S02 - 04 - VA Hospital Phase 2C - ATC As-Built Drawings.pdf

PDF 3 MB Posted

Attached to
J041--Direct Digital Controls Preventative Maintenance and Inspection Services | Wilmington VA Medical Center
Solicitation number
36C24426Q0675
Issued by

About this file

This document is a technical design specification for the VA HVAC Controls Upgrade - Phase 2C at VA Medical Center in Wilmington, Delaware. The partial submittal includes control system drawings and specifications for third-floor HVAC equipment.

The deliverable consists of detailed control drawings for multiple air handling units (AHUs) and associated VAV (Variable Air Volume) box controls. Specifically included are: AHU for OR (MER 3117) with controller wiring details and sequence of operations; AHU for Lab (3rd Floor Roof) with complete control documentation; AHU for CT Scanner (3rd Floor Roof) with wiring and operational sequences; AHU for ICU (3rd Floor Roof) serving ten VAV boxes with comprehensive controller specifications; and AHU-9 for Laundry as a supplemental drawing. Each AHU section contains Air Handling Unit Control schematics, Controller Wiring Details showing FEC2611 and IOM4711 controller configurations, and Sequence of Operations documenting temperature control, airflow control, humidity control, freeze protection, and emergency shutdown procedures. The control systems utilize modern controls technology with supervisory controllers, modulating valves for temperature and humidity management, variable speed drives for fan control, and integrated safety interlocks. All control point designations, point identification tables, bills of materials listing sensors and actuators, and valve schedules are provided. The drawings reference an AS-Built O&M Manual Binder for master building network architecture and complete valve schedules. Last revision dates range from December 3, 2013 to January 28, 2014, with drawing number 211-1009.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL AND CONTROL SYSTEMS

Environmental Control System

Building Automation System

VA MEDICAL CENTER

HVAC CONTROLS UPGRADE - PHASE 2C

WILMINGTON, DELAWARE

PROJECT

ARCHITECT

ENGINEER

CONTRACTOR

211-1009

DATE CONTRACT NUMBER

IW/BM

APPLICATION ENGINEER

8/15/11IW/JA

PROJECT MANAGER

IW

SALES ENGINEER

REFERENCE DRAWING

NO. REVISION-LOCATION ECN DATE BY

Automatic Temperature Controls

Heating

Air Conditioning

Air Filters

Water Treatment

Coil Cleaning

Contract Operations

Time-Shared Automated Building Service

Refrigeration

Industrial Controls / Recording / Indication Equipment

Air and Water Systems Balancing

Instrumentation System Installation

Building Operations Management

Energy Conservation Control

Custom Programmed Maintenance

HATCH MOTT MACDONALD

27 BLEEKER ST.

MILLBURN, NJ 07041

BOB SMITH CONTRACTORS

281 EAST EVERGREEN ST.

WEST GROVE, PA 19390

DEPT. OF VETERANS AFFAIRS

1601 KIRKWOOD HIGHWAY

WILMINGTON, DE 19805

VA HVAC CONTROLS UPGRADE - PHASE 2C

(PARTIAL SUBMITTAL - INCLUDES 3RD FLOOR HVAC EQUIPMENT)

PAGE # DRAWING TITLE LAST REVISION

TP-1 TITLE PAGE 01/28/14

C-1B CONTROLLER WIRING DETAIL – AHU FOR OR (MER 3117) 12/03/13

C-1C VAV BOX CONTROLS FOR 3RD FLOOR (SERVED BY AHU FOR OR) 12/03/13

C-1D SEQUENCE OF OPERATIONS – AHU FOR OR (MER 3117) 12/03/13

C-2A AIR HANDLING UNIT CONTROL – AHU FOR LAB (3RD FLOOR ROOF) 12/03/13

C-2B CONTROLLER WIRING DETAIL – AHU FOR LAB (3RD FLOOR ROOF) 12/03/13

C-2C SEQUENCE OF OPERATIONS – AHU FOR LAB (3RD FLOOR ROOF) 12/03/13

C-3A AIR HANDLING UNIT CONTROL – AHU FOR CT SCANNER (3RD FLOOR ROOF) 12/03/13

C-3B CONTROLLER WIRING DETAIL – AHU FOR CT SCANNER (3RD FLOOR ROOF) 12/03/13

C-3C SEQUENCE OF OPERATIONS – AHU FOR CT SCANNER (3RD FLOOR ROOF) 12/03/13

C-4A AIR HANDLING UNIT CONTROL – AHU FOR ICU (3RD FLOOR ROOF) 12/03/13

C-4B CONTROLLER WIRING DETAIL – AHU FOR ICU (3RD FLOOR ROOF) 12/03/13

C-4C VAV BOX CONTROLS FOR 3RD FLOOR (SERVED BY AHU FOR ICU) 12/03/13

C-4D SEQUENCE OFOPERATIONS – AHU FOR ICU (3RD FLOOR ROOF) 12/03/13

C-5 SUPPLEMENTAL DRAWING – AHU-9 FOR LAUNDRY 01/28/14

SUB. REVISION TITLE DATES1 12/13/11 VD

AS-BUILT REV. DRAWING TITLE/DATES2 12/3/13 BM

AS-BUILT REV. DATES / REMOVE DWGS.3 12/20/13 DB

3 4

AS-BUILT REV. ADD ‘MASTER’ NOTE4 01/28/14 DB

NOTE(S): REFER TO ‘MASTER BUILDING NETWORK ARCHITECTURE DRAWING’

PROVIDED IN OUR ATC AS-BUILT / O&M MANUAL BINDER FOR ALL

SUPERVISORY CONTROLLER INFORMATION AND ASSOCIATED IP

ADDRESSES USED BY MODERN CONTROLS.

REFER TO ‘MASTER BUILDING VALVE SCHEDULE’ PROVIDED IN OUR

ATC AS-BUILT / O&M MANUAL BINDER FOR A COMPLETE LIST OF ALL

CONTROL VALVES PROVIDED FOR AIR HANDLING UNITS AND

ASSOCIATED VAV BOXES.

*DRAWING C-5 (AHU-9 FOR LAUNDRY) HAS BEEN ADDED TO PHASE-2C

AS A SUPPLEMENT TO OUR COMPLETE AS-BUILT REVISION.

IW/BMIW/JAIW BM 8/12/11

SUB. REVISION EDIT SEQUENCE1 12/13/11 VD

C-1D

NO. REVISION-LOCATION ECN DATE BY

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

CONTRACT NUMBER

DRAWING NUMBER

VA HVAC CONTROLS UPGRADE -

PHASE 2C

WILMINGTON, DELAWARE

Drawing Title

SEQUENCE OF OPERATIONS -

AHU FOR OR (MER 3117)

Project Title

SEQUENCE OF OPERATIONS - AHU FOR OR (MER 3117)

AHU FOR OF (MER #3117) SEQUENCE OF OPERATION

1. GENERAL

UNIT IS NORMALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT THE BMS. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND

"OFF" POSITIONS SHALL BE USED FOR MAINTENANCE ONLY. WHEN THE UNIT IS "OFF" D-1 SHALL BE CLOSED. WHEN THE UNIT IS "ON" D-1 SHALL BE FULLY

OPENED.

2. TEMPERATURE CONTROL

SUPPLY AIR TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATING V-1 AND V-2 IN SEQUENCE.

3. AIRFLOW CONTROL

THE SUPPLY AIRFLOW SHALL BE CONTROLLED BY DCP MODULATING THE SUPPLY FAN VARIABLE SPEED MOTOR CONTROLLER (VSMC) TO MAINTAIN 1.5"

OF DUCT STATIC PRESSURE (FIELD ADJUSTABLE) SENSED BY SPS-1.

THE DCP USING HIGH STATIC PRESSURE SENSOR SPS-2 LOCATED AT THE SUPPLY FAN DISCHARGE SHALL PREVENT THE SUPPLY FAN FROM DEVELOPING

OVER 3" OF STATIC PRESSURE (FIELD ADJUSTABLE). IF STATIC PRESSURE AT SPS-2 EXCEEDS 3" THE SUPPLY FAN SHALL STOP.

4. HUMIDITY CONTROL

WHEN THE DCP IS NOT CALLING FOR HUMIDIFICATION SENSED BY ROOM HUMIDISTAT H-1, TWO-WAY "ON-OFF" CONTROL VALVE V-3 SHALL REMAIN

CLOSED. WHEN THE DCP IS CALLING FOR HUMIDIFICATION, V-3 SHALL REMAIN OPEN.

SPACE AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATION CONTROL VALVE V-4 TO MAINTAIN THE DESIRED HUMIDITY. THE DCP

SHALL OVERRIDE THE CONTROL TO MAINTAIN HUMIDITY IN SUPPLY DUCT BELOW 80% AS SENSED BY H-2. DCP SHALL CLOSE VALVE V-3 WHENEVER THE

SUPPLY FAN IS OFF. VALVE V-4 SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE

TEMPERATURE APPROACHES STEAM TEMPERATURE. (FIELD VERIFY).

5. FREEZE PROTECTION

IF THE AIR TEMPERATURE SENSED BY T-2 FALLS BELOW 45F AN ALARM SIGNAL SHALL INDICATE AT THE DCP AND BMS. IF THIS TEMPERATURE FALLS

BELOW 40F THE SUPPLY FAN SHALL SHUT DOWN, D-1 SHALL CLOSE AND A CRITICAL ALARM SHALL INDICATE AT THE DCP AND BMS.

6. EMERGENCY SHUTDOWN/RESTART

WHEN SMOKE IS DETECTED BY THE DUCT MOUNTED SMOKE DETECTOR THE SUPPLY FAN SHALL SHUT OFF, DAMPE D-1 CLOSE AND AN ALARM SIGNAL

SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM. SUPPLY FAN RESTARTS AND DAMPER D-1 OPENS WHEN THE FIRE ALARM CIRCUIT IS MANUALLY

RESET.

7. EMERGENCY CONSTANT SPEED OPERATION

UPON FAILURE OF VSMC THE SUPPLY AND EXHAUST FANS SHALL BE STARTED/STOPPED MANUALLY AT THE DCP OR THE BMS THROUGH THE BYPASS

STARTER. FANS SHALL THEN OPERATE AT CONSTANT SPEED.

*SEE NOTES 1

AS-BUILT REV. NEW DRAWING/REV. NOTE2 12/3/13 BM

IW/BMIW/JAIW BM 8/12/11

C-2B

NO. RE I ION-LOCA ION ECN DA E B

Sales Eng nee P oject Manage Appl cat on Enginee

B DA E B DA E

DRAWN APPRO ED

ON RAC NUMBER

RAW NG NUMBER

VA HVAC CONTROLS UPGRADE -

PHASE 2C

WILMINGTON, DELAWARE

Drawing Title

CONTROLLER WIRING DETAIL –

AHU FOR LAB (3RD FLOOR ROOF)

Project T tle

CONTROLLER WIRING DETAIL – AHU FOR LAB (3RD FLOOR ROOF)

AS-BUILT REV. NEW DWG. / POINT TERM.1 12/3/13 DB

SEE AS-BUILT CONTROL DRAWINGS C-2A AND C-2C FOR

ASSOCIATED UNIT CONTROL DIAGRAM AND SEQUENCE OF

OPERATIONS.

NOTE(S):

124816326412

ON

Address:

SA

PW

R

CO

M

SA BUS

FC BUS

CO

M

SH

LD+1

5V N 1 CO

M

N 2 CO

M

+1

5V N 3 CO

M

N 4 CO

M

+1

5V N 5 CO

M

N 6 CO

M

N 7 CO

M

N 8 CO

M

UNIVERSAL BINARY

BINARY

OU

T4

OC

OM

OU

T5

OC

OM

OU

T6

OC

OM

OU

T7

OC

OM

OU

T8

OC

OM

OU

T9

OC

OM

CONFIGURABLE ANALOG

HOT

24V

COM

FEC2611

OU

T1

OC

OM

OU

T2

OC

OM

OU

T3

OC

OM

FC EOL

IN

TRIAC JUMPERS

OUT1 INT

EXT

OUT2 OUT3

124816326412

ON

Address:

SA

FC

HOT

24V

COM

IOM4711

FC EOL

IN

TRIAC JUMPERS

OUT1 INT

EXT

OUT2 OUT3

SA

PW

R

CO

M

+ - CO

M

SH

LD

SA/FC BUS

BINARY

OU

T4

OC

OM

OU

T5

OC

OM

OU

T6

OC

OM

OU

T7

OC

OM

OU

T8

OC

OM

OU

T9

OC

OM

CONFIGURABLE ANALOG

OU

T1

OC

OM

OU

T2

OC

OM

OU

T3

OC

OM

+1

5V N 1 CO

M

N 2 CO

M

+1

5V N 3 CO

M

N 4 CO

M

+1

5V N 5 CO

M

N 6 CO

M

N 7 CO

M

N 8 CO

M

UNIVERSAL BINARY

ZO

NE

TE

MP

ER

AT

UR

E

CO

OL

ING

VA

LV

E 1

CO

OL

ING

VA

LV

E 2

SU

PP

LY

FA

N E

NA

BL

E/D

AM

PE

R

HU

M

DIF

ER

CO

NT

RO

L V

AL

VE

CO

MM

AN

D (

V-4

RE

TU

RN

FA

N E

NA

BL

E

HU

M

DIF

ER

S

OL

AT

ION

VA

LV

E C

OM

MA

ND

(V -3)

ZO

NE

HU

MI

DIT

Y

DIS

CH

AR

GE

AI

R T

EM

PE

RA

TU

RE

(D

A-T

PR

E-H

EA

T T

EM

PE

RA

TU

RE

(H

C-T

PR

E-C

OO

L C

OIL

TE

MP

ER

AT

UR

E (

PC

-T)

EX

HA

US

T F

AN

ST

AT

US

SU

PP

LY

FA

N S

TA

TU

S

FR

EE

ZE

ST

AT

/ S

HU

TD

OW

N

DIS

CH

AR

GE

HU

M

DT

Y 1

DIS

CH

AR

GE

HU

M

DT

Y 2

File details come from the government source that posted it. Updated .