VA HVAC Controls Upgrade - Phase 2A Technical Drawings Summary
This document comprises a comprehensive set of technical control drawings and specifications for the VA Medical Center HVAC Controls Upgrade project in Wilmington, Delaware. The package is a partial submittal covering the 4th Floor East and West HVAC equipment systems and includes detailed control schematics, wiring diagrams, sequence of operations, and VAV box control configurations for two air handling units (AHUs).
The technical drawings specify Johnson DDC controllers (FEC2611, IOM4711-1, IOM4711-2) integrated with Modern Controls building automation systems to manage supply and return air temperature, humidity, air flow, and freeze protection across both floor sections. The AHU control systems employ variable speed motor controllers (VSMC) for fan modulation, pneumatic dampers for outdoor/return air mixing, and electronic control valves for heating coil modulation. Key operational requirements include maintaining 180°F supply water temperature via booster heater, modulating supply air temperature at set point through damper and valve sequencing based on outdoor air conditions (above 65°F, between 65°F and setpoint, and below setpoint), humidity control via standalone electric humidifiers with BMS override capability, and emergency shutdown procedures triggered by duct-mounted smoke detectors. The VAV box schedules indicate 25 boxes on the 4th Floor West and 24 boxes on the 4th Floor East, each equipped with velocity probes and serving between 50-450 CFM. Freeze protection activates alarm signals at 45°F and shuts down the supply fan at 40°F. All construction notes reference replacement of pneumatic control devices with new electronic controls and integration into existing building network architecture per the master building network documentation provided separately.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL AND CONTROL SYSTEMS
Environmental Control System
Building Automation System
VA MEDICAL CENTER
HVAC CONTROLS UPGRADE - PHASE 2A
WILMINGTON, DELAWARE
PROJECT
OWNER
ENGINEER
CONTRACTOR
211-1009IW/BM 3/7/11IW/BMIW
REFERENCE DRAWING
SUB. REVISION TITLE AND DATE REVS.1 4/20/11 BM
NO. REVISION-LOCATION ECN DATE BY
SUB. REVISION REVISION DATES2 5/10/11 BM
SUB. REVISION ADDED DWG. C-3; HX3 8/8/11 BM
Automatic Temperature Controls
Heating
Air Conditioning
Air Filters
Water Treatment
Coil Cleaning
Contract Operations
Time-Shared Automated Building Service
Refrigeration
Industrial Controls / Recording / Indication Equipment
Air and Water Systems Balancing
Instrumentation System Installation
Building Operations Management
Energy Conservation Control
Custom Programmed Maintenance
HATCH MOTT MACDONALD
27 BLEEKER ST.
MILLBURN, NJ 07041
BOB SMITH CONTRACTORS
281 EAST EVERGREEN ST.
WEST GROVE, PA 19390
DEPT. OF VETERANS AFFAIRS
1601 KIRKWOOD HIGHWAY
WILMINGTON, DE 19805
PAGE # DRAWING TITLE LAST REVISION
TP-1 TITLE PAGE 01/28/14
C-1A AIR HANDLING UNIT CONTROL – AHU FOR 4TH FLOOR WEST 12/02/13
C-1B CONTROLLER WIRING DETAIL – AHU FOR 4TH FLOOR WEST 12/02/13
C-1C AHU FOR 4TH FLOOR WEST – SEQUENCE OF OPERATIONS 12/02/13
C-1D AHU FOR 4TH FLOOR WEST – VAV BOX CONTROLS 12/02/13
C-2A AIR HANDLING UNIT CONTROL – AHU FOR 4TH FLOOR EAST 12/02/13
C-2B CONTROLLER WIRING DETAIL – AHU FOR 4TH EAST 12/02/13
C-2C AHU FOR 4TH FLOOR EAST – SEQUENCE OF OPERATIONS 12/02/13
C-2D AHU FOR 4TH FLOOR EAST – VAV BOX CONTROLS 12/02/13
C-3 HEAT EXCHANGER CONTROL; 4TH FLOOR MECH. ROOM 12/02/13
1 2 3
VA HVAC CONTROLS UPGRADE - PHASE 2A
(PARTIAL SUBMITTAL - 4TH FLOOR EAST & WEST HVAC EQUIPMENT) 4
AS-BUILT REV. FINAL AS-BUILT DATES4 12/20/13 BM
NOTE(S): REFER TO ‘MASTER BUILDING NETWORK ARCHITECTURE DRAWING’
PROVIDED IN OUR ATC AS-BUILT / O&M MANUAL BINDER FOR ALL
SUPERVISORY CONTROLLER INFORMATION AND ASSOCIATED IP
ADDRESSES USED BY MODERN CONTROLS.
REFER TO ‘MASTER BUILDING VALVE SCHEDULE’ PROVIDED IN OUR
ATC AS-BUILT / O&M MANUAL BINDER FOR A COMPLETE LIST OF ALL
CONTROL VALVES PROVIDED FOR AIR HANDLING UNITS AND
ASSOCIATED VAV BOXES.
AS-BUILT REV. ADD ‘MASTER’ NOTE5 1/28/14 DB
211-1009
IW/BMIW/BMIW VD 3/7/11
REFERENCE DRAWING
SUB. REVISION REVISE DWG. TITLE1 4/20/11 BM
C-1D
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
RAWING NUMBER
VA HVAC CONTROLS UPGRADE
- PHASE 2A
WILMINGTON, DELAWARE
Drawing Title
AIR HANDLING UNIT;
AHU FOR 4TH FLOOR WEST -
SEQUENCE OF OPERAITONS
Project Title
AIR HANDLING UNIT; AHU FOR 4TH FLOOR WEST - SEQUENCE OF OPERATIONS
GENERAL:
Unit AHU and return fan are normally started and stopped by the DCP (EX.CP) or remotely at the BMS. H-O-A switch shall be kept in the ‘AUTO’ position.
‘HAND’ and ‘OFF’ positions shall be used for maintenance only. When the unit is ‘OFF’ D-1 and D-3 shall be closed. When the unit is ‘ON’ D-1 and D-3 shall be open.
TEMPERATURE CONTROL:
Supply air temperature sensed by T-1 shall be maintained at set point via DCP (EX.CP) by modulating either V-1 and V-2 or D-1, D-2 and D-3 in sequence.
When the temperature of the outside air provided by BMS is above 65 F DCP (EX.CP) prevents modulation of D-1, D-2 and D-3; D-1 assumes minimum outside air position (D-3 is closed and D-2 is open). V-1 modulates to maintain supply air temperature sensed by T-1.
When the temperature of the outside air provided by the BMS is between 65F and the supply air temperature sensed by T-1 damper D-2 is closed. Damper D-1 is open (maximum outside air position) and damper D-3 is open. V-1 modulates to maintain the supply air temperature sensed by T-1.
When the temperature of the outside air provided by the BMS is below the supply air temperature sensed by T-1 then dampers D-1, D-2 and D-3 modulate to maintain the schedules supply air temperature and the pump at the reheat coil runs. If D-2 is open and D-1 is closed to minimum outside air in the mode V-2 modulates open to maintain the supply air temperature.
AIR FLOW CONTROLS:
The supply air flow is controlled by the DCP (EX.CP) modulating supply fan variable speed motor controller (VSMC) to maintain the duct static pressure set point as sensed by SPS-1
The DCP (EX.CP) by using total supply air and return air flow signals shall reset the return air fan VSMC to maintain a constant CFM difference between the supply air fan CFM and the return air fan CFM.
The DCP (EX.CP) by using high pressure sensor SPS-2 located at the supply air fan discharge prevents the supply air fan from developing over 3" static pressure. If static pressure at SPS-2 exceeds 3" the supply fan stops.
HUMIDITY CONTROL:
When the DCP (EX.CP) is not calling for humidification sensed by exhaust air humidistat H-1, the stand alone electric humidifier shall be off. When the DCP (EX.CP) is calling for humidity, the humidifier shall operate under it’s built in controls to maintain desired humidity sensed by H-1.
The BMS shall override the control to maintain humidity in supply duct below 80% as sensed by H-2. BMS shall shut the humidifier off whenever the supply fan is off.
FREEZE PROTECTION:
If the air temperature sensed by T-2 falls below 45F an alarm signal shall indicate at the DCP (EX.CP) and BMS. If the temperature falls below 40F the supply fan shall shut down, damper D-1 shall close and a critical alarm shall indicate at the DCP (EX.CP) and BMS.
EMERGENCY SHUTDOWN/RESTART
When smoke is detected by the duct mounted smoke detector the supply and return fans shall stop and the alarm signal shall be transmitted to the fire alarm system, dampers D-1, D-2, SD-1 and SD-2 shall close, damper D-3 shall open. Supply and return fans shall restart and dampers open when the fire alarm circuit is manually reset.
EMERGENCY CONSTANT SPEED OPERATION
Upon failure of VSMC the supply and return fans shall be started/stopped manually at the DCP (EX.CP) or the BMS through the bypass starter. Fans shall then operate at constant speed.
AS-BUILT REV. NEW DWG. / DATES2 12/2/13 BM
File details come from the government source that posted it. Updated .