VA HVAC Controls Upgrade - Phase 2D Technical Specifications
This document is a partial submittal of technical design drawings for HVAC controls upgrade at VA Medical Center in Wilmington, Delaware, specifically addressing second floor HVAC equipment installations. The project is being executed by Bob Smith Contractors under the Department of Veterans Affairs, with engineering oversight by Hatch Mott Macdonald.
The submittal contains detailed control system specifications for five air handling units (AHU for Canteen, AHU for Nuclear Medicine, AHU-3, AHU-4, and AHU-6), two variable air volume (VAV) box control systems serving 52 terminal units across the second floor clinical addition and east wing, and chiller controls for the operating room. Each AHU drawing package includes unit control diagrams, controller wiring schematics using Johnson DDC controllers (FEC2611, IOM47-1, and IOM47-2 series), and detailed sequences of operations. The control systems incorporate temperature sensors, humidity sensors, damper and valve controls, supply and return fan speed management, freeze protection protocols, and emergency shutdown procedures coordinated with fire alarm systems. All pneumatic control devices have been replaced with electronic equivalents, and new control valves have been furnished by Modern Controls. VAV boxes feature velocity probe-based damper modulation for space temperature control in both heating and cooling modes. The chiller control system manages condenser water and chilled water pump operations with integrated alarms and status monitoring through the building management system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL AND CONTROL SYSTEMS
Environmental Control System
Building Automation System
PROJECT
ARCHITECT
ENGINEER
CONTRACTOR
211-1009
DATE CONTRACT NUMBER
IW/BM
APPLICATION ENGINEER
12/30/11IW/JA
PROJECT MANAGER
IW
SALES ENGINEER
REFERENCE DRAWING
NO. REVISION-LOCATION ECN DATE BY
Automatic Temperature Controls
Heating
Air Conditioning
Air Filters
Water Treatment
Coil Cleaning
Contract Operations
Time-Shared Automated Building Service
Refrigeration
Industrial Controls / Recording / Indication Equipment
Air and Water Systems Balancing
Instrumentation System Installation
Building Operations Management
Energy Conservation Control
Custom Programmed Maintenance
VA MEDICAL CENTER
HVAC CONTROLS UPGRADE - PHASE 2D
WILMINGTON, DELAWARE
HATCH MOTT MACDONALD
27 BLEEKER ST.
MILLBURN, NJ 07041
BOB SMITH CONTRACTORS
281 EAST EVERGREEN ST.
WEST GROVE, PA 19390
DEPT. OF VETERANS AFFAIRS
1601 KIRKWOOD HIGHWAY
WILMINGTON, DE 19805
VA HVAC CONTROLS UPGRADE - PHASE 2D
(PARTIAL SUBMITTAL - INCLUDES 2ND FLOOR HVAC EQUIPMENT)
PAGE # DRAWING TITLE LAST REVISION
TP-1 TITLE PAGE 01/28/14
C-1A AIR HANDLING UNIT CONTROL – AHU FOR CANTEEN 12/06/13
C-1B CONTROLLER WIRING DETAIL – AHU FOR CANTEEN 12/06/13
C-1C SEQUENCE OF OPERATIONS – AHU FOR CANTEEN 12/06/13
C-2A AIR HANDLING UNIT CONTROL – AHU FOR NUCLEAR MEDICINE 12/20/13
C-2B CONTROLLER WIRING DETAIL – AHU FOR NUCLEAR MEDICINE 12/20/13
C-2C SEQUENCE OF OPERATIONS – AHU FOR NUCLEAR MEDICINE 12/06/13
C-3A AIR HANDLING UNIT CONTROL – AHU-3 (MER 2147) 12/06/13
C-3B CONTROLLER WIRING DETAIL – AHU-3 (MER 2147) 12/06/13
C-3C SEQUENCE OF OPERATIONS – AHU-3 (MER 2147) 12/06/13
C-4A AIR HANDLING UNIT CONTROL – AHU-4 (MER 2147) 12/06/13
C-4B SEQUENCE OF OPERATIONS – AHU-4 (MER 2147) 12/06/13
C-4C SEQUENCE OF OPERATIONS – AHU-4 (MER 2147) 12/06/13
C-5A AIR HANDLING UNIT CONTROL – AHU-6 (2ND FLOOR ROOF) 12/06/13
C-5B CONTROLLER WIRING DETAIL – AHU-6 (2ND FLOOR ROOF) 12/06/13
C-5C SEQUENCE OF OPERATIONS – AHU-6 (2ND FLOOR ROOF) 12/06/13
C-6A TYPICAL VAV BOX CONTROL; 2ND FLOOR CLINICAL ADDITION 12/06/13
C-6B TYPICAL VAV BOX CONTROL; 2ND FLOOR EAST 12/06/13
C-7 CHILLER FOR O.R. CONTROL 12/20/13
SUB. REVISION TITLE DATES1 12/13/11 VD
AS-BUILT REV. DRAWING TITLE/DATES2 12/06/13 BM
AS-BUILT REV. ADD/REMV. DWG./ REV. DATE3 12/20/13 DB
3 4
AS-BUILT REV. ADD ‘MASTER’ NOTE4 01/28/14 DB
NOTE(S): REFER TO ‘MASTER BUILDING NETWORK ARCHITECTURE DRAWING’
PROVIDED IN OUR ATC AS-BUILT / O&M MANUAL BINDER FOR ALL
SUPERVISORY CONTROLLER INFORMATION AND ASSOCIATED IP
ADDRESSES USED BY MODERN CONTROLS.
REFER TO ‘MASTER BUILDING VALVE SCHEDULE’ PROVIDED IN OUR
ATC AS-BUILT / O&M MANUAL BINDER FOR A COMPLETE LIST OF ALL
CONTROL VALVES PROVIDED FOR AIR HANDLING UNITS AND
ASSOCIATED VAV BOXES.
IW/BMIW/JAIW BM 12/30/11
C-1C
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
CONTRACT NUMBER
DRAWING NUMBER
Drawing Title
SEQUENCE OF OPERATIONS -
AHU FOR CANTEEN
(2ND FLOOR ROOF)
Project Title
VA HVAC CONTROLS UPGRADE -
PHASE 2D
WILMINGTON, DELAWARE
SEQUENCE OF OPERATIONS - AHU FOR CANTEEN (2ND FLOOR ROOF)
AHU FOR CANTEEEN (2nd FLOOR ROOF) - SEQUENCE OF OPERATION
1. GENERAL
UNIT IS NORMALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT THE BMS. H-O-A SWITCH SHALL BE KEPT IN THE ‘AUTO’ POSITION. ‘HAND’ AND
‘OFF’ POSITIONS SHALL BE USED FOR MAINTENANCE ONLY. WHEN THE UNIT IS ‘OFF’ D-1 SHALL BE CLOSED. WHEN THE UNIT IS ‘ON’ D-1 SHALL BE FULLY
OPENED.
2. TEMPERATURE CONTROL
SPACE TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATING V-1 AND V-2 IN SEQUENCE.
3. AIR FLOW CONTROL
THE SUPPLY FAN SHALL RUN AT CONSTANT SPEED PROVIDING CONSTANT AIR FLOW.
4. HUMIDITY CONTROL
WHEN THE DCP IS NOT CALLING FOR HUMIDIFICATION SENSED BY RETURN AIR SENSOR H-2, TWO-WAY “ON-OFF” CONTROL VALVE V-3 SHALL REMAIN
CLOSED. WHEN THE DCP IS CALLING FOR HUMIDIFICATION, V-3 SHALL OPEN.
RETURN AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT SENSED BY H-2 VIA DCP BY MODULATING CONTROL VALVE V-4 TO MAINTAIN THE DESIRED
HUMIDITY. THE DCP SHALL OVERRIDE THE CONTROL TO MAINTAIN HUMIDITY IN SUPPLY DUCT BELOW 80% AS SENSED BY H-1. DCP SHALL CLOSE VALVE
V-3 WHENEVER THE SUPPLY FAN IS OFF. VALVE V-4 SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL
CONDENSATE TEMPERATURE APPROACHES STEAM TEMPERATURE.
5. FREEZE PROTECTION
IF THE AIR TEMPERATURE SENSED BY T-3 FALLS BELOW 45°F AN ALARM SIGNAL SHALL INDICATE AT THE DCP AND BMS. IF THIS TEMPERATURE FALLS
BELOW 40°F THE SUPPLY FAN SHALL SHUT DOWN, THE DAMPER D-1 SHALL CLOSE AND A CRITICAL ALARM SHALL INDICATE AT THE DCP AND BMS.
6. EMERGENCY SHUTDOWN/RESTART
WHEN SMOKE IS DETECTED BY THE DUCT MOUNTED SMOKE DETECTOR THE SUPPLY FAN STOPS AND THE ALARM SIGNAL IS TRANSMITTED TO THE FIRE
ALARM SYSTEM, DAMPERS D-1 AND D-2 SHALL CLOSE. SUPPLY FAN SHALL RESTART AND THE DAMPERS OPEN WHEN THE FIRE ALARM CIRCUIT IS
MANUALLY RESET.
AS-BUILT REV. NEW DWG. 1 12/6/13 BM
C-2C
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
CONTRACT NUMBER
DRAWING NUMBER
Drawing Title
SEQUENCE OF OPERATIONS -
AHU FOR NUCLEAR MEDICINE
Project Title
VA HVAC CONTROLS UPGRADE -
PHASE 2D
WILMINGTON, DELAWARE
SEQUENCE OF OPERATIONS – AHU FOR NUCLEAR MEDICINE
AHU FOR NUCLEAR MED. - SEQUENCE OF OPERATION
1. GENERAL
UNIT IS NORMALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT THE BMS. H-O-A SWITCH SHALL BE KEPT IN THE “AUTO” POSITION. “HAND” AND
“OFF” POSITIONS SHALL BE USED FOR MAINTENANCE ONLY. WHEN THE UNIT IS “OFF” D-1 SHALL BE CLOSED. WHEN THE UNIT IS “ON” D-1 SHALL BE FULLY
OPENED.
2. TEMPERATURE CONTROL
SPACE TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATING V-1 AND V-2 IN SEQUENCE.
3. AIR FLOW CONTROL
THE SUPPLY FAN SHALL RUN AT CONSTANT SPEED PROVIDING CONSTANT AIR FLOW.
4. HUMIDITY CONTROL
WHEN THE DCP IS NOT CALLING FOR HUMIDIFICATION SENSED BY HUMIDISTAT H-1, TWO-WAY “ON-OFF” CONTROL VALVE V-3 SHALL REMAIN CLOSED.
WHEN THE DCP IS CALLING FOR HUMIDIFICATION, V-3 SHALL OPEN.
RETURN AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT SENSED BY H-1 VIA DCP BY MODULATING CONTROL VALVE V-4 TO MAINTAIN THE DESIRED
HUMIDITY. THE DCP SHALL OVERRIDE THE CONTROL TO MAINTAIN HUMIDITY IN SUPPLY DUCT BELOW 80% AS SENSED BY H-2. DCP SHALL CLOSE VALVE
V-3 WHENEVER THE SUPPLY FAN IS OFF. VALVE V-4 SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL
CONDENSATE TEMPERATURE APPROACHES STEAM TEMPERATURE.
5. FREEZE PROTECTION
IF THE AIR TEMPERATURE SENSED BY T-2 FALLS BELOW 45°F AN ALARM SIGNAL SHALL INDICATE AT THE DCP AND BMS. IF THIS TEMPERATURE FALLS
BELOW 40°F THE SUPPLY FAN SHALL SHUT DOWN, THE DAMPER D-1 SHALL CLOSE AND A CRITICAL ALARM SHALL INDICATE AT THE DCP AND BMS.
6. EMERGENCY SHUTDOWN/RESTART
WHEN SMOKE IS DETECTED BY THE DUCT MOUNTED SMOKE DETECTOR THE SUPPLY FAN STOPS AND THE ALARM SIGNAL IS TRANSMITTED TO THE FIRE
ALARM SYSTEM, DAMPERS D-1 AND D-2 SHALL CLOSE. SUPPLY AND RETURN FANS SHALL RESTART AND THE DAMPERS OPEN WHEN THE FIRE ALARM
CIRCUIT IS MANUALLY RESET.
AS-BUILT REV. NEW DWG.1 12/6/13 BM
REFERENCE DRAWING NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
ONTRACT NUMBER
RAWING NUMBER
Drawing Title
Project Title
C-3C
VA HVAC CONTROLS UPGRADE -
PHASE 2D
WILMINGTON, DELAWARE
SEQUENCE OF OPERATIONS -
AHU-3 (MER 2147)
SEQUENCE OF OPERATIONS – AHU-3 (MER 2147)
AHU-3 (MER 2147) SEQUENCE OF OPERATION
1. GENERAL
UNIT AHU-3 AND RETURN FAN RF-6 ARE NORMALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT THE BMS. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS
SHALL BE USED FOR MAINTENANCE ONLY. WHEN THE UNIT IS "OFF" D-1, D-2 AND D-3 SHALL BE CLOSED. WHEN THE UNIT IS "ON" D-1, D-2 AND D-3 SHALL BE OPEN
2. TEMPERATURE CONTROL
SUPPLY AIR TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATING EITHER V-1 AND V-2 OR D-1, D-2 AND D-3 IN SEQUENCE.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR PROVIDED BY BMS IS ABOVE 65°F DCP PREVENTS MODULATION OF D-1 AND D-2; D-1 ASSUMES MINIMUM OUTSIDE AIR POSITION AND D-2 IS OPENED. V-2
MODULATES TO MAINTAIN SUPPLY AIR TEMPERATURE SENSED BY T-1.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR PROVIDED BY BMS IS BETWEEN 65°F AND THE SUPPLY AIR TEMPERATURE SENSED BY T-1 DAMPER D-2 IS CLOSED, DAMPER D-1 IS OPEN TO MAXIMUM
OUTSIDE AIR POSITION AND D-3 IS FULLY OPENED. V-1 MODULATES TO MAINTAIN THE SUPPLY AIR TEMPERATURE SENSED BY T-1.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR PROVIDED BY BMS IS BELOW THE SUPPLY AIR TEMPERATURE SENSED BY T-1 THEN DAMPERS D-1, D-2 AND D-3 MODULATE TO MAINTAIN THE SCHEDULED
SUPPLY AIR TEMPERATURE. IF D-2 IS OPENED AND D-1 IS CLOSED TO MINIMUM OUTSIDE AIR. V-1 MODULATES TO MAINTAIN THE SUPPLY AIR TEMPERATURE.
3. AIR FLOW CONTROL
THE SUPPLY AIR FLOW IS CONTROLLED BY DCP MODULATING SUPPLY FAN VARIABLE SPEED MOTOR CONTROLLER (VSMC) TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT AS SENSED BY SPS-1.
THE DCP BY USING TOTAL SUPPLY AIR AND RETURN AIR FLOW SIGNALS SHALL RESET THE RETURN AIR FAN VSMC TO MAINTAIN A CONSTANT CFM DIFFERENCE BETWEEN THE SUPPLY AIR FAN CFM AND THE
RETURN AIR FAN CFM.
THE DCCP USING HIGH STATIC PRESSURE SENSOR SPS-2 LOCATED AT THE SUPPLY FAN DISCHARGE SHALL PREVENT THE SUPPLY FAN FROM DEVELOPING OVER 3” OF STATIC PRESSURE (FIELD
ADJUSTABLE). IF STATIC PRESSURE AT SPS-2 EXCEEDS 3” THE SUPPLY AND RETURN FANS SHALL STOP AND THE ALARM SIGNAL SHALL INDICATE ON DCP AND BMS.
4. HUMIDITY CONTROL
WHEN THE DCP IS NOT CALLING FOR HUMIDIFICATION SENSED BY RETURN AIR HUMIDISTAT H-1, THE TWO-WAY “ON-OFF” CONTROL VALVE V-3 SHALL REMAIN CLOSED. WHEN THE DCP IS CALLING THE
HUMIDIFICATION, V-3 SHALL OPEN.
RETURN AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT VIA DCP OR MODULATING CONTROL VALVE V-4 TO MAINTAIN THE DESIRED HUMIDITY. THE DCP SHALL OVERRIDE THE CONTROL TO MAINTAIN
HUMIDITY IN SUPPLY DUCT BELOW 80% AS SENSED BY H-2.
DCP SHALL CLOSE VALVE V-3 WHENEVER THE SUPPLY FAN IS OFF.
VALVE V-4 SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM TEMPERATURE.
5. FREEZE PROTECTION
IF THE AIR TEMPERATURE SENSED BY T-3 FALLS BELOW 45°F AN ALARM SIGNAL SHALL INDICATE AT THE DCP AND BMS. IF THIS TEMPERATURE FALLS BELOW 40°F THE SUPPLY AND RETURN FANS SHALL
SHUT DOWN, DAMPER D-1 SHALL CLOSE AND A CRITICAL ALARM SHALL INDICATE AT THE DCP AND BMS.
6. EMERGENCY SHUTDOWN/RESTART
WHEN SMOKE IS DETECTED BY THE DUCT MOUNTED SMOKE DETECTOR THE SUPPLY AND RETURN FANS SHALL STOP AND THE ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM.
DAMPERS D-1, D-2 AND D-3 SHALL CLOSE. SUPPLY AND RETURN FANS SHALL RESTART AND THE DAMPERS SHALL OPEN WHEN THE FIRE ALARM CIRCUIT IS MANUALLY RESET.
7. EMERGENCY CONSTANT SPEED OPERATION
UPON FAILURE OF THE VSMC THE SUPPLY AND RETURN FANS SHALL BE STARTED/STOPPED MANUALLY AT THE DCP OR THE BMS THROUGH THE BYPASS STARTER. FANS SHALL THEN OPERATE AT
CONSTANT SPEED.
AS-BUILT REV. NEW DWG. / POINT TERM.1 12/6/13 BM
C-4C
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
ONTRACT NUMBER
RAWING NUMBER
Drawing Title
SEQUENCE OF OPERATIONS -
AHU-4 (MER 2147)
Project Title
VA HVAC CONTROLS UPGRADE -
PHASE 2D
WILMINGTON, DELAWARE
SEQUENCE OF OPERATIONS – AHU-4 (MER 2147)
(ASSOCIATED WITH AHU-1 MER 245)
AHU-1 (MER 245) AND AHU-4 (MER 2147) - SEQUENCE OF OPERATION
1. GENERAL
UNITS ARE NORMALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT THE BMS. H-O-A SWITCH SHALL BE KEPT IN THE “AUTO” POSITION. “HAND” AND “OFF”
POSITIONS SHALL BE USED FOR MAINTENANCE ONLY. WHEN THE UNITS ARE “OFF” D-1 SHALL BE CLOSED. WHEN THE UNITS ARE “ON” D-1 SHALL BE FULLY OPEN.
2. TEMPERATURE CONTROL
SUPPLY AIR TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATING V-1 AND V-2 IN SEQUENCE.
PUMP 1-P7 RUNS WHEN OUTDOOR AIR TEMPERATURE AT T-1 IS BELOW 45°F AND ABOVE 80°F. PUMP IS OFF WHEN OUTDOOR AIR TEMPERATURE IS BETWEEN 46°F AND
79°F.
3. AIR FLOW CONTROL
THE SUPPLY FAN SHALL RUN AT CONSTANT SPEED PROVIDING CONSTANT AIR FLOW.
4. HUMIDITY CONTROL
WHEN THE DCP IS NOT CALLING FOR HUMIDIFICATION (BASED ON HUMIDITY SENSED BY THE EXHAUST BY THE EXHAUST AIR HUMIDISTAT H-1), THE TWO-WAY “ON-OFF”
CONTROL VALVE V-3 SHALL REMAIN CLOSED. WHEN THE DCP IS CALLING FOR HUMIDIFICATIN, V-3 SHALL OPEN.
EXHAUST AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATING CONTROL VALVE V-4 TO MAINTAIN THE DESIRED HUMIDITY. THE DCP SHALL
OVERRIDE THE CONTROL TO MAINTAIN HUMIDITY IN SUPPLY DUCT BELOW 80% AS SENSED BY H-2.
DCP SHALL CLOSE VALVE V-3 WHENEVER THE SUPPLY FAN IS OFF.
VALVE V-4 SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM
TEMPERATURE.
5. FREEZE PROTECTION
IF THE AIR TEMPERATURE SENSED BY T-2 FALLS BELOW 45°F AN ALARM SIGNAL SHALL INDICATE AT THE DCP AND BMS. IF THIS TEMPERATURE FALLS BELOW 40°F THE
SUPPLY FAN SHALL SHUT DOWN, D-1 SHALL CLOSE AND A CRITICAL ALARM SHALL INDICATE AT THE DCP AND BMS.
6. EMERGENCY SHUTDOWN/RESTART
WHEN SMOKE IS DETECTED BY THE DUCT MOUNTED SMOKE DETECTOR THE SUPPLY FAN SHALL SHUT OFF AND AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE
ALARM SYSTEM, DAMPER D-1 SHALL CLOSE, EXHAUST FAN SERVICING AREAS OF THE SUPPLY FAN SHALL CONTINUE TO RUN.
SUPPLY FAN RESTARTS AND DAMPER D-1 OPENS WHEN THE FIRE ALARM CIRCUIT IS MANUALLY RESET.
AS-BUILT REV. NEW DWG. 1 12/6/13 BM
SEE CONTROL DRAWING C-1A/1B IN PHASE-2E FOR
ASSOCIATED AIR HANDLING UNIT ‘AHU-1 (MER 245) & AHU-4
(MER 2147)’ CONTROL. THESE (2) UNITS ARE IN SEPARATE
MECHANICAL ROOMS BUT OPERATE TOGETHER PER THIS
SEQUENCE OF OPERATIONS.
THE SAME CONTROL DRAWING IS REFERENCED ON C-4A/4B
FOR ASSOCIATED AIR HANDLING UNIT ‘AHU-4 (MER 2147)’ IN
PHASE-2D.
NOTE(S):1
C-5C
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
VA HVAC CONTROLS UPGRADE -
PHASE 2D
WILMINGTON, DELAWARE
Drawing Title
SEQUENCE OF OPERATIONS -
AHU-6 (2ND FLOOR ROOF)
Project Title
SEQUENCE OF OPERATIONS – AHU-6 (2ND FLOOR ROOF)
AHU-6 (2ND FLOOR ROOF ) SEQUENCE OF OPERATION
1. GENERAL
SUPPLY AND RETURN FANS ARE NORMALLY STARTED AND STOPPEED BY THE DECP OR REMOTELY AT THE BMS. H-O-A SWITCH SHALL BE KEPT IN THE “AUTO” POSITION. “HAND” AND “OFF” POSITIONS SHALL
BE USED FOR MAINTENANCE ONLY. WHEN THE UNIT IS “OFF” D-1, D-2 AND D-3 SHALL BE CLOSED. WHEN THE UNIT IS “ON” D-1, D-2 AND D-3 SHALL BE OPENED.
2. TEMPERATURE CONTROL
SUPPLY AIR TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATING EITHER V-1 AND V-2 OR D-1, D-2 AND D-3 IN SEQUENCE.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR PROVIDED BY BMS IS ABOVE 65°F DCP PREVENTS MODULATION OF D-1 AND D-2; D-1 ASSUMES MINIMUM OUTSIDE AIR POSITION AND D-2 IS OPENED. V-2
MODULATES TO MAINTAIN SUPPLY AIR TEMPERATURE SENSED BY T-1.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR PROVIDED BY BMS IS BETWEEN 65°F AND THE SUPPLY AIR TEMPERATURE SENSED BY T-1 DAMPER D-2 IS CLOSED AND DAMPERS D-1 AND D-3 ARE OPEN
(MAXIMUM OUTSIDE AIR POSITION). V-2 MODULATES TO MAINTAIN THE SUPPLY AIR TEMPERATURE SENSED BY T-1.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR PROVIDED BY BMS IS BETWEEN 65°F AND THE SUPPLY AIR TEMPERATURE SENSED BY T-1 DAMPER D-2 IS CLOSED AND DAMPERS D-1 AND D-3 ARE OPEN
(MAXIMUM OUTSIDE AIR POSITION). V-2 MODULATES TO MAINTAIN THE SUPPLY AIR TEMPERATURE SENSED BY T-1.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR PROVIDED BY BMS IS BELOW THE SUPPLY AIR TEMPERATURE SENSED BY T-1 THEN DAMPERS D-1, D-2 AND D-3 MODULATE TO MAINTAIN THE SCHEDULED
SUPPLY AIR TEMPERATURE. IF D-2 IS OPENED AND D-1 IS CLOSED TO MINIMUM OUTSIDE AIR. V-1 MODULATES TO MAINTAIN THE SUPPLY AIR TEMPERATURE.
3. AIR FLOW CONTROL
THE SUPPLY AIR FLOW IS CONTROLLED BY DCP MODULATING SUPPLY FAN VARIABLE SPEED MOTOR CONTROLLER (VSMC) TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT AS SENSED BY SPS-1.
THE DCP BY USING TOTAL SUPPLY AIR AND RETURN AIR FLOW SIGNALS SHALL RESET THE RETURN AIR FAN VSMC TO MAINTAIN A CONSTANT CFM DIFFERENCE BETWEEN THE SUPPLY AIR FAN CFM AND THE
RETURN AIR FAN CFM.
THE DCCP USING HIGH STATIC PRESSURE SENSOR SPS-2 LOCATED AT THE SUPPLY FAN DISCHARGE SHALL PREVENT THE SUPPLY FAN FROM DEVELOPING OVER 3” OF STATIC PRESSURE (FIELD
ADJUSTABLE). IF STATIC PRESSURE AT SPS-2 EXCEEDS 3” THE SUPPLY AND RETURN FANS SHALL STOP AND THE ALARM SIGNAL SHALL INDICATE ON DCP AND BMS.
4. HUMIDITY CONTROL
WHEN THE DCP IS NOT CALLING FOR HUMIDIFICATION SENSED BY RETURN AIR HUMIDISTAT H-1, THE TWO-WAY “ON-OFF” CONTROL VALVE V-3 SHALL REMAIN CLOSED. WHEN THE DCP IS CALLING THE
HUMIDIFICATION, V-3 SHALL OPEN.
RETURN AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT VIA DCP OR MODULATING CONTROL VALVE V-4 TO MAINTAIN THE DESIRED HUMIDITY. THE DCP SHALL OVERRIDE THE CONTROL TO MAINTAIN
HUMIDITY IN SUPPLY DUCT BELOW 80% AS SENSED BY H-2.
DCP SHALL CLOSE VALVE V-3 WHENEVER THE SUPPLY FAN IS OFF.
VALVE V-4 SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM TEMPERATURE.
5. FREEZE PROTECTION
IF THE AIR TEMPERATURE SENSED BY T-3 FALLS BELOW 45°F AN ALARM SIGNAL SHALL INDICATE AT THE DCP AND BMS. IF THIS TEMPERATURE FALLS BELOW 40°F THE SUPPLY AND RETURN FANS SHALL
SHUT DOWN, DAMPER D-1 SHALL CLOSE AND A CRITICAL ALARM SHALL INDICATE AT THE DCP AND BMS.
6. EMERGENCY SHUTDOWN/RESTART
WHEN SMOKE IS DETECTED BY THE DUCT MOUNTED SMOKE DETECTOR THE SUPPLY AND RETURN FANS SHALL STOP AND THE ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM.
DAMPERS D-1, D-2 AND D-3 SHALL CLOSE. SUPPLY AND RETURN FANS SHALL RESTART AND THE DAMPERS SHALL OPEN WHEN THE FIRE ALARM CIRCUIT IS MANUALLY RESET.
7. EMERGENCY CONSTANT SPEED OPERATION
UPON FAILURE OF THE VSMC THE SUPPLY AND RETURN FANS SHALL BE STARTED/STOPPED MANUALLY AT THE DCP OR THE BMS THROUGH THE BYPASS STARTER. FANS SHALL THEN OPERATE AT
CONSTANT SPEED.
AS-BUILT REV. NEW DWG.1 12/6/13 DB