S02 - 04 - VA Hospital Phase 2C - ATC As-Built Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- 36C24426Q0675
About this file
This document is a technical design specification for the VA HVAC Controls Upgrade - Phase 2C at VA Medical Center in Wilmington, Delaware. The partial submittal includes control system drawings and specifications for third-floor HVAC equipment.
The deliverable consists of detailed control drawings for multiple air handling units (AHUs) and associated VAV (Variable Air Volume) box controls. Specifically included are: AHU for OR (MER 3117) with controller wiring details and sequence of operations; AHU for Lab (3rd Floor Roof) with complete control documentation; AHU for CT Scanner (3rd Floor Roof) with wiring and operational sequences; AHU for ICU (3rd Floor Roof) serving ten VAV boxes with comprehensive controller specifications; and AHU-9 for Laundry as a supplemental drawing. Each AHU section contains Air Handling Unit Control schematics, Controller Wiring Details showing FEC2611 and IOM4711 controller configurations, and Sequence of Operations documenting temperature control, airflow control, humidity control, freeze protection, and emergency shutdown procedures. The control systems utilize modern controls technology with supervisory controllers, modulating valves for temperature and humidity management, variable speed drives for fan control, and integrated safety interlocks. All control point designations, point identification tables, bills of materials listing sensors and actuators, and valve schedules are provided. The drawings reference an AS-Built O&M Manual Binder for master building network architecture and complete valve schedules. Last revision dates range from December 3, 2013 to January 28, 2014, with drawing number 211-1009.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL AND CONTROL SYSTEMS
Environmental Control System
Building Automation System
VA MEDICAL CENTER
HVAC CONTROLS UPGRADE - PHASE 2C
WILMINGTON, DELAWARE
PROJECT
ARCHITECT
ENGINEER
CONTRACTOR
211-1009
DATE CONTRACT NUMBER
IW/BM
APPLICATION ENGINEER
8/15/11IW/JA
PROJECT MANAGER
IW
SALES ENGINEER
REFERENCE DRAWING
NO. REVISION-LOCATION ECN DATE BY
Automatic Temperature Controls
Heating
Air Conditioning
Air Filters
Water Treatment
Coil Cleaning
Contract Operations
Time-Shared Automated Building Service
Refrigeration
Industrial Controls / Recording / Indication Equipment
Air and Water Systems Balancing
Instrumentation System Installation
Building Operations Management
Energy Conservation Control
Custom Programmed Maintenance
HATCH MOTT MACDONALD
27 BLEEKER ST.
MILLBURN, NJ 07041
BOB SMITH CONTRACTORS
281 EAST EVERGREEN ST.
WEST GROVE, PA 19390
DEPT. OF VETERANS AFFAIRS
1601 KIRKWOOD HIGHWAY
WILMINGTON, DE 19805
VA HVAC CONTROLS UPGRADE - PHASE 2C
(PARTIAL SUBMITTAL - INCLUDES 3RD FLOOR HVAC EQUIPMENT)
PAGE # DRAWING TITLE LAST REVISION
TP-1 TITLE PAGE 01/28/14
C-1B CONTROLLER WIRING DETAIL – AHU FOR OR (MER 3117) 12/03/13
C-1C VAV BOX CONTROLS FOR 3RD FLOOR (SERVED BY AHU FOR OR) 12/03/13
C-1D SEQUENCE OF OPERATIONS – AHU FOR OR (MER 3117) 12/03/13
C-2A AIR HANDLING UNIT CONTROL – AHU FOR LAB (3RD FLOOR ROOF) 12/03/13
C-2B CONTROLLER WIRING DETAIL – AHU FOR LAB (3RD FLOOR ROOF) 12/03/13
C-2C SEQUENCE OF OPERATIONS – AHU FOR LAB (3RD FLOOR ROOF) 12/03/13
C-3A AIR HANDLING UNIT CONTROL – AHU FOR CT SCANNER (3RD FLOOR ROOF) 12/03/13
C-3B CONTROLLER WIRING DETAIL – AHU FOR CT SCANNER (3RD FLOOR ROOF) 12/03/13
C-3C SEQUENCE OF OPERATIONS – AHU FOR CT SCANNER (3RD FLOOR ROOF) 12/03/13
C-4A AIR HANDLING UNIT CONTROL – AHU FOR ICU (3RD FLOOR ROOF) 12/03/13
C-4B CONTROLLER WIRING DETAIL – AHU FOR ICU (3RD FLOOR ROOF) 12/03/13
C-4C VAV BOX CONTROLS FOR 3RD FLOOR (SERVED BY AHU FOR ICU) 12/03/13
C-4D SEQUENCE OFOPERATIONS – AHU FOR ICU (3RD FLOOR ROOF) 12/03/13
C-5 SUPPLEMENTAL DRAWING – AHU-9 FOR LAUNDRY 01/28/14
SUB. REVISION TITLE DATES1 12/13/11 VD
AS-BUILT REV. DRAWING TITLE/DATES2 12/3/13 BM
AS-BUILT REV. DATES / REMOVE DWGS.3 12/20/13 DB
3 4
AS-BUILT REV. ADD ‘MASTER’ NOTE4 01/28/14 DB
NOTE(S): REFER TO ‘MASTER BUILDING NETWORK ARCHITECTURE DRAWING’
PROVIDED IN OUR ATC AS-BUILT / O&M MANUAL BINDER FOR ALL
SUPERVISORY CONTROLLER INFORMATION AND ASSOCIATED IP
ADDRESSES USED BY MODERN CONTROLS.
REFER TO ‘MASTER BUILDING VALVE SCHEDULE’ PROVIDED IN OUR
ATC AS-BUILT / O&M MANUAL BINDER FOR A COMPLETE LIST OF ALL
CONTROL VALVES PROVIDED FOR AIR HANDLING UNITS AND
ASSOCIATED VAV BOXES.
*DRAWING C-5 (AHU-9 FOR LAUNDRY) HAS BEEN ADDED TO PHASE-2C
AS A SUPPLEMENT TO OUR COMPLETE AS-BUILT REVISION.
IW/BMIW/JAIW BM 8/12/11
SUB. REVISION EDIT SEQUENCE1 12/13/11 VD
C-1D
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
CONTRACT NUMBER
DRAWING NUMBER
VA HVAC CONTROLS UPGRADE -
PHASE 2C
WILMINGTON, DELAWARE
Drawing Title
SEQUENCE OF OPERATIONS -
AHU FOR OR (MER 3117)
Project Title
SEQUENCE OF OPERATIONS - AHU FOR OR (MER 3117)
AHU FOR OF (MER #3117) SEQUENCE OF OPERATION
1. GENERAL
UNIT IS NORMALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT THE BMS. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND
"OFF" POSITIONS SHALL BE USED FOR MAINTENANCE ONLY. WHEN THE UNIT IS "OFF" D-1 SHALL BE CLOSED. WHEN THE UNIT IS "ON" D-1 SHALL BE FULLY
OPENED.
2. TEMPERATURE CONTROL
SUPPLY AIR TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATING V-1 AND V-2 IN SEQUENCE.
3. AIRFLOW CONTROL
THE SUPPLY AIRFLOW SHALL BE CONTROLLED BY DCP MODULATING THE SUPPLY FAN VARIABLE SPEED MOTOR CONTROLLER (VSMC) TO MAINTAIN 1.5"
OF DUCT STATIC PRESSURE (FIELD ADJUSTABLE) SENSED BY SPS-1.
THE DCP USING HIGH STATIC PRESSURE SENSOR SPS-2 LOCATED AT THE SUPPLY FAN DISCHARGE SHALL PREVENT THE SUPPLY FAN FROM DEVELOPING
OVER 3" OF STATIC PRESSURE (FIELD ADJUSTABLE). IF STATIC PRESSURE AT SPS-2 EXCEEDS 3" THE SUPPLY FAN SHALL STOP.
4. HUMIDITY CONTROL
WHEN THE DCP IS NOT CALLING FOR HUMIDIFICATION SENSED BY ROOM HUMIDISTAT H-1, TWO-WAY "ON-OFF" CONTROL VALVE V-3 SHALL REMAIN
CLOSED. WHEN THE DCP IS CALLING FOR HUMIDIFICATION, V-3 SHALL REMAIN OPEN.
SPACE AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATION CONTROL VALVE V-4 TO MAINTAIN THE DESIRED HUMIDITY. THE DCP
SHALL OVERRIDE THE CONTROL TO MAINTAIN HUMIDITY IN SUPPLY DUCT BELOW 80% AS SENSED BY H-2. DCP SHALL CLOSE VALVE V-3 WHENEVER THE
SUPPLY FAN IS OFF. VALVE V-4 SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE
TEMPERATURE APPROACHES STEAM TEMPERATURE. (FIELD VERIFY).
5. FREEZE PROTECTION
IF THE AIR TEMPERATURE SENSED BY T-2 FALLS BELOW 45F AN ALARM SIGNAL SHALL INDICATE AT THE DCP AND BMS. IF THIS TEMPERATURE FALLS
BELOW 40F THE SUPPLY FAN SHALL SHUT DOWN, D-1 SHALL CLOSE AND A CRITICAL ALARM SHALL INDICATE AT THE DCP AND BMS.
6. EMERGENCY SHUTDOWN/RESTART
WHEN SMOKE IS DETECTED BY THE DUCT MOUNTED SMOKE DETECTOR THE SUPPLY FAN SHALL SHUT OFF, DAMPE D-1 CLOSE AND AN ALARM SIGNAL
SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM. SUPPLY FAN RESTARTS AND DAMPER D-1 OPENS WHEN THE FIRE ALARM CIRCUIT IS MANUALLY
RESET.
7. EMERGENCY CONSTANT SPEED OPERATION
UPON FAILURE OF VSMC THE SUPPLY AND EXHAUST FANS SHALL BE STARTED/STOPPED MANUALLY AT THE DCP OR THE BMS THROUGH THE BYPASS
STARTER. FANS SHALL THEN OPERATE AT CONSTANT SPEED.
*SEE NOTES 1
AS-BUILT REV. NEW DRAWING/REV. NOTE2 12/3/13 BM
IW/BMIW/JAIW BM 8/12/11
C-2B
NO. RE I ION-LOCA ION ECN DA E B
Sales Eng nee P oject Manage Appl cat on Enginee
B DA E B DA E
DRAWN APPRO ED
ON RAC NUMBER
RAW NG NUMBER
VA HVAC CONTROLS UPGRADE -
PHASE 2C
WILMINGTON, DELAWARE
Drawing Title
CONTROLLER WIRING DETAIL –
AHU FOR LAB (3RD FLOOR ROOF)
Project T tle
CONTROLLER WIRING DETAIL – AHU FOR LAB (3RD FLOOR ROOF)
AS-BUILT REV. NEW DWG. / POINT TERM.1 12/3/13 DB
SEE AS-BUILT CONTROL DRAWINGS C-2A AND C-2C FOR
ASSOCIATED UNIT CONTROL DIAGRAM AND SEQUENCE OF
OPERATIONS.
NOTE(S):
124816326412
ON
Address:
SA
PW
R
CO
M
SA BUS
FC BUS
CO
M
SH
LD+1
5V N 1 CO
M
N 2 CO
M
+1
5V N 3 CO
M
N 4 CO
M
+1
5V N 5 CO
M
N 6 CO
M
N 7 CO
M
N 8 CO
M
UNIVERSAL BINARY
BINARY
OU
T4
OC
OM
OU
T5
OC
OM
OU
T6
OC
OM
OU
T7
OC
OM
OU
T8
OC
OM
OU
T9
OC
OM
CONFIGURABLE ANALOG
HOT
24V
COM
FEC2611
OU
T1
OC
OM
OU
T2
OC
OM
OU
T3
OC
OM
FC EOL
IN
TRIAC JUMPERS
OUT1 INT
EXT
OUT2 OUT3
124816326412
ON
Address:
SA
FC
HOT
24V
COM
IOM4711
FC EOL
IN
TRIAC JUMPERS
OUT1 INT
EXT
OUT2 OUT3
SA
PW
R
CO
M
+ - CO
M
SH
LD
SA/FC BUS
BINARY
OU
T4
OC
OM
OU
T5
OC
OM
OU
T6
OC
OM
OU
T7
OC
OM
OU
T8
OC
OM
OU
T9
OC
OM
CONFIGURABLE ANALOG
OU
T1
OC
OM
OU
T2
OC
OM
OU
T3
OC
OM
+1
5V N 1 CO
M
N 2 CO
M
+1
5V N 3 CO
M
N 4 CO
M
+1
5V N 5 CO
M
N 6 CO
M
N 7 CO
M
N 8 CO
M
UNIVERSAL BINARY
ZO
NE
TE
MP
ER
AT
UR
E
CO
OL
ING
VA
LV
E 1
CO
OL
ING
VA
LV
E 2
SU
PP
LY
FA
N E
NA
BL
E/D
AM
PE
R
HU
M
DIF
ER
CO
NT
RO
L V
AL
VE
CO
MM
AN
D (
V-4
RE
TU
RN
FA
N E
NA
BL
E
HU
M
DIF
ER
S
OL
AT
ION
VA
LV
E C
OM
MA
ND
(V -3)
ZO
NE
HU
MI
DIT
Y
DIS
CH
AR
GE
AI
R T
EM
PE
RA
TU
RE
(D
A-T
PR
E-H
EA
T T
EM
PE
RA
TU
RE
(H
C-T
PR
E-C
OO
L C
OIL
TE
MP
ER
AT
UR
E (
PC
-T)
EX
HA
US
T F
AN
ST
AT
US
SU
PP
LY
FA
N S
TA
TU
S
FR
EE
ZE
ST
AT
/ S
HU
TD
OW
N
DIS
CH
AR
GE
HU
M
DT
Y 1
DIS
CH
AR
GE
HU
M
DT
Y 2
File details come from the government source that posted it. Updated .