

SE

CT

F

SECT B

SECT A SECT A

SECT B

SECT E

SECT A

SECT E

SECT A SECT A

SECT ESECT E

SECT A

SECT B

SECT A SECT A

SECT B

SE

CT

E

SE

CT

F

SE

CT

A

SE

CT

F

SE

CT

E

SE

CT

A

SE

CT

F

SE

CT

F

SECT B

SECT A SECT A

SECT B

SECT E

SECT A

SECT E

SECT A SECT A

SECT ESECT E

SECT A

SECT B

SECT A SECT A

SECT B

SE

CT

E

SE

CT

F

SE

CT

A

SE

CT

F

4F115C

4F115C1

OFFICE

NURSING

OFFICE

NURSING

PT/TR OFFICE & STORAGE THERAPEUTIC

RECREATION

REFRIGERATOR

WALK-IN

DIRTY

STORAGE

CL

EA

N

ST

OR

AG

E

UROLOGY LAB

TOILET

FEMALE

OFFICE

HBPC

OFFICE

HBPC

OFFICE

HBPC

OFFICE

GERIATRICS

TOILET

FEMALE

TOILET

MALE

SOILED

LINEN

UROLOGY

RECEPTION

SOILED

LINEN

H.A.C.

CLINIC

HBPC

SUPPLY-MED

UROLOGY

STORAGE

GERIATRIC RESEARCH

OFFICE

OFFICE

HBPC

OCCUPATIONAL THERAPY SPEECH - LANGUAGE PATHOLOGYOFFICE

UROLOGY

OFFICE

UROLOGY

OFFICE

GEROPSYCHOLOGY

OFFICE

SOCIAL WORK

OFFICE

MENTAL HEALTH

OFFICE NURSING

PSYCHOLOGY

WAITING

ELEVATOR LOBBY

TOILET

BREAK ROOM /EDUCATION

NURSE STATION

KITCHEN

SOILED LINEN

CLEAN LINEN

PATIENT LAUNDRY

CLEAN LINEN

SOILED LINEN

NOURISHMENT

KITCHEN

SOILED

LINEN

LAB

PATHOLOGY OFFICERESIDENT'S

OFFICE

LABORATORY

HISTOLOGY

CONFERENCE ROOM

DIRECTOR Q.F.I.A./

FLOW OFFICE

CYTOLOGY IMAGE

ANALYSIS

LABORATORY

CYTOTECH

PREP LAB CYTOLOGY

OFFICE

SLIDE & BLOCK FILES

RESIDENT'S LABORATORY OFFICE

PATHOLOGIST

OFFICE

PATHOLOGIST

OFFICE

PATHOLOGIST

`OFFICE

SPECIMEN ACCESSION

OFFICE

MICROBIOLOGY

A.F.B./FUNGUS

ISOLATION

CHEMISTRY HEMATOLOGY LABORATORY

4F117A 4F138 4F139 4F140 4F141

4F141A

4F142 4F143 4F144

4F117

4F118 4F137 4F136 4F135

4F134 4F133 4F132 4F131

4F130 4F129

4F146 4F145

4F147

4F127 4F126

4F128

4F125 4F1244F123

4F1224F121 4F120

4F120A

4F1194F116A 4F116

4F115D

4F115

4F113 4F112B 4F112A

4F

4F111 4F110

4F109

4F108

4F100

4F151

4F150

4F149

4F148

4F101 4F102A

4F104

4F1074F106

4F105

4F105A

4F105B

4F105C

4F115B1

4F115B

4F115A 4F105D

4F105E 4F114

4A140 4A140A 4A139A

4A139 4A138A 4A138 4A137

4A137A

4A134

4A133A

4A134A

4A133

4E108

4E107 4E106 4E104

4E105 4E103

4E109

4A132A

4A131A

4A132

4A131

4A129A

4A

4A129 4A128

4A127

4A126 4A125

4A124

4A123

4A123A

4A121A

4A121

4A120

4A120A

4A119A

4A119

4E110

4E102

4E

4E100

4A118

4A118A

4A117A

4A117

4A116

4A116A

4A113A

4A

4A114

4A113 4A112

4A107A

4A106

4A106A

4A105 4A104

4A103 4A102

4A

4A100

4B172

4B170

4B169

4B168

4B167

4B166

4B165

4B164 4B163 4B162 4B161 4B160 4B159

4B1584B1574B1564B1554B1544B153

4B151

4B150

4B152

4B149

4B148 4B147A

4B147

4B1384B138A

4B

4B136

4B1354B134

4B133

4B132

4B1314B113Q4B113P4B113O4B113N4B113M4B113L4B113K4B113J

4B113I

4B

3H 4B113G 4B113F 4B113E 4B113D 4B113C

4B113 4B113A

4B113B

4B112

4B111

4B110 4B109

4B108

4B107

4B106

4B105

4B104

4B1034B102 4B100

4B101

4A1534A152

4A154

4A151

4A150

4A149

4A148 4A147A

4A147

4A146

4A145A

4A145

4A136

4A144

4A143

4A142

4A142A4A141A

4A141

OFFICEOFFICE

OFFICE

BLOOD BANK

H.A.C.

ELECTRICAL

CLOSET

STORAGE

BREAK ROOM

OFFICE

OFFICE

OFFICE

A.F.B./ FUNGUS

STORAGE

SEROLOGY

FILING

OFFICE

TOILET TOILET

OFFICE

WAITING

URINALYSIS

PHLEBOTOMY

OFFICE

EMS

STORAGE

TELE/DATA

CLOSET

DINING/RECREATION

STORAGE

H.A.C.

TOILET

MALE

TOILET

FEMALE

ELECTRICAL

CLOSET

PATIENT ROOM

1 BED

PATIENT ROOM

1 BED

NURSE STATIONPATIENT ROOM

1 BED

PATIENT ROOM

1 BED

PATIENT ROOM

1 BED

PATIENT ROOM

1 BED

PATIENT ROOM

1 BED

FAMILY ROOM

ELECTRICAL

CLOSET

PATIENT ROOM

2 BED STORAGE

O₂ STORAGE

ELEC.

TOILET

COPIER

TOILET

MALE

TOILET

FEMALE

CONFERENCE ROOM

OFFICE

UROLOGY

CONFERENCE

UROLOGY

STORAGE

UROLOGY

OFFICE/EXAM

UROLOGY

OFFICE

HBPC

ULTRASOUND EXAM

RADIOLOGY

QUIET ROOM PATIENT ROOM

2 BEDS

PATIENT ROOM

PATIENT ROOM

1 BED

PATIENT ROOM

2 BEDS

ELEC.

PATIENT ROOM

1 BED

PATIENT ROOM

1 BED

PATIENT ROOM

1 BED

VACANT

KITCHEN

OFFICE

SOCIAL WORK

PATIENT ROOM

1 BED

PATIENT ROOM

1 BED

PATIENT ROOM

1 BED

EL

EC

PATIENT ROOM

2 BEDS

TOILET

FEMALE

TOILET MALE

PATIENT ROOM

2 BEDS

PATIENT ROOM

1 BED

OFFICE

NURSE MANAGER

4F103

TOILET

MALE

OFFICE

MIREOC

OFFICE

CLC OFFICE OFFICE

GERIATRICS

OFFICE

HOSPICE

OFFICE

GERIATRICS OFFICE OFFICE

CLC

OFFICE OFFICE OFFICE

OFFICE

PALLIATIVE

CARE

OFFICE

GERIATRICS

MEDICATION

ROOM

4A132B

PSYCHOLOGY

WAITING

4G100

FAMILY RESTROOM

4G102

OFFICE

4G103

OFFICE

4G104

OFFICE

4G105

STOR.

4G106

ELECT.

4G107

TELE/DATA

ROOM

4G108A

BREAK

4G108

H.A.C.

4G110 OFFICE

4G112

COMPUTER TESTING

4G101

OFFICE

4G109

OFFICE

4G111

RECEPTION

4G100A

OFFICE

4G137

OFFICE

4G138

OFFICE

4G139

ST

OR

AG

E

4G

ST

OR

AG

E

4G

BIO-FEEDBACK

ROOM

4G113

OFFICE

4G134

OFFICE

4G140

CONFERENCE

ROOM

4G141

4A

CLIENT SERVICES

MICROBIOLOGY

ELECTRICAL

CLOSET

STORAGE

STORAGE

OFFICE

OFFICE MOLECULAR

PATHOLOGY

MOLECULAR

PATHOLOGY

TOILET

MALE

LOCKER ROOM

MALE

LOCKER ROOM

FEMALE

TOILET

FEMALE

H.A.C.

OFFICEBREAK ROOMSTORAGE

OFFICE

HISTOLOGY

LABORATORY

CYTOLOGY

SCREENING LAB

TOILET/

SHOWER

TOILET/

SHOWER

ELECTRICAL

EL

EC

EL

EC

TELE/

DATA

4A107B

TOILET/

SHOWER

TOILET/

SHOWER

TOILET/

SHOWER

TOILET/

SHOWER

TOILET/

SHOWER

TOILET/

SHOWER

TOILET/

SHOWER

TOILET/

SHOWER

MEDICATION

PREPTOILET/

SHOWER

SUPPLY

STORAGE

TOILET/

SHOWER

OFFICE

NURSE EDUCATION

TOILET/

SHOWER

TOILET/

SHOWER

4A135

STOR.TOILET/

SHOWER

TOILET/

SHOWER

TOILET/

SHOWER

CLEAN

LINEN

TOILET/

SHOWER

TOILET/

SHOWER

TOILET/

SHOWER

STORAGE

EM

S

ST

OR

AG

E

STORAGE H.A.C.

SIGN ROOM/

STORAGE

LACTATION

ROOM H.A.C.

WAITINGMAIL

ROOM

STOR.

TE

LE

EL

EC

TR

IC

AL

CL

OS

ET OFFICE

HBPC

OFFICE

HBPC

OFFICE

HBPC

OFFICE

HBPC

OFFICE

HBPC

OFFICE

HBPC

WAITING

UROLOGY

OFFICE

PHARMACY

GERIATRICS

OFFICE VOC REHAB

4E107A4E107B

TE

LE

/D

AT

A

EL

EC

TR

IC

AL

4F102

REFRIGERATOR

WALK-IN

4B113I1

STORAGE

4B113Q1

O₂

STO

PHLEBOTOMY

AREA SERVED BY AHU-14, LOCATED IN 3F101

03/26/2021 DD MR

M-140

FOURTH FLOOR AHU 14 ZONES

VEG 20.13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

635-20-102

921 NE 13TH ST OKLAHOMA CITY, OK 73104

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: REPLACE AIR HANDLERS 4, 7, 14,

AND FCU

KEY PLAN

NO SCALE

B

D

8 G

HW

C

5 18

Tr ue

N or th

E

A

F

100% CONSTRUCTION

DOCUMENTS

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

FOURTH FLOOR AHU 14 ZONES

Pl an

N or th Tr ue N or th

STAIR 6

CH

AS

E

CH

AS

E

CHASE

CH

AS

E

CHASE

ELEVATOR

P-8

C1

A

D

C

B

2 3 65 7 8

E

F

G

H

B1

A1

656 SF

9 S

F

0 S

F 100 SF

6 S

F

2F142

2F107b

PATIENT

HOLDING

TOILET

PATIENT PHLEBOTOMYDRESSING

ROOM

SPS

STORAGE

BONE

DENSITOMETRY

EMS

STORAGE

MRI #1

MRI

EQUIP

CONTROL

MRI

#2

ELECTRICAL

EQUIPMENT

PATIENT

HOLDING

EQUIPMENT

EQUIPMENT

CONTROL

WORK AREA

SCRUB

ROOM

H.A.C.

IR STORAGE FILES

SPS

STORAGE

TOILET

OFFICE

PHYSICIAN

OFFICEOFFICEOFFICE

OFFICE

PHYSICIAN

STAFFRADIOLOGY P.A.C.U.

TOILET

PATIENT

WAITING

HOLDING

ROOM

TOILET

TOILET

80 SLICE CT WORKROOM

64 SLICE CT

TOILETTOILET

TOILET TOILET

FLUOROSCOPY

CONTROL

X-RAY X-RAY

READING ROOM

EXPEDITE

DESKELECTRIC

PROCESSING ALCOVEH.A.C.

OFFICE

X-RAY

FERROUS

QUARRANTINE

FLUOROSCOPY

2F135

CONTROL

X-RAYX-RAY

READING ROOM

2F126

2F125

2F125c

2F153b

PATIENT CHECK-IN

ULTRASOUND

2F124b

TOILET

2F124b1

TOILET

2F124a1

ULTRASOUND

2F124a

TOILET

MALE

2F125b

TOILET

FEMALE

2F125a

ST

OR

AG

E

2F

4c

2F138

80 SLICE CT

2F113a

2F112

2F133

2F134

2F108a

2F108

2F109

2F110

2F110a

2F111

2F116

2F1117b 2F117c

2F117

2F117a

2F117e

2F117d

2F118

2F119

2F121d

2F121f 2F121g 2F121h 2F121i 2F121j

2F121k

2F121l C7 2F

2F121c

2F121b 2F121a

2F121

2F132

2F139

2F102g 2F102f2F106

2F105

2F102

2F102a2F102b

2F101

2F1412F1402F144

2F1452F144a

2F1462F147a

2F147

2F150

2F151

2F154

2F152 2F153

2F153a

2F127

2F128 2F1292F129a2F130

CONTROL

EQUIPMENT

2F111a

MRI

EQUIPMENT

INTERVENTIONAL

RADIOLOGY

INTERVENTIONAL

RADIOLOGY

SOILED

UTILITY

PATIENT

HOLDING

RECEPTION/CHECK IN

TOILET TOILET

DRESSING

ROOM

DRESSING

ROOM

DRESSING

ROOM

DRESSING

ROOM

2F102e 2F102d 2F102c

OFFICE

RN

2F105a

COMPUTER

ROOM2F107c

TOILET

MALE

TOILET

FEMALE

LOCKER

ROOM

2F151a

OFFICE

C2F 1

C2 F

C2F 5

C2 F

C2F 7

C2 F

C2F 10

C2F 15

C2 F

1108 SF

9 S

F

IV ROOM

2F125d

1200CFM

1624CD"B" 10"x10"

T

12"Ø

10"Ø

12"Ø

8"Ø

6" Ø

8" Ø

8"Ø

8"Ø

8"Ø

10"Ø

8"Ø

12"Ø 14"Ø

"Ø

10"Ø

8"Ø

12" x12

" 10" Ø

10" Ø10"Ø

10"Ø

10"Ø

8"Ø

"Ø

8" Ø

8" Ø

22"Ø SA

UP

18x10

12x10 x1

12"Ø

6" Ø

7" Ø

25" x 12"

8"Ø

8"Ø

6"Ø

14"Ø

28"Ø

(AG-13)

FD

SD

x1

TYP 8 44x20

(AC-13)

SD

24x10

(AC-2)

VAV 6

25" x 12"

VAV VAV

VAV

VAV

VAV

4VAV

VAV

VAV

EX.

FCU

24"x12"

455 CFM

"x

8"

20"x10"

16"x14" 20"x16"

10"x12" 18"x10"

14x8

"x

8"

"x

8"

FD

365 CFM

6"Ø

12"Ø

2F120

532 7641

H

G

H1

03/26/2021 DD MR

MH123

SECOND FLOOR HVAC PLAN 3

(AHU 7)

VEG 20.13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

635-20-102

921 NE 13TH ST OKLAHOMA CITY, OK 73104

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: REPLACE AIR HANDLERS 4, 7, 14,

AND FCU

KEY PLAN

NO SCALE

B

D

8 G

HW

C

5 18

Tr ue

N or th

E

A

F

100% CONSTRUCTION

DOCUMENTS

SCALE:

2' 4' 8' 16' 32'

1/8" = 1'-0"

SECOND FLOOR HVAC PLAN 3 (AHU 7)

Pl an

N or th Tr ue N or th

1. AFTER TEST AND BALANCE REPORT IS COMPLETE, VERIFY AIR

DIFFUSERS IN BORDERED AREA IS PRODUCING INDICATED CFMs.

KEY NOTES: -

A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND

REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING

WITH WORK.

B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND

ROOF STRUCTURE.

C. REFER TO M-001 AND M-002 FOR ADDITIONAL GENERAL NOTES AND

SYMBOLS.

GENERAL MECHANICAL NOTES:

SE

CT

F

SE

CT

E

SE

CT

F

SE

CT

A

SE

CT

F

SE

CT

A

SE

CT

F

SE

CT

E

SE

CT

F

SE

CT

A

SE

CT

F

SOILED

LINEN

ELECTRICAL

CLOSET

MECHANICAL

EQUIPMENT

ROOM

3F102 3F103

3F100

3F101

3F101a

ELECTRICAL

CLOSET

CLEAN

LINEN

TELE/DATA

3F101b

AHU-7

AHU-17

AHU-14

5 TON 2 TON

2 TON

5 TON

AFM-11

18x16 R/A28x24 R/A 12"x12" E/A

30x14 R/A

10x10

HR

N o.

x

E

XH

. U P x2

0 E

XH

x1

10x10 x

E

XH

x1

8 E /A

"x

" E

/A x1

38x24RISE28x2448x20

12"x18"

12x12 10x10

29x15 22x7

27x15

26"x36"

30"x20"

EXHAUST

FAN

EF-43

8"Ø

DOWN

EF-23

COIL

AM

F

CO

IL

8" Ø

EF

-4 x7

40"X18"

UP TO HOODS

& FIRE DAMPER

IN FLOOR

UP TO

HOOD

HD 1

40x18

8X8 x7

E /A

UP27x15 E/A 7x22 E/A

17x17 EXH x2

E/

A

22x7 E/A

"x

" 6

"x

" O

/A x2

0 O /A x3

30x24 R/A

DAMPER

60x26 R.A.44x26 R.A.

x2

6 R .A x2 0 R

.A x

R

.A

AC

3)

"x

28"x15" 36"x15" 40"x15"

36"x15"

36x15 24"x15"

22" Ø

24" Ø

10"Ø

24"x20" S/A

28"Ø DN

16"Ø

28"Ø

UP

"Ø

10"Ø

O. A. PLENUM

AFM-17

28"Ø

22"Ø

96x20 O.A.

AFM-16

28"Ø39x14"

22"Ø DOWN 18"Ø

"Ø

"Ø

"Ø

AFM

22" Ø

"Ø

"Ø

AFM-14AFM-18

AFM-18

34" Ø

66" x16

38" x28

"Ø

P

36" Ø

34" Ø

"x

22"x15"

24"X15"

24"X15"

22"x15" 30"x14"

22"X15" 26"X13"

26"X13" 13"x18"

M

M

13"x18"

RETURN AIR DAMPER

26x14 S.A.

26x14 SA

DOWN TO

CATH LAB

6"Ø

M RF-7A 26x14 R.A.

26x14 R.A.

26x14 R.A.

6"Ø EA UP

FROM 1ST FLOOR

7x

8"Ø

EF-21

EXHAUST

FAN

EF-42

MOTORIZED DAMPER

FD

UP

FROM

2F110a

FD

FD

FD

MAXIMUM

OUTSIDE AIR

DAMPER

MINIMUM

OUTSIDE AIR

DAMPER M

FD

FD

72 x 108

MOTOR

OPERATED

DAMPERS 96x20 O.A.

FROM

HOOD

HD-36

M

32x12 x1 x1

10x10

26x28"

FD

FDFD

FD

FD

O/A DAMPER

PF-14

PH-14

SF-14

CC-14

HM-14

PH

-7

CC

-7

FAN

AF

-7

HM

-7

PF

-7

EF-7B

EF-7

18"Ø

14"Ø

C1

A

D

C

B

E

F

G

H

B1

A1

4 11a2 3 65 7 81

D

F

E

03/26/2021 DD MR

MH131

THIRD FLOOR HVAC PLAN (AHU 7

AND 14)

VEG 20.13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

635-20-102

921 NE 13TH ST OKLAHOMA CITY, OK 73104

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: REPLACE AIR HANDLERS 4, 7, 14,

AND FCU

KEY PLAN

NO SCALE

B

D

8 G

HW

C

5 18

Tr ue

N or th

E

A

F

100% CONSTRUCTION

DOCUMENTS

SCALE:

2' 4' 8' 16' 32'

1/8" = 1'-0"

THIRD FLOOR HVAC PLAN (AHU 7 AND 14)

Pl an

N or th Tr ue N or th

1. AHU-7 PROVIDE ACCESS DOORS ON BOTH SIDES OF THE AHU.

2. AHU-14 PROVIDE ACCESS DOORS ON BOTH SIDES OF THE AHU

3. PROVIDE 18"Ø SA DUCT UP TO 4TH FLOOR. PROVIDE FIRE DAMPER AT

FLOOR PENETRATION.

4. PROVIDE 14"Ø SA DUCT UP TO 4TH FLOOR. PROVIDE FIRE DAMPER AT

FLOOR PENETRATION.

5. ROUTE SUPPLY AIR DUCTWORK FROM UNIT TO AHU-7 OR AHU-14

DEPENDING ON THE PHASE OF WORK. UNIT SHOWN ON THIS PLAN

FOR REFERENCE; HOWEVER, THIS UNIT IS LOCATED EXTERIOR TO

THE BUILDING ON GRADE. SEE TEMP AHU SCHEDULE FOR MORE

INFORMATION.

6. ENGAGE LICENSED AND SITE-APPROVED FIRE ALARM CONTRACTOR

TO CONNECT AHU FACTORY SMOKE DETECTOR TO FIRE ALARM

SYSTEM FOR MONITORING. BAS CONTRACTOR SHALL MONITOR

STATUS IN BAS PER M700 SERIES SHEETS.

7. PROVIDE NEW SMOKE DAMPERS IN AHU-14 OUTLETS PER NFPA90A.

8. ENGAGE BAS AND TAB CONTRACTORS TO REBALANCE AND

REPROGRAM RELIEF FAN VFD PER M-700 SERIES SHEETS.

9. MECHANICAL CONTRACTOR SHALL SURVEY AND MEASURE THE

MECHANICAL SPACE AND OPENINGS IN ADVANCE OF THE SUBMITTAL

PHASE TO DETERMINE REQUIRED AHU SHIPPING SPLITS TO FIT INTO

THE SPACE. COORDINATE THESE REQUIREMENTS WITH THE

MANUFACTURER. PROVIDE CONFIRMATION OF THIS PRIOR

COORDINATION WITH THE AHU SUBMITTALS. REFER TO

SPECIFICATION 23 73 00 FOR FURTHER AHU ASSEMBLY AND

DISASSEMBLY REQUIREMENTS.

KEY NOTES: -

A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND

REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING

WITH WORK.

B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND

ROOF STRUCTURE.

C. REFER TO M-001 AND M-002 FOR ADDITIONAL GENERAL NOTES AND

SYMBOLS.

GENERAL MECHANICAL NOTES:

TEMP

AHU-7/14

M-504

M -504

"x

7"

"x

8"

8"x8" EXH

"X

6"

"B",12"X12"

"X

F.D.

10"x4"

"Ø

"B",24"X24"

"B",24"X24

"x

7"

"x

7"

"x 7"

24"x8"

HD-3

"B",12"X12"

F.D.

48"X16"

DOWN

HD

-1

"x

"x

8"

40"X18"

DOWN

40"X18"

F.D.

F.D.

"B",24"X24" 32"x14"

12"Ø

LAB HOOD

8" Ø

12"x10" "B",12"X12"

12"x8"

12"x8"

HD-2"B",12"X12"

8"Ø

48"x16"

"x

"B",12"X12" 12"x8"

"x

"B",12"X12"

"x

8"

"B",24"X24"

24"x8"

"B", 24"X24"

8" Ø 24"x12"

"B",24"X24"

12"Ø

"B",24"X24"

12"Ø

12"Ø

24"x14"

"B",24"X24" 24"X12"

"x

B,24"X24"

AFM-1 40"x12"

24"x12"

"x

"x

HD-4 14"Ø

12" Ø

"B",24"X24" 24"x12"

"x

8"

"x

14"Ø

28"Ø

DOWN

14" Ø

P

"A"2414, 730 CFM

135 CFM

350 CFM

"A",2410, 10"Ø

"A",2410, 350 CFM

24"x18"

225 CFM

"A",2412, 450 CFM

10"Ø

"A"2414, 500 CFM

8"Ø 14"x10"

14"Ø

"A"2408, P

"A",2410, 225 CFM

6" Ø

6"Ø

6"Ø

VA

V

6" Ø

"Ø

14"Ø

250 CFM

"A",2408, 8"Ø

"x

8" "A",2414, 150 CFM

"A"2408, "A",2414, 740 CFM

"Ø

24"x18"

"Ø

740 CFM

"A",2414, "A"2408, 150 CFM

12"x10"

740 CFM

"A",2414, "A"2414, 730 CFM

14"Ø

450 CFM

"A",2414, "A",2414, 450 CFM

8" Ø

570 CFM

"A",2414, 570 CFM

"A",2414, 570 CFM

"A",2414, 10"Ø

22"x16" "A",2414, 14"Ø

700 CFM

14"Ø

"A",2414, 700 CFM

24"x18"

"Ø

"A",2414, "Ø

"Ø

740 CFM

"A",2414, "Ø

740 CFM

570 CFM

"A",2414,14

"Ø

"Ø

570 CFM

"A",2414, 740 CFM

"A",2414, 570 CFM

"A",2414, "Ø

"Ø

570 CFM

"A",2414, 570 CFM

"A",2414,14

"Ø

"Ø

"Ø

"Ø

"x

" 14"Ø

"A",2414, 570 CFM

12"Ø

"Ø

12"Ø

14"x10"

8" Ø

14"x

"A",2410, 300 CFM

"x

10"Ø

8"x5"

WALL. 18" OFF FLOOR

8"x5" DUCT DOWN THE

250 CFM

300 CFM

"A",2410, 16"x16"

F.D.

"Ø

8"Ø

10"Ø

"A"2414, 500 CFM

"A"2414, 500 CFM

500 CFM

16"x14"

40"x18"Ø 38"x14"Ø

"Ø

7"Ø

"x

6"Ø

"x

6"Ø

20"x14"

"x

"Ø

"x

12"Ø

10"Ø

"Ø

28"x14"Ø 22"x14"Ø

14"Ø

"Ø

8"Ø

8"Ø

8"Ø

8" Ø

8"Ø

8"Ø

"A",2414, 700 CFM

"A",2414,700 CFM

"A",2414, 700 CFM

ACCESS

PANEL

"B", 24"X24"

ACCESS

PANEL

VALVE

(TYPICAL)

8"Ø

DOWN

8"Ø

1000 CFM

"S1",2416

1000 CFM

"S1",2416

"x

VAV-1

2000 CFM

14"Ø

NC

"x

18"Ø

REFRIGERATOR

WALK-IN

DIRTY

STORAGE

CL

EA

N

ST

OR

AG

E

4F115C

4F115C1

OFFICE

SPECIMEN

ACCESSION

OFFICE MICROBIOLOGY

A.F.B./FUNGUS ISOLATION

OFFICE

BLOOD BANK

H.A.C.

ELECTRICAL

CLOSET

STORAGE

BREAK ROOM

OFFICE

OFFICE

OFFICE

A.F.B./

FUNGUS

STORAGE

SEROLOGY

FILING

TOILET

TOILET

OFFICE

WAITING

PHLEBOTOMY

OFFICE

EMS

STORAGE

TELE/DATA

CLOSET

4F105E

4F114

4F115A

4F105D

4F105C

4F115B

4F115B1

4F105B

4F149

4F150

4F151

4F100

4F102A

4F103 4F104

4F101

4F107

4F106

4F148

4F108

4F110

4F109 4F111

4F

24F112A 4F112B

4F113

4F115

CLIENT SERVICES

MICRO-

BIOLOGY

4F102

PHLEBOTOMY

506 SF 296 SF

5 S

F

1 S F

8 S

F C4

F

C4F 2

C4 F

C4F 4

C4 F

C4F 12 C4F 13

C4 F

C4F 15

590 SF

3 S

F

315 SF

234 SF

CHEMISTRY HEMATOLOGY

LABORATORY

OFFICE

URINALYSIS

4F105A

4F105

STAIR 8

ELEVATOR

P-9

ELEVATOR

P-10

ELEVATOR

P-7

ELEVATOR

P-8

SEE SHEET MH142

I

E

F

G

H

42 3 65 7 8

8 9a9 118a

532 764

119 10

03/26/2021 DD MR

MH141

FOURTH FLOOR HVAC PLAN 1

(AHU 14)

SCALE:

2' 4' 8' 16' 32'

1/8" = 1'-0"

FOURTH FLOOR HVAC PLAN 1 (AHU 14)

Pl an

N or th Tr ue N or th

1. BALANCE EXISTING VAV AND DIFFUSERS FOR NEW CFM TOTALS

2. PROVIDE NEW DUCTWORK FROM 3RD FLOOR INTO NEW CHASE AND

UP TO 4TH FLOOR CEILING SPACE. REFER TO ARCHITECTURAL

DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

WORK MUST BE COORDINATED WITH VHA COR 2 WEEKS PRIOR TO

START AND MUST BE DONE DURING NIGHTS OR WEEKEND.

3. PROVIDE VAV-1, MAX 2000 CFM, MIN 500 CFM, HEATING 500 CFM, .5"

INLET PRESSURE, NO REHEAT COIL, BASIS OF DESIGN JCI TSS-14.

REFERENCE SPECIFICATION 23 36 00 FOR REQUIRED INFORMATION.

KEY NOTES: -

A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND

REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING

WITH WORK.

B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND

ROOF STRUCTURE.

C. REFER TO M-001 AND M-002 FOR ADDITIONAL GENERAL NOTES AND

SYMBOLS.

GENERAL MECHANICAL NOTES:

VEG 20.13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

635-20-102

921 NE 13TH ST OKLAHOMA CITY, OK 73104

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: REPLACE AIR HANDLERS 4, 7, 14,

AND FCU

KEY PLAN

NO SCALE

B

D

8 G

HW

C

5 18

Tr ue

N or th

E

A

F

100% CONSTRUCTION

DOCUMENTS

"X

6"

"B",12"X12"

"X

12"

"Ø

"B",12"X

"B",24"X24

B,24"X24" 24"X8"

"x

7"8" Ø 24"x12"

"B",24"X24"

12"Ø 12"Ø

1500 CFM

8"Ø

"B",24"X24"

14"X10" "B"-14"X14"

HD-10

"x

8"

8"Ø 24"x10"

PRESSURE

EXH. FAN

STATIC

SENSOR

P

8" Ø12"x6"

"x

16"X8"

HD-9

B,24"X24"

34"x16" 30"x14"

"X

20"x12" 12"Ø

8"Ø

"Ø

HD-11

"B",24"X24"

730 CFM

"A"2414, 14"Ø

"Ø

"A"2414, 730 CFM

12"Ø

12"Ø "A",2412, 350 CFM

350 CFM

"A",2412, 12"Ø "A",2412, 350 CFM

"x

12"Ø

350 CFM

"A",2412, "x

"A",2410, 300 CFM

450 CFM

"A",2414, 14"x10"

500 CFM

"A",2414, "x

"A",2414, 500 CFM

400 CFM

"A"2412, 400 CFM

"A"2412,16

"X

"Ø

"Ø 14"Ø

24"x16"Ø

14"Ø

"A"2412, 20"x16"

400 CFM

"A"2412, "Ø

16"x12"

"A",2414, 600 CFM

12"Ø 8"Ø

10"Ø

10"x12"

"A",2410, 250 CFM

500 CFM

"x

300 CFM

"A",2410, 300 CFM

"A",2410, 10"Ø

300 CFM

"A",2410, "A",2410, 10"Ø

300 CFM

"x

"x

" 10"Ø

Ø

14"Ø

400 CFM14"Ø 14"Ø

12"x6"

B, 24"X24"

"B", 24"X24"

DIRTY

CL

EA

N

ST

OR

AG

E

LAB

PATHOLOGY OFFICE

RESIDENT'S OFFICE

LABORATORY

HISTOLOGY

CONFERENCE ROOM

DIRECTOR

Q.F.I.A./

FLOW OFFICE

CYTOTECH

PREP LAB CYTOLOGY

OFFICE

SLIDE & BLOCK FILES

RESIDENT'S

LABORATORY

OFFICE PATHOLOGIST OFFICE

PATHOLOGIST

OFFICEOFFICE

OFFICE

H.A.C.

4F144

4F143

4F142 4F141a

4F141 4F1404F1394F1384F117a

4F129

4F130 4F131

4F132

4F133

4F134

4F135

4F136 4F137

4F117

4F147

4F148

4F127 4F128

4F126 4F125

4F124

4F110

4F123

4F122

4F121

4F120 4F1194F1164F116A

4F115D

4F115

MICRO-

BIOLOGY

ELECTRICAL

CLOSET

STORAGE

STORAGE

MOLECULAR

PATHOLOGY

MOLECULAR

PATHOLOGY

TOILET

MALE

LOCKER

ROOM

MALE

LOCKER

ROOM

FEMALE

TOILET

FEMALE

H.A.C.

OFFICEBREAK ROOMSTORAGE OFFICE HISTOLOGY

LABORATORY

CYTOLOGY

SCREENING LAB

REFRIGERATOR

WALK-IN

STAIR 6 ELEVATOR

P11

SEE SHEET MH141

CYTOLOGY

IMAGE

ANALYSIS

LABORATORY

OFFICE

PATHOLOGIST

OFFICE

4F118

110 SF

OFFICE

4F120a

114 SF

532 7641

42 3 65 7 81

C1

A

D

C

B

B1

A1

8 9a98a

03/26/2021 DD MR

MH142

FOURTH FLOOR HVAC PLAN 2

(AHU 14)

VEG 20.13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

635-20-102

921 NE 13TH ST OKLAHOMA CITY, OK 73104

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: REPLACE AIR HANDLERS 4, 7, 14,

AND FCU

KEY PLAN

NO SCALE

B

D

8 G

HW

C

5 18

Tr ue

N or th

E

A

F

100% CONSTRUCTION

DOCUMENTS

SCALE:

2' 4' 8' 16' 32'

1/8" = 1'-0"

FOURTH FLOOR HVAC PLAN 2 (AHU 14)

Pl an

N or th Tr ue N or th

1. NO NEW WORK IN THIS AREA. BALANCE AREAS SERVED BY AHU

AFTER REPLACEMENT.

KEY NOTES: -

A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND

REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING

WITH WORK.

B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND

ROOF STRUCTURE.

C. REFER TO M-001 AND M-002 FOR ADDITIONAL GENERAL NOTES AND

SYMBOLS.

GENERAL MECHANICAL NOTES:

1 1

SOILED

LINEN

ELECTRICAL

CLOSET

MECHANICAL

EQUIPMENT

ROOM

3F102 3F103

3F100

3F101

3F101a

SOCIAL WORK

SOCIAL WORK

ELECTRICAL

CLOSET

CLEAN

LINEN

TELE/DATA

3F101b

AHU-7

RE

TU

RN

F

AN

EX

B

MX

B

HW

C

OI

L

PL

EN

UM

CH

ILL

ED

W

AT

ER

CO

IL

SU

PP

LY

F

AN

PL

EN

UM

AF

TE

R

FI

LT

ER

AHU-17

AHU'S 5 TON

AHU-14

AF-9

CO

OL

IN

G

CO

IL

FI

NA

L F

ILT

ER

IN

TA

KE

P

LE

NU

M w/

P

RE

FI

LT

ER

ST

EA

M

HU

MI

DI

FI

ER

PR

EH

EA

T

CO

IL

AC

-7

A

SU

PP

LY

FA

N

MPR MP

G H

R G

H S

G H

S

MPR MPR

GHR GHR

GHS GHS GHS

M

PR

M

PR

M

PR

GHR GHRGHS GHS GHS GHS

CHS

C H

R C

H R

CHS

CHR

C H

S C

H R

CHR

CHS

CHS CHS CHSCHS CHS CHS

HWHWR

HWS

H W

R H

W R

G H

S G

H S

G H

S G

H R

G H

RHWR HWRCHS

HWR

CHR

C H

S C

H S

C H

S

G H

R G

H R

G H

S G

H S

G H

S

C H

R

RISER UP

RISER DOWN

2"

2"

2"

1 2"

2"1 2" 11

2"

2"

5" 3"

PUMP

HR-14

C H

S

2"

H W

S 2" 2"

C H

R

HWS

CHS CHS

1 2"

11 4"

4"

HWR HWR

1 2"

H W

R

2"

UP TO 4th FL

11 4"

4"

CHR

UP TO

4th

FLOOR

DOWN

FROM

4th

FLOOR

UP TO

4th FLR

UP TO

4th

FLOOR

DOWN

FROM

4th

FLOOR

2-1/2" 2-1/2"

C1

A

D

C

B

E

F

G

H

B1

A1

4 11a2 3 65 7 81

D

F

E

03/26/2021 DD MR

MP131

THIRD FLOOR MECHANICAL PIPING

PLAN (AHU 7 AND 14)

VEG 20.13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

635-20-102

921 NE 13TH ST OKLAHOMA CITY, OK 73104

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: REPLACE AIR HANDLERS 4, 7, 14,

AND FCU

KEY PLAN

NO SCALE

B

D

8 G

HW

C

5 18

Tr ue

N or th

E

A

F

100% CONSTRUCTION

DOCUMENTS

SCALE:

2' 4' 8' 16' 32'

1/8" = 1'-0"

THIRD FLOOR MECHANICAL PIPING PLAN (AHU 7 AND 14)

Pl an

N or th Tr ue N or th

1. PROVIDE RUN AROUND HEAT RECOVERY SYSTEM TO INCLUDE PIPING,

PUMP AND GLYCOL UNIT.

2. RECONNECT NEW PIPING TO EXISTING RUNAROUND COILS IN

EXHAUST DUCT.

KEY NOTES: -

A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND

REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING

WITH WORK.

B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND

ROOF STRUCTURE.

C. REFER TO M-001 AND M-002 FOR ADDITIONAL GENERAL NOTES AND

SYMBOLS.

GENERAL MECHANICAL NOTES:

MP132

M-504

M -504

CHR

HWS HWS

HWR HWR

H W

S H

W S

H W

S H

W S

C H

S

CHS CHS CHS CHS CHS CHS

HWS HWS HWS HWS HWS

H W

R H

W R

CHR

CHS

CHS CHS

HWR HWR

HWR

HWS

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

S H

W S

H W

S

G H

S G

H S

G H

S G

H S

G H

S G

H S

G H

S G

H S

G H

S G

H S

G H

R G

H R

G H

R G

H R

G H

R G

H R

HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR

CHS CHS CHS CHS CHS CHS CHS CHS CHS CHS

HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR

CHR CHR CHR

HWS HWS HWS HWS

CHS CHS

CHS

CHR

HWS

C H

S C

H S

C H

S

HWS

HWR

H W

R H

W R

C H

R

C H

S

C H

R

C H

S C

H S

CHR

CHR CHR CHR CHR CHR CHR CHR CHR CHR CHR

C H

S

HWS

C H

R

HWS HWS

CHS CHS CHS CHS

HWR HWR HWR

CHR

HWR

HWSHWS

CHRCHR

C H

R

CHSCHS

C H

S

H W

R

2"LPS, 1"LPR

03/26/2021 DD MR

MP132

MECHANICAL PIPING ENLARGEMENT

PLAN (AHU 7 AND 14)

VEG 20.13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

635-20-102

921 NE 13TH ST OKLAHOMA CITY, OK 73104

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: REPLACE AIR HANDLERS 4, 7, 14,

AND FCU

KEY PLAN

NO SCALE

B

D

8 G

HW

C

5 18

Tr ue

N or th

E

A

F

100% CONSTRUCTION

DOCUMENTS

SCALE: 1/2" = 1'-0"

6" 1' 2' 4' 8'0

AHU-7 AND AHU-14 MECHANICAL PIPING ENLARGEMENT PLAN

Pl an

N or th Tr ue N or th

1. EXTEND 2" CWS & CWR TO NEW AHU-7 COOLING COIL. REFER TO COIL

CONNECTION DETAILS ON M500 SHEET SERIES.

2. EXTEND 1-1/2" LPS & 3/4" LPR TO NEW AHU-7 HEATING COIL. REFER TO

COIL CONNECTION DETAILS ON M500 SHEET SERIES.

3. EXTEND 3/4" LPS, 3/4" LPR & 3/4" DCW TO NEW AHU-7 STEAM

GENERATOR AND HUMIDIFIER COIL. REFER TO COIL CONNECTION

DETAILS ON M500 SHEET SERIES.

4. EXTEND 5" CWS & CWR TO NEW AHU-14 COOLING COIL. REFER TO

COIL CONNECTION DETAILS ON M500 SHEET SERIES.

5. EXTEND 3" HWS & HWR TO NEW AHU-14 HEATING COIL. REFER TO COIL

CONNECTION DETAILS ON M500 SHEET SERIES.

6. EXTEND 1-1/4" LPS, 3/4" LPR & 3/4" DCW TO NEW AHU-14 HUMIDIFIER.

REFER TO COIL CONNECTION DETAILS ON M500 SHEET SERIES.

7. EXTEND 2-1/2" RUNAROUND LOOP PIPING TO NEW AHU-14 HEAT

RECOVERY COIL. PROVIDE COIL ACCESSORIES PER M500 SHEET

SERIES AHU COIL CONNECTION DETAILS, LESS CONTROL VALVE.

KEY NOTES: -

A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND

REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING

WITH WORK.

B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND

ROOF STRUCTURE.

C. REFER TO M-001 AND M-002 FOR ADDITIONAL GENERAL NOTES AND

SYMBOLS.

GENERAL MECHANICAL NOTES:

REF: 1/MP131 FOR PIPING CONTINUATIONS

IN MECHANICAL SPACE, TYP.

AHU-7

AHU-14

M-504

M -504

CSHX-7

CSHX-14

MOTOR, SINGLE-PHASE

MOTOR, THREE-PHASE

TRANSFORMER

WYE CONNECTION

PULL BOX

ELECTRICAL SYMBOLS - DIAGRAM

JUNCTION BOX

TRANSFORMER, PLAN

BRANCH CIRCUIT HOMERUN. LINES INDICATE NUMBER OF

CIRCUITS,NEUTRAL, AND SWITCH LEG CONDUCTORS. ONE

SEPARATE GREEN GROUNDING CONDUCTOR SHALL BE

PROVIDED FOR EACH HOMERUN; NOT SHOWN

PANELBOARD CABINET, FLUSH MOUNTED

PANELBOARD CABINET, SURFACE MOUNTED

RECEPTACLE, DUPLEX (MOUNT 18"AFF.)

RECEPTACLE, DUPLEX ON EMERGENCY POWER

(MOUNT 18" AFF. UNLESS NOTED OTHERWISE)

RECEPTACLE, QUADRAPLEX

FUSE WITH RATING

NORMALLY CLOSED RELAY CONTACT

NORMALLY OPEN RELAY CONTACT

MOLDED CASE CIRCUIT BREAKER

LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

SWITCH AND FUSE UNIT

FUSIBLE LINK

VARIABLE FREQUENCY DRIVE

DISCONNECT SWITCH, FUSED

DISCONNECT SWITCH, UNFUSED, VAV

ELECTRICAL SYMBOLS - POWER PLAN

VFD

T

J

PB

GROUNDING BAR

NEUT OR N

NC

NEUTRAL

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NS NO SCALE

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OL OVERLOAD

P POLE

PA PUBLIC ADDRESS

PB PULL BOX OR PANEL BOARD

PBPU PREFABRICATED BEDSIDE PATIENT UNIT

PCB POLYCHLORINATED BIPHENYL

PEC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PNL PANEL

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER

RCP REFLECTED CEILING PLAN

REC RECESSED

RECPT RECEPTACLE

REQ REQUIRED

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

SCC SHORT CIRCUIT CAPACITY

SES SERVICE ENTRANCE SECTION

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SPEC SPECIFICATION

SPST SINGLE POLE, SINGLE THROW

SURF SURFACE

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TEL TELEPHONE

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UFD UNDERFLOOR DUCT

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

V VOLT

VAR VOLT·AMPERE REACTIVE

VAV VARIABLE AIR VOLUME BOX

VFD VARIABLE FREQUENCY DRIVE

VOLT VOLTAGE

W WATT

WH WATER HEATER

WP WEATHERPROOF

XFER TRANSFER

XFMR TRANSFORMER

DRSW DOOR SWITCH

DS DISCONNECT SWITCH

DWG DRAWING

EL ELEVATION

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

EMCP EMERGENCY MONITORING CONTROL PANEL

EMER EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPO EMERGENCY POWER OFF

EPRF EXPLOSION PROOF

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXST EXISTING

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FABL FIRE ALARM BELL

FABX FIRE ALARM BOX

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FCU FAN COIL UNIT

FLA FULL LOAD AMPS

FLEX FLEXIBLE METALLIC CONDUIT

FLT FLOODLIGHT

FLUOR FLUORESCENT

FLUOR

FIX

FLUORESCENT FIXTURE

FOUTT TELEPHONE FLOOR OUTLET

FP FIRE PROTECTION

FT FEET OR FOOT

FU SW FUSED SWITCH

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

G OR GND ELECTRICAL GROUND

GEN GENERATOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GTB GROUND TERMINAL BOX

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HZ HERTZ

IESNA ILLUMINATION ENGINEERING SOCIETY OF

NORTH AMERICA

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

IR INFRARED

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT AMPERE

KVAH KILOVOLT AMPERE PER HOUR

KVAR KILOVOLT AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

KWHM KILOWATT HOUR METER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LM LUMEN

LP LIGHT POLE

LPS LOW PRESSURE SODIUM

LRA LOCKED ROTOR AMPS

LT LIGHT

LTG LIGHTING

LTG PNL LIGHTING PANEL

LTNG LIGHTNING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MC METAL-CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MG MOTOR GENERATOR

MH MANHOLE

MIN MINIMUM

MLO MAIN LUGS ONLY

MOCP MAXIMUM OVERCURRENT PROTECTION

MT MOUNT

MTD MOUNTED

MTG MOUNTING

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

MVA MEGAVOLT·AMPERE

MW MEGAWATT

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

SINGLE POLE

1PH SINGLE PHASE

2/C TWO-CONDUCTOR

3/C THREE-CONDUCTOR

3PH THREE PHASE

4/C FOUR-CONDUCTOR

4W FOUR WIRE

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT / ENGINEER

AAP ALARM ANNUNCIATOR PANEL

AC ALTERNATING CURRENT OR ARMORED

CABLE

ACC ACCESSIBLE

ADDL ADDITIONAL

ADJ ADJACENT OR ADJOINING

ADO AUTOMATIC DOOR OPENER

AMPERE FRAME OR AMP FUSE

AFC ABOVE FINISHED COUNTER, AUTOMATIC

FREQUENCY CONTROL, OR AVAILABLE

FAULT CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AH AMPERE·HOUR

AHJ AUTHORITY HAVING JURISDICTION

AIC AMPERE INTERRUPTING CAPACITY

ALT ALTERNATE

AMB OR A AMBIENT

AMP AMPERE

ARCH ARCHITECT

ASC AMPS SHORT CIRCUIT

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AV AUDIO VISUAL

BAT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISHED FLOOR

BIL BASIC INSULATION LEVEL

BLDG BUILDING

BPIP BOILER PLANT INSTRUMENTATION PANEL

BRKR BREAKER

BYP BYPASS

CONDUIT

CAB CABINET

CALC CALCULATE

CAP CAPACITY

CAT CATALOG

CATV COMMUNITY ANTENNA TELEVISION

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

CD CANDELA OR CONSTRUCTION DOCUMENTS

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED / CONTRACTOR

INSTALLED

CF/OI CONTRACTOR FURNISHED / OWNER

INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CKT CIRCUIT

CKT

BRKR

CIRCUIT BREAKER

CLF CURRENT LIMITING FUSE

CLG CEILING

CMU CONCRETE MASONRY UNIT

COAX COAX CABLE

COMM COMMUNICATION

COMPT COMPARTMENT

CONC CONCRETE

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CPT CONTROL POWER TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CU COPPER

CU FT CUBIC FEET

CUR CURRENT

DB DECIBEL

DC DIRECT CURRENT

DCP DIMMER CONTROL PANEL

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DIAG DIAGRAM

DISC DISCONNECT

DISTR DISTRIBUTION

DISTR

PNL

DISTRIBUTION PANEL

DMR SW DIMMER SWITCH

DN DOWN

DPDT DOUBLE POLE, DOUBLE THROW

NORMALLY CLOSED

1P

AF

C

ELECTRICAL ABBREVIATIONS ELECTRICAL ABBREVIATIONS ELECTRICAL ABBREVIATIONS ELECTRICAL GENERAL NOTES:

A. ALL FINAL LOCATIONS AND ARRANGEMENTS OF LIGHTING FIXTURES SHALL BE

OBTAINED FROM THE ARCHITECTURAL REFLECTED CEILING PLAN, AS REQUIRED.

B. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH

BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT

GROUNDING CONDUCTOR.

C. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND

NORMAL BRANCH WIRING DEVICES SHALL HAVE DIVIDERS BETWEEN DEVICES.

D. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR THE LOCATION OF CEILING

AND WALL MOUNTED DEVICES, AS REQUIRED.

E. ALL WIRING SHALL BE SIZED AT MINIMUM (3)#12 THWN/THHN COPPER 3/4C" UNLESS

OTHERWISE NOTED.

F. MINIMUM SIZE CONDUIT FOR CONTROL CIRCUITS SHALL BE 3/4".

G. CORE DRILL AND SAW CUT, AS REQUIRED, FOR FLOOR AND WALL PENETRATIONS. SEAL

REMAINING ANULUS WITH FIRE CAULK.

H. FURNISH ACCESS DOORS FOR INSTALLATION BY GENERAL CONTRACTOR IN WALLS

AND CEILINGS WHERE ACCESS IS REQUIRED TO CONCEALED ELECTRICAL BOXES AND

DEVICES.

I. ARMORED CABLE (AC) MAY BE USED FOR LAY-IN FIXTURE PIGTAILS. ARMORED CABLE

(AC) SHALL NOT BE USED FOR BRANCH CIRCUIT HOMERUNS. ARMORED CABLE (AC)

SHALL NOT BE USED WHERE MORE THAN THREE CONDUCTORS

(PHASE/NEUTRAL/GROUND) ARE REQUIRED, WHERE EXPOSED; OR IN LENGTHS

EXCEEDING 20 FEET EXCEPT FOR TEMPORARY WIRING.

J. COORDINATE ALL OUTAGES WITH VHA COR PER SPECS PRIOR TO WORK BEING DONE.

K. ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED A DISCONNECT AT THE EQUIPMENT

FOR SAFE MAINTENANCE. REFER TO MANUFACTURER'S INSTRUCTIONS FOR

INSTALLATION OF DISCONNECT WHEN UNIT IS NOT PROVIDED WITH ONE.

L. CONTRACTOR TO FOLLOW MANUFACTURER'S RECOMMENDATIONS WHEN TESTING

LOADS ON EXISTING PANELS.

M. PROVIDE BREAKERS THAT MATCH EXISTING PANEL TYPE AND MANUFACTURER.

N. REFER TO MECHANICAL CONTROLS SHEETS AND SPECIFICATIONS FOR ADDITIONAL

CONTROLS INFORMATION.

A. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES,

CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY CUT/CAP

CONDUITS AT THE AREA OF WORK PERIMETER AND REMOVE CONDUIT WITHIN THE

WORK AREA, DISCONNECT WIRING AT THE OVERCURRENT PROTECTIVE DEVICE AND

REMOVE WIRING COMPLETELY FROM THE ABANDONED CONDUITS.

B. DISCONNECT AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .